City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Great Marton,
England Blackpool United Kingdom |
Marton Circle: M55 Ramps / A583 (Preston New Rd.) (53.79396, -2.98484) |
Rotary Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Transjö,
Kronoberg County Alvesta kommun Sweden |
Värnamovägen / Rte25-Rte 27 WB Ramps (56.91585, 14.50128) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. |
Alvesta,
Kronoberg County Alvesta kommun Sweden |
Värnamovägen / Rte 25-Rte 27 EB Ramps (56.91407, 14.50210) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. |
Växjö,
Kronoberg County Växjö Sweden |
Rte 30 / Rte 25-Rte 27 WB Ramps (56.89816, 14.72903) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Was a T-intersection. Year Completed estimated (2021-2022). |
Finnveden,
Jönköping County Värnamo Sweden |
Malmövägen / Rte 27 WB Ramps (57.16874, 14.06233) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | Year Completed estimated (2012-2014). |
Värnamo,
Jönköping County Värnamo Sweden |
Rte 27 / E4-Rte 84 SB Ramps (57.16575, 14.06992) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Completed before 2009. |
Kaptensgården,
Jönköping County Värnamo Sweden |
Bredastensvägen / E4 NB Ramps (57.16254, 14.07496) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Completed before 2009. |
Värnamo,
Jönköping County Värnamo Sweden |
Gotavägen / Rte 27 WB Ramps / Fornminnesvägen (57.16938, 14.03289) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | Year Completed estimated (2011-2014). |
Mörrum,
Blekinge County Karlshamns kommun Sweden |
Pukaviksvägen / E22 NB Rapms (56.16762, 14.67657) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | Raindrop shaped. |
Mörrum,
Blekinge County Karlshamns kommun Sweden |
Pukaviksvägen / E22 SB Ramps (56.16834, 14.67366) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Raindrop shaped. |
Durango,
CO La Plata Co. United States |
US 550 / US 160 WB Ramps / US 160 EB Exit Ramp / Wilson Gulch Dr. (37.22978, -107.83943) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 64.0080 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2014 | Year Completed estimated (2011-2014). North leg added 2014-2017. US 550 added in 2024, although that uses the same leg as US 160 EB. https://www.durangoherald.com/articles/u-s-highway-550-connection-finally-opens-in-durango/ |
Durango,
CO La Plata Co. United States |
US 550 / US 160 EB Entrance Ramp (37.22666, -107.83949) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
2024 | https://www.facebook.com/coloradodot/videos/grandview-interchange-us-550-us-160-durango-on-monday-715-many-motorists-travele/853241030015092/ |
Hulje,
Östergötland County Mjölby Sweden |
Rte 50 / E4 EB Ramps (58.32543, 15.09463) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Raindrop shaped. Year Completed estimated (2012-2013). |
Penrose,
CO Fremont Co. United States |
SR 115 / US 50 EB Ramps (38.41802, -105.04263) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | https://krdo.com/news/top-stories/2024/07/02/traffic-roundabout-now-open-at-interchange-of-us-50-highway-115-in-fremont-county/ |
Fremont,
NE Dodge Co. United States |
US 77 / US 275 NB Ramps / Old Highway 8 (41.40473, -96.44391) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Year Completed estimated (2021-2024). |
Fremont,
NE Dodge Co. United States |
US 77 / US 275 SB Ramps (41.40474, -96.44633) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Yield-controlled right-turn-only lane on west leg. Year Completed estimated (2021-2024). |
Helena,
MT Lewis and Clark Co. United States |
SR 279 (Lincoln Rd. E) / I-15 NB Ramps (46.70444, -112.01118) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 32.0040 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. Right-turn-only lane on south leg. Year Completed estimated (2021-2024). |
Tumwater,
WA Thurston Co. United States |
6th Ave. SW / I-5 NB Ramps (46.99904, -122.91042) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | Yield-controlled right-turn bypass lane with low entry angle on north leg. Left-turn-only lane on south leg. https://www.facebook.com/cityoftumwater/videos/roundabouts/851059580420485/ |
Kirkland,
WA King Co. United States |
NE 132nd St. / Totem Lake Blvd. NE / 116th Ave. NE / I-405 NB Entrance Ramp (47.71844, -122.18653) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://wsdot.wa.gov/construction-planning/search-projects/i-405northeast-132nd-street-interchange-project |
Kirkland,
WA King Co. United States |
NE 132nd St. / 116th Way NE / I-405 SB Exit Ramp / 114th Pl. NE (47.71843, -122.18834) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
5 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2024 | https://wsdot.wa.gov/construction-planning/search-projects/i-405northeast-132nd-street-interchange-project |
Portage Township,
OH Ottawa Co. United States |
SR 53 (Catawba Rd.) / SR 2 Ramps (41.50681, -82.85952) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | https://sanduskyregister.com/news/522707/recognizing-the-roundabout/ |
Braselton,
GA Barrow Co. United States |
GA 211 / I-85 SB Ramps (34.09876, -83.81355) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | https://www.mainstreetnews.com/hwy-211-roundabouts-now-open/article_62a7c036-63cd-11ef-9bd3-3f83a9ac83c9.html |
Anoka,
MN Anoka Co. United States |
Thurston Ave. / US 10-US 169 Ramps (45.21253, -93.41300) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Peanut shaped. Node ICDs 140 ft; length 290 ft. Year Completed estimated (2023-2024). |
Newport,
MI Monroe Co. United States |
Swan Creek Rd. / I-75 NB Ramps (42.00419, -83.31263) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/. |
Newport,
MI Monroe Co. United States |
Swan Creek Rd. / Newport Rd. / I-75 SB Ramps (42.00705, -83.31515) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Yield-controlled right-turn bypass lane on southwest leg. Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/. |
Lincoln,
NE Lancaster Co. United States |
Jamaica Ave. / SR 2 WB Ramps (40.69198, -96.67250) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. |
LIncoln,
NE Lancaster Co. United States |
Jamaica Ave. / SR 2 EB Ramps (40.69029, -96.67110) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. |
Syracuse,
NY Onondaga Co. United States |
E Brighton Ave. / E Glen Ave. / I-481 WB Exit Ramp / I-81 NB Entrance Ramp (43.00895, -76.13260) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
2024 | https://dailyorange.com/2024/09/new-york-transportation-completes-syracuse-roundabout/ |
Henderson,
KY Henderson Co. United States |
KY 54-KY 351 (2nd St.) / US 41 SB Ramps (37.83090, -87.56729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Raindrop shaped. https://news.wnin.org/2024-07-25/henderson-roundabouts-to-open-soon. |
Lincoln,
NE Lancaster Co. United States |
S 82nd St. / SR 2 WB Ramps (40.69395, -96.60874) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Lincoln,
NE Lancaster Co. United States |
S 84nd St. / SR 2 EB Ramps (40.69054, -96.61087) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Henderson,
KY Henderson Co. United States |
KY 54-KY 351 (2nd St.) / US 41 NB Ramps (37.83052, -87.56569) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2024 | Raindrop shaped. Replaces PARCLO B ramp with diamond ramp and shifts intersection approximately 200 ft west. |
Findlay,
OH Hancock Co. United States |
US 68 / SR 15 EB Ramps / CR 80 (40.98862, -83.65067) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | New exit ramp from SR 15 coming in from the east. Former exit ramp from SR 15 (from the west) is now connected to County Road 80. https://wfin.com/local-news/opening-of-new-findlay-roundabout-pushed-back-a-few-days/ . |
San Juan,
San Juan Oriente Barrio Puerto Rico |
Calle A (Marginal Rd.) / Hwy 17 EB Entrance Ramp (18.40897, -66.02947) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 44.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2014 | Concentric striped circulatory roadway. |
Ironton,
OH Lawrence Co. United States |
SR 93 (Park Ave.) / US 52 EB Ramps (38.53856, -82.67758) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.facebook.com/photo.php?fbid=611157614528583&id=100069030495739&set=a.176172631360419 |
Ironton,
OH Lawrence Co. United States |
SR 93 (Park Dr.) / US 52 WB Ramps (38.53950, -82.67593) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.facebook.com/photo.php?fbid=611157614528583&id=100069030495739&set=a.176172631360419 |
Northfield,
MN Rice Co. United States |
Lonsdale Blvd. W (SR 19 / CR 46) / I-35 NB Ramps / Anoka Ave. / Hazelwood Ave. (44.47181, -93.29085) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Combines a 4-way intersection with a freeway interchange ramp terminal intersection. https://www.ricecountymn.gov/CivicAlerts.aspx?AID=969 |
New Castle,
DE New Castle Co. United States |
Airport Rd. / I-95 NB Exit Ramp (39.69593, -75.61570) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | https://www.facebook.com/FirstStateUpdate1/photos/-i-95-offramp-to-airport-road-has-re-opened-after-new-roundabout-installed-/1135316878598748/?_rdr |
Oak Level Township,
NC Nash Co. United States |
Sunset Ave. / I-95 SB Ramps / Freight Rd. (35.96924, -77.88406) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html. |
Oak Level Township,
NC Nash Co. United States |
Sunset Ave. / I-95 NB Ramps (35.96838, -77.88020) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html. |
Wentzville,
MO St. Charles Co. United States |
Veterans Memorial Pkwy. / I-70 EB Ramps / Ruggeri Rd. (38.80935, -90.87713) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Green Oak Township,
MI Livingston Co. United States |
Whitmore Lake Rd. / Silver Lake Rd. / US 23 SB Ramps (42.46683, -83.75719) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 1 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | |
Lodi,
WI Columbia Co. United States |
STH 60 / I-90 WB Ramps (43.33575, -89.45242) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Placed PARCLO B interchange ramps with diamond ramps. https://x.com/WisconsinDOT/status/1811030212756357174. |
Lodi,
WI Columbia Co. United States |
STH 60 / I-90 EB Ramps (43.33478, -89.45497) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Placed PARCLO B interchange ramps with diamond ramps. https://x.com/WisconsinDOT/status/1811030212756357174 |
New Ulm,
MN Nicollet Co. United States |
CSAH 37 / US 14 WB Ramps (44.30186, -94.42165) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Year Completed estimated (2021-2024). |
New Ulm,
MN Nicollet Co. United States |
CSAH 37 / US 14 EB Ramps (44.30098, -94.42365) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Year Completed estimated (2021-2024). |
Winnipeg,
MB Division 11 Canada |
St Marys Rd. / Perimeter Hwy. WB Ramps (49.79669, -97.11296) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | |
Winnipeg,
MB Division 11 Canada |
St Marys Rd. / Perimeter Hwy. EB Ramps (49.79151, -97.10948) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | |
Napa,
CA Napa Co. United States |
Soscol Ferry Rd. / SR 221 / SR 12 EB Ramps (38.24117, -122.26975) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/soscol-junction |
Napa,
CA Napa Co. United States |
SR 221 (Napa Vallejo Hwy.) / SR 12 WB Entrance Ramp (38.24207, -122.26930) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/soscol-junction |
Evergreen,
CO Clear Creek Co. United States |
US 40 / Homestead Rd. / I-70 WB Entrance Ramp (39.72195, -105.40944) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Through bypass lane on east leg. Year Completed estimated (2023-2024). https://www.codot.gov/projects/i70floydhill/earlyprojects. |
(unincorporated),
CO Jefferson Co. United States |
US 40 / CR 65 / I-70 WB Exit Ramp (39.71621, -105.39166) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Year Completed estimated (2023-2024). https://www.codot.gov/projects/i70floydhill/earlyprojects. |
Valdosta,
GA Lowndes Co. United States |
SR 31 (Madison Hwy.) / I-75 NB Ramps (30.75206, -83.27321) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
2025 | https://valdostatoday.com/news-2/local/2025/02/lowndes-i75-exit-11-traffic-to-begin-using-roundabouts/ |
Valdosta,
GA Lowndes Co. United States |
SR 31 (Madison Hwy.) / I-75 SB Ramps (30.75023, -83.27416) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
2025 | https://valdostatoday.com/news-2/local/2025/02/lowndes-i75-exit-11-traffic-to-begin-using-roundabouts/ |
Lake Park,
GA Lowndes Co. United States |
Lake Park Bellville Rd. / I-75 NB Ramps (30.64409, -83.18847) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
2022 | https://wfxl.com/news/local/traffic-pattern-change-expected-in-lowndes-county-on-i-75-exit-2 |
Lake Park,
GA Lowndes Co. United States |
Lake Park Bellville Rd. / I-75 SB Ramps (30.64297, -83.18993) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://wfxl.com/news/local/traffic-pattern-change-expected-in-lowndes-county-on-i-75-exit-2 |
Hemel Hempstead,
England Herts United Kingdom |
A4251 (London Rd.) / A41 EB Ramps (51.74489, -0.51312) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Hemel Hempstead,
England Herts United Kingdom |
A414 (Two Waters Way) / A41 EB Ramps (51.73648, -0.47996) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
Raindrop shaped. | |
Hemel Hempstead,
England Herts United Kingdom |
A414 (Two Waters Way) / A41 WB Ramps (51.73616, -0.48168) |
Roundabout Existing |
All-Way Yield Unknown |
2 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
Raindrop shaped. | |
Oak Level Township,
NC Nash Co. United States |
N Old Carriage Rd. / US 64 EB Ramps (35.98033, -77.89689) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html |
Oak Level Township,
NC Nash Co. United States |
N Old Carriage Rd. / US 64 WB Ramps (35.98205, -77.89806) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html |
New Iberia,
LA Iberia Par. United States |
LA 88 (Coteau Rd.) / US 90 WB Ramps (30.05086, -91.92829) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Left-turn-only lane on west leg; merging right-turn bypass lane on east leg; right-turn-only lane on south leg. https://www.katc.com/news/construction-of-roundabouts-continues-in-iberia-parish |
New Iberia,
LA Iberia Par. United States |
LA 88 (Coteau Rd.) / US 90 EB Ramps (30.05083, -91.92975) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Left-turn-only lane on east leg; merging right-turn bypass lane on west leg; right-turn-only lane on north leg. https://www.katc.com/news/construction-of-roundabouts-continues-in-iberia-parish |
Hemel Hempstead,
England Herts United Kingdom |
A4251 (London Rd.) / A41 WB Ramps (51.74372, -0.51106) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Shelby,
NC Cleveland Co. United States |
NC-150 (Cherryville Rd.) / Shelby Bypass EB Ramps (35.31324, -81.49081) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2022-2024). |
Shelby,
NC Cleveland Co. United States |
NC-150 (Cherryville Rd.) / Shelby Bypass WB Ramps (35.31432, -81.48908) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2022-2024). |
Hemel Hempstead,
England Herts United Kingdom |
(Breakspear Park entrance) / (parking) (51.75549, -0.42416) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
||
Shelby,
NC Cleveland Co. United States |
NC-150 (Cherryville Rd.) / NC-180 (N Post Rd.) (35.31228, -81.49215) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Left-turn-only lane on northeast leg. Year Completed estimated (2022-2024). |
Oak Level Township,
NC Nash Co. United States |
N Old Carriage Rd. / (school entrance) (35.97561, -77.89630) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html |
Oak Level Township,
NC Nash Co. United States |
Sunset Ave. / Arrow Rd. (35.97106, -77.89111) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2023-2024). https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html. |
Hemel Hempstead,
England Herts United Kingdom |
A414 (Saint Albans Rd.) / Jarman Way (51.74980, -0.45562) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Through bypass lane on west leg. | |
Hemel Hempstead,
England Herts United Kingdom |
A414 (Saint Albans Rd.) / White Hart Rd. / Bennetts End Rd. (51.74958, -0.45123) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
Left-turn-only lane on east and west legs. | |
Hemel Hempstead,
England Herts United Kingdom |
A414 (Saint Albans Rd. / Breakspear Way) / A4147 (Leverstock Green Way / Maylands Ave.) (51.75379, -0.43624) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
Left-turn add-lane bypass lanes on north and south legs. Left-turn-only lanes on east and west legs. | |
Hemel Hempstead,
England Herts United Kingdom |
A414 (Breakspear Way) / Green Ln. (51.75630, -0.42355) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
||
Hemel Hempstead,
England Herts United Kingdom |
Green Ln. / Boundary Way (51.76027, -0.42309) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Hemel Hempstead,
England Herts United Kingdom |
Boundary Way / Buncefield Ln. / (parking) (51.76062, -0.42889) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Hemel Hempstead,
England Herts United Kingdom |
Green Ln. / Cherry Tree Ln. / Hogg End Ln. (51.76618, -0.42265) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Hemel Hempstead,
England Herts United Kingdom |
A4147 (Swallowdale Ln. / Maylands Ave.) / Swallowdale Ln. / Eastman Way (51.76690, -0.44389) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Hemel Hempstead,
England Herts United Kingdom |
A4147 (Redbourn Rd. / Swallowdale Ln.) / High Street Green / Queensway (51.76548, -0.44808) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
Left-turn bypass lanes on west and south legs. | |
Hemel Hempstead,
England Herts United Kingdom |
A4147 (Link Rd. / Redbourn Rd.) / B487 (Redbourn Rd.) / Saint Agnells Ln. (51.77084, -0.44894) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Hemel Hempstead,
England Herts United Kingdom |
A4147 (Link Rd.) / Cambrian Way / Aycliffe Dr. (51.76921, -0.45691) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Hemel Hempstead,
England Herts United Kingdom |
A4147 (Link Rd.) / Piccotts End Rd. (51.76574, -0.47503) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Hemel Hempstead,
England Herts United Kingdom |
A4146 (Leighton Buzzard Rd.) / A4147 (Link Rd.) / B440 (Leighton Buzzard Rd.) / Galley Hill (51.76563, -0.47949) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Hemel Hempstead,
England Herts United Kingdom |
A4146 (Leighton Buzzard Rd.) / Queensway / Warners End Rd. (51.75713, -0.47560) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Left-turn-only lanes on all legs. | |
Hemel Hempstead,
England Herts United Kingdom |
Queensway / Marlowes (51.75735, -0.47277) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Hemel Hempstead,
England Herts United Kingdom |
Leighton Buzzard Rd. / Combe St. (51.75370, -0.47514) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Bowling Green,
KY Warren Co. United States |
Frist Blvd. / Hub Blvd. (36.96968, -86.40929) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2019 | |
Bowling Green,
KY Warren Co. United States |
Frist Blvd. / Golden Autumn Way (36.96509, -86.40386) |
Other Existing |
All-Way Yield None |
2 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Lane change required to make left turn. |
Bowling Green,
KY Warren Co. United States |
Ken Bale Blvd. / Middle Bridge Rd. W (36.95185, -86.41547) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2022 | |
Bowling Green,
KY Warren Co. United States |
Fieldstone Blvd. / Cave Springs Ave. (36.92962, -86.42874) |
Other Existing |
All-Way Stop None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Bowling Green,
KY Warren Co. United States |
Chasefield Ave. / Andover St. (36.93716, -86.43202) |
Other Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Kennewick,
WA Benton Co. United States |
W Deschutes Ave. / N Colorado St. (46.21261, -119.22344) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | https://www.youtube.com/watch?v=FWq2ItERef0 (view of roundabout at 1:14 in video) |
Hemel Hempstead,
England Herts United Kingdom |
A4251 (London Rd.) / A4146 (Station Rd.) (51.74301, -0.48452) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Hemel Hempstead,
England Herts United Kingdom |
A4251 (London Rd.) / Fishery Rd. (51.74305, -0.49149) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Marion,
OH Marion Co. United States |
SR 98 (Columbus-Sandusky Rd. S) / SR 529 (Marion-Cardington Rd. E) (40.54939, -83.05017) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2021-2024). |
Macon,
GA Bibb Co. United States |
N Pierce Ave. / N Pierce Cir. (32.87326, -83.65562) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2013-2015). |
Napa,
CA Napa Co. United States |
RiverSound Way / Kaiser Rd. (38.25745, -122.27725) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | |
Cecilia,
KY Hardin Co. United States |
Woodland Way / Greencrest Dr. / Lombardy Dr. / Red Sunset Blvd. (37.66056, -85.94234) |
Other Existing |
All-Way Yield None |
4 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Shepherdsville,
KY Bullitt Co. United States |
Michelle Dr. / Lanai Dr. (37.97994, -85.66681) |
Other Existing |
Uncontrolled None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2006 | |
Shepherdsville,
KY Bullitt Co. United States |
Michelle Dr. / Landon Way / Casey Ct. (37.97969, -85.66524) |
Other Existing |
Uncontrolled None |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2006 |