City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Davenport,
IA Scott Co. United States |
Leclaire St. / E 2nd St. (41.52114, -90.56831) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | Located underneath railroad bridge and connecting to lower deck of bridge over river. https://www.kwqc.com/video/2024/08/09/rock-island-arsenal-davenport-update-progress-government-bridge-traffic-circle/ |
Fountaintown,
IN Shelby Co. United States |
US 52 / SR 9 (39.69259, -85.77385) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2023 | https://www.wtreradio.com/regional-news/construction-update-from-shelby-county/ |
Buffalo,
MN Wright Co. United States |
35th St. NE / Braddock Ave. (45.20177, -93.87000) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Intersection moved 250-300 feet to the west. |
Glencoe,
MN McLeod Co. United States |
16th St. E / 110th St. / Falcon Ave. / Morningside Dr. (44.77578, -94.13155) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2020-2022). |
Ramsey,
MN Anoka Co. United States |
Armstrong Blvd. NW / Alpine Dr. NW (45.24865, -93.47053) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2023 | Elliptical shaped. ICD = 140 ft x 125 ft. https://stories.opengov.com/anokacountymn/published/3CanECRn-XG |
Anoka,
MN Anoka Co. United States |
Thurston Ave. / US 10-US 169 Ramps (45.21253, -93.41300) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Peanut shaped. Node ICDs 140 ft; length 290 ft. Year Completed estimated (2023-2024). |
Maple Grove,
MN Hennepin Co. United States |
101st Ave. N / Lawndale Ln. (45.13832, -93.50388) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Maple Grove,
MN Hennepin Co. United States |
101st Ave. N / Troy Ln. N (45.13846, -93.51193) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Arden Hills,
MN Ramsey Co. United States |
Snelling Ave. N / Lake Johanna Blvd. / CR E (45.05023, -93.16374) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2023 | |
Owatonna,
MN Steele Co. United States |
24th Ave. SW / W Bridge St. (44.08433, -93.25657) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2021 | |
Grand Rapids,
MN Itasca Co. United States |
Fairgrounds Rd. / Crystal Lake Blvd. / Ridgewood Rd. / 14th St. N (47.24598, -93.52334) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2013-2019). |
Polk City,
IA Polk Co. United States |
Vista Lake Ct / N 3rd St / NW Sheldahl Dr (41.78316, -93.71045) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2022 | https://www.polkcityia.gov/sites/g/files/vyhlif5571/f/pages/notice_to_bidders_3rd_and_vista_lake_intersection_improvements_2021-11-22.pdf |
Clarksville,
TN Montgomery Co. United States |
Needmore Rd. / N Whitfield Rd. (36.58403, -87.33613) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://clarksvillenow.com/local/rhonda-the-roundabout-has-public-debut-city-of-clarksville-adjusting-signage-signal-timing/ |
Altoona,
IA Polk Co. United States |
NE 62nd Ave. / 20th Ave. NW (41.67289, -93.48702) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). |
Huntsville,
AL Madison Co. United States |
McMullen Ln. SE / Summerlyn Way SE (34.70066, -86.43826) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2006-2007). |
Chatsworth,
GA Murray Co. United States |
GA 225 / Mt Carmel Church Rd. / Mitchell Bridge Rd. (34.81145, -84.81570) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2017 | Elliptical shaped. ICD = 160 ft x 140 ft. |
Ellijay,
GA Gilmer Co. United States |
GA 382 / Old Highway 5 (34.63999, -84.50847) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | West leg realigned 360 feet to south to create four-legged intersection. Year Completed estimated (2019-2021). |
Cartersville,
GA Bartow Co. United States |
GA 293 (Kingston Hwy.) / Beavers Dr. (34.23442, -84.86784) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2022 | https://delta.creativecirclecdn.com/dailytribune/files/20220704-113647-DTN%207_5_2022.pdf |
Cumming,
GA Forsyth Co. United States |
Buford Dam Rd. / (parking) (34.19829, -84.13895) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | South leg stubbed. Year Completed estimated (2021-2022). |
Braselton,
GA Barrow Co. United States |
GA 211 / I-85 SB Ramps (34.09876, -83.81355) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | https://www.mainstreetnews.com/hwy-211-roundabouts-now-open/article_62a7c036-63cd-11ef-9bd3-3f83a9ac83c9.html |
Braselton,
GA Barrow Co. United States |
GA 211 / Tour de France Dr. / Braselton Pkwy. (34.10000, -83.81382) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.mainstreetnews.com/hwy-211-roundabouts-now-open/article_62a7c036-63cd-11ef-9bd3-3f83a9ac83c9.html |
Winder,
GA Barrow Co. United States |
Jefferson Hwy. (GA 11-GA 211) / GA 211 / Rockwell Church Rd. (34.02523, -83.67649) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2024 | Opened to traffic Dec 2023; construction completed 2024. |
Covington,
GA Newton Co. United States |
GA 142 / (unknown) (33.59068, -83.79206) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2021 | Elliptical shaped. ICD = 140 ft x 120 ft. |
Tyrone,
GA Coweta Co. United States |
Shaw Rd. / Pete Rd. (33.46489, -84.65330) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2021 | |
Newnan,
GA Coweta Co. United States |
Poplar Rd. / Poplar Preserve Blvd. / Yeagar Rd. (33.35591, -84.73724) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | |
Newnan,
GA Coweta Co. United States |
Poplar Rd. / Silver Birch Pass / Poplar Village Ave. (33.35586, -84.74057) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | |
Americus,
GA Sumter Co. United States |
GA 27 (Vienna Rd.) / District Line Rd. (32.06704, -84.16649) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2022). |
Bradford West Gwillimbury,
ON Simcoe Canada |
6th Line / Sideroad 10 (44.09236, -79.59798) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2023 | Intersection moved about 100 m south. https://www.townofbwg.com/en/business-development/south-west-arterial-road-swar.aspx. |
Oshawa,
ON Durham Canada |
Windfields Farm Dr. W / Stallion Dr. / Bandsman Crescent (43.95999, -78.91461) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2018 | |
Oshawa,
ON Durham Canada |
Windfield Farms Dr. W / Thoroughbred St. (43.96297, -78.90465) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Bowmanville,
ON Durham Canada |
Concession Road 3 / Middle Rd. / Scugog St. (43.93418, -78.70130) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Whitby,
ON Durham Canada |
Barkerville Dr. / Bonacord Ave. / Westfield Dr. (43.88208, -78.97554) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.0000 |
Other (At-Grade) Single-Lane |
2019 | East leg stubbed. |
Ajax,
ON Durham Canada |
Formosa Ave / Lloydminster Ave / Mosley Ave (43.88143, -79.00965) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2009-2013). |
Ajax,
ON Durham Canada |
Kerrison Dr. E / Alexander's Crossing / Turnerbury Ave. (43.87354, -79.00248) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2004 | |
Ajax,
ON Durham Canada |
Williamson Dr. W / Bellinger Ave. (43.88221, -79.05023) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2005-2009). |
Brampton,
ON Peel Canada |
Squire Ellis Dr. / Leo Auston Rd. / Belladonna Cir. (43.81419, -79.72371) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Brampton,
ON Peel Canada |
Martin Byrne Dr. / Evermeek Rd. / Arda Crescent (43.80748, -79.72501) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2018 | |
Brampton,
ON Peel Canada |
John Carroll Dr. / Evermeek Rd. / Possession Crescent (43.80592, -79.72707) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2018 | |
Brampton,
ON Peel Canada |
Gordon Randle Dr. / Snaresbrook Crescent / Pendergast Ct. (43.80055, -79.73266) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2018 | |
Brampton,
ON Peel Canada |
Gordon Randle Dr. / Bansbury Cir. / Love Ct. (43.80483, -79.74174) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2018 | |
Brampton,
ON Peel Canada |
Inspire Blvd. / Sarno Rd. / Wardenwood Dr. (43.75971, -79.78483) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Georgetown,
ON Halton Canada |
Danby Rd. / Northwest Ct. / Hidden Lake Trl. (43.62272, -79.88452) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2015 | |
Georgetown,
ON Halton Canada |
Danby Rd. / Hartwell Rd. (43.63483, -79.86954) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Granite Falls,
WA Snohomish Co. United States |
84th St. NE / 163rd Ave. NE (48.07206, -122.01269) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/SnoCoPW/videos/final-touches-are-taking-place-at-the-84th-st-ne-and-163rd-ave-ne-roundabout-in-/2124130604683380/ |
Bremerton,
WA Kitsap Co. United States |
Washington Ave. / Manette Bridge (47.56922, -122.62369) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.youtube.com/watch?v=tD7NviOOFDE |
Corbin,
KY Whitley Co. United States |
Black Diamond Rd. / SR 727 (5th Street Rd.) (36.92753, -84.14583) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2024 | Intersection moved 150-200 feet to the west. |
Crossville,
TN Cumberland Co. United States |
US 70 / SR 392 (Miller Ave.) / SR 101 (Peavine Rd.) (35.95708, -84.98459) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Merging right-turn bypass lanes on all legs. Year Completed estimated (2022-2024). |
Waterville,
ME Kennebec Co. United States |
Washington St. / Campus Dr. / Rice Rips Rd. (44.56576, -69.66692) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | |
Topsham,
ME Sagadahoc Co. United States |
Topsham Fair Mall Rd. / (parking) (43.93146, -69.98109) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | Unfinished leg to the north for future development. |
Thief River Falls,
MN Pennington Co. United States |
US 59 / Center St. E (CR 3) (48.01959, -96.05493) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Ponchatoula,
LA Tangipahoa Par. United States |
LA 3158 (Airport Rd. / N Hoover Rd.) / Sisters Rd. (30.46547, -90.41409) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2023 | https://tangipahoa.org/intersection-of-south-airport-north-hoover-and-sisters-road-closed-nov-11-12-for-asphalt-work/ |
New Palestine,
IN Hancock Co. United States |
S 600 W / W 200 S (39.75666, -85.91432) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | Replaced two offset T-intersections. |
Newport,
MI Monroe Co. United States |
Swan Creek Rd. / I-75 NB Ramps (42.00419, -83.31263) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/. |
Newport,
MI Monroe Co. United States |
Swan Creek Rd. / Newport Rd. / I-75 SB Ramps (42.00705, -83.31515) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Yield-controlled right-turn bypass lane on southwest leg. Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/. |
Bristol,
IN Elkhart Co. United States |
Walorski Pkwy. / (parking) (41.73614, -85.87479) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | North leg stubbed. Surface drainage to ditches. https://rv-pro.com/news/elkhart-road-to-be-named-after-late-congresswoman-walorski/ |
Las Cruces,
NM Dona Ana Co. United States |
Sonoma Ranch Blvd. / Arroyo Rd. (32.41740, -106.73863) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2016-2019). |
Horizon City,
TX El Paso Co. United States |
Kieth Booth Dr. / Tobe Davis Dr. / Glenn Warner Blvd. (31.68831, -106.18588) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Single-Lane |
Vertical curb on central island apron. | |
Santa Fe,
NM Santa Fe Co. United States |
Las Soleras Dr. / (unknown) (35.61991, -106.02561) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 2 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). South and east driveways added 2023-2024. |
Georgetown,
TX Williamson Co. United States |
Moonlight Terrace Dr. / Legacy Crossing / Wolf Ridge Rd. (30.64654, -97.70171) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | |
Bend,
OR Deschutes Co. United States |
Powell Butte Hwy. / NE Butler Market Rd. (44.09444, -121.20382) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | https://www.youtube.com/watch?v=q0T0f0Cp1z4 |
Port Orchard,
WA Kitsap Co. United States |
Mitchell Ave. SE / SE Lincoln Ave. (47.52374, -122.63041) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.kitsapdailynews.com/news/1st-of-2-y-intersection-roundabouts-opens-in-po/ |
Gahanna,
OH Franklin Co. United States |
Taylor Station Rd. / Craycraft Rd. / Research Rd. (39.99250, -82.83997) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://gahanna.gov/CivicAlerts.aspx?AID=214 |
Edmonton,
AB Division 11 Canada |
89 Ave. NW / 160 St. NW (53.52439, -113.59653) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.0000 |
Other (At-Grade) Single-Lane |
2009 | |
Plain City,
OH Union Co. United States |
Industrial Pkwy. / Mitchell-Dewitt Rd. (40.14221, -83.21567) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Easley,
SC Pickens Co. United States |
Crestview Rd. / Sheffield Rd. (34.80448, -82.54993) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Completed August 2024. https://www.foxcarolina.com/video/2024/06/15/construction-roundabout-easley-causes-significant-backups/ |
Rock Hill,
SC York Co. United States |
Bird St. / University Dr. (34.94354, -81.00143) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2008 | Year completed estimated (2006-2010). |
London,
ON Middlesex Canada |
Denview Ave. / Buroak Dr. (43.02568, -81.32362) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.0000 |
Other (At-Grade) Single-Lane |
2012 | Pedestrian crossings nearly adjacent to circulatory roadway. Yield lines within circulatory roadway in advance of pedestrian crossings on exits. |
Edwards,
CO Eagle Co. United States |
US 6 / Hillcrest Dr. (39.65388, -106.62911) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.eaglecounty.us/news_detail_T24_R433.php. |
Genoa Township,
MI Livingston Co. United States |
Challis Rd. / Bauer Rd. (42.54205, -83.81326) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | West leg of Challis Road realigned to south at roundabout. https://www.livingstondaily.com/story/news/local/community/genoa-township/2024/09/02/roundabout-at-challis-bauer-roads-in-genoa-township-now-open/75001158007/ |
St Leo,
FL Pasco Co. United States |
SR 52 / Pompanic St. / College Ave. (28.33559, -82.27027) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | SR 52 makes 90-degree turn at roundabout (south and east legs). https://www.msn.com/en-us/autos/news/new-county-road-52-roundabout-in-pasco-county-now-open/ar-AA1p8sW3?ocid=BingNewsVerp&apiversion=v2&noservercache=1&domshim=1&renderwebcomponents=1&wcseo=1&batchservertelemetry=1&noservertelemetry=1# |
Springfield,
KY Washington Co. United States |
US 150-KY 555 / KY 528 (Lincoln Park Rd.) (37.69899, -85.22166) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Henderson,
KY Henderson Co. United States |
KY 54-KY 351 (2nd St.) / US 41 SB Ramps (37.83090, -87.56729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Raindrop shaped. https://news.wnin.org/2024-07-25/henderson-roundabouts-to-open-soon. |
Henderson,
KY Henderson Co. United States |
KY 351 (2nd St.) / KY 2084 (Southside Dr.) / (entrance to North Middle School) (37.83126, -87.56895) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://news.wnin.org/2024-07-25/henderson-roundabouts-to-open-soon |
Cave Spring,
VA Roanoke Co. United States |
Starkey Rd. / Buck Mountain Rd. (37.20302, -79.99099) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | https://www.vdot.virginia.gov/projects/salem-district/route-904-starkey-road-and-route-679-buck-mountain-road-roundabout----roanoke-county/ |
Hurricane,
UT Washington Co. United States |
100 N / 700 W / Birchview Ln. (37.17802, -113.30065) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Lincoln,
NE Lancaster Co. United States |
Saltillo Rd. / S 84th St. / S 82nd St. (40.69709, -96.60644) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2023 | https://dot.nebraska.gov/lincoln-south-beltway/ |
Lincoln,
NE Lancaster Co. United States |
S 82nd St. / SR 2 WB Ramps (40.69395, -96.60874) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Lincoln,
NE Lancaster Co. United States |
S 84nd St. / SR 2 EB Ramps (40.69054, -96.61087) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Lincoln,
NE Lancaster Co. United States |
Saltillo Rd. / Jamaica Ave. (40.69713, -96.67573) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Single-Lane |
2023 | https://dot.nebraska.gov/lincoln-south-beltway/ |
Lincoln,
NE Lancaster Co. United States |
Jamaica Ave. / SR 2 WB Ramps (40.69198, -96.67250) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. |
LIncoln,
NE Lancaster Co. United States |
Jamaica Ave. / SR 2 EB Ramps (40.69029, -96.67110) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. |
Port Ludlow,
WA Jefferson Co. United States |
SR 104 / SR 19 (Beaver Valley Rd.) (47.89014, -122.73245) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2024 | Through lane bypass on west leg. https://www.facebook.com/groups/porttownsendchat/posts/the-highway-104-and-19-roundabout-is-open-in-all-directions/1440699556614168/?_rdr |
Doylestown Township,
PA Bucks Co. United States |
New Britain Rd. / S Easton Rd. (southbound) (40.29104, -75.12883) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2024 | |
Doylestown Township,
PA Bucks Co. United States |
New Britain Rd. / S Easton Rd. (northbonud) (40.29072, -75.12772) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
South Lebanon,
OH Warren Co. United States |
Grandin Rd. / King Ave. / (parking) (39.35121, -84.24123) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2023 | https://www.youtube.com/watch?v=yhm7HUcqkV0 |
Gordonville,
MO Cape Girardeau Co. United States |
SR 25 / CR K (37.31757, -89.66588) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.msn.com/en-us/autos/news/rte-25k-roundabout-at-gordonville-finished-early/ar-AA1rkPGt |
Westville,
IN La Porte Co. United States |
US 421 / US 6 / US 6-US 421 / W 600 S (41.51838, -86.89415) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2024 | Rural. https://www.facebook.com/LaPorteCountySheriffsOffice/videos/lcso-drone-footage-of-the-completed-us-6-us-421-south-junction-roundabout-projec/989150306303223/ |
Brier,
WA Snohomish Co. United States |
Locust Way / Logan Rd. / Larch Way (47.80828, -122.25425) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://snohomishcountywa.gov/3811/Larch-Way-and-Locust-Way---Bothell-2024 |
Merrifield,
MN Crow Wing Co. United States |
CSAH 3 / CSAH 4 (46.48182, -94.17288) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.instagram.com/crowwingcountymn/p/C8sK5DXvURa/ |
West Springfield,
MA Hampden Co. United States |
Elm St. / Westfield St. / (parking) (42.10703, -72.62284) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://www.wwlp.com/news/local-news/hampden-county/final-phases-of-construction-of-the-new-elm-street-roundabout-in-west-springfield/ |
(unincorporated),
CA Plumas Co. United States |
SR 36 / CR A13 (40.30580, -121.14170) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | South leg disconnected from existing TWSC intersection and shifted about 250 feet east along SR 36 to make two T-intersections. Roundabout designed for OSOW vehicles along SR 36. https://www.facebook.com/story.php?story_fbid=122177854508225216&id=61556756493806&_rdr |
Saskatoon,
SK Division 11 Canada |
8th St. E / Brighton Blvd. / Brighton Common (52.12388, -106.54987) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2016 | "Coming Home" sculpture in central island. https://globalnews.ca/news/7299745/art-donation-saskatoon-brighton-dream-development/ |
Saskatoon,
SK Division 11 Canada |
Brighton Blvd. / Taskamanwa St. / McOrmond Dr. (52.12011, -106.54988) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2024 | "Brighton Birds" sculpture in center island. |
West Kelowna,
BC Central Okanagan Canada |
Shannon Lake Rd. / Asquith Rd. / Asquith Ct. (49.85115, -119.61874) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2024 | https://www.kelownanow.com/watercooler/news/news/West_Kelowna/New_roundabout_on_Shannon_Lake_Road_set_to_open_this_week/#fs_141439 |
(unincorporated),
TX Fort Bend Co. United States |
Old Richmond Rd. / Voss Rd. (29.64542, -95.66199) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | |
Lévis,
QC Lévis Canada |
Rue de Saint-Denis / Rue de Bernières (46.69436, -71.30060) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2019 | Add-lane right-turn bypass lane on southeast leg. Southwest leg stubbed. |
Candiac,
QC Roussillon Regional County Municipality Canada |
Boulevard Jean-Leman / Avenue des Chênes / Rang Saint-André (45.36467, -73.50839) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Watertown,
NY Jefferson Co. United States |
Coffeen St. / N Hycliff Dr. / Gaffney Dr. (43.99017, -75.93460) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | On campus of Jefferson Community College. Year Completed estimated (2020-2022). |
Amherst,
NY Erie Co. United States |
John James Audubon Pkwy. / Frontier Rd. (43.00764, -78.78133) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Buffalo,
NY Erie Co. United States |
Freeman Rd. / Salvatore Pkwy. / (parking) (42.95226, -78.69540) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2009 |