City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Toa Alta,
PR Contorno United States |
PR 165 / PR 165R / Calle 1 (18.39162, -66.25352) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2005 | Northeast and southeast legs approaches have painted splitter islands. Year Completed estimated (2004-2006). |
Plattsmouth,
NE Cass Co. United States |
US 34 / 8th Ave. / 2nd Ave. / (parking) (41.00229, -95.90650) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2008 | Yielding right-turn bypass lane on west leg. |
Connerton,
FL Pasco Co. United States |
Pleasant Plains Pkwy. / Blue Mist Pkwy. (28.28350, -82.45924) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2007 | Through-left, through-right arrows on all three legs even though T-intersection. Year Completed estimated (2006-2007). |
Connerton,
FL Pasco Co. United States |
Pleasant Plains Pkwy. / Forget Me Not Ct. (28.28388, -82.46512) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2008 | Left-through, through-right arrows on southwest leg even through no right-turn movement. Two circulating lanes in front of southwest and east legs even through only one conflicting movement. Year Completed estimated (2007-2008). |
Connerton,
FL Pasco Co. United States |
Connerton Blvd. / Blue Mist Pkwy. (28.28746, -82.45886) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2007 | Year Completed estimated (2006-2007). |
Connerton,
FL Pasco Co. United States |
Connerton Blvd. / Fountain Garden Way (28.28692, -82.46821) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2007 | Year Completed estimated (2006-2007). |
Rockford,
IL Winnebago Co. United States |
Lyford Rd. / (medical center entrance) (42.31307, -88.95526) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2018 | Yielding right-turn bypass lanes on south and east legs. Year Completed estimated (2018-2019). |
Wesley Chapel,
FL Pasco Co. United States |
Bella Corsa Blvd. / Estancia Blvd. (28.22100, -82.33913) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2015-2016). |
Wesley Chapel,
FL Pasco Co. United States |
Estancia Blvd. / Santa Luce Dr. (28.21463, -82.34170) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2014 | |
Wesley Chapel,
FL Pasco Co. United States |
Wiregrass Ranch Blvd. / (future streets) (28.20875, -82.33626) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Painted spirals in circulatory roadway. |
Wesley Chapel,
FL Pasco Co. United States |
Wiregrass Ranch Blvd. / (future streets) (28.20570, -82.33636) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Painted spirals in circulatory roadway. |
Wesley Chapel,
FL Pasco Co. United States |
Wiregrass Ranch Blvd. / Strickland Ave. (28.20205, -82.33645) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Replaced stubbed two-way stop intersection. Painted spirals in circulatory roadway. |
Lakeville,
MN Dakota Co. United States |
Flagstaff Ave. / Dodd Blvd. (44.70700, -93.19724) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2019 | Elliptical shaped. ICD = 200 ft x 150 ft. |
St Augustine,
FL St. Johns Co. United States |
Four Mile Rd. / N Volusia St. / E Aiken St. / W Aiken St. (29.89808, -81.34637) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2013 | |
The Aurora Highlands,
CO Adams Co. United States |
Aurora Highlands Pkwy. / Denali Blvd. (39.77048, -104.70663) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2021 | Merging right-turn bypass lane on east leg; add-lane bypass lane on north leg. Year Completed estimated (2020-2021). |
Waunakee,
WI Dane Co. United States |
STH 19 / River Rd. (43.19512, -89.36551) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Yield-controlled right-turn bypass lanes on north and south legs. |
Franklin,
TN Williamson Co. United States |
Townsend Blvd. / Westhaven Blvd. (35.92499, -86.92313) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2008 | |
St Augustine,
FL St. Johns Co. United States |
Las Calinas Blvd. / Ensenada Dr. (30.04447, -81.39071) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2006-2007). |
Merrillville,
IN Lake Co. United States |
Connecticut Dr. / E 100th Pl. / Delaware St. (41.43632, -87.33005) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2006 | |
Merrillville,
IN Lake Co. United States |
E 98th Ave. (Connecticut Dr.) / (future road) (41.43973, -87.33358) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2003-2005). |
Akron,
OH Summit Co. United States |
SR 241 (Seiberling St. - Innovation Way) / Seiberling St. / Eagle St. / Eagle Way (41.05604, -81.47194) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2011 | |
Roca,
NE Lancaster Co. United States |
Saltillo Rd. / US 77 (S 12th St.) SB Ramps / Shrine Way (40.69716, -96.70783) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Altamont,
KS Labette Co. United States |
US 160 (14000 Rd.) / US 59 / Ottawa Rd. (37.19345, -95.26780) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2020 | https://www.fourstateshomepage.com/news/construction-to-an-altamont-intersection-is-making-progress/ |
Marshfield,
MO Webster Co. United States |
Brinkley Rd. / CR CC / I-44 WB Ramps (37.36529, -92.90927) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | |
Hoffman Estates,
IL Cook Co. United States |
Center Dr. / (parking) (42.07088, -88.12878) |
Rotary Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
This is a privately maintained roadway. The site is currently being redeveloped from an office campus to a mixed-use development. A single-lane modern roundabout has been considered as a replacement for the existing rotary. | |
Bryan,
TX Brazos Co. United States |
5th St. / Rellis Pkwy. (30.64071, -96.46193) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Part of the gateway entrance to the Texas A&M University System RELLIS Campus (formerly Riverside Campus) from SH 47. The intersection was added when RELLIS Parkway (the leg to the northwest) was completed in 2018 (approximately). It was built as a bit of a hybrid, in terms of the number of lanes, in that the circulating roadway does not have two lanes all the way around, but it's built so that the second lane can be added for all movements as the need develops. |
Summerville,
SC Dorchester Co. United States |
Wescott Blvd. / Oak Forest Blvd. (32.94488, -80.14152) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2000 | Built originally as multilane (2x1) roundabout. Year Completed estimated (2000). Converted to single-lane in 2015 by striping out inner circulating lane but retaining two-lane exits at pedestrian crossings on north and south legs. |
Gardnerville,
NV Douglas Co. United States |
Muller Pkwy. / Pinenut Rd. (38.91887, -119.71378) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | West leg stubbed. |
Ängelholm,
Skane County Ängelholm Sweden |
Rte 105 / Margretetorpsvägen (56.31950, 12.88808) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.9342 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
St. George,
UT Washington Co. United States |
Washington Pkwy. / (unknown) (37.14462, -113.48590) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9290 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2005 | Date estimated. ICD estimated from Google Maps linework. |
Monroe,
WA Snohomish Co. United States |
SR 522 EB Ramps / 164th St. SE / Tester Rd. (47.84863, -122.00580) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 60.9143 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2001 | Completed August 2001. This project won the Washington State APWA 2001 Project of the Award and the ASCE Seattle Section 2001 Outstanding Project Award. The Project is documented in the Compendium of Papers for 2000 ITE District 6 Annual Meeting, San Diego, CA. Reconfiguration of two intersections into a roundabout. Previously controlled by two-way stop ICD estimated from Google Maps linework. |
Camp Lejeune,
NC Onslow Co. United States |
Holcomb Blvd. / McHugh Blvd. (34.66476, -77.34787) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.9043 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Was previously a rotary. ICD estimated from Google Maps linework. |
Draper,
UT Salt Lake Co. United States |
Mike Weir Dr. / Sage Hollow Dr. / S Rambling Rd. (40.49752, -111.84179) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.8499 |
Other (At-Grade) Single-Lane |
1999 | Partially painted splitter islands on two legs; no splitter islands on third leg. ICD estimated from Google Maps linework. |
San Sebastián,
Basque Country Guipúzcoa Spain |
Irun plaza (43.30531, -1.97456) |
Other Existing |
Unknown Unknown |
6 Approaches 0 Driveways 60.8387 |
Unknown Unknown |
ICD estimated from Google Maps linework. | |
Porterville,
CA Tulare Co. United States |
S Jaye St. / W Montgomery Ave. (36.04954, -119.02654) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.8344 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Right-turn bypass lane on east leg. ICD estimated from Google Maps linework. |
South Jordan,
UT Salt Lake Co. United States |
Daybreak View Pkwy. (11400 South) / Oakmond Rd. (40.54534, -112.00610) |
Roundabout Existing |
Unknown Unknown |
4 Approaches 0 Driveways 60.8066 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Functional Class: Arterial ICD estimated from Google Maps linework. |
(unincorporated),
FL Seminole Co. United States |
Alqua Blvd. / Fernlake Pl. (28.76020, -81.39994) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 60.7259 |
Other (At-Grade) Single-Lane |
1999 | ICD estimated from Google Maps linework. |
Kingsnorth,
England Kent United Kingdom |
Forestall Meadow / Moatfield Meadow / Bluebell Rd. / Field View (51.12140, 0.86532) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.7214 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Vastra Fralunda,
Vastra Gotaland County Gothenburg Sweden |
Skattegardsvagen / Lilla Grevegardsvagen (57.64861, 11.89233) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.7143 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Chattanooga,
TN Hamilton Co. United States |
Premier Dr. / Pointe Center Dr. (35.01333, -85.18897) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.6470 |
Other (At-Grade) Single-Lane |
2000 | Year Completed estimated (1999-2002). ICD estimated from Google Maps linework. |
The Villages,
FL Sumter Co. United States |
Buena Vista Blvd. / Stillwater Trl. (28.90300, -81.98000) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.6426 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2003 | Bypass lane for southbound through movement in addition to two entry lanes. ICD estimated from Google Maps linework. |
Umea,
Vasterbotten County Umea Sweden |
E12 / Marknadsgatan (63.81169, 20.24916) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.6147 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Staffanstorp,
Skane County Staffanstorp Sweden |
Rte 108 / E22 Ramps (55.67813, 13.18171) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.6071 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Greenfield,
IN Hancock Co. United States |
CR 300 N / Mt. Comfort Rd. (600 W) (39.82710, -85.91524) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.5366 |
Unknown Multilane (3+ Lane) |
2014 | Yield-controlled right-turn bypass lane on south leg. ICD estimated from Google Maps linework. |
Amsterdam,
North Holland Amsterdam Netherlands |
Burgemeester de Vlugtlaan / Antony Moddermanstraat (52.38343, 4.81879) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.5060 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Cape Town,
Western Cape Cape Town South Africa |
Helen Suzman Blvd. / Granger Bay Blvd. (-33.90722, 18.41089) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.4646 |
Other (At-Grade) Multilane (3+ Lane) |
ICD estimated from Google Maps linework. | |
Nijmegen,
Gelderland Nijmegen Netherlands |
RampsKeizer Hendrik VI Singel / Dorpensingel / N325 Ramps (51.88277, 5.85903) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.4525 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Kalmar,
Kalmar County Kalmar Sweden |
Södra Vägen / Strömsbergsvägen / Fölehagsvägen / Törnebyvägen (56.67056, 16.30511) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 60.3728 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Sept-Îles,
QC Sept-Rivières Canada |
Rue Smith / Rue Comeau (50.22375, -66.37588) |
Rotary Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.3655 |
Other (At-Grade) Single-Lane |
According to the article below, this was converted from a rotary to roundabout in 2011 (but no apparent geometric changes). https://ici.radio-canada.ca/nouvelle/682505/carrefour-rond-point-sept-iles [Translation note: French has two terms for circular intersections: rond-point and carrefour giratoire. According to the article, the former term means rotary (traffic in circle yields) and the latter means roundabout (entering traffic yields). However, Google Translate translates them both as 'roundabout', making for a confusing article if you don't refer back to the original French.] ICD estimated from Google Maps linework. | |
Norfolk,
NE Madison Co. United States |
US 275 / N 37th St. (42.03242, -97.46577) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.3233 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Newport,
KY Campbell Co. United States |
Taylor-Southgate Bridge / 3rd St. / York St. (39.09337, -84.49734) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.2512 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
London,
England London United Kingdom |
Millennium Way / John Harrison Way / Bugsby's Way / Blackwall Ln. (51.49339, 0.00978) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.2312 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Grand Junction,
CO Mesa Co. United States |
Horizon Dr. / H Rd. / Eagle Dr. (39.11827, -108.52976) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.2299 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Year Completed estimated (2006-2011). Slight elliptical shape. Right-turn bypass lane on west leg. ICD estimated from Google Maps linework. |
Union Township,
OH Clermont Co. United States |
Miami View Trl. / Miami Hills Dr. / Terrace Ridge Dr. (39.15189, -84.28027) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.2012 |
Other (At-Grade) Single-Lane |
No splitter islands. ICD estimated from Google Maps linework. | |
Delaware,
OH Delaware Co. United States |
Glenn Pkwy. / Cheshire Rd. (40.24134, -83.03521) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.1700 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Year Completed estimated (2006-2009). ICD estimated from Google Maps linework. |
Watford City,
ND McKenzie Co. United States |
ND 23 / ND 73 (Johnsons Corner) (47.80439, -102.94176) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.1641 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Winnipeg,
MB Manitoba Canada |
Bison Dr. / Appleford Gate (49.79085, -97.21023) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.1407 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2013-2014). ICD estimated from Google Maps linework. |
Oldcastle,
ON Essex Canada |
Hwy 9 / Hwy 3 / Hwy 401 WB Ramps / Hwy 401 EB Ramps (42.23142, -82.99124) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.1340 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Year Completed estimated (2009-2014). ICD estimated from Google Maps linework. |
Hingham,
MA Plymouth Co. United States |
Rte. 3A (Summer St.) / Chief Justic Cushing Hwy. / Green St. (42.24615, -70.88130) |
Rotary Existing |
Unknown Unknown |
4 Approaches 0 Driveways 60.1200 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
Functional Class: Arterial ICD estimated from Google Maps linework. | |
Catonsville,
MD Baltimore Co. United States |
Hilltop Cir. / UMBC Blvd. (39.25178, -76.71442) |
Rotary Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.1156 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | Lane changes needed for some through movements. ICD estimated from Google Maps linework. |
Sevastopol,
WI Door Co. United States |
STH 4 / STH 57 / Egg Harbor Rd. (44.85354, -87.34650) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1138 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | https://www.greenbaypressgazette.com/story/news/local/door-co/news/2016/06/24/door-countys-first-roundabout-opens/86338626/ ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 SB Ramps (44.03272, -88.58319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1058 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
DeForest,
WI Dane Co. United States |
CR V / US 51 NB Ramps (43.25270, -89.32322) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.0214 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | date: https://www.oesllc.com/portfolio-items/ush-51-expansion-and-interchange-madison-deforest-dane-county-wi/ ICD estimated from Google Maps linework. |
Berlin,
MA Worcester Co. United States |
River Rd W / South St / Whitney Rd (42.35764, -71.62354) |
Rotary Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0136 |
Other (At-Grade) Single-Lane |
New pavement markings (shark teeth and definition of circular roadway) in 2016 ICD estimated from Google Maps linework. | |
Waterloo,
ON Regional Municipality of Waterloo Canada |
Townline Rd. / Can-Amera Pkwy. (43.41154, -80.28042) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2003 | Year Completed estimated (2002-2004). |
Woolwich,
ON Waterloo Regional Municipality Canada |
Arthur St. / Sawmill Rd. (43.54355, -80.54693) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | |
Koper,
Koper Slovenia |
Ljubljanska cesta / Ferrarska ulica (45.54332, 13.73102) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Turbo roundabout. https://e-zbornik.gf.sum.ba/images/radovi//e_zbornik_03_01.pdf |
Lethbridge,
AB Alberta Canada |
Metis Trl. / Country Meadows Blvd. W (49.69571, -112.90888) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | |
Wood Buffalo,
AB Alberta Canada |
Snowbird Way / (air cargo access) (56.64996, -111.23847) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Single-Lane |
2013 | Entry to Fort McMurray International Airport. Year Completed estimated (2011-2014). |
Blue Mountains,
ON Grey Canada |
CR 19 / Gord Canning Dr. / Scenic Caves Rd. (44.49650, -80.30181) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Year Completed estimated (2009-2011). |
Repentigny,
QC L'Assomption Regional County Municipality Canada |
Boulevard Basile-Routhier / Avenue des Rivières (45.78281, -73.43269) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Single-Lane |
2010 | |
Repentigny,
QC L'Assomption Regional County Municipality Canada |
Boulevard Louis-Phillippe-Picard / Boulevard Iberville (45.78892, -73.40757) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Year Completed estimated (2006-2008). |
Paq'tnkek,
NS Antigonish Canada |
Afton Rd / Rte 104 WB Ramps (45.59666, -61.73600) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2019 | http://porthawkesburyreporter.com/interchange-officially-opens-in-paqtnkek/ |
Paq'tnkek,
NS Antigonish Canada |
Afton Rd. / Rte 104 EB Ramps / (unknown) (45.59474, -61.73567) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2019 | http://porthawkesburyreporter.com/interchange-officially-opens-in-paqtnkek/ |
Shediac,
NB Westmorland Canada |
Chesley St. / Rte 15 WB Ramps (46.21116, -64.54385) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2018 | Third leg stubbed but will connect to Breaux Bridge St. https://skyscraperpage.com/forum/showthread.php?p=8206255 |
L’Assomption,
QC L'Assomption Regional County Municipality Canada |
Chemin du Golf / Rang Point du Jour N / Boulevard Lafortune (45.83759, -73.41587) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (2002-2005). |
Stratford,
PE Queens Canada |
Trans Canada Hwy. / Hollis Ave. / Georgetown Rd. (46.21811, -63.07865) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | Year Completed estimated (2019-2020). |
Marieholm,
Skåne County Eslöv Sweden |
Rte 17 / Rte 108 / Kvarngatan (55.87589, 13.16170) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Single-Lane |
Built before 2009. | |
Matjhabeng,
Free State Lejweleputswa South Africa |
Craib Ave. / Nathaniel Dr. (-27.93619, 26.80163) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
Tempest Rd. / Jan Hofmeyr Rd. (-27.97304, 26.73351) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
State Way / 3rd St. (-27.99058, 26.75894) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Olds,
AB Division 6 Canada |
Hwy 2A / 68 St. (51.77414, -114.09612) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Single-Lane |
2022 | East leg stubbed. Year Completed estimated (2021-2022). |
Sherbrooke,
QC Sherbrooke Canada |
Rue Terrill / Rue des Grandes-Fourches N (45.40783, -71.89476) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | Previous control type was a grade-separated interchange. https://www.sherbrookerecord.com/new-grandes-fourches-bridge-opens-in-sherbrooke/ |
Charlottetown,
PE Queens Canada |
Hwy 2 (St Peters Rd. [Veteran's Memorial Hwy.]) / Greenwood Dr. / Macwilliams Rd. (46.28108, -63.09860) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Charlottetown,
PE Queens Canada |
Hwy 2 (St Peters Rd. [Veteran's Memorial Hwy.]) / Avonlea Dr. / Oakland Dr. (46.27385, -63.10747) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Charlottetown,
PE Queens Canada |
Hwy 2 (St Peters Rd. [Veteran's Memorial Hwy.]) / Angus Dr. / Hammac Dr. (46.27720, -63.10328) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Kitchener,
ON Waterloo Canada |
Fischer-Hallman Rd. / Bleams Rd. (43.40176, -80.49651) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | Originally constructed as 3x2 roundabout with additional southbound through lane that is marked off by striping and delineators. https://kitchener.ctvnews.ca/kitchener-s-newest-roundabout-closing-for-overnight-paving-1.5935760 |
Stratford,
PE Queens Canada |
Trans Canada Hwy 1 / Lottie Way (46.22429, -63.09089) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.princeedwardisland.ca/en/news/new-roundabout-in-stratford-planned-for-2022-construction-season |
Sylvan Lake,
AB Division 8 Canada |
Hwy 11 (David Thompson Hwy.) / 50 St. / Hwy 781 (52.28232, -114.09704) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Painted spiral in circulatory roadway. Previous control was stop control on south leg and yield control on north leg. Year Completed estimated (2022-2023). |
Sylvan Lake,
AB Division 8 Canada |
Hwy 11 (David Thompson Hwy.) / 60 St. / Range Road 15 (52.28193, -114.12092) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Painted spirals in circulatory roadway. Year Completed estimated (2022-2023). |
Ashford,
England Kent United Kingdom |
A2042 (Romney Marsh Rd.) / A2042 (Bad Munstereifel Rd.) / Ave Jacques Faucheux / Malcolm Sargent Rd. (51.12690, 0.86736) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 59.9646 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Mankato,
MN Blue Earth Co. United States |
CSAH 12 / US 14 EB Ramps (44.17221, -93.92420) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 59.9641 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Nocatee,
FL St. Johns Co. United States |
Town Plaza Ave. / Tavernier Dr. / Village Lake Dr. (30.11136, -81.42140) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.9231 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2008-2010). ICD estimated from Google Maps linework. |
Dussen,
North Brabant Werkendam Netherlands |
N283 / Molenkade (51.72865, 4.96267) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 59.9198 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Huntsville,
AL Madison Co. United States |
John Wright Dr. / Knowledge Dr. / (parking lot) (34.72452, -86.64226) |
Roundabout Existing |
All-Way Yield Other |
4 Approaches 0 Driveways 59.8788 |
Other (At-Grade) Single-Lane |
2007 | Entrance to the University of Alabama in Huntsville (UAH). Year completed estimated (2007-2010, but under construction early 2007). ICD estimated from Google Maps linework. |
Newnan,
GA Coweta Co. United States |
Summerlin Blvd. / Harrison Dr. / Macalester Dr. (33.37722, -84.74667) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 59.8406 |
Other (At-Grade) Single-Lane |
2005 | Functional Class: Local ICD estimated from Google Maps linework. |
Fort Collins,
CO Larimer Co. United States |
US 287-SR 14 / US 287 Business (40.62610, -105.10657) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 59.8267 |
Other (At-Grade) Single-Lane |
2019 | https://www.coloradoan.com/story/news/2019/05/13/highway-287-construction-project-north-fort-collins-cdot/1189772001/ ICD estimated from Google Maps linework. |
Phoenix,
AZ Maricopa Co. United States |
99th Ave. / Lower Buckeye Rd. (33.42116, -112.27260) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.8104 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2005 | ICD estimated from Google Maps linework. |
Warwick,
RI Kent Co. United States |
Veteran's Memorial Dr. / Post Rd. / Post Rd. Extension (41.70266, -71.45475) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.7435 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | New roundabout fully operational and opened in fall 2016. Note that traffic was previously NB only on Post Rd south of the roundbaout, and WB only on VMD, but traffic is now bi-directional in all directions. ICD estimated from Google Maps linework. |
Ribadeo,
Galicia Lugo Spain |
N-634 / N-642 Ramps (43.54127, -7.06795) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 59.7363 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. |