Shawano Ave. / I-41 NB Ramps
- Type
- Roundabout
- Status
- Existing
- Functional Class
- Freeway Ramps (Grade-Separated)
- Lane Type
- Multilane (3+ Lane)
- Control Type
- All-Way Yield
- Previous Control Type
- Signal
- Other Control Type
- None
- Approaches
- 3
- Driveways
- 0
- Diameter (ICD)
- 47.67 m
- City
- Green Bay
- County
- Brown Co.
- State
- WI
- Country
- United States
- Latitude
- 44.53750
- Longitude
- -88.07683
- Year Completed
- 2013
- Notes