|
City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
|---|---|---|---|---|---|---|---|
|
Brighton,
NY Monroe Co. United States |
E Henrietta Rd. / (unklnown) (43.09657, -77.60624) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2014 | Merging right-turn bypass lane on south leg. |
|
Canandaigua,
NY Ontario Co. United States |
CR 46 / Smith Rd. (42.88614, -77.22771) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2020-2023). |
|
Moseley,
VA Chesterfield Co. United States |
SR 604 (Genito Rd.) / Otterdale Rd. (37.44694, -77.70821) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
|
Matoaca,
VA Chesterfield Co. United States |
Matoaca Rd. / Hickory Rd. (37.26110, -77.48372) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2021). |
|
Goose Creek,
SC Berkeley Co. United States |
Alder Dr. / Clayburne Dr. (33.01052, -80.01501) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). |
|
Mount Pleasant,
SC Charleston Co. United States |
Harry M Hallman Jr Blvd. / Bayfront Dr. / Grafton St. (32.79978, -79.90208) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2016). |
|
Charleston,
SC Charleston Co. United States |
St Johns Woods Pkwy. / Edwins Crossing (32.72292, -80.06569) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (2002-2003). |
|
Farragut,
TN Knox Co. United States |
Northshore Dr. / Choto Rd. (35.82968, -84.16750) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2014-2015). |
|
Farragut,
TN Knox Co. United States |
Iron Plow Dr. / Branch Hook Rd. / Wagon Hitch Rd. (west) (35.84614, -84.18296) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2024). |
|
Farragut,
TN Knox Co. United States |
Iron Plow Dr. / Branch Hook Rd. / Wagon Hitch Rd. (east) (35.84531, -84.18085) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2024). |
|
Bossier City,
LA Bossier Par. United States |
Walter O. Bigby Carriageway / Hamilton Rd. (32.52940, -93.72630) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://www.shreveporttimes.com/story/news/local/2024/10/01/walter-o-bigby-carriageway-opens-in-bossier-city/75455416007/ |
|
Bossier City,
LA Bossier Par. United States |
Walter O. Bigby Carriageway / Shed Rd. (32.53213, -93.72376) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://www.shreveporttimes.com/story/news/local/2024/10/01/walter-o-bigby-carriageway-opens-in-bossier-city/75455416007/ |
|
Lincoln,
NE Lancaster Co. United States |
W A St. / SW 31st St. (40.79933, -96.76701) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | https://www.lincoln.ne.gov/files/sharedassets/public/v/1/ltu/projects/westa/2024-05-30-displays.pdf |
|
Cedar Rapids,
IA Linn Co. United States |
Ellis Blvd. NW / F Ave. NW (41.97904, -91.68202) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://www.facebook.com/Matthew25MinistryHub/posts/the-roundabout-at-f-ave-and-ellis-blvd-near-the-cultivate-hope-corner-store-is-n/5906539946051568/ |
|
Hortonville,
WI Outagamie Co. United States |
STH 15 (Greenville Dr.) / CR JJ (W Broadway Dr.) (44.32965, -88.60005) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Yield-controlled right-turn bypass lane on southwest leg. Intersection was moved about 400 feet to the southeast. Year Completed estimated (2023-2024). |
|
Hortonville,
WI Outagamie Co. United States |
STH 15 / CR T (44.34801, -88.67547) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2023-2024). https://projects.511wi.gov/wis15expand/full-project-overview/ |
|
Dover,
WI Racine Co. United States |
US 45 (N Raynor Ave. / Washington Ave.) / STH 20 (Washington Ave.) / N Raynor Ave. (42.74204, -88.07155) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2023 | https://racinecountyeye.com/2023/05/03/highway-20-resurfacing-project/ |
|
Lincoln,
NE Lancaster Co. United States |
W A St. / SW 36th St. (40.79929, -96.77267) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | https://www.lincoln.ne.gov/files/sharedassets/public/v/1/ltu/projects/westa/2024-05-30-displays.pdf |
|
Lake Cormorant,
MS De Soto Co. United States |
SR 301 / Star Landing Rd. (34.90410, -90.10037) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | https://mdot.ms.gov/portal/news_release_view/1575 |
|
Town of Maine,
WI Marathon Co. United States |
CR K / CR WW (45.02727, -89.69047) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
|
Mineral,
VA Louisa Co. United States |
US 522 (Zachary Taylor Hwy.) / SR 208 (New Bridge Rd.) (38.08007, -77.87956) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | West leg stubbed. Year Completed estimated (2024-2025). |
|
Spokane,
WA Spokane Co. United States |
E 57th Ave. / S Freya St. (47.60212, -117.35739) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.spokanecounty.org/4935/57th-and-Freya-Roundabout. |
|
West St Paul,
MN Dakota Co. United States |
Thompson Ave. E (CR 6) / Oakdale Ave. (CR 73) (44.90155, -93.07054) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | Elliptical shaped. ICD = 130 ft x 100 ft. https://www.co.dakota.mn.us/Transportation/CurrentConstruction/ThompsonOakdale. |
|
Ironton,
OH Lawrence Co. United States |
SR 93 (Park Ave.) / US 52 EB Ramps (38.53856, -82.67758) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.facebook.com/photo.php?fbid=611157614528583&id=100069030495739&set=a.176172631360419 |
|
Ironton,
OH Lawrence Co. United States |
SR 93 (Park Dr.) / US 52 WB Ramps (38.53950, -82.67593) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.facebook.com/photo.php?fbid=611157614528583&id=100069030495739&set=a.176172631360419 |
|
Findlay,
OH Hancock Co. United States |
US 68 / SR 15 EB Ramps / CR 80 (40.98862, -83.65067) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | New exit ramp from SR 15 coming in from the east. Former exit ramp from SR 15 (from the west) is now connected to County Road 80. https://wfin.com/local-news/opening-of-new-findlay-roundabout-pushed-back-a-few-days/ . |
|
Toledo,
OH Lucas Co. United States |
Ottawa River Rd / 108th St (41.70892, -83.49333) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-Lane |
2023 | Signs in central island. https://www.wtol.com/article/news/local/road-closed-ottawa-river-road-in-point-place-closes-for-roundabout-construction-detour-traffic/512-a28041a7-4232-4dfb-99aa-e106e6681237. |
|
(unincorporated),
UT Kane Co. United States |
SR 9 (Zion Park Scenic Byway) / North Fork Rd. (37.23921, -112.83215) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://kmyu.tv/news/local/udot-construction-projects-this-spring-summer-fall-autumn-2024-mountain-view-corridor-completion-date-i-15-travel-conditions-why-arent-potholes-being-filled-repaired-new-roads-traffic-forecast |
|
Santa Fe,
NM Santa Fe Co. United States |
Oshara Blvd. / Falcon Way (35.61812, -105.98968) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.santafecountynm.gov/news/detail/county-celebrates-early-completion-of-landmark-ne-se-connector-roads-project |
|
Santa Fe,
NM Santa Fe Co. United States |
Rabbit Rd. / Falcon Way (35.62208, -105.99127) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). https://www.santafecountynm.gov/news/detail/county-celebrates-early-completion-of-landmark-ne-se-connector-roads-project. |
|
Statesboro,
GA Bulloch Co. United States |
Langston Chapel Rd. / Harville Rd. / Bethel Church Rd. (32.39523, -81.75920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.statesboroherald.com/local/a-friday-surprise-harville-roadlangston-chapel-road-roundabout-opens/ |
|
Montrose,
CO Montrose Co. United States |
Niagara Rd. / Hillcrest Dr. (38.46724, -107.85663) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.montrosepress.com/hillcrest-and-niagara-roundabout-opens/image_bc92464a-3aea-11ef-be15-b79f08cef2a5.html |
|
Montrose,
CO Montrose Co. United States |
Grand Ave. / N 9th St. (38.48349, -107.88856) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
|
Elliott,
SC Lee Co. United States |
US 401 (Darlington Hwy.) / SC 341 (Lynchburg Hwy.) (34.11931, -80.14440) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Completed Nov. 2024 https://www.wistv.com/2024/02/13/scdot-install-all-way-stop-sc-341-us-401-lee-county-intersection/ |
|
Bear,
DE New Castle Co. United States |
Denny Rd. / Lexington Pkwy. / Airdrie Dr. (39.57173, -75.74234) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | Year Completed estimated (2023-2024). |
|
Florence,
AZ Pinal Co. United States |
SR 79 Business / E Florence Heights Dr. (33.01869, -111.38695) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Intersection shifted approximately 200 ft to south. https://azdot.gov/projects/southcentral-district-projects/state-route-28779b-roundabout-florence |
|
Wentzville,
MO St. Charles Co. United States |
Veterans Memorial Pkwy. / I-70 EB Ramps / Ruggeri Rd. (38.80935, -90.87713) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
|
Mankato,
MN Blue Earth Co. United States |
STH 22 / Augusta Dr. (44.18859, -93.94948) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.keyc.com/video/2024/10/04/roundabout-highway-22-augusta-drive-mankato-opens-october-5/ |
|
Goochland,
VA Goochland Co. United States |
US 522 (Sandy Hook Rd.) / Fairgrounds Rd. (37.69816, -77.88842) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.youtube.com/watch?v=tTjky2-2958 |
|
Thibodaux,
LA Lafourche Par. United States |
SR 20 (Canal Blvd.) / Jackson St. / Thompson Pl. / Gerald T Peltier Dr. (29.78750, -90.82301) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://houmatimes.com/news/city-of-thibodaux-announces-official-completion-of-canal-boulevard-roundabout/ |
|
Fairfield,
OH Butler Co. United States |
Tylersville Rd. / Seward Rd. (39.36256, -84.49156) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
|
South Haven,
MI Allegan Co. United States |
Blue Star Hwy. / N Shore Dr. (42.42646, -86.25553) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2006-2011). |
|
Independence,
MI Oakland Co. United States |
Clintonville Rd. / Waldon Rd. (42.73447, -83.34991) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.youtube.com/watch?v=7dLM3y1e23U |
|
New Castle,
DE New Castle Co. United States |
Airport Rd. / I-95 NB Exit Ramp (39.69593, -75.61570) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | https://www.facebook.com/FirstStateUpdate1/photos/-i-95-offramp-to-airport-road-has-re-opened-after-new-roundabout-installed-/1135316878598748/?_rdr |
|
Enumclaw,
WA King Co. United States |
Suntop Blvd. / Bondgard Ave. E / (parking) (47.19554, -121.97087) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
|
Lexington Park,
MD St. Mary's Co. United States |
FDR Blvd. / MacArthur Blvd. (38.28609, -76.48549) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2023 | https://thebaynet.com/new-section-of-fdr-boulevard-opened-to-the-public/ |
|
Lexington Park,
MD St. Mary's Co. United States |
FDR Blvd. / (parking) / (future road) (38.28732, -76.48888) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2023 | South leg stubbed. https://thebaynet.com/new-section-of-fdr-boulevard-opened-to-the-public/. |
|
Lexington Park,
MD St. Mary's Co. United States |
FDR Blvd. / Buck Hewitt Rd. (38.28398, -76.48121) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2023 | https://thebaynet.com/new-section-of-fdr-boulevard-opened-to-the-public/ |
|
(unincorporated),
SC Berkeley Co. United States |
US 176 (State Rd.) / Mudville Rd. (33.20839, -80.25724) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://info2.scdot.org/SCDOTPress/Lists/Posts/Post.aspx?ID=3627 |
|
Winfield,
IN Lake Co. United States |
E 109th Ave. / Green Pl. (41.42020, -87.26608) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.instagram.com/mattscottmedia/reel/DDNztI8hQq3/ |
|
Richmond,
RI Washington Co. United States |
SR 138 (Kingstown Rd.) / SR 112 (Richmond Townhouse Rd.) / Carolina Nooseneck Rd. (41.50041, -71.65955) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.turnto10.com/news/local/ridot-completes-richmond-roundabout-project-southern-new-england-rhode-island-massachusetts-november-26-2024 |
|
Red Deer County,
AB Division 8 Canada |
Hwy 20 / Memorial Trl. / Township Road 384 (52.29009, -114.07341) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 39.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Completed in October 2024. RRFB is located on the north leg only. Currently, Memorial Trail is only one lane in each direction, but can be upgraded to two lanes in the future. |
|
Whitby,
ON Durham Canada |
Coronation Rd. / Twin Streams Rd. (43.90073, -78.98366) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2023 | Converted from neighborhood traffic calming circle in 2022-2024. |
|
Martinsburg,
WV Berkeley Co. United States |
Tavern Rd. / Rock Cliff Dr. (39.47342, -77.97015) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://panhandlenewsnetwork.com/2024/04/05/bcems-director-offers-detours-as-rock-cliff-drive-tavern-road-intersection-closed-all-weekend-to-prep-for-roundabout/ |
|
Oak Level Township,
NC Nash Co. United States |
N Old Carriage Rd. / US 64 EB Ramps (35.98033, -77.89689) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html |
|
Oak Level Township,
NC Nash Co. United States |
N Old Carriage Rd. / US 64 WB Ramps (35.98205, -77.89806) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html |
|
Oak Level Township,
NC Nash Co. United States |
N Old Carriage Rd. / (school entrance) (35.97561, -77.89630) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html |
|
Oak Level Township,
NC Nash Co. United States |
Sunset Ave. / Arrow Rd. (35.97106, -77.89111) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2023-2024). https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html. |
|
Burlington,
WI Racine Co. United States |
STH 11 (Durand Ave). / CR J (English Settlement Ave.) (42.68366, -88.18849) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | https://projects.511wi.gov/11roundabout/full-project-overview/ |
|
Ishpeming,
MI Marquette Co. United States |
US 41-M-28 / Lakeshore Dr. (46.49855, -87.68279) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.michigan.gov/mdot/news-outreach/pressreleases/2024/10/22/major-work-on-us-41-m-28-roundabout-project-in-ishpeming |
|
Tompkins Township,
MI Jackson Co. United States |
Springport Rd. / Minard Rd. (42.33710, -84.54673) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.mlive.com/news/jackson/2024/09/new-roundabout-opens-in-northern-jackson-county.html |
|
Bainbridge Island,
WA Kitsap Co. United States |
SR 305 / NE Seabold Rd. / NE Port Madison Rd. (47.70104, -122.55759) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://wsdot.wa.gov/about/news/2023/safety-improvement-project-sr-305-bainbridge-island-begins-oct-23 |
|
Bainbridge Island,
WA Kitsap Co. United States |
SR 395 / NE Adas Will Ln. (47.70562, -122.56059) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://wsdot.wa.gov/about/news/2023/safety-improvement-project-sr-305-bainbridge-island-begins-oct-23 |
|
Florence,
AZ Pinal Co. United States |
SR 287 / SR 79 Business (Main St.) (33.01978, -111.38809) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Replaced channelized at-grade interchange. https://azdot.gov/projects/southcentral-district-projects/state-route-28779b-roundabout-florence |
|
Hanover,
ON Grey Canada |
Grey Road 4 / Grey Road 3 (44.15682, -80.95434) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/CountyOfGrey/videos/grey-road-3-4-roundabout/1307920140569289/?_rdr |
|
Tecumseh,
ON Essex Canada |
County Road 42 / County Road 43 (Concession Road 11) / Banwell Rd. (42.27605, -82.89638) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2024 | Combined two T-intersections by realigning CR 43 and Banwell Rd to the west. Previously, one was signalized and the other controlled by stop sign. https://www.countyofessex.ca/en/resident-services/county-road-42-reconstruction.aspx. |
|
Halifax,
NS Halifax Canada |
Barrington St. / Upper Water St. / Valour Way / Nora Bernard St. (44.65429, -63.58093) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.reddit.com/r/halifax/comments/1gcimzq/the_barringtonnora_bernard_roundabout/ |
|
Ottawa,
ON Ottawa Canada |
Portobello Blvd. / Valin St. (45.47454, -75.46975) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.linkedin.com/posts/graeme-stewart-70712540_a-brand-new-circle-in-orleans-the-portobello-activity-7134922398721548288-JUW2 |
|
St Thomas,
ON Elgin Canada |
Hwy 3 (St. Thomas Expressway / Heritage Hwy.) / Centennial Ave. (42.78906, -81.14742) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://www.youtube.com/watch?v=sH0wZd962xw |
|
St Thomas,
ON Elgin Canada |
S Edgeware Rd. / Centennial Ave. / Highbury Ave. (42.79264, -81.15053) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Unknown |
2024 | https://www.youtube.com/watch?v=sH0wZd962xw. |
|
St Thomas,
ON Elgin Canada |
Centennial Rd. / Elm St. / Elm Line (42.76316, -81.14757) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.stthomastoday.ca/2023/05/16/centennial-ave-and-elm-line-roundabout-currently-ahead-of/ |
|
St Thomas,
ON Elgin Canada |
Peach Tree Blvd. / Blairmont Terrace / Empire Pkwy. (42.75560, -81.15701) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.0000 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2015-2016). |
|
St Thomas,
ON Elgin Canada |
Wellington St. / Highview Dr. (42.77443, -81.15316) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
|
St Thomas,
ON Elgin Canada |
Caso Crossing / (unknown) (42.77726, -81.18001) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
|
Limoges,
ON Prescott and Russell Canada |
Limoges Rd. / Rte. 300 (45.30533, -75.23732) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2024 | https://www.instagram.com/munrusselltwp/p/DCFWFM2J22v/ |
|
Greater Sudbury,
ON Greater Sudbury Canada |
Lasalle Blvd. / Frood Rd. (46.51506, -81.00561) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | https://www.greatersudbury.ca/live/transportation-parking-and-roads/construction/completed-projects/2023/lasalle-boulevard-at-frood-road-sudbury3/ |
|
Québec,
QC Capitale-Nationale Canada |
Avenue Wilfrid-Pelletier / Rue de Tripoli (46.77159, -71.30965) |
Other Existing |
All-Way Yield None |
4 Approaches 5 Driveways 72.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. Pedestrian access to central island. | |
|
St-Georges,
QC Beauce-Sartigan Regional County Municipality Canada |
42e Avenue / 126e Rue (46.13684, -70.64171) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 2 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2009-2015). |
|
Prince George,
BC Fraser-Fort George Canada |
Foothills Blvd. / 18 Ave. (53.90734, -122.81107) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways |
Other (At-Grade) Single-Lane |
2023 | https://www.princegeorge.ca/city-hall/news-notices/roundabout-construction-complete |
|
Prince George,
BC Fraser-Fort George Canada |
Boundary Rd. / Boeing Rd. / Gunn Rd. (53.90194, -122.67834) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2017). |
|
Quesnel,
BC Cariboo Canada |
Johnston Ave. / Ranch Rd. (52.97197, -122.48810) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.0000 |
Other (At-Grade) Single-Lane |
2005 | Year Completed 2005 or earlier. |
|
Red Deer County,
AB Division 8 Canada |
40 Ave. (Range Road 273) / McKenzie Rd. (Township Road 374) (52.20118, -113.79011) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2021). |
|
Surrey,
BC Greater Vancouver Canada |
140 St. / 32 Ave. (49.06026, -122.83447) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.northdeltareporter.com/news/surrey-council-to-consider-contract-for-intersection-work-in-newton-south-surrey-2749829 |
|
Springfield,
KY Washington Co. United States |
US 150 (KY 55 / KY 555) / US 150 Business (Bardstown Rd.) (37.69068, -85.23244) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2024 | |
|
Elizabethtown,
KY Hardin Co. United States |
KY 434 (Battle Training Rd.) / KY 251 (Shepherdsville Rd.) (37.78142, -85.85653) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2024 | Newspaper Articles: *June 2024 (Work Begins): https://www.thenewsenterprise.com/news/local/work-about-to-begin-on-another-roundabout/article_9ab1ff3c-0660-5285-9e4a-f38be708a425.html *Nov. 2024 (Work Finishing Up): https://www.thenewsenterprise.com/news/local/crews-put-finishing-touches-on-roundabout/article_0de37f1d-6f6c-5628-8ace-b004be52caee.html |
|
Oak Level Township,
NC Nash Co. United States |
Sunset Ave. / I-95 SB Ramps / Freight Rd. (35.96924, -77.88406) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html. |
|
Oak Level Township,
NC Nash Co. United States |
Sunset Ave. / I-95 NB Ramps (35.96838, -77.88020) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html. |
|
Roanoke,
VA Roanoke City United States |
13th St. SE / Wise Ave. SE (37.27623, -79.92490) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2023 | https://www.wdbj7.com/2021/11/02/roanokes-13th-street-se-project-begin-wednesday/ |
|
Sherborn,
MA Middlesex Co. United States |
Washington St. / Sanger St. / Maple St. (42.24060, -71.37120) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2024 | https://www.youtube.com/watch?v=7B6zWOWi74o. |
|
Cornwall,
ON Stormont, Dundas and Glengarry Canada |
Lemay St. / 13th St. / Reneal St. / Sydney St. (45.03504, -74.73812) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 34.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Sydney St is approach only. https://www.cornwall.ca/en/live-here/2023-reconstruction-thirteenth-street_sydney_street.aspx |
|
Covington,
GA Newton Co. United States |
Kirkland Rd. / Jack Neely Rd. (33.59134, -83.93158) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2024 | |
|
Eau Claire,
WI Eau Claire Co. United States |
Menomonie St. / Water St. / (parking) / (parking) (44.80108, -91.52105) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.eauclairewi.gov/our-city/construction-projects/2024-project-information/menomonie-street-rab. |
|
Parrish,
FL Manatee Co. United States |
US 301 / Moccasin Wallow Rd. (27.59393, -82.42550) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2024 | Designed as 2x2 but striped as single-lane with inner lane striped out. https://moccasinwallowroad.com/wp-content/uploads/2024/08/Moccasin-Wallow-Rd-Impr-Bi-Weekly-Proj-Updt-2_Tina-Allen.pdf. |
|
Gambier,
OH Knox Co. United States |
SR 229 (Newcastle Rd.) / SR 308 (Wiggin St.) / Laymon Rd. (40.37633, -82.40226) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://kenyoncollegian.com/news/2024/11/roundabout-opens-at-intersection-of-sr-229-and-sr-30/ |
|
Franklin,
IN Johnson Co. United States |
N Graham Rd. / Earlywood Dr. (39.52081, -86.05894) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://dailyjournal.net/wp-content/uploads/2024/10/133863878_web1_20241012dj-earlywood-graham-brief-1.jpg |
|
Rocky Mount,
NC Nash Co. United States |
SR 48 (Goldrock Rd.) / Roundtree Dr. / Waterloo Dr. (35.99310, -77.80791) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | https://www.facebook.com/photo.php?fbid=955156466066790&id=100047173362729&set=a.584158543166586 |
|
Westwood,
MI Kalamazoo Co. United States |
N Drake Rd. / Squires Dr. / W H Ave. (42.31852, -85.64814) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.mlive.com/news/kalamazoo/2024/08/new-roundabout-opens-near-kalamazoo-school.html |
|
Augusta Township,
MI Washtenaw Co. United States |
Whittaker Rd. / Willis Rd. (42.15726, -83.60088) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/photo.php?fbid=960810756074083&set=a.249859160502583&type=3. |
|
St Thomas,
ON Elgin Canada |
Hwy 30 (Highbury Ave.) / Ron McNeil Line (42.81099, -81.15033) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://www.youtube.com/watch?v=hiwMT6hxZi0 |
|
Atlanta,
GA Fulton Co. United States |
Marietta Rd. NW / Laurel Ave. NW / Annie St. NW / (unknown) (33.80150, -84.44302) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Elliptical shaped. ICD = 80 ft x 70 ft. Painted splitter island on east leg. Year Completed estimated (2022-2023). |