Roundabout Details
SR 115 / US 50 EB Ramps
- Type
- Roundabout
- Status
- Existing
- Functional Class
- Freeway Ramps (Grade-Separated)
- Lane Type
- Single-Lane
- Control Type
- All-Way Yield
- Previous Control Type
- One/Two-Way Stop
- Other Control Type
- None
- Approaches
- 3
- Driveways
- 0
- Diameter (ICD)
- 0.00 m
- City
- Penrose
- County
- Fremont Co.
- State
- CO
- Country
- United States
- Latitude
- 38.41802
- Longitude
- -105.04263
- Year Completed
- 2024
- Notes