City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / CTH Y (43.80647, -87.78098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9247 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / CTH JJ (43.81919, -87.79837) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.3314 |
Other (At-Grade) Single-Lane |
2009 | High-speed approach roadways. Opened October 2009. ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
CTH CE (College Ave.) / CTH KK (Walter Ave.-E John St.) (44.25859, -88.38350) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.2026 |
Other (At-Grade) Single-Lane |
2008 | Opened November 2008. ICD estimated from Google Maps linework. |
Eau Claire,
WI Eau Claire Co. United States |
STH 53 / Old Town Hall Rd. / Scully Rd. (44.76384, -91.41872) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.4875 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Opened October 2008. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / CTH X / Gateway Blvd. (42.53840, -88.94769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.7205 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / I-43 NB Ramps (42.53960, -88.94841) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.6798 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / I-43 SB Ramps (42.54142, -88.94933) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.0787 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / Moon Rd. / Giebel Ct. (43.56057, -89.78316) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.8114 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / Timothy Ln. (43.55597, -89.77811) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 39.8145 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 EB Ramps (43.55774, -89.77940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.6788 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 WB Ramps (43.55867, -89.78077) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5437 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
Moon Rd. / Timothy Ln. (43.56132, -89.77681) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.0800 |
Other (At-Grade) Single-Lane |
2010 | Fatal crash July 10, 2010. ICD estimated from Google Maps linework. |
Baraboo,
WI Sauk Co. United States |
Old US 12 / CTH BD (43.48896, -89.77718) |
Roundabout Removed |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2010 | Constructed in 2010. Removed in 2017(?) due to bypass expansion. |
Merrill,
WI Lincoln Co. United States |
STH 64 (1st St. E) / N Center Ave. (45.18173, -89.68332) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.5152 |
Other (At-Grade) Single-Lane |
2010 | Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Marinette,
WI Marinette Co. United States |
STH 64 (Hall Ave.) / STH 180 / CTH T (45.09968, -87.66032) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.8788 |
Other (At-Grade) Single-Lane |
2010 | Opened November 17, 2010. ICD estimated from Google Maps linework. |
(unincorporated),
WI Outagamie Co. United States |
STH 76 / CTH O (44.35172, -88.53697) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.1389 |
Other (At-Grade) Single-Lane |
2010 | Opened September 24, 2010. High-speed approach roadways. ICD estimated from Google Maps linework. |
Platteville,
WI Grant Co. United States |
Chestnut St. / Markee Ave. (42.72607, -90.48517) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.6039 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
CTH M (Pleasant View Rd.) / CTH S (Mineral Point Rd.) (43.06030, -89.53722) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.2298 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened June 27, 2011. ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
CTH M (Pleasant View Rd.) / Valley View Rd. / Junction Rd. (43.04614, -89.53278) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.1149 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened July 17, 2011. ICD estimated from Google Maps linework. |
Pleasant Prairie,
WI Kenosha Co. United States |
STH 165 (104th St.) / CTH EZ (39th Ave.) (42.52248, -87.85383) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.5327 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened August 8, 2011. ICD estimated from Google Maps linework. |
Pleasant Prairie,
WI Kenosha Co. United States |
STH 165 (104th St.) / CTH ML (Springbrook Rd.) (42.52253, -87.86031) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.8919 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 7, 2011. Yield-controlled right-turn bypass lanes. ICD estimated from Google Maps linework. |
Mukwonago,
WI Waukesha Co. United States |
STH 83 / CTH I (River Rd.) (42.92252, -88.34597) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.3560 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 23, 2011. ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH LP (Lake Park Rd.) / CTH AP (Plank Rd.) (44.23572, -88.36309) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9297 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH AP (Plank Rd.) / Midway Rd. (44.23008, -88.37485) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.2316 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Sherwood,
WI Calumet Co. United States |
STH 114 / CTH N (44.20024, -88.32381) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.0987 |
Other (At-Grade) Single-Lane |
2011 | High-sped approach roadways. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 WB Ramps (42.91764, -89.36607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2309 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 EB Ramps (42.91774, -89.36817) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1083 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 EB Ramps (42.95128, -89.37859) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7217 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 WB Ramps (42.95272, -89.37769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9591 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / CTH M (42.94950, -89.37981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9613 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Crooks Ave.) / CTE CE (E College Ave.) (44.25803, -88.27377) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9138 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Greenville,
WI Outagamie Co. United States |
STH 15 / CTH CB (Greenville Dr.) (44.28721, -88.50600) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.1525 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Opened August 2013. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / N Koeller St. / Oshkosh Ave. (44.03258, -88.57882) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2012 | Roundabout relocated to west of previous intersection. Series of 4 roundabouts. Opened June 18, 2012. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / Brooks Ln. / N Washburn St. (44.03244, -88.58758) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.9435 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened June 8, 2012. Three-lane roundabout. Series of 4 roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 SB Ramps (44.03272, -88.58319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1058 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 NB Ramps (44.03271, -88.58178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 140.8193 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 EB Ramps (44.95862, -92.55999) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.1723 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 WB Ramps (44.96036, -92.55952) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.7061 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / CTH TT (Graham St.-80th Ave.) (44.97808, -92.55799) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.5353 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 130th St. (44.99273, -92.53744) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.8527 |
Other (At-Grade) Single-Lane |
2012 | Opened July 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 120th St. (44.99254, -92.55791) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.0760 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
New Richmond,
WI Saint Croix Co. United States |
STH 65 / CTH G (45.07907, -92.53756) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9508 |
Other (At-Grade) Single-Lane |
2012 | Opened September 2012. ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / Klondike Dr. (44.59813, -90.18018) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.6235 |
Other (At-Grade) Single-Lane |
2012 | Opened November 2012. Free-flow right-turn bypass lane with acceleration lane. ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / Heritage Dr. (44.62685, -90.18053) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.6000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / CTH BB (44.62490, -90.18009) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.3017 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. Free-flow right-turn bypass lane into added lane. ICD estimated from Google Maps linework. |
Sherwood,
WI Calumet Co. United States |
STH 114-STH 55 / Stommel Rd. (44.19113, -88.28387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.5360 |
Other (At-Grade) Single-Lane |
2012 | Opened September 24, 2012. ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) (43.38493, -87.92303) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) / Northwood Rd. (43.38498, -87.92057) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Port Washington,
WI Ozaukee Co. United States |
STH 33 (W Grand Ave.) / CTH LL (43.38688, -87.90026) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.6619 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 NB Ramps (43.32441, -88.18568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 19.1147 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 SB Ramps (43.32437, -88.18747) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.5901 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Polk,
WI Washington Co. United States |
STH 60 / CTH C (Hillsdale Rd.) (43.32433, -88.24101) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4426 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / Tillie Rd. / Cedar Pkwy (43.32438, -88.19016) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.1475 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 NB Ramps (42.75114, -88.95416) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 SB Ramps (42.75331, -88.95426) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
Green Bay,
WI Brown Co. United States |
W Mason St. (STH 54) / STH 172 (Airport Dr.) (44.50001, -88.17641) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened November 2011. |
Caledonia,
WI Racine Co. United States |
STH 38 / CTH K (Northwestern Ave.) (42.75957, -87.86417) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.9524 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Opened November 2007. Right-turn bypass lane. ICD estimated from Google Maps linework. |
Medford,
WI Taylor Co. United States |
STH 13 / Allman St. (45.14894, -90.33466) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.8545 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 2011. ICD estimated from Google Maps linework. |
Medford,
WI Taylor Co. United States |
STH 13 / Ann's Way (45.15473, -90.33393) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.9030 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 2011. ICD estimated from Google Maps linework. |
Dodgeville,
WI Iowa Co. United States |
US 18 / Bennett Rd. (42.96960, -90.11338) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.6954 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Opened October 7, 2008. ICD estimated from Google Maps linework. |
New Berlin,
WI Waukesha Co. United States |
Moorland Rd. (CTH O) / I-43 NB Ramps / Rockridge Rd. (42.94913, -88.10900) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2068 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | Opened September 2007. ICD estimated from Google Maps linework. |
New Berlin,
WI Waukesha Co. United States |
CTH Y (Racine Ave.) / I-43 NB Ramps (42.93221, -88.15884) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9731 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened November 2009. ICD estimated from Google Maps linework. |
Oconomowoc,
WI Waukesha Co. United States |
Wisconsin Ave. / Walnut St. (43.10956, -88.49469) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.6205 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Opened August 15, 2008. ICD estimated from Google Maps linework. |
Lannon,
WI Waukesha Co. United States |
STH 74 (Main St.) / CTH V (Townline Dr.) / McLaughlin Rd. (43.13902, -88.18408) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.3459 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Opened November 15, 2008. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
US 141 / Atkinson Dr. (44.53348, -88.02827) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.4601 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 17, 2012. ICD estimated from Google Maps linework. |
New Berlin,
WI Waukesha Co. United States |
CTH Y (Racine Ave.) / I-43 SB Ramps (42.93426, -88.15884) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2182 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened November 2009. ICD estimated from Google Maps linework. |
New Berlin,
WI Waukesha Co. United States |
Moorland Rd. (CTH O) / I-43 SB Ramps (42.95341, -88.10897) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 67.3087 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2008 | Opened November 2008. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Main Ave.-Wisconsin St. (STH 32) / Broadway (STH 57) (44.44744, -88.06049) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.5995 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Opened July 12, 2007. First multilane roundabout in Wisconsin. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. (CTH M) / Belmont Rd. (44.59075, -88.09447) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.5159 |
Other (At-Grade) Single-Lane |
2006 | Completed summer 2006. Previously controlled by two-way stop ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. (CTH M) / Velp Ave. (CTH HS) (44.59094, -88.07787) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.3200 |
Other (At-Grade) Single-Lane |
2005 | Completed summer 2005. Fatal crash October 30, 2005. 11861-05. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. (CTH M) / Waterway Ct. (44.59112, -88.07314) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.9178 |
Other (At-Grade) Single-Lane |
2007 | Completed summer 2007. ICD estimated from Google Maps linework. |
Milwaukee,
WI Milwaukee Co. United States |
W Canal St. / N 25th St. (43.03109, -87.94351) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9057 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2005 | Opened September 15, 2005 ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
Star Dr. / Apollo Way (43.08892, -89.27760) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.1663 |
Other (At-Grade) Single-Lane |
2003 | Date estimated. ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
Star Dr. / Dominion Dr. (43.09153, -89.27502) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 26.1652 |
Other (At-Grade) Single-Lane |
2006 | Date estimated. ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
McLean Dr. / Sharpsburg Dr. (43.08695, -89.27359) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.1672 |
Other (At-Grade) Single-Lane |
2003 | Date estimated. ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
Lien Rd. / Zeier Rd. (43.12128, -89.29919) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.1768 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Opened October 2010. ICD estimated from Google Maps linework. |
Mosinee,
WI Marathon Co. United States |
Main St. / Old Highway 51 / Ranger St. (44.79026, -89.69181) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7706 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Glendale Ave. / Evergreen Ave. (44.57615, -88.11939) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9252 |
Other (At-Grade) Single-Lane |
2008 | Opened November 2008. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
US 45 / Fernau Ave. / Lake Butte des Morts Dr. (44.05513, -88.57150) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened August 24, 2010. |
Neenah,
WI Winnebago Co. United States |
Co. Hwy. PP / Jacobsen Rd. / American Dr. (44.21429, -88.47825) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.8167 |
Other (At-Grade) Single-Lane |
2007 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Riverdale Dr. (CTH J) / CTH RK (44.54785, -88.10120) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.4509 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
E John St. / E South River St. (44.25623, -88.38274) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 30.7947 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Gillett,
WI Oconto Co. United States |
STH 32 / STH 22 / Daly Creek Rd. (44.89609, -88.24677) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.3787 |
Other (At-Grade) Single-Lane |
2012 | Rural, high-speed approaches. ICD estimated from Google Maps linework. |
Kansasville,
WI Racine Co. United States |
STH 20 / STH 75 / CTH S (42.74191, -88.11098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7169 |
Other (At-Grade) Single-Lane |
2014 | Rural, high-speed approaches. ICD estimated from Google Maps linework. |
Sparta,
WI Monroe Co. United States |
STH 16 / STH 71 / Hardwood Rd. (43.94078, -90.78544) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.7996 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Brookfield,
WI Waukesha Co. United States |
North Ave. (CTH M) / Brookfield Rd. (43.06123, -88.14588) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 17.4521 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Wales,
WI Waukesha Co. United States |
US 18 / STH 83 (43.01185, -88.38395) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2989 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
(unincorporated),
WI Outagamie Co. United States |
CTH A / CTH JJ (44.31701, -88.44591) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.1627 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Chippewa Falls,
WI Chippewa Co. United States |
STH 124 / STH 29 (44.92093, -91.38065) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.9694 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Right-turn bypass lanes on all three legs. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Shawano Ave. / I-41 NB Ramps (44.53750, -88.07683) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.6732 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Shawano Ave. / I-41 SB Ramps (44.53894, -88.07831) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.3746 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Shawano Ave. / Duck Creek Pkwy. (44.54055, -88.08010) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0093 |
Other (At-Grade) Multilane (3+ Lane) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Cardinal Ln. / Duck Creek Pkwy. / Elmhurst Ave. (44.54540, -88.08519) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.5596 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Cardinal Ln. / N Packerland Dr. / Shawano Ave. / STH 32 WB On-Ramp (44.54373, -88.08784) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.3705 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
N Packerland Dr. / STH 32 EB Off-Ramp (44.54289, -88.08979) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.2639 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Hobart, Village of,
WI Brown Co. United States |
N Packerland Dr. / Badgerland Dr. (44.54245, -88.09075) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.9667 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Menasha,
WI Winnebago Co. United States |
Appleton Rd. / US 10 WB Ramps (44.23458, -88.42393) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 49.6320 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2016 | Yield-controlled right-turn bypass lane on east leg. ICD estimated from Google Maps linework. |
Menasha,
WI Winnebago Co. United States |
Appleton Rd. / US 10 EB Ramps (44.23334, -88.42408) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.2101 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2016 | Yield-controlled right-turn bypass lane on west leg. ICD estimated from Google Maps linework. |
Menasha,
WI Winnebago Co. United States |
Racine Road Connector / US 10 WB Ramps (44.22103, -88.44994) |
Roundabout Existing |
All-Way Yield Unknown |
2 Approaches 0 Driveways 45.3638 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Menasha,
WI Winnebago Co. United States |
Racine Rd / US 10 Ramps (44.21780, -88.44526) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 52.2141 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2016 | ICD estimated from Google Maps linework. |