City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Monclova Township,
OH Lucas Co. United States |
Salisbury Rd. / Holloway Rd. / Hidden Ridge Dr. (41.58406, -83.71315) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/story.php/?story_fbid=930610322439407&id=100064713420627&_rdr |
Noblesville,
IN Hamilton Co. United States |
E 141st St. / Promise Rd. (39.99383, -85.97090) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Open August 30, 2024. https://www.noblesville.in.gov/topic/subtopic.php?topicid=645&structureid=1 |
Davenport,
IA Scott Co. United States |
Leclaire St. / E 2nd St. (41.52114, -90.56831) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | Located underneath railroad bridge and connecting to lower deck of bridge over river. https://www.kwqc.com/video/2024/08/09/rock-island-arsenal-davenport-update-progress-government-bridge-traffic-circle/ |
Anoka,
MN Anoka Co. United States |
Thurston Ave. / US 10-US 169 Ramps (45.21253, -93.41300) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Peanut shaped. Node ICDs 140 ft; length 290 ft. Year Completed estimated (2023-2024). |
Clarksville,
TN Montgomery Co. United States |
Needmore Rd. / N Whitfield Rd. (36.58403, -87.33613) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://clarksvillenow.com/local/rhonda-the-roundabout-has-public-debut-city-of-clarksville-adjusting-signage-signal-timing/ |
Braselton,
GA Barrow Co. United States |
GA 211 / I-85 SB Ramps (34.09876, -83.81355) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | https://www.mainstreetnews.com/hwy-211-roundabouts-now-open/article_62a7c036-63cd-11ef-9bd3-3f83a9ac83c9.html |
Braselton,
GA Barrow Co. United States |
GA 211 / Tour de France Dr. / Braselton Pkwy. (34.10000, -83.81382) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.mainstreetnews.com/hwy-211-roundabouts-now-open/article_62a7c036-63cd-11ef-9bd3-3f83a9ac83c9.html |
Winder,
GA Barrow Co. United States |
Jefferson Hwy. (GA 11-GA 211) / GA 211 / Rockwell Church Rd. (34.02523, -83.67649) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2024 | Opened to traffic Dec 2023; construction completed 2024. |
(unincorporated),
GA Paulding Co. United States |
Seven Hills Blvd. / Blackberry Run Dr. / Bent Leaf Dr. (34.02534, -84.78221) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2023-2024). |
Granite Falls,
WA Snohomish Co. United States |
84th St. NE / 163rd Ave. NE (48.07206, -122.01269) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/SnoCoPW/videos/final-touches-are-taking-place-at-the-84th-st-ne-and-163rd-ave-ne-roundabout-in-/2124130604683380/ |
Bremerton,
WA Kitsap Co. United States |
Washington Ave. / Manette Bridge (47.56922, -122.62369) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.youtube.com/watch?v=tD7NviOOFDE |
Corbin,
KY Whitley Co. United States |
Black Diamond Rd. / SR 727 (5th Street Rd.) (36.92753, -84.14583) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2024 | Intersection moved 150-200 feet to the west. |
Crossville,
TN Cumberland Co. United States |
US 70 / SR 392 (Miller Ave.) / SR 101 (Peavine Rd.) (35.95708, -84.98459) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Merging right-turn bypass lanes on all legs. Year Completed estimated (2022-2024). |
Topsham,
ME Sagadahoc Co. United States |
Topsham Fair Mall Rd. / (parking) (43.93146, -69.98109) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | Unfinished leg to the north for future development. |
Thief River Falls,
MN Pennington Co. United States |
US 59 / Center St. E (CR 3) (48.01959, -96.05493) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Norman,
OK Cleveland Co. United States |
N Flood Ave. / James Garner Ave. (35.23491, -97.45350) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.normanstreets.com/projects/james-garner-phase-ll |
New Palestine,
IN Hancock Co. United States |
S 600 W / W 200 S (39.75666, -85.91432) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | Replaced two offset T-intersections. |
Bend,
OR Deschutes Co. United States |
Powell Butte Hwy. / NE Butler Market Rd. (44.09444, -121.20382) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | https://www.youtube.com/watch?v=q0T0f0Cp1z4 |
Bismarck,
ND Burleigh Co. United States |
N 19th St. / E Calgary Ave. (46.84530, -100.76220) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | Painted splitter islands. https://us1033.com/bismarcks-first-mini-roundabout-is-now-open-people-are-freakin/. https://www.youtube.com/watch?v=6m3XF49XU4Q. |
Port Orchard,
WA Kitsap Co. United States |
Mitchell Ave. SE / SE Lincoln Ave. (47.52374, -122.63041) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.kitsapdailynews.com/news/1st-of-2-y-intersection-roundabouts-opens-in-po/ |
Gahanna,
OH Franklin Co. United States |
Taylor Station Rd. / Craycraft Rd. / Research Rd. (39.99250, -82.83997) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://gahanna.gov/CivicAlerts.aspx?AID=214 |
Edwards,
CO Eagle Co. United States |
US 6 / Hillcrest Dr. (39.65388, -106.62911) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.eaglecounty.us/news_detail_T24_R433.php. |
East Rockhill Township,
PA Bucks Co. United States |
W Park Ave. / Three Mile Run Rd. (40.38177, -75.31170) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | https://www.eastrockhilltownship.org/resources/news-announcements/article/?id=8002 |
Genoa Township,
MI Livingston Co. United States |
Challis Rd. / Bauer Rd. (42.54205, -83.81326) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | West leg of Challis Road realigned to south at roundabout. https://www.livingstondaily.com/story/news/local/community/genoa-township/2024/09/02/roundabout-at-challis-bauer-roads-in-genoa-township-now-open/75001158007/ |
St Leo,
FL Pasco Co. United States |
SR 52 / Pompanic St. / College Ave. (28.33559, -82.27027) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | SR 52 makes 90-degree turn at roundabout (south and east legs). https://www.msn.com/en-us/autos/news/new-county-road-52-roundabout-in-pasco-county-now-open/ar-AA1p8sW3?ocid=BingNewsVerp&apiversion=v2&noservercache=1&domshim=1&renderwebcomponents=1&wcseo=1&batchservertelemetry=1&noservertelemetry=1# |
Springfield,
KY Washington Co. United States |
US 150-KY 555 / KY 528 (Lincoln Park Rd.) (37.69899, -85.22166) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Henderson,
KY Henderson Co. United States |
KY 54-KY 351 (2nd St.) / US 41 SB Ramps (37.83090, -87.56729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Raindrop shaped. https://news.wnin.org/2024-07-25/henderson-roundabouts-to-open-soon. |
Henderson,
KY Henderson Co. United States |
KY 351 (2nd St.) / KY 2084 (Southside Dr.) / (entrance to North Middle School) (37.83126, -87.56895) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://news.wnin.org/2024-07-25/henderson-roundabouts-to-open-soon |
Smiths Grove,
KY Warren Co. United States |
KY 101 (Smiths Grove-Scottsville Rd.) / (parking) (37.03988, -86.21051) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Right-turn bypass lane on north leg. Double left turn on west leg. https://www.wnky.com/kytc-announces-smiths-grove-road-projects-near-buc-ees/ |
Syracuse,
NY Onondaga Co. United States |
E Brighton Ave. / E Glen Ave. / I-481 WB Exit Ramp / I-81 NB Entrance Ramp (43.00895, -76.13260) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
2024 | https://dailyorange.com/2024/09/new-york-transportation-completes-syracuse-roundabout/ |
Cave Spring,
VA Roanoke Co. United States |
Starkey Rd. / Buck Mountain Rd. (37.20302, -79.99099) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | https://www.vdot.virginia.gov/projects/salem-district/route-904-starkey-road-and-route-679-buck-mountain-road-roundabout----roanoke-county/ |
Plain City,
OH Union Co. United States |
Industrial Pkwy. / Mitchell-Dewitt Rd. (40.14221, -83.21567) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Rogers,
AR Benton Co. United States |
S 52nd St. / W Oak St. / W Metro Park Crossing (36.32797, -94.18675) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.5newsonline.com/article/news/local/oak-street-overpass-rogers-open-two-years-construction/527-0586afae-17c6-4a62-a3cc-bbda5e891e86 (advance the video to 1:30 to see a nice aerial picture of the roundabout) |
Easley,
SC Pickens Co. United States |
Crestview Rd. / Sheffield Rd. (34.80448, -82.54993) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Completed August 2024. https://www.foxcarolina.com/video/2024/06/15/construction-roundabout-easley-causes-significant-backups/ |
Port Ludlow,
WA Jefferson Co. United States |
SR 104 / SR 19 (Beaver Valley Rd.) (47.89014, -122.73245) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2024 | Through lane bypass on west leg. https://www.facebook.com/groups/porttownsendchat/posts/the-highway-104-and-19-roundabout-is-open-in-all-directions/1440699556614168/?_rdr |
Doylestown Township,
PA Bucks Co. United States |
New Britain Rd. / S Easton Rd. (southbound) (40.29104, -75.12883) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2024 | |
Doylestown Township,
PA Bucks Co. United States |
New Britain Rd. / S Easton Rd. (northbonud) (40.29072, -75.12772) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Gardner,
MA Worcester Co. United States |
Central St. / Green St. / Pearl St. / Elm St. (42.57964, -71.98623) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2024 | |
Templeton,
MA Worcester Co. United States |
Rte 2A (Patriots Rd.) / N Main St. / S Main St. / Gardner Rd. (42.56238, -72.03744) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | |
Waxhaw,
NC Union Co. United States |
SR 200 (Lancaster Hwy.) / Potter Rd. / Marvin Fowler Rd. (34.86694, -80.68273) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2024 | https://www.wbtv.com/2024/10/09/waxhaw-intersection-close-roundabout-construction/. |
Mount Pleasant,
SC Charleston Co. United States |
Lexington Dr. / All American Blvd. (32.86559, -79.78774) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024) |
Page,
AZ Coconino Co. United States |
US 89 / N Lake Powell Blvd. / Scenic View Dr. (36.92559, -111.47206) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2024 | Elliptical shaped. ICD = 160 ft x 135 ft. |
Wade,
NC Cumberland Co. United States |
Wade-Stedman Rd. / Elva Wallace Rd. (35.16039, -78.71954) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | |
Rocky Mount,
NC Nash Co. United States |
N Old Carriage Rd. / Green Hills Rd. / Reges Store Rd. (35.98950, -77.90142) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | https://www.rockymounttelegram.com/news/local/intersection-in-northern-nash-county-to-close-to-construct-new-roundabout/article_cb2ec944-65a6-11ef-9297-b7f16df6e1ad.html |
Williamston,
SC Anderson Co. United States |
US 29 / Welcome Rd. / Crappie Dr. (34.62087, -82.53513) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://info2.scdot.org/projects/ViewerFiles/DRAFT%20US29%20and%20Welcome%20Road%20handout%2002182022.pdf https://www.independentmail.com/story/news/local/2024/02/21/scdot-begins-project-in-anderson-county-intersection-of-us-29-and-s-96/72424556007/ |
Dade City,
FL Pasco Co. United States |
US 98-US 301 Bypass / Old Lakeland Hwy. / (parking) (28.35921, -82.18200) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Previous control was a merge lane on northbound; use a side street for southbound. https://www.facebook.com/MyFDOTTampa/posts/-project-progress-us-98-bypass-roundabout-is-opendade-city-a-new-roundabout-open/1001085718724813/ |
Fredericton,
NB York Canada |
Rte 148 (Saint Marys St.) / Brookside Dr. / (parking) (46.01356, -66.63085) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2024 | RRFB on north leg only. https://www.facebook.com/100063795853960/posts/beginning-next-wednesday-august-7th-construction-will-begin-on-the-brookside-dri/974103448059508/?_rdr |
Gaylord,
MI Otsego County United States |
S Otsego Ave. (I-75 Business) / McCoy Rd. W (45.00258, -84.67734) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.michigan.gov/mdot/news-outreach/pressreleases/2024/07/03/traffic-changes-for-i-75-bl-south-otsego-ave-project-in-gaylord-start-july-9 |
Kitchener,
ON Waterloo Canada |
Fischer Hallman Rd. / Rosenberg Way (43.39622, -80.49481) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Yield-controlled right-turn bypass lanes on north and west legs. https://www.regionofwaterloo.ca/en/living-here/fischer-hallman-bleams-to-plains.aspx |
Kitchener,
ON Waterloo Canada |
Fischer Hallman Rd. / Wallaceton Way (43.37951, -80.48783) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.regionofwaterloo.ca/en/living-here/fischer-hallman-bleams-to-plains.aspx |
Kitchener,
ON Waterloo Canada |
Rosenberg Way / Abram Clemens St. (43.39570, -80.49768) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Kitchener,
ON Waterloo Canada |
Bleams Rd. / Commonwealth St. / Abram Clemens St. (43.40059, -80.50162) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.regionofwaterloo.ca/en/living-here/bleams-road-fischer-hallman-to-trussler.aspx |
Easley,
SC Pickens County United States |
SC 135 (Dacusville Hwy.) / Jameson Rd. (34.90548, -82.60143) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://info2.scdot.org/projects/ViewerFiles/P039384_Project%20Handout_05.27.2021.pdf |
Golden Valley,
MN Hennepin County United States |
STH 55 (Olson Hwy) Service Rd. / Douglas Dr. (44.98385, -93.36023) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2024 | https://www.goldenvalleymn.gov/395/Douglas-Drive-Highway-55-Intersection |
Boiling Springs,
SC Spartanburg County United States |
Sugar Ridge Rd. / Clark Rd. (35.05989, -82.02370) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/photo.php?fbid=660831062759092&id=100064966113442&set=a.343020981206770 |
Boiling Springs,
SC Spartanburg County United States |
Clark Rd. / Seay Rd. (35.05945, -82.01234) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2024-2025). https://www.wspa.com/news/local-news/look-alive-more-road-work-coming-to-the-upstate/ |
Shakopee,
MN Scott County United States |
Eagle Creek Blvd / Vierling Dr (44.78342, -93.48206) |
Roundabout Existing |
All-Way Yield Other |
4 Approaches 0 Driveways 15.2400 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Double left-turn on north leg. Other control is warning lights that emergency vehicles are approaching. See the video for them. https://www.youtube.com/watch?v=vMYxApGIW7E |
Hastings,
MN Dakota County United States |
160th St. E (CR 46) / Goodwin Ave. (CR 85) (44.71686, -92.95405) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.hastingsjournal.news/stories/county-road-46-expected-to-open-by-the-end-of-the-week,113462 |
Billings,
MT Yellowstone County United States |
Rimrock Rd. / 62nd St. W (45.79864, -108.67362) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/trailnetbillings/photos/top-the-roundabout-at-rimrock-and-62nd-street-west-above-heading-east-on-rimrock/1087984726704259/?_rdr |
Castle Pines,
CO Douglas County United States |
E Happy Canyon Rd. / Lagae Rd. (39.45014, -104.87819) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://coloradocommunitymedia.com/2024/06/27/castle-pines-lagae-happy-canyon-road-roundabout-open/ |
Post Falls,
ID Kootenai County United States |
E 4th Ave. / N Idaho St. (47.71101, -116.93727) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Cartersville,
VA Cumberland County United States |
SR 45 (Cartersville Rd.) / Columbia Rd. (37.65869, -78.12544) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://farmvilleherald.com/2024/03/work-continues-on-cartersville-roundabout-with-end-date-set/ |
Moreland,
GA Coweta County United States |
US 29 / US 27 Alternate / Harris Rd. / Ralph Evans Rd. (33.27899, -84.76548) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | Traffic from the west (Harris Rd) must turn right before entering the roundabout. https://www.facebook.com/reel/385831194453450/ |
Derry Township,
PA Dauphin County United States |
Bachmanville Rd. / Homestead Rd. (40.26233, -76.63657) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2024 | |
Lower Sackville,
NS Halifax Canada |
Glendale Ave. / Hwy 102 SB Ramps (44.75648, -63.64662) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 72.0000 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2024 | https://news.novascotia.ca/en/2024/12/20/new-highway-connects-sackville-bedford-burnside |
Lower Sackville,
NS Halifax Canada |
Duke St. / Hwy 102 NB Ramps / Hwy 107 (44.75484, -63.64417) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 65.0000 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2024 | https://news.novascotia.ca/en/2024/12/20/new-highway-connects-sackville-bedford-burnside |
Burnside,
NS Halifax Canada |
Burnside Dr. / Hwy 107 WB Entrance Ramp (44.72592, -63.59776) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 60.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2024 | https://news.novascotia.ca/en/2024/12/20/new-highway-connects-sackville-bedford-burnside |
Burnside,
NS Halifax Canada |
Burnside Dr. / Hwy 107 WB Exit Ramp (44.72429, -63.59823) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 65.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2024 | https://news.novascotia.ca/en/2024/12/20/new-highway-connects-sackville-bedford-burnside |
Johns Island,
SC Charleston Co. United States |
Fenwick Hall Alley / Bernice Robinson Way (32.74886, -80.03425) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Aerial image obscured by trees. Year Completed estimated (2023-2024). |
Bettendorf,
IA Scott Co. United States |
Middle Rd. / Competition Dr. (41.59159, -90.45915) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2023-2025). |
North Port,
FL Sarasota Co. United States |
US 41 (S Tamiami Trl.) / Wellen Park Blvd. (27.04947, -82.32793) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://westvillagesid.org/us41improvementproject/ |
Jackson,
WI Washington Co. United States |
STH 60 (Main St.) / Eagle Dr. (43.32370, -88.15001) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://villageofjacksonwi.gov/DocumentCenter/View/944/Update-24-04-17-Eagle-Dr-Closure-PDF |
Rehoboth,
MA Bristol Co. United States |
US 44 (Winthrop St.) / Rte 118 (Anawan St. / Bay State Rd.) (41.85467, -71.23881) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2024-2025). |
Sevierville,
TN Sevier Co. United States |
Gateway Blvd / Buc-ee's Blvd. (north) (35.98354, -83.60111) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2021-2024). |
Selma,
NC Johnston Co. United States |
US 70 Alternate / W Providence Blvd. / Absher Rd. (35.51780, -78.28264) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2024 | Add-lane right-turn bypass lane on west and south legs. |
Selma,
NC Johnston Co. United States |
W Providence Blvd. / Absher Rd. (35.52057, -78.28225) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Airway Heights,
WA Spokane Co. United States |
US 2 (W Sunset Hwy.) / S Lyons Rd. (47.64293, -117.57159) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | |
Mason,
OH Warren Co. United States |
US 42 / Mason Morrow Millgrove Rd. (39.37785, -84.27915) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2022-2024). |
Mason,
OH Warren Co. United States |
US 42 / Bethany Rd. (39.37696, -84.28220) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2022-2024). |
El Cajon,
CA San Diego Co. United States |
El Cajon Blvd. / S Johnson Ave. (32.79159, -116.97107) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2024 | Peanut shaped. Nodes 105 ft diameter; length 205 ft. https://www.elcajon.gov/your-government/departments/public-works/projects/el-cajon-boulevard-roundabout-and-streetscape |
Independence,
MI Oakland Co. United States |
S Baldwin Rd, / Clarkston Rd. / W Clarkston Rd. (42.76543, -83.31409) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Elliptical shaped. Opened August 2024. https://www.rcocweb.org/675/Baldwin-RoadClarkston-Road-Roundabout-Op |
Santa Barbara,
CA Santa Barbara Co. United States |
Olive Mill Rd. / Coast Village Rd. / N Jameson Ln. / US 101 Ramps (34.42156, -119.63993) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 46.3296 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Opened May 2024. https://www.youtube.com/watch?v=QKQzLS7q3iw |
Montecito,
CA Santa Barbara Co. United States |
San Ysidro Rd. / N Jameson Ln. / US 101 NB Ramps (34.42287, -119.63152) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 53.6445 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | This is an unique kidney shaped single-lane roundabout (approx. varying ICD 176' x 116'). Opened May 2024. https://www.youtube.com/watch?v=QKQzLS7q3iw |
(unincorporated),
WA King Co. United States |
Redmond Ridge Dr. / NE Alder Crest Dr. (47.69211, -122.03572) |
Roundabout Unknown |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://kingcounty.gov/en/dept/local-services/transit-transportation-roads/roads-and-bridges/projects-and-programs/redmond-ridge-dr-ne-roundabout (open to traffic, but final paving delayed by weather until Spring 2024) |
Frisco,
TX Denton Co. United States |
Annandale Way / Samuel Way (33.18818, -96.84857) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2024 | The street names on the Bing base map are incorrect - correct street names in this record. |
Tallevast,
FL Manatee Co. United States |
Tuttle Ave. / Whitfield Ave. (27.41960, -82.51325) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://tuttle-ave-and-whitfiled-ave-roundabout-manateegis.hub.arcgis.com/ |
Severance,
CO Weld Co. United States |
CR 74 / CR 33 (40.52430, -104.75593) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://northfortynews.com/category/news/work-complete-weld-county-road-74-33-roundabout-now-open/ |
Irvington,
AL Mobile Co. United States |
SR 188 / Irvington Bayou La Batre Hwy. (30.42821, -88.24595) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.wlox.com/video/2024/01/24/bayou-la-batre-roundabout-open-today/ |
Zionsville,
IN Boone Co. United States |
W Oak St. / S 800 E (39.94965, -86.31676) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://youarecurrent.com/2024/02/15/new-roundabout-opens-at-zionsville-intersection/ |
Kokomo,
IN Howard Co. United States |
Smith Rd. (CR 300N) / Sparks Rd. (CR 50E) (40.52021, -86.11715) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Frisco,
TX Denton Co. United States |
Teel Pkwy. / Fields Pkwy. (33.19990, -96.86863) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | |
Frisco,
TX Denton Co. United States |
Fields Pkwy. / Edmonds St. (33.20027, -96.85311) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.3296 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | |
Frisco,
TX Denton Co. United States |
Fields Pkwy. / Verde Meadows Dr. (33.19984, -96.84935) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | |
(unincorporated),
TX Fort Bend Co. United States |
Cross Creek West Blvd. / Fulshear Bend Dr. (29.72055, -95.91471) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2024 | |
McCordsville,
IN Hancock Co. United States |
Mount Comfort Rd. / W 400 N (39.84148, -85.91530) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2024 | |
McCordsville,
IN Hancock Co. United States |
Mount Comfort Rd. / Airport Blvd. / W Airport Blvd. (39.84309, -85.91530) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2024 | |
McCordsville,
IN Hancock Co. United States |
Mount Comfort Rd. / Enterprise Dr. (39.85252, -85.91544) |
Roundabout Unknown |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2024 | |
Greenville,
NC Pitt Co. United States |
W 5th St. / 14th Ave. / Tyson St. (35.61294, -77.38683) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2024 | https://www.reflector.com/news/local/new-traffic-circle-welcomes-fifth-street-motorists/article_00a1eca6-f341-11ee-9098-bf9358b17966.html |
Spring Hill,
AL Pike Co. United States |
SR 167 / SR 87 / Carson Waters Rd. (31.67707, -85.95737) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2024 | Peanut shaped. Node ICDs are 140 ft; length is 485 ft. https://www.troymessenger.com/2024/03/25/drone-footage-of-new-pike-county-roundabout/ |
Lakeland,
FL Polk Co. United States |
SR 542 (W Main St.) / US 92 Business (N Sloan Ave.) / Lake Beulah Dr. (28.04224, -81.96944) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2024 | https://www.lkldnow.com/five-points-roundabout-is-three-months-ahead-of-schedule-but-faulty-utility-info-added-151k/ |