City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Alvesta,
Kronoberg County Alvesta kommun Sweden |
Värnamovägen / Rte 25-Rte 27 EB Ramps (56.91407, 14.50210) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. |
Växjö,
Kronoberg County Växjö Sweden |
Rte 30 / Rte 25-Rte 27 WB Ramps (56.89816, 14.72903) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Was a T-intersection. Year Completed estimated (2021-2022). |
Finnveden,
Jönköping County Värnamo Sweden |
Malmövägen / Rte 27 WB Ramps (57.16874, 14.06233) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | Year Completed estimated (2012-2014). |
Värnamo,
Jönköping County Värnamo Sweden |
Rte 27 / E4-Rte 84 SB Ramps (57.16575, 14.06992) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Completed before 2009. |
Kaptensgården,
Jönköping County Värnamo Sweden |
Bredastensvägen / E4 NB Ramps (57.16254, 14.07496) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Completed before 2009. |
Värnamo,
Jönköping County Värnamo Sweden |
Gotavägen / Rte 27 WB Ramps / Fornminnesvägen (57.16938, 14.03289) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | Year Completed estimated (2011-2014). |
Hulje,
Östergötland County Mjölby Sweden |
Rte 50 / E4 EB Ramps (58.32543, 15.09463) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Raindrop shaped. Year Completed estimated (2012-2013). |
Hulje,
Östergötland County Mjölby Sweden |
Kungsvägen / Rte 50 NB Ramps / Hagalundsgatan (58.33667, 15.10513) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 73.1520 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | |
Mjölby,
Östergötland County Mjölby Sweden |
Kungsvägen / Rte 50 SB Ramps (58.33732, 15.10334) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Raindrop shaped. |
Mörrum,
Blekinge County Karlshamns kommun Sweden |
Pukaviksvägen / E22 NB Rapms (56.16762, 14.67657) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | Raindrop shaped. |
Mörrum,
Blekinge County Karlshamns kommun Sweden |
Pukaviksvägen / E22 SB Ramps (56.16834, 14.67366) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Raindrop shaped. |
Durango,
CO La Plata Co. United States |
US 550 / US 160 WB Ramps / US 160 EB Exit Ramp / Wilson Gulch Dr. (37.22978, -107.83943) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 64.0080 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2014 | Year Completed estimated (2011-2014). North leg added 2014-2017. US 550 added in 2024, although that uses the same leg as US 160 EB. https://www.durangoherald.com/articles/u-s-highway-550-connection-finally-opens-in-durango/ |
Durango,
CO La Plata Co. United States |
US 550 / US 160 EB Entrance Ramp (37.22666, -107.83949) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
2024 | https://www.facebook.com/coloradodot/videos/grandview-interchange-us-550-us-160-durango-on-monday-715-many-motorists-travele/853241030015092/ |
Penrose,
CO Fremont Co. United States |
SR 115 / US 50 EB Ramps (38.41802, -105.04263) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | https://krdo.com/news/top-stories/2024/07/02/traffic-roundabout-now-open-at-interchange-of-us-50-highway-115-in-fremont-county/ |
Fremont,
NE Dodge Co. United States |
US 77 / US 275 NB Ramps / Old Highway 8 (41.40473, -96.44391) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Year Completed estimated (2021-2024). |
Fremont,
NE Dodge Co. United States |
US 77 / US 275 SB Ramps (41.40474, -96.44633) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Yield-controlled right-turn-only lane on west leg. Year Completed estimated (2021-2024). |
Helena,
MT Lewis and Clark Co. United States |
SR 279 (Lincoln Rd. E) / I-15 NB Ramps (46.70444, -112.01118) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 32.0040 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. Right-turn-only lane on south leg. Year Completed estimated (2021-2024). |
Tumwater,
WA Thurston Co. United States |
6th Ave. SW / I-5 NB Ramps (46.99904, -122.91042) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | Yield-controlled right-turn bypass lane with low entry angle on north leg. Left-turn-only lane on south leg. https://www.facebook.com/cityoftumwater/videos/roundabouts/851059580420485/ |
Kirkland,
WA King Co. United States |
NE 132nd St. / Totem Lake Blvd. NE / 116th Ave. NE / I-405 NB Entrance Ramp (47.71844, -122.18653) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://wsdot.wa.gov/construction-planning/search-projects/i-405northeast-132nd-street-interchange-project |
Kirkland,
WA King Co. United States |
NE 132nd St. / 116th Way NE / I-405 SB Exit Ramp / 114th Pl. NE (47.71843, -122.18834) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
5 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2024 | https://wsdot.wa.gov/construction-planning/search-projects/i-405northeast-132nd-street-interchange-project |
Portage Township,
OH Ottawa Co. United States |
SR 53 (Catawba Rd.) / SR 2 Ramps (41.50681, -82.85952) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | https://sanduskyregister.com/news/522707/recognizing-the-roundabout/ |
Anoka,
MN Anoka Co. United States |
Thurston Ave. / US 10-US 169 Ramps (45.21253, -93.41300) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Peanut shaped. Node ICDs 140 ft; length 290 ft. Year Completed estimated (2023-2024). |
Braselton,
GA Barrow Co. United States |
GA 211 / I-85 SB Ramps (34.09876, -83.81355) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | https://www.mainstreetnews.com/hwy-211-roundabouts-now-open/article_62a7c036-63cd-11ef-9bd3-3f83a9ac83c9.html |
Newport,
MI Monroe Co. United States |
Swan Creek Rd. / I-75 NB Ramps (42.00419, -83.31263) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/. |
Newport,
MI Monroe Co. United States |
Swan Creek Rd. / Newport Rd. / I-75 SB Ramps (42.00705, -83.31515) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Yield-controlled right-turn bypass lane on southwest leg. Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/. |
Henderson,
KY Henderson Co. United States |
KY 54-KY 351 (2nd St.) / US 41 SB Ramps (37.83090, -87.56729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Raindrop shaped. https://news.wnin.org/2024-07-25/henderson-roundabouts-to-open-soon. |
Syracuse,
NY Onondaga Co. United States |
E Brighton Ave. / E Glen Ave. / I-481 WB Exit Ramp / I-81 NB Entrance Ramp (43.00895, -76.13260) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
2024 | https://dailyorange.com/2024/09/new-york-transportation-completes-syracuse-roundabout/ |
Lincoln,
NE Lancaster Co. United States |
S 82nd St. / SR 2 WB Ramps (40.69395, -96.60874) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Lincoln,
NE Lancaster Co. United States |
S 84nd St. / SR 2 EB Ramps (40.69054, -96.61087) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Lincoln,
NE Lancaster Co. United States |
Jamaica Ave. / SR 2 WB Ramps (40.69198, -96.67250) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. |
LIncoln,
NE Lancaster Co. United States |
Jamaica Ave. / SR 2 EB Ramps (40.69029, -96.67110) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. |
Henderson,
KY Henderson Co. United States |
KY 54-KY 351 (2nd St.) / US 41 NB Ramps (37.83052, -87.56569) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2024 | Raindrop shaped. Replaces PARCLO B ramp with diamond ramp and shifts intersection approximately 200 ft west. |
Ironton,
OH Lawrence Co. United States |
SR 93 (Park Ave.) / US 52 EB Ramps (38.53856, -82.67758) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.facebook.com/photo.php?fbid=611157614528583&id=100069030495739&set=a.176172631360419 |
Ironton,
OH Lawrence Co. United States |
SR 93 (Park Dr.) / US 52 WB Ramps (38.53950, -82.67593) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.facebook.com/photo.php?fbid=611157614528583&id=100069030495739&set=a.176172631360419 |
Findlay,
OH Hancock Co. United States |
US 68 / SR 15 EB Ramps / CR 80 (40.98862, -83.65067) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | New exit ramp from SR 15 coming in from the east. Former exit ramp from SR 15 (from the west) is now connected to County Road 80. https://wfin.com/local-news/opening-of-new-findlay-roundabout-pushed-back-a-few-days/ . |
San Juan,
San Juan Oriente Barrio Puerto Rico |
Calle A (Marginal Rd.) / Hwy 17 EB Entrance Ramp (18.40897, -66.02947) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 44.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2014 | Concentric striped circulatory roadway. |
Northfield,
MN Rice Co. United States |
Lonsdale Blvd. W (SR 19 / CR 46) / I-35 NB Ramps / Anoka Ave. / Hazelwood Ave. (44.47181, -93.29085) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Combines a 4-way intersection with a freeway interchange ramp terminal intersection. https://www.ricecountymn.gov/CivicAlerts.aspx?AID=969 |
New Castle,
DE New Castle Co. United States |
Airport Rd. / I-95 NB Exit Ramp (39.69593, -75.61570) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | https://www.facebook.com/FirstStateUpdate1/photos/-i-95-offramp-to-airport-road-has-re-opened-after-new-roundabout-installed-/1135316878598748/?_rdr |
Oak Level Township,
NC Nash Co. United States |
N Old Carriage Rd. / US 64 EB Ramps (35.98033, -77.89689) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html |
Oak Level Township,
NC Nash Co. United States |
N Old Carriage Rd. / US 64 WB Ramps (35.98205, -77.89806) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html |
Oak Level Township,
NC Nash Co. United States |
Sunset Ave. / I-95 SB Ramps / Freight Rd. (35.96924, -77.88406) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html. |
Oak Level Township,
NC Nash Co. United States |
Sunset Ave. / I-95 NB Ramps (35.96838, -77.88020) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html. |
Wentzville,
MO St. Charles Co. United States |
Veterans Memorial Pkwy. / I-70 EB Ramps / Ruggeri Rd. (38.80935, -90.87713) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Green Oak Township,
MI Livingston Co. United States |
Whitmore Lake Rd. / Silver Lake Rd. / US 23 SB Ramps (42.46683, -83.75719) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 1 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | |
Lodi,
WI Columbia Co. United States |
STH 60 / I-90 WB Ramps (43.33575, -89.45242) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Placed PARCLO B interchange ramps with diamond ramps. https://x.com/WisconsinDOT/status/1811030212756357174. |
Lodi,
WI Columbia Co. United States |
STH 60 / I-90 EB Ramps (43.33478, -89.45497) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Placed PARCLO B interchange ramps with diamond ramps. https://x.com/WisconsinDOT/status/1811030212756357174 |
New Iberia,
LA Iberia Par. United States |
LA 88 (Coteau Rd.) / US 90 WB Ramps (30.05086, -91.92829) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Left-turn-only lane on west leg; merging right-turn bypass lane on east leg; right-turn-only lane on south leg. https://www.katc.com/news/construction-of-roundabouts-continues-in-iberia-parish |
New Iberia,
LA Iberia Par. United States |
LA 88 (Coteau Rd.) / US 90 EB Ramps (30.05083, -91.92975) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Left-turn-only lane on east leg; merging right-turn bypass lane on west leg; right-turn-only lane on north leg. https://www.katc.com/news/construction-of-roundabouts-continues-in-iberia-parish |
New Ulm,
MN Nicollet Co. United States |
CSAH 37 / US 14 WB Ramps (44.30186, -94.42165) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Year Completed estimated (2021-2024). |
New Ulm,
MN Nicollet Co. United States |
CSAH 37 / US 14 EB Ramps (44.30098, -94.42365) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Year Completed estimated (2021-2024). |
Winnipeg,
MB Division 11 Canada |
St Marys Rd. / Perimeter Hwy. WB Ramps (49.79669, -97.11296) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | |
Winnipeg,
MB Division 11 Canada |
St Marys Rd. / Perimeter Hwy. EB Ramps (49.79151, -97.10948) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | |
Napa,
CA Napa Co. United States |
Soscol Ferry Rd. / SR 221 / SR 12 EB Ramps (38.24117, -122.26975) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/soscol-junction |
Napa,
CA Napa Co. United States |
SR 221 (Napa Vallejo Hwy.) / SR 12 WB Entrance Ramp (38.24207, -122.26930) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/soscol-junction |
Evergreen,
CO Clear Creek Co. United States |
US 40 / Homestead Rd. / I-70 WB Entrance Ramp (39.72195, -105.40944) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Through bypass lane on east leg. Year Completed estimated (2023-2024). https://www.codot.gov/projects/i70floydhill/earlyprojects. |
(unincorporated),
CO Jefferson Co. United States |
US 40 / CR 65 / I-70 WB Exit Ramp (39.71621, -105.39166) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Year Completed estimated (2023-2024). https://www.codot.gov/projects/i70floydhill/earlyprojects. |
Valdosta,
GA Lowndes Co. United States |
SR 31 (Madison Hwy.) / I-75 NB Ramps (30.75206, -83.27321) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
2025 | https://valdostatoday.com/news-2/local/2025/02/lowndes-i75-exit-11-traffic-to-begin-using-roundabouts/ |
Valdosta,
GA Lowndes Co. United States |
SR 31 (Madison Hwy.) / I-75 SB Ramps (30.75023, -83.27416) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
2025 | https://valdostatoday.com/news-2/local/2025/02/lowndes-i75-exit-11-traffic-to-begin-using-roundabouts/ |
Lake Park,
GA Lowndes Co. United States |
Lake Park Bellville Rd. / I-75 NB Ramps (30.64409, -83.18847) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
2022 | https://wfxl.com/news/local/traffic-pattern-change-expected-in-lowndes-county-on-i-75-exit-2 |
Lake Park,
GA Lowndes Co. United States |
Lake Park Bellville Rd. / I-75 SB Ramps (30.64297, -83.18993) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://wfxl.com/news/local/traffic-pattern-change-expected-in-lowndes-county-on-i-75-exit-2 |
Hemel Hempstead,
England Herts United Kingdom |
A4251 (London Rd.) / A41 EB Ramps (51.74489, -0.51312) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Hemel Hempstead,
England Herts United Kingdom |
A414 (Two Waters Way) / A41 EB Ramps (51.73648, -0.47996) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
Raindrop shaped. | |
Hemel Hempstead,
England Herts United Kingdom |
A414 (Two Waters Way) / A41 WB Ramps (51.73616, -0.48168) |
Roundabout Existing |
All-Way Yield Unknown |
2 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
Raindrop shaped. | |
Hemel Hempstead,
England Herts United Kingdom |
A4251 (London Rd.) / A41 WB Ramps (51.74372, -0.51106) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Atlanta,
GA DeKalb Co. United States |
Maynard Terrace SE / McPherson Ave. / I-20 EB Exit Ramp (33.74396, -84.33482) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2025 | |
Shelby,
NC Cleveland Co. United States |
NC-150 (Cherryville Rd.) / Shelby Bypass EB Ramps (35.31324, -81.49081) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2022-2024). |
Shelby,
NC Cleveland Co. United States |
NC-150 (Cherryville Rd.) / Shelby Bypass WB Ramps (35.31432, -81.48908) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2022-2024). |
Arlington,
VA Arlington Co. United States |
Boundary Channel Dr. / I-395 SB Ramps (38.87067, -77.04839) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | https://www.arlnow.com/2024/05/30/boundary-channel-drive-roundabouts-and-trail-upgrades-are-officially-complete/ |
Arlington,
VA Arlington Co. United States |
Boundary Channel Dr. / Jefferson Davis Hwy. / I-395 NB Ramps (38.86975, -77.04548) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | https://www.arlnow.com/2024/05/30/boundary-channel-drive-roundabouts-and-trail-upgrades-are-officially-complete/ |
Amherst,
NY Erie Co. United States |
John James Audubon Pkwy. / I-990 WB Ramps / Alamosa Way (43.02618, -78.78262) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | |
Sollefteå,
Västernorrland County Sollefteå Municipality Sweden |
Rte 90 (Cpl Hågesta) WB Ramps / Söderleden / Gösta Frohms Backe / Bataljonsvägen (63.16040, 17.28886) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Elliptical shaped. ICD = 44 m x 35 m. Year Completed estimated (2016-2019). |
Bay City,
MI Bay Co. United States |
MacKinaw Rd. / US 10 WB Ramps (43.59677, -83.99239) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | |
Bay City,
MI Bay Co. United States |
MacKinaw Rd. / US 10 EB Ramps (43.59527, -83.99235) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | |
Hamilton,
ON Hamilton Canada |
Hwy 52 / Hwy 403 WB Ramps (43.20276, -80.04528) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Year Completed estimated (2021-2025). |
Hamilton,
ON Hamilton Canada |
Hwy 52 / Hwy 430 EB Ramps (43.19974, -80.04435) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Year Completed estimated (2021-2025). |
Las Vegas,
NV Clark Co. United States |
Lake South / Crystal Water Way (36.13289, -115.29050) |
Roundabout Existing |
Unknown Unknown |
4 Approaches 0 Driveways 25.0796 |
Other (At-Grade) Single-Lane |
1994 | Completed August 1994. Functional Class: Collector ICD estimated from Google Maps linework. |
(unincorporated),
FL Palm Beach Co. United States |
Lakes at Boca Raton / Cain Blvd. (26.39603, -80.21160) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.3962 |
Other (At-Grade) Single-Lane |
1994 | Completed November 1994. ICD estimated from Google Maps linework. |
Lisbon,
MD Howard Co. United States |
MD 94 / MD 144 (39.33700, -77.07360) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
1993 | First roundabout in Maryland. Built initially as temporary, made permanent after one month. |
Gainesville,
FL Alachua Co. United States |
SE 7th St. / SE 4th Ave. (29.64824, -82.31792) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-Lane |
1992 | Pedestrian crossings within circulatory roadway. Completed April 1992. |
Fort Walton Beach,
FL Okaloosa Co. United States |
Hollywood Blvd. / Doolittle Blvd. (30.41364, -86.66468) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.8704 |
Other (At-Grade) Single-Lane |
1994 | |
Tallahassee,
FL Leon Co. United States |
Killarney Way / Shamrock Dr. (30.51361, -84.22315) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.7810 |
Other (At-Grade) Single-Lane |
1994 | Completed August 1994. ICD estimated from Google Maps linework. |
Bradenton Beach,
FL Manatee Co. United States |
SR 789 / Bridge St. (27.46500, -82.69847) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 14.8361 |
Other (At-Grade) Single-Lane |
1994 | Completed August 1994. ICD estimated from Google Maps linework. |
Short Pump,
VA Goochland Co. United States |
Capitol One Dr. / (unknown) (37.62693, -77.66927) |
Roundabout Existing |
Unknown Unknown |
3 Approaches 0 Driveways 37.8365 |
Other (At-Grade) Single-Lane |
2004 | ICD estimated from Google Maps linework. |
Santa Barbara,
CA Santa Barbara Co. United States |
Alameda Padre Serra / Montecito St. / Salinas St. / Sycamore Canyon Rd. (34.42903, -119.67720) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 1 Driveways 23.6427 |
Other (At-Grade) Single-Lane |
1992 | Includes driveway into roundabout serving one home. ICD estimated from Google Maps linework. |
Long Beach,
CA Los Angeles Co. United States |
Los Alamitos Circle (Hwy. 1 / Lakewood Blvd. / Los Coyotes Diagonal) (33.78989, -118.14250) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 137.1597 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
1993 | Traffic circle conversion. Modified in 2020 to reduce lanes. 21442 |
Las Vegas (Summerlin),
NV Clark Co. United States |
Town Center Dr. / Hualapai Way (36.17850, -115.31770) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
1990 | Completed March 1990. Modified 2003 to reduce from three-lane entries to two-lane entries with add-lane right-turn bypasses on all legs. ICD estimated from Google Maps linework. 21442 |
Las Vegas (Summerlin),
NV Clark Co. United States |
Town Center Dr. / Village Center Cir. / Library Hills Dr. (36.18960, -115.30360) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 91.4400 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
1990 | Completed March 1990. Modified 2010 to reduce lane configuration. 21442 |
Boca Raton,
FL Palm Beach Co. United States |
SW 18th St. / Juana Rd. (SW 12th Ave.) (26.33206, -80.11059) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
Raised splitter islands on SW 18th St., painted splitter islands on Juana Rd.. Flashing warning beacon on eastbound SW 18th St. approach. Year Completed unknown (before 1985). | |
Vail,
CO Eagle Co. United States |
Vail Rd. / I-70 WB Ramps / North Frontage Rd. / Spraddle Cr. Rd. (39.64477, -106.37770) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
1995 | Raindrop-shaped central island. |
Vail,
CO Eagle Co. United States |
Vail Rd. / I-70 EB Ramps / South Frontage Rd. (39.64355, -106.37810) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1995 | Completed October 1995. Circular central island. |
Lothian,
MD Anne Arundel Co. United States |
MD 2 / MD 408 / MD 422 (38.82973, -76.61590) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.8423 |
Other (At-Grade) Single-Lane |
1995 | Completed October 1995. ICD estimated from Google Maps linework. |
Elkton,
MD Cecil Co. United States |
MD 213 (Fair Hill Rd.) / Leeds Rd. / Elk Mill Rd. (Lanzi Circle) (39.66364, -75.85529) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.0178 |
Other (At-Grade) Single-Lane |
1995 | Previously controlled by two-way stop. Functional Class: Arterial ICD estimated from Google Maps linework. |
Cearfoss,
MD Washington Co. United States |
MD 63 / MD 58 / MD 494 (Cearfoss Pike) (39.70017, -77.77593) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
1995 | Completed December 1995. |
Towson,
MD Baltimore Co. United States |
MD 45 / MD 146 / Joppa Rd. / Allegheny Ave. (39.40185, -76.60230) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 47.9892 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
1998 | Opened October 1998. Exit striping retrofitted to roundabout after opening. Hotdog/racetrack shape. ICD estimated from Google Maps linework. 21442 |
West Palm Beach,
FL Palm Beach Co. United States |
S. Quadrille Blvd. (El Campeon Blvd.) / Fern St. (26.71040, -80.05505) |
Roundabout Removed |
All-Way Yield Unknown |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
1997 | Replaced with TWSC 1995-1999; signalized in 2019. |
Daytona Beach,
FL Volusia Co. United States |
Seabreeze Circle (Seabreeze Bridge / Mason Ave. / Ballough Dr.) (29.22941, -81.02484) |
Rotary Removed |
All-Way Yield Unknown |
0 Approaches 0 Driveways 42.7326 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
1997 | Replaced with construction of new Seabreeze Bridge. Year Completed estimated (1995-1999). ICD estimated from Google Maps linework. |
Lake Worth,
FL Palm Beach Co. United States |
SR 802 (Lucerne Ave. - Lake Ave.) / A St. (26.61670, -80.06500) |
Roundabout Existing |
All-Way Yield Pedestrian Signal (red-yellow-green to drivers) |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2002 | ICD = 190 ft x 140 ft. |
Naples,
FL Collier Co. United States |
8th St. S / 12th Ave. S (26.13267, -81.79491) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2281 |
Other (At-Grade) Single-Lane |
1996 | Installed for community enhancement. ICD estimated from Google Maps linework. |
Naples,
FL Collier Co. United States |
7th St. N. / 3rd Ave. N. (26.15530, -81.80524) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 9.6483 |
Other (At-Grade) Single-Lane |
1998 | Installed for traffic calming. Detailed traffic volume, speed data available. ICD estimated from Google Maps linework. |
Tavares,
FL Lake Co. United States |
Main St. / Disston Ave. / Lake Dora Dr. (28.80215, -81.72475) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 20.9315 |
Other (At-Grade) Single-Lane |
1996 | Railroad tracks running along edge of central island. RR unprotected, train frequency 1-2/wk, 10 mph. ICD estimated from Google Maps linework. |