29867 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways / ICD (m) Functional Class /
LaneType
Year Completed Comments
Finnveden, Jönköping County
Värnamo
Sweden
Malmövägen / Rte 27 WB Ramps
(57.16874, 14.06233)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
32.0040
Freeway Ramps (Grade-Separated)
Single-Lane
2013 Year Completed estimated (2012-2014).
Värnamo, Jönköping County
Värnamo
Sweden
Rte 27 / E4-Rte 84 SB Ramps
(57.16575, 14.06992)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
60.9600
Freeway Ramps (Grade-Separated)
Single-Lane
2008 Completed before 2009.
Kaptensgården, Jönköping County
Värnamo
Sweden
Bredastensvägen / E4 NB Ramps
(57.16254, 14.07496)
Roundabout
Existing
All-Way Yield
None
3 Approaches
1 Driveways
54.8640
Freeway Ramps (Grade-Separated)
Single-Lane
2008 Completed before 2009.
Värnamo, Jönköping County
Värnamo
Sweden
Gotavägen / Rte 27 WB Ramps / Fornminnesvägen
(57.16938, 14.03289)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
33.5280
Freeway Ramps (Grade-Separated)
Single-Lane
2013 Year Completed estimated (2011-2014).
Hulje, Östergötland County
Mjölby
Sweden
Rte 50 / E4 EB Ramps
(58.32543, 15.09463)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
36.5760
Freeway Ramps (Grade-Separated)
Single-Lane
2012 Raindrop shaped. Year Completed estimated (2012-2013).
Hulje, Östergötland County
Mjölby
Sweden
Kungsvägen / Rte 50 NB Ramps / Hagalundsgatan
(58.33667, 15.10513)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
73.1520
Freeway Ramps (Grade-Separated)
Single-Lane
2012
Mjölby, Östergötland County
Mjölby
Sweden
Kungsvägen / Rte 50 SB Ramps
(58.33732, 15.10334)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2011 Raindrop shaped.
Mörrum, Blekinge County
Karlshamns kommun
Sweden
Pukaviksvägen / E22 NB Rapms
(56.16762, 14.67657)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
38.1000
Freeway Ramps (Grade-Separated)
Single-Lane
2015 Raindrop shaped.
Mörrum, Blekinge County
Karlshamns kommun
Sweden
Pukaviksvägen / E22 SB Ramps
(56.16834, 14.67366)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
38.1000
Freeway Ramps (Grade-Separated)
Single-Lane
2016 Raindrop shaped.
Durango, CO
La Plata Co.
United States
US 550 / US 160 WB Ramps / US 160 EB Exit Ramp / Wilson Gulch Dr.
(37.22978, -107.83943)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
64.0080
Freeway Ramps (Grade-Separated)
Multilane (3+ Lane)
2014 Year Completed estimated (2011-2014). North leg added 2014-2017. US 550 added in 2024, although that uses the same leg as US 160 EB. https://www.durangoherald.com/articles/u-s-highway-550-connection-finally-opens-in-durango/
Durango, CO
La Plata Co.
United States
US 550 / US 160 EB Entrance Ramp
(37.22666, -107.83949)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Unknown
2024 https://www.facebook.com/coloradodot/videos/grandview-interchange-us-550-us-160-durango-on-monday-715-many-motorists-travele/853241030015092/
Penrose, CO
Fremont Co.
United States
SR 115 / US 50 EB Ramps
(38.41802, -105.04263)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 https://krdo.com/news/top-stories/2024/07/02/traffic-roundabout-now-open-at-interchange-of-us-50-highway-115-in-fremont-county/
Fremont, NE
Dodge Co.
United States
US 77 / US 275 NB Ramps / Old Highway 8
(41.40473, -96.44391)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
50.2920
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped. Year Completed estimated (2021-2024).
Fremont, NE
Dodge Co.
United States
US 77 / US 275 SB Ramps
(41.40474, -96.44633)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
48.7680
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped. Yield-controlled right-turn-only lane on west leg. Year Completed estimated (2021-2024).
Helena, MT
Lewis and Clark Co.
United States
SR 279 (Lincoln Rd. E) / I-15 NB Ramps
(46.70444, -112.01118)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
32.0040
Freeway Ramps (Grade-Separated)
Single-Lane
2022 Raindrop shaped. Right-turn-only lane on south leg. Year Completed estimated (2021-2024).
Tumwater, WA
Thurston Co.
United States
6th Ave. SW / I-5 NB Ramps
(46.99904, -122.91042)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
36.5760
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 Yield-controlled right-turn bypass lane with low entry angle on north leg. Left-turn-only lane on south leg. https://www.facebook.com/cityoftumwater/videos/roundabouts/851059580420485/
Kirkland, WA
King Co.
United States
NE 132nd St. / Totem Lake Blvd. NE / 116th Ave. NE / I-405 NB Entrance Ramp
(47.71844, -122.18653)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
36.5760
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://wsdot.wa.gov/construction-planning/search-projects/i-405northeast-132nd-street-interchange-project
Kirkland, WA
King Co.
United States
NE 132nd St. / 116th Way NE / I-405 SB Exit Ramp / 114th Pl. NE
(47.71843, -122.18834)
Roundabout
Existing
All-Way Yield
Rectangular Rapid Flashing Beacon (RRFB)
5 Approaches
0 Driveways
42.6720
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x2 max)
2024 https://wsdot.wa.gov/construction-planning/search-projects/i-405northeast-132nd-street-interchange-project
Portage Township, OH
Ottawa Co.
United States
SR 53 (Catawba Rd.) / SR 2 Ramps
(41.50681, -82.85952)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 https://sanduskyregister.com/news/522707/recognizing-the-roundabout/
Anoka, MN
Anoka Co.
United States
Thurston Ave. / US 10-US 169 Ramps
(45.21253, -93.41300)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.6720
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Peanut shaped. Node ICDs 140 ft; length 290 ft. Year Completed estimated (2023-2024).
Braselton, GA
Barrow Co.
United States
GA 211 / I-85 SB Ramps
(34.09876, -83.81355)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 https://www.mainstreetnews.com/hwy-211-roundabouts-now-open/article_62a7c036-63cd-11ef-9bd3-3f83a9ac83c9.html
Newport, MI
Monroe Co.
United States
Swan Creek Rd. / I-75 NB Ramps
(42.00419, -83.31263)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/.
Newport, MI
Monroe Co.
United States
Swan Creek Rd. / Newport Rd. / I-75 SB Ramps
(42.00705, -83.31515)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Yield-controlled right-turn bypass lane on southwest leg. Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/.
Henderson, KY
Henderson Co.
United States
KY 54-KY 351 (2nd St.) / US 41 SB Ramps
(37.83090, -87.56729)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Raindrop shaped. https://news.wnin.org/2024-07-25/henderson-roundabouts-to-open-soon.
Syracuse, NY
Onondaga Co.
United States
E Brighton Ave. / E Glen Ave. / I-481 WB Exit Ramp / I-81 NB Entrance Ramp
(43.00895, -76.13260)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Unknown
2024 https://dailyorange.com/2024/09/new-york-transportation-completes-syracuse-roundabout/
Lincoln, NE
Lancaster Co.
United States
S 82nd St. / SR 2 WB Ramps
(40.69395, -96.60874)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
60.9600
Freeway Ramps (Grade-Separated)
Single-Lane
2022
Lincoln, NE
Lancaster Co.
United States
S 84nd St. / SR 2 EB Ramps
(40.69054, -96.61087)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
60.9600
Freeway Ramps (Grade-Separated)
Single-Lane
2022
Lincoln, NE
Lancaster Co.
United States
Jamaica Ave. / SR 2 WB Ramps
(40.69198, -96.67250)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
57.9120
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped.
LIncoln, NE
Lancaster Co.
United States
Jamaica Ave. / SR 2 EB Ramps
(40.69029, -96.67110)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
57.9120
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped.
Henderson, KY
Henderson Co.
United States
KY 54-KY 351 (2nd St.) / US 41 NB Ramps
(37.83052, -87.56569)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
2024 Raindrop shaped. Replaces PARCLO B ramp with diamond ramp and shifts intersection approximately 200 ft west.
Ironton, OH
Lawrence Co.
United States
SR 93 (Park Ave.) / US 52 EB Ramps
(38.53856, -82.67758)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2023 https://www.facebook.com/photo.php?fbid=611157614528583&id=100069030495739&set=a.176172631360419
Ironton, OH
Lawrence Co.
United States
SR 93 (Park Dr.) / US 52 WB Ramps
(38.53950, -82.67593)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2023 https://www.facebook.com/photo.php?fbid=611157614528583&id=100069030495739&set=a.176172631360419
Findlay, OH
Hancock Co.
United States
US 68 / SR 15 EB Ramps / CR 80
(40.98862, -83.65067)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 New exit ramp from SR 15 coming in from the east. Former exit ramp from SR 15 (from the west) is now connected to County Road 80. https://wfin.com/local-news/opening-of-new-findlay-roundabout-pushed-back-a-few-days/ .
San Juan, San Juan
Oriente Barrio
Puerto Rico
Calle A (Marginal Rd.) / Hwy 17 EB Entrance Ramp
(18.40897, -66.02947)
Roundabout
Existing
All-Way Yield
None
2 Approaches
0 Driveways
44.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x2 max)
2014 Concentric striped circulatory roadway.
Northfield, MN
Rice Co.
United States
Lonsdale Blvd. W (SR 19 / CR 46) / I-35 NB Ramps / Anoka Ave. / Hazelwood Ave.
(44.47181, -93.29085)
Roundabout
Existing
All-Way Yield
Unknown
5 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Combines a 4-way intersection with a freeway interchange ramp terminal intersection. https://www.ricecountymn.gov/CivicAlerts.aspx?AID=969
New Castle, DE
New Castle Co.
United States
Airport Rd. / I-95 NB Exit Ramp
(39.69593, -75.61570)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 https://www.facebook.com/FirstStateUpdate1/photos/-i-95-offramp-to-airport-road-has-re-opened-after-new-roundabout-installed-/1135316878598748/?_rdr
Oak Level Township, NC
Nash Co.
United States
N Old Carriage Rd. / US 64 EB Ramps
(35.98033, -77.89689)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
51.8160
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html
Oak Level Township, NC
Nash Co.
United States
N Old Carriage Rd. / US 64 WB Ramps
(35.98205, -77.89806)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
51.8160
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html
Oak Level Township, NC
Nash Co.
United States
Sunset Ave. / I-95 SB Ramps / Freight Rd.
(35.96924, -77.88406)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
51.8160
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html.
Oak Level Township, NC
Nash Co.
United States
Sunset Ave. / I-95 NB Ramps
(35.96838, -77.88020)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
51.8160
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html.
Wentzville, MO
St. Charles Co.
United States
Veterans Memorial Pkwy. / I-70 EB Ramps / Ruggeri Rd.
(38.80935, -90.87713)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Year Completed estimated (2023-2024).
Green Oak Township, MI
Livingston Co.
United States
Whitmore Lake Rd. / Silver Lake Rd. / US 23 SB Ramps
(42.46683, -83.75719)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
1 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024
Lodi, WI
Columbia Co.
United States
STH 60 / I-90 WB Ramps
(43.33575, -89.45242)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Placed PARCLO B interchange ramps with diamond ramps. https://x.com/WisconsinDOT/status/1811030212756357174.
Lodi, WI
Columbia Co.
United States
STH 60 / I-90 EB Ramps
(43.33478, -89.45497)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Placed PARCLO B interchange ramps with diamond ramps. https://x.com/WisconsinDOT/status/1811030212756357174
New Iberia, LA
Iberia Par.
United States
LA 88 (Coteau Rd.) / US 90 WB Ramps
(30.05086, -91.92829)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
47.2440
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2023 Left-turn-only lane on west leg; merging right-turn bypass lane on east leg; right-turn-only lane on south leg. https://www.katc.com/news/construction-of-roundabouts-continues-in-iberia-parish
New Iberia, LA
Iberia Par.
United States
LA 88 (Coteau Rd.) / US 90 EB Ramps
(30.05083, -91.92975)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
47.2440
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2023 Left-turn-only lane on east leg; merging right-turn bypass lane on west leg; right-turn-only lane on north leg. https://www.katc.com/news/construction-of-roundabouts-continues-in-iberia-parish
New Ulm, MN
Nicollet Co.
United States
CSAH 37 / US 14 WB Ramps
(44.30186, -94.42165)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
44.1960
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped. Year Completed estimated (2021-2024).
New Ulm, MN
Nicollet Co.
United States
CSAH 37 / US 14 EB Ramps
(44.30098, -94.42365)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
44.1960
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped. Year Completed estimated (2021-2024).
Winnipeg, MB
Division 11
Canada
St Marys Rd. / Perimeter Hwy. WB Ramps
(49.79669, -97.11296)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
Freeway Ramps (Grade-Separated)
Single-Lane
2024
Winnipeg, MB
Division 11
Canada
St Marys Rd. / Perimeter Hwy. EB Ramps
(49.79151, -97.10948)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
Freeway Ramps (Grade-Separated)
Single-Lane
2024
Napa, CA
Napa Co.
United States
Soscol Ferry Rd. / SR 221 / SR 12 EB Ramps
(38.24117, -122.26975)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
47.2440
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/soscol-junction
Napa, CA
Napa Co.
United States
SR 221 (Napa Vallejo Hwy.) / SR 12 WB Entrance Ramp
(38.24207, -122.26930)
Roundabout
Existing
All-Way Yield
None
2 Approaches
0 Driveways
44.1960
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/soscol-junction
Evergreen, CO
Clear Creek Co.
United States
US 40 / Homestead Rd. / I-70 WB Entrance Ramp
(39.72195, -105.40944)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Through bypass lane on east leg. Year Completed estimated (2023-2024). https://www.codot.gov/projects/i70floydhill/earlyprojects.
(unincorporated), CO
Jefferson Co.
United States
US 40 / CR 65 / I-70 WB Exit Ramp
(39.71621, -105.39166)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Year Completed estimated (2023-2024). https://www.codot.gov/projects/i70floydhill/earlyprojects.
Valdosta, GA
Lowndes Co.
United States
SR 31 (Madison Hwy.) / I-75 NB Ramps
(30.75206, -83.27321)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Unknown
2025 https://valdostatoday.com/news-2/local/2025/02/lowndes-i75-exit-11-traffic-to-begin-using-roundabouts/
Valdosta, GA
Lowndes Co.
United States
SR 31 (Madison Hwy.) / I-75 SB Ramps
(30.75023, -83.27416)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Unknown
2025 https://valdostatoday.com/news-2/local/2025/02/lowndes-i75-exit-11-traffic-to-begin-using-roundabouts/
Lake Park, GA
Lowndes Co.
United States
Lake Park Bellville Rd. / I-75 NB Ramps
(30.64409, -83.18847)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Unknown
2022 https://wfxl.com/news/local/traffic-pattern-change-expected-in-lowndes-county-on-i-75-exit-2
Lake Park, GA
Lowndes Co.
United States
Lake Park Bellville Rd. / I-75 SB Ramps
(30.64297, -83.18993)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2022 https://wfxl.com/news/local/traffic-pattern-change-expected-in-lowndes-county-on-i-75-exit-2
Hemel Hempstead, England
Herts
United Kingdom
A4251 (London Rd.) / A41 EB Ramps
(51.74489, -0.51312)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
Hemel Hempstead, England
Herts
United Kingdom
A414 (Two Waters Way) / A41 EB Ramps
(51.73648, -0.47996)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
Raindrop shaped.
Hemel Hempstead, England
Herts
United Kingdom
A414 (Two Waters Way) / A41 WB Ramps
(51.73616, -0.48168)
Roundabout
Existing
All-Way Yield
Unknown
2 Approaches
0 Driveways
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
Raindrop shaped.
Hemel Hempstead, England
Herts
United Kingdom
A4251 (London Rd.) / A41 WB Ramps
(51.74372, -0.51106)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
Atlanta, GA
DeKalb Co.
United States
Maynard Terrace SE / McPherson Ave. / I-20 EB Exit Ramp
(33.74396, -84.33482)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
41.1480
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x2 max)
2025
Shelby, NC
Cleveland Co.
United States
NC-150 (Cherryville Rd.) / Shelby Bypass EB Ramps
(35.31324, -81.49081)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
48.7680
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 Year Completed estimated (2022-2024).
Shelby, NC
Cleveland Co.
United States
NC-150 (Cherryville Rd.) / Shelby Bypass WB Ramps
(35.31432, -81.48908)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
48.7680
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 Year Completed estimated (2022-2024).
Hamilton, ON
Hamilton
Canada
Hwy 52 / Hwy 403 WB Ramps
(43.20276, -80.04528)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Year Completed estimated (2021-2025).
Hamilton, ON
Hamilton
Canada
Hwy 52 / Hwy 430 EB Ramps
(43.19974, -80.04435)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
45.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Year Completed estimated (2021-2025).