City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Stockton,
CA San Joaquin Co. United States |
Breaker Way / Sand Castle Way (38.05649, -121.34750) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2006 | |
Stockton,
CA San Joaquin Co. United States |
Swainsons Hawk St. / Lands End Dr. (38.05429, -121.34275) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 2 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2006 | |
Sacramento,
CA Sacramento Co. United States |
New Market Dr. / Town Center Dr. (38.65823, -121.52205) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Single-Lane |
2002 | Bike lane around circulatory roadway. East leg added 2019-2020. |
Windsor,
CA Sonoma Co. United States |
Windsor River Rd. / Windsor Rd. (38.54725, -122.81687) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling all approaches) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Rail line through central island. |
Jamestown,
CA Tuolumne Co. United States |
SR 108 / People of the Mountain Rd. (MacKey Ranch Rd.) / Sierra Rock Rd. (37.92569, -120.44641) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.uniondemocrat.com/news/local/article_c858c6e0-40ee-11ed-b07d-6b13ef882d63.html |
Tracy,
CA San Joaquin Co. United States |
W Byron Rd. / W Grant Line Rd. (37.75831, -121.49221) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2018 | Temporary installation using striping and raised dividers and barriers. |
Lincoln,
CA Placer Co. United States |
E Joiner Pkwy. / Fieldstone Dr. (38.84770, -121.28659) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lane on northwest leg. https://www.lincolnca.gov/en/our-government/east-joiner-parkway-widening-project.aspx |
Rocklin,
CA Placer Co. United States |
Whitney Ranch Pkwy. / W Oaks Blvd. / Songbird Way (38.83190, -121.26676) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Roseville,
CA Placer Co. United States |
Campus Pkwy. / Crimson Ridge Way (38.78933, -121.32544) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2018). |
Big Bear Lake,
CA San Bernardino Co. United States |
Moonridge Rd. / Elm St. (34.24075, -116.87464) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.youtube.com/watch?v=wfZy_7SYJvg (starts at 1:10) |
Big Bear Lake,
CA San Bernardino Co. United States |
Moonridge Rd. / Rathbun Dr. / Club View Dr. (34.23967, -116.86952) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Peanut shaped. https://www.youtube.com/watch?v=wfZy_7SYJvg (starts at 2:10) |
Fillmore,
CA Ventura Co. United States |
Heritage Valley Pkwy. / Central Ave. (34.39351, -118.91237) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | Painted splitter islands. Initial unfinished construction around 2014. Year Completed estimated (2021-2022). |
Fillmore,
CA Ventura Co. United States |
Heritage Valley Pkwy. / Mountain View St. (34.39380, -118.90777) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2020 | Painted splitter islands on west and southeast legs. Initially constructed as traffic circle with pedestrian access to central island. Year Completed estimated (2019-2021). |
Madera,
CA Madera Co. United States |
Root Creek Pkwy. W / Riverstone Blvd. SE (36.91441, -119.80757) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Madera,
CA Madera Co. United States |
Riverstone Blvd. SE / Market Ave. W (36.91787, -119.80758) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Madera,
CA Madera Co. United States |
Market Ave. W / Mission Dr. (36.91788, -119.81209) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Madera,
CA Madera Co. United States |
Riverstone Blvd. SW / Market Ave. W (36.91791, -119.81547) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2018-2020). |
Madera,
CA Madera Co. United States |
Market Ave. W / Lodge Rd. (36.91915, -119.80219) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2017 | |
Madera,
CA Madera Co. United States |
Root Creek Pkwy. W / Riverstone Blvd. SW (36.90613, -119.81664) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Woodlake,
CA Tulare Co. United States |
E Sierra Ave. / Castle Rock St. (36.42102, -119.08984) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2022 | |
Redding,
CA Shasta Co. United States |
S Bonnyview Rd. / Bechelli Ln. (40.53910, -122.35470) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Serves as a primary intersection for a Costco store. https://krcrtv.com/news/local/south-bonnyview-and-bechelli-lane-roadabout-update |
Camino,
CA El Dorado Co. United States |
Pondorado Rd. / (US 50 underpass) / (future road) (38.73683, -120.70547) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | North leg passes under US 50. Future east leg not built. https://dot.ca.gov/caltrans-near-me/district-3/d3-projects/d3-us-50-camino-safety-4e620 |
Woodland,
CA Yolo Co. United States |
Road 25A / Parkland Ave. (38.64099, -121.74450) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2020 | |
Woodland,
CA Yolo Co. United States |
Road 25A / Miekle Ave. (38.64078, -121.73624) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Woodland,
CA Yolo Co. United States |
Hunt St. / Heritage Pkwy. (38.64945, -121.74580) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Stockton,
CA San Joaquin Co. United States |
E Miner Ave. / N San Joaquin St. (37.95611, -121.28804) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2021 | Bicycle lanes leading into roundabout with bicycle sharrows on outer edge of circulatory roadway beyond each entry. https://twitter.com/stocktonupdates/status/1407046118156947458 |
Santa Clara,
CA Santa Clara Co. United States |
(shopping center entrance) / (parking) (37.35667, -121.93755) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://www.svvoice.com/coleman-costco-installing-roundabout/ |
Truckee,
CA Nevada Co. United States |
Cold Creek Cir. / Summer Camp Way (39.32143, -120.22793) |
Unknown Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Truckee,
CA Nevada Co. United States |
Donner Pass Rd. / Cold Stream Rd. / I-80 EB Ramps (39.32359, -120.22747) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Folsom,
CA Sacramento Co. United States |
Grand Prairie Rd. / Rustic Ridge Dr. (38.63617, -121.09165) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
Folsom,
CA Sacramento Co. United States |
Grand Prairie Rd. / Rustic Ridge Dr. / Alder Creek Pkwy (38.64059, -121.09212) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
Avila Beach,
CA San Luis Obispo Co. United States |
Avila Beach Dr. / Palisades Rd. / US 101 SB Ramps (35.17977, -120.70042) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening in fall of 2024. | |
Santa Barbara,
CA Santa Barbara Co. United States |
Olive Mill Rd. / Coast Village Rd. / N Jameson Ln. / US 101 Ramps (34.42156, -119.63993) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 46.3296 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Opened May 2024. https://www.youtube.com/watch?v=QKQzLS7q3iw |
Montecito,
CA Santa Barbara Co. United States |
San Ysidro Rd. / N Jameson Ln. / US 101 NB Ramps (34.42287, -119.63152) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 53.6445 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | This is an unique kidney shaped single-lane roundabout (approx. varying ICD 176' x 116'). Opened May 2024. https://www.youtube.com/watch?v=QKQzLS7q3iw |
San Juan Bautista,
CA San Benito Co. United States |
SR 156 (San Juan Hollister Rd.) / Bixby Rd. (36.84096, -121.49042) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 68.2749 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
ICD 224 ft x 211 ft. Anticipated opening year in 2025. | |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 EB Ramps (36.76908, -121.73823) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.7573 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. Future 3rd leg is planned to connect to BlackieRd. | |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 WB Ramps (36.77058, -121.73771) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. | |
Castroville,
CA Monterey Co. United States |
Castroville Blvd. / (unknown) (36.77419, -121.74051) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 49.3776 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2025. | |
Fisherman Flats,
CA Monterey Co. United States |
SR 68 / Josselyn Canyon Rd. (36.58359, -121.85655) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.7868 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Monterey,
CA Monterey Co. United States |
SR 68 / Olmsted Rd. (36.58399, -121.84976) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.6344 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Del Rey Oaks,
CA Monterey Co. United States |
SR 68 / Canyon del Rey Blvd. / Monterra Rd. (36.58090, -121.82797) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 52.5780 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Anticipated opening year 2029. | |
Monterey,
CA Monterey Co. United States |
SR 68 / York Rd. (36.57156, -121.80839) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.7868 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 ./ Pasadera Dr. / Boots Rd. (36.56766, -121.77857) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.9087 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / Laureles Grade Rd. (36.56964, -121.75566) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.5427 |
Other (At-Grade) Single-Lane |
Future 4th leg connects to Laguna Seca Entrance. Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / Corral de Tierra Rd. / Cypress Church Dr. (36.57854, -121.72709) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.1772 |
Other (At-Grade) Single-Lane |
Oval shaped. ICD = 151.5 ft x 141.5 ft. Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / San Benancio Rd. (36.57977, -121.72073) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.2323 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 NB Ramps (35.56543, -120.70151) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 56.0829 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 184 ft x 157 ft. Anticipated opening year 2030. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 SB Ramps / Theatre Dr. (35.56644, -120.70261) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.8909 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2030. | |
Morro Bay,
CA San Luis Obispo Co. United States |
Atascadero Rd. / US 101 NB Ramps / Main St. (35.38023, -120.85489) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 160 ft x 130 ft. Anticipated opening year 2026. | |
Rocklin,
CA Placer Co. United States |
Rocklin Rd. / Pacific St. (38.79073, -121.23610) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | Yield-controlled right-turn bypass lanes on west and south legs; add-lane right-turn bypass lane on east leg. https://www.rocklin.ca.us/roundabout |
Encinitas,
CA San Diego Co. United States |
North Coast Highway 101 / El Portal St. (33.05666, -117.29828) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.encinitasca.gov/government/departments/engineering/capital-improvements/north-highway-101-projects |
San Marcos,
CA San Diego Co. United States |
N City Dr. / June Way (33.13429, -117.16177) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2019 | Yield-controlled right-turn bypass lanes on west and south legs. Year Completed estimated (2018-2019). |
San Marcos,
CA San Diego Co. United States |
N City Dr. / Campus Way (33.13473, -117.15999) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2016 | |
Berkeley,
CA Alameda Co. United States |
University Ave. / Marina Blvd. (37.86518, -122.31113) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.berkeleyside.org/2022/06/16/berkeley-marina-university-avenue-repaved |
Kingsburg,
CA Fresno Co. United States |
S Bethel Ave. / E Conejo Ave. (Sierra St.) (36.51795, -119.57532) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | Fire station in southeast quadrant. https://www.cityofkingsburg-ca.gov/DocumentCenter/View/1930/Kingsburg-Roundabout-4-1-22?bidId= |
El Cerrito,
CA Contra Costa Co. United States |
Lynn Ave. / Ramona Ave. (37.90057, -122.29100) |
Traffic Calming Circle Existing |
One-Way/Two-Way Stop Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
El Cerrito,
CA Contra Costa Co. United States |
Lynn Ave. / Carmel Ave. (37.90074, -122.29015) |
Traffic Calming Circle Existing |
One-Way/Two-Way Stop Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Vacaville,
CA Solano Co. United States |
Carroll Way / Primrose Dr. (38.34930, -121.92726) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2019-2020). |
San Diego,
CA San Diego Co. United States |
Florida Dr. / Morley Field Dr. (32.73983, -117.14367) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Modular (quick build) construction. https://www.californiaconstructionnews.com/2022/10/01/construction-starts-on-modular-roundabout-quick-build/ |
Weedpatch,
CA Kern Co. United States |
SR 184 (Weedpatch Hwy.) / Sunset Blvd. (35.22330, -118.91449) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2023 | https://bakersfieldnow.com/news/local/roundabouts-on-hwy-184-bring-safety-to-students-farmworkers |
Santa Maria,
CA Santa Barbara Co. United States |
Bethel Ln. / Marsala Ave. (34.92790, -120.45579) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2002 | Year Completed estimated (2001-2002). North leg added 2003-2004. |
Folsom,
CA Sacramento Co. United States |
Prairie City Rd. / Scott Rd. (38.61225, -121.14817) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.facebook.com/CityofFolsom/videos/6294236023941862/ |
Berkeley,
CA Alameda Co. United States |
Gilman St. / I-80 EB Ramps / Eastshore Hwy. (37.87826, -122.30681) |
Roundabout Unknown |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
Opening 2024 https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/d4-alameda-80-gilman-interchange-improvement-project | |
Berkeley,
CA Alameda Co. United States |
Gilman St. / I-80 WB Ramps / Frontage Rd. (37.87808, -122.30769) |
Roundabout Unknown |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
Opening 2024 https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/d4-alameda-80-gilman-interchange-improvement-project | |
Lodi,
CA San Joaquin Co. United States |
Cherokee Ln. / SR 99 SB Exit Ramp / (connector to E Turner Rd.) (38.14475, -121.26156) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. https://www.youtube.com/watch?v=K4bMgmfZOPg |
Roseville,
CA Placer Co. United States |
Washington Blvd. / All America City Blvd. / Lincoln St. (38.75716, -121.28871) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Lincoln St. has been converted to one-way in the vicinity of the roundabout, going away from the roundabout, with a separate right-in/right-out connection to Washington Blvd. https://www.roseville.ca.us/government/departments/public_works/roadways_traffic/current_projects/roundabout_washington_allamericacity_lincoln |
Sacramento,
CA Sacramento Co. United States |
Crossfield Dr. / Lindbergh Dr. / Airport Blvd. SB Ramps (38.67892, -121.59240) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Serves Sacramento International Airport. https://sacramento.aero/scas/about/news-and-events/upcoming-smf-construction-plan-ahead-for-improved-travel-experience |
Sacramento,
CA Sacramento Co. United States |
Crossfield Dr. / Meister Way / Airport Blvd. NB Ramps (38.67890, -121.58937) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Serves Sacramento International Airport. https://sacramento.aero/scas/about/news-and-events/upcoming-smf-construction-plan-ahead-for-improved-travel-experience |
Los Angeles,
CA Los Angeles Co. United States |
MIssion Rd. / Myers St. / Jesse St. (34.03637, -118.22567) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2023 | https://la.streetsblog.org/2023/12/19/eyes-on-the-street-boyle-heights-myers-mission-roundabout-completed-short-bike-paths-open |
Davis,
CA Yolo Co. United States |
Hutchison Dr. / Bioletti Way (38.53915, -121.75619) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 19.8120 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2012 | Oval shaped. ICD = 65 ft x 55 ft. Painted and marked central and splitter islands. |
Davis,
CA Yolo Co. United States |
Engineering Bikeway / (unknown) (38.53777, -121.75421) |
Other Existing |
Uncontrolled Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Open to bicycles and pedestrians only. | |
Davis,
CA Yolo Co. United States |
Acer St. / Celadon St. (38.54316, -121.77348) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Davis,
CA Yolo Co. United States |
Acer St. / Citron St. (38.54317, -121.77625) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Davis,
CA Yolo Co. United States |
Tilia St. / Citron St. (38.54207, -121.77631) |
Other Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands on two legs. | |
Davis,
CA Yolo Co. United States |
Hutchison Dr. / (unknown) (38.53911, -121.75507) |
Other Existing |
Other Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Yield control only on side street. | |
Davis,
CA Yolo Co. United States |
Hutchison Dr. / (unknown) (38.53910, -121.75450) |
Other Existing |
Other Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Yield control only on side street. | |
Davis,
CA Yolo Co. United States |
California Ave. / Shields Ave. (38.53989, -121.75222) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Painted and marked central island and splitter islands on north and south legs. No splitter island on east leg. | |
Davis,
CA Yolo Co. United States |
Tercero Hall Cir. / Bioletti Way (38.53743, -121.75582) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Oval shaped. Painted and marked central and splitter islands. | |
Davis,
CA Yolo Co. United States |
Bioletti Way / Bainer Hall Dr. (38.53608, -121.75682) |
Other Existing |
Uncontrolled Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Painted and marked central and splitter islands. | |
Davis,
CA Yolo Co. United States |
Bainer Hall Dr. / (unknown) (38.53655, -121.75405) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Painted splitter islands. | |
Sundale,
CA Alameda Co. United States |
Walnut Ave. / Argonaut Way / Parkhurst Dr. (37.54260, -121.98521) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 33.5277 |
Other (At-Grade) Single-Lane |
2015 | Raised crosswalks. Year Completed estimated (2014-2015). |
Dinuba,
CA Tulare Co. United States |
Rosemary Ave. / Viscaya Pkwy. (36.55671, -119.40398) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2006 | No truck apron. 2011 or earlier (SV) |
Dinuba,
CA Tulare Co. United States |
Nebraska Ave. (Avenue 424) / N Alta Ave. (Road 80) (36.56040, -119.39519) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2022 | https://www.facebook.com/cityofdinuba/videos/the-alta-nebraska-roundabout-project-is-completed-and-the-roadway-is-now-openthi/779884746555640/ |
Dinuba,
CA Tulare Co. United States |
Ridge Creek Dr. / Ridge Creek Estates Way (36.54539, -119.43504) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2006-2009). |
Truckee,
CA Nevada Co. United States |
Soaring Way / Joerger Dr. (39.32058, -120.15540) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2019-2020). |
Bakersfield,
CA Kern Co. United States |
SR 43 (Enos Ln.) / Stockdale Hwy. (35.35452, -119.25223) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://transportationfoundation.org/transportation-awards/ |
Bakersfield,
CA Kern Co. United States |
SR 119 (Taft Hwy.) / SR 43 (Enos Ln.) (35.26736, -119.25267) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | https://www.bakersfield.com/news/two-roundabouts-going-in-on-highway-43-west-of-bakersfield/article_323d5924-ae51-11e9-a377-b70d0742572b.html |
La Quinta,
CA Riverside Co. United States |
Calle Sinaloa / Avenida 52 / Avenida Bermudas (33.67259, -116.30364) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2020 | http://lqcompletestreets.com/overview |
La Quinta,
CA Riverside Co. United States |
Eisenhower Dr. / Avenida Montezuma (33.67616, -116.30798) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2020 | http://lqcompletestreets.com/overview |
La Quinta,
CA Riverside Co. United States |
Calle Tampico / Avenida Bermudas (33.67816, -116.30371) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2020 | http://lqcompletestreets.com/overview |
La Quinta,
CA Riverside Co. United States |
Eisenhower Dr. / Calle Tampico (33.67793, -116.30802) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2020 | http://lqcompletestreets.com/overview |
Vista,
CA San Diego Co. United States |
S Santa Fe Ave. / Eucalyptus Ave. (33.19938, -117.24162) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2016 | Northwest and southeast S Santa Fe Avenue legs were reduced from two lanes to one lane in each direction 2015-2016. |
Vista,
CA San Diego Co. United States |
S Santa Fe Ave. / Guajome St. (33.19747, -117.23982) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2020 | |
Carlsbad,
CA San Diego Co. United States |
Kelly Dr. / Hillsdale Dr. (33.14870, -117.31127) |
Traffic Calming Circle Existing |
Other Unknown |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2014 | Hedionda Point neighborhood. Mix of top and yield control. |
Paso Robles,
CA San Luis Obispo Co. United States |
SR 46 / Vineyard Dr. (35.55334, -120.76157) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | |
Riviera,
CA Santa Barbara Co. United States |
Mountain Dr. / Mission Ridge Rd. (34.44102, -119.71150) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 9.1440 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2007 | Central island is painted only, similar to UK practice. Two approaching streets are only separated by a retaining wall. Year Completed estimated (2006-2007). |
Fort Bragg,
CA Mendocino Co. United States |
E Fir St. / N Harrison St. (39.44803, -123.80204) |
Traffic Calming Circle Removed |
One-Way/Two-Way Stop None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | From the City of Fort Bragg: "The City installed a small neighborhood traffic calming circle in about 2012 on E Fir Street at N Harrison Street. Unfortunately, due to many years of complaints as well as traffic collision increases at the intersection, the roundabout was removed in 2019. It is still shown in Google Maps but it is removed now and replaced with at 4-way stop intersection." |
Natomas,
CA Sacramento Co. United States |
Orchard Ln. / W. River Dr. (38.61135, -121.53004) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2005 | |
Santa Teresa,
CA Santa Clara Co. United States |
Raleigh Rd. / Coronado Ave. (37.24222, -121.78522) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
Ventura,
CA Ventura Co. United States |
Tanager St. / S Hill Rd. / Robin Ave. (34.25986, -119.20563) |
Traffic Calming Circle Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |