City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Hutchinson,
MN McLeod Co. United States |
STH 15 / CSAH 12 (N High Dr.) (44.90686, -94.36822) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.2191 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Cranberry Township,
PA Butler Co. United States |
Cranberry Woods Dr. / Longtree Way
(40.68406, -80.08105) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.1328 |
Other (At-Grade) Single-Lane |
2009 | Yield-controlled right-turn bypass lanes on north and south legs. ICD estimated from Google Maps linework. |
Lakeland,
MN Washington Co. United States |
CTH 18 (St. Croix Trl.) / 4th St. S (44.94334, -92.77101) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.0409 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Lakeland,
MN Washington Co. United States |
CTH 18 (St. Croix Trl.) / 5th St. N (44.95510, -92.77084) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.4138 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Lakeland,
MN Washington Co. United States |
CTH 18 (St. Croix Trl.) / Division St. (44.94964, -92.77091) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.1914 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
E Main St. / Keystone Pkwy. SB Ramps (39.97844, -86.11319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Raindrop shaped. Year Completed estimated (2008-2010). |
Carmel,
IN Hamilton Co. United States |
E Main St. / Keystone Pkwy. NB Ramps (39.97843, -86.11238) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Raindrop shaped. Year Completed estimated (2008-2010). |
Chippewa Falls,
WI Chippewa Co. United States |
STH 124 / STH 29 (44.92093, -91.38065) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.9694 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Right-turn bypass lanes on all three legs. ICD estimated from Google Maps linework. |
Farmington,
MN Dakota Co. United States |
STH 3 (Chippendale Ave.) / 195th St. W / 190th St. W (44.67382, -93.13663) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5204 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Jupiter,
FL Palm Beach Co. United States |
Donald Ross Rd. / 69th Dr. N (26.88188, -80.14336) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.0886 |
Other (At-Grade) Single-Lane |
2009 | Right-turn bypass lane. ICD estimated from Google Maps linework. |
The Villages,
FL Sumter Co. United States |
Buena Vista Blvd. / Old 44A (28.84546, -82.01556) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.2609 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Rome,
GA Floyd Co. United States |
Chatillon Rd. / J L Todd Dr. (34.28111, -85.16573) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.6845 |
Other (At-Grade) Single-Lane |
2009 | Entrance to Speaks Mattress Company factory. Construction cost of under $150,000. ICD estimated from Google Maps linework. |
(unincorporated),
FL Broward Co. United States |
Parkland Reserve Blvd. / NW 110th Dr. (26.32262, -80.27387) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.3967 |
Other (At-Grade) Single-Lane |
2009 | Functional Class: Local ICD estimated from Google Maps linework. |
Port Salerno,
FL Martin Co. United States |
SE Salerno Rd. / SE Martin Meadows Ave. / (unknown) / (unknown) (27.13707, -80.21922) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 38.2628 |
Other (At-Grade) Single-Lane |
2009 | Long oval. ICD estimated from Google Maps linework. |
Chippewa Falls,
WI Chippewa Co. United States |
STH 124 / BUS 29 (44.93498, -91.39065) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.5100 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Ledgeview,
WI Brown Co. United States |
Dickinson Rd. (CTH G) / Monroe Rd. (CTH GV) (44.43271, -88.01631) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.0532 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 15, 2009. ICD estimated from Google Maps linework. |
West Bend,
WI Washington Co. United States |
Veterans Ave. / Water St. / S Island Ave. (43.42306, -88.18069) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 32.0952 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Somers,
WI Kenosha Co. United States |
CTH G (Wood Rd.-30th Ave.) / Parkside Blvd. (42.64751, -87.84920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.0173 |
Other (At-Grade) Single-Lane |
2009 | Opened September 8, 2009. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
CTH P (Old US 45) / CTH PV (Pleasant Valley Rd.) (43.35352, -88.18166) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.0005 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Lisbon,
WI Waukesha Co. United States |
STH 164 / CTH Q (43.19316, -88.26125) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.7948 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Wales,
WI Waukesha Co. United States |
US 18 / Blackwood Dr. (43.01132, -88.38609) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.5660 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened August 2009. ICD estimated from Google Maps linework. |
Muskego,
WI Waukesha Co. United States |
CTH Y (Racine Ave.) / Kelsey Dr. (42.85757, -88.15911) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.6425 |
Other (At-Grade) Single-Lane |
2009 | Opened November 9, 2009. ICD estimated from Google Maps linework. |
Amelia Island,
FL Nassau Co. United States |
Amelia Island Pkwy / 14th St. S (30.61876, -81.45530) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.8899 |
Other (At-Grade) Single-Lane |
2009 | Previously controlled by one-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Miramar Beach,
FL Okaloosa Co. United States |
Commons Dr. W / Indian Bayou Dr. (30.39025, -86.45789) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.2091 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Austin,
TX Travis Co. United States |
Mueller Blvd. / Aldrich St. / Mueller Central Dr. (30.29807, -97.70716) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Partially completed in 2005. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / CTH Y (43.80647, -87.78098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9247 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / CTH JJ (43.81919, -87.79837) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.3314 |
Other (At-Grade) Single-Lane |
2009 | High-speed approach roadways. Opened October 2009. ICD estimated from Google Maps linework. |
Jupiter,
FL Palm Beach Co. United States |
N Jog Rd. / Donald Ross Rd. (26.88178, -80.14438) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 36.2192 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Chippewa Falls,
WI Chippewa Co. United States |
STH 178 / CTH S (44.96615, -91.36333) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.1807 |
Other (At-Grade) Single-Lane |
2009 | Right turn bypass lanes on two corners. Opened October 2009. ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH LP (Lake Park Rd.) / Midway Rd. (44.22892, -88.36319) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.2323 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Milton,
WI Rock Co. United States |
STH 59 / STH 26 NB Ramps (42.76902, -88.92310) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 2009. |
Milton,
WI Rock Co. United States |
STH 59 / STH 26 SB Ramps (42.76911, -88.92484) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 2009. |
Milton,
WI Rock Co. United States |
STH 59 / CTH M (42.76886, -88.91364) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.5632 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Harrison,
WI Calumet Co. United States |
US 10 / STH 55 (44.21376, -88.28327) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.0893 |
Other (At-Grade) Single-Lane |
2009 | Opened September 2009. High speed approach roadways. ICD estimated from Google Maps linework. |
Oconto,
WI Oconto Co. United States |
STH 22 (Charles St.) / US 41 NB Ramps (44.89208, -87.89580) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.9203 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 7, 2009. ICD estimated from Google Maps linework. |
Oconto,
WI Oconto Co. United States |
STH 22 (Charles St.) / US 41 SB Ramps (44.89205, -87.90080) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.9203 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 7, 2009. ICD estimated from Google Maps linework. |
(unincorporated),
WI Manitowoc Co. United States |
STH 310 / CTH B (44.15364, -87.66055) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.4174 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. High-speed approach roadways. ICD estimated from Google Maps linework. |
(unincorporated),
WI Manitowoc Co. United States |
STH 310 / CTH Q (44.15357, -87.67864) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7037 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. High-speed approach roadways. ICD estimated from Google Maps linework. |
Kiel,
WI Manitowoc Co. United States |
STH 67 / CTH AA (E Park Ave.-Rockville Rd.) (43.92072, -88.02247) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.4329 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
(unincorporated),
WI Manitowoc Co. United States |
STH 310 / CTH R (44.15350, -87.70831) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7037 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. High-speed approach roadways. ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Marina Pkwy / US 17 Connector (33.75152, -78.83283) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.7142 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Marina Pkwy / 79th Ave. N (33.75726, -78.82594) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6974 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Marina Pkwy / (unknown) (33.76145, -78.81818) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.7237 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Marina Pkwy / Amalfi Pl. (33.76431, -78.81388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.7082 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / CTH X / Gateway Blvd. (42.53840, -88.94769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.7205 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / I-43 NB Ramps (42.53960, -88.94841) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.6798 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / I-43 SB Ramps (42.54142, -88.94933) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.0787 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. |
Malta,
NY Saratoga Co. United States |
Luther Forest Blvd. / Rocket Way (42.95595, -73.76094) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2015 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Malta,
NY Saratoga Co. United States |
Luther Forest Blvd. / Cordero Blvd. (42.95753, -73.75259) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.9485 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Chino Valley,
AZ Yavapai Co. United States |
SR 89 / Road 4S (34.71659, -112.45340) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.9577 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Functional Class: Arterial ICD estimated from Google Maps linework. |
(unincorporated),
GA Chatham Co. United States |
Rice Mill Rd. / (unknown) (32.21944, -81.19250) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 74.7708 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
(unincorporated),
GA Cherokee Co. United States |
River Ridge High School access / parking access (34.11611, -84.47916) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 140.4079 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Access to high school. ICD estimated from Google Maps linework. |
Evans,
GA Columbia Co. United States |
Riverwood Pkwy. / Amberley Dr. (33.57611, -82.19083) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.8122 |
Other (At-Grade) Single-Lane |
2009 | Functional Class: Local ICD estimated from Google Maps linework. |
Evans,
GA Columbia Co. United States |
Ronald Reagan Dr. / Williamsburg Way / Industrial Park Dr. (33.54528, -82.12945) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.8899 |
Other (At-Grade) Single-Lane |
2009 | Functional Class: Local ICD estimated from Google Maps linework. |
Louisville,
KY Jefferson Co. United States |
Trevilian Way / Louisville Zoo Entrance (38.20764, -85.70862) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 26.2772 |
Other (At-Grade) Single-Lane |
2009 | Oblong shape. ICD estimated from Google Maps linework. |
Lexington,
KY Fayette Co. United States |
Iron Works Pkwy. / War Admiral Blvd. / Jenney Ln. (38.14812, -84.52026) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.3265 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Concord,
NH Merrimack Co. United States |
N. State St. / Franklin St. (43.21304, -71.54215) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 23.5019 |
Other (At-Grade) Single-Lane |
2009 | Fifth leg is departure only into frontage road. ICD estimated from Google Maps linework. |
New London,
NH Merrimack Co. United States |
Newport Rd. / County Rd. (43.42280, -72.00003) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 29.4930 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Peterborough,
NH Hillsborough Co. United States |
NH 101 / Shaw's Plaza entrance (42.87519, -71.96153) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 28.0080 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Morrisville,
NC Wake Co. United States |
Shiloh Glenn Dr. / Lower Shiloh Way (35.86587, -78.84024) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 31.9398 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Durham,
NC Durham Co. United States |
Flat River Dr. / Irving Way / Carthage Ct. (35.94976, -78.81408) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.8728 |
Other (At-Grade) Single-Lane |
2009 | No splitter islands on three legs. ICD estimated from Google Maps linework. |
Durham,
NC Durham Co. United States |
University Pl. / Ivy Creek Blvd. (35.95846, -78.96373) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.0687 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Youngsville,
NC Franklin Co. United States |
Olde Liberty Dr. / Commonwealth Dr. / Clubhouse Dr. (36.07125, -78.52006) |
Roundabout Existing |
Unknown Unknown |
4 Approaches 0 Driveways 77.2287 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Wantagh,
NY Nassau Co. United States |
Ocean Pkwy. / Jones Beach Causeway (40.59647, -73.50811) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 106.1035 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Converted rotary. ICD estimated from Google Maps linework. |
Hamburg,
NY Erie Co. United States |
US 62 (Buffalo St.) / Prospect Ave. (42.72197, -78.82588) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 28.9548 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Hamburg,
NY Erie Co. United States |
US 62 (Buffalo St.) / Legion St. / Clark St. (42.72590, -78.82574) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.1134 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Fort Erie,
ON Niagara Canada |
Queen St. / Goderich St. (42.90951, -78.91385) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 29.7419 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Avon,
IN Hendricks Co. United States |
N County Road 800 E / County Rd 100 (39.77772, -86.38114) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.9761 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Year Completed estimated (2008-2010). ICD estimated from Google Maps linework. |
Lethbridge,
AB Alberta Canada |
University Dr. W / Sunridge Blvd. / 40 Ave. W (49.65489, -112.86879) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2005-2012). |
Windsor,
NS Hants Canada |
Wentworth Rd. / Highway 101 NB Ramps / Morrison Dr. (44.99165, -64.11267) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.5231 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Cape Breton,
NS Cape Breton Canada |
Alexandra St. / Kenwood / Highway125 WB Ramps / Kenwood Dr. (46.10623, -60.20218) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.4978 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Ellington,
CT Tolland Co. United States |
Windsorville Rd. / Wappington Rd. / Skinner Rd. / Pinney St. (41.86738, -72.49265) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 1 Driveways 40.9127 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Fayetteville,
NC Cumberland Co. United States |
Augusta Dr. / Commerce St. (35.04725, -78.89901) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 13.6888 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2009 | ICD estimated from Google Maps linework. |
Winston-Salem,
NC Forsyth Co. United States |
Bethania-Rural Hall Rd. / Mizpah Church Rd. (36.20428, -80.30709) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.9842 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Charlotte,
NC Mecklenburg Co. United States |
Shopton Rd. / Robbie Cir. (35.17288, -80.96278) |
Roundabout Existing |
Unknown None |
4 Approaches 0 Driveways 33.1930 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Highland,
MI Oakland Co. United States |
White Lake Rd. / Duck Lake Rd. N (42.69157, -83.57226) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.7247 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Highland,
MI Oakland Co. United States |
White Lake Rd. / Rose Center Rd. E (42.69312, -83.57431) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.9909 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
New Hudson,
MI Oakland Co. United States |
Grand River Ave. / Lyon Center Dr. E (42.50967, -83.60697) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 42.2599 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Middletown,
DE New Castle Co. United States |
S Ridge Ave / Private Driveway (39.44821, -75.73234) |
Roundabout Existing |
Unknown None |
4 Approaches 0 Driveways 40.5794 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Middletown,
DE New Castle Co. United States |
Gloucester Blvd. / Hampton Rd. (39.45210, -75.68096) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0439 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Cary,
NC Wake Co. United States |
Lily Ridge Rd. / Winston Hill Dr. / Walker Stone Dr. (35.79122, -78.84358) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.9386 |
Other (At-Grade) Single-Lane |
2009 | No splitter islands on two legs. ICD estimated from Google Maps linework. |
Cary,
NC Wake Co. United States |
Wellingborough Dr. / Forest Park Way (35.74966, -78.76117) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 13.5701 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2009 | Third leg is stubbed for future expansion. ICD estimated from Google Maps linework. |
Wake Forest,
NC Wake Co. United States |
S Franklin St. / Elm Ave. (35.97503, -78.50629) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.7954 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Zebulon,
NC Wake Co. United States |
Pippin Rd. / Weavers Pond Dr. (35.85601, -78.33159) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.6237 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Bemidji,
MN Beltrami Co. United States |
Event Center Dr. / Grant Ave. (47.46223, -94.85417) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.3356 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Right-turn bypass lane on west leg. ICD estimated from Google Maps linework. |
Bemidji,
MN Beltrami Co. United States |
Event Center Dr. / Central Ave. (47.46218, -94.86070) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9878 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Fargo,
ND Cass Co. United States |
Veterans Blvd. S / 44th Ave. S (46.81391, -96.88235) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2334 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Fargo,
ND Cass Co. United States |
Veterans Blvd. S / 48th Ave. S (46.80974, -96.88209) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.4190 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Fargo,
ND Cass Co. United States |
Veterans Blvd. S / 51st Ave. S (46.80612, -96.88188) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2391 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Utica,
MI Macomb Co. United States |
26 Mile Rd. / M-53 SB Ramps (42.71388, -83.02834) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 44.7542 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Utica,
MI Macomb Co. United States |
26 Mile Rd. / M-53 NB Ramps (42.71396, -83.02374) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 42.9991 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Replaced back-to-back loop ramps on northbound M-53. ICD estimated from Google Maps linework. |
West Lafayette,
IN Tippecanoe Co. United States |
Cumberland Ave. / Kent Ave. (40.46064, -86.93030) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.7092 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Olathe,
KS Johnson Co. United States |
W 153rd St. / Olathe Medical Center Pkwy. (38.85100, -94.82983) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.4361 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Year Completed estimated (2008-2010). ICD estimated from Google Maps linework. |
Wilmington,
NC New Hanover Co. United States |
Windemere Rd. / Camberly Dr. (34.24265, -77.84314) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2009 | Year Completed estimated (2008-2009). |
Wilmington,
NC New Hanover Co. United States |
Tanbridge Rd. / Wells Rd. (34.24406, -77.83776) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2009 | |
Hampstead,
MD Carroll Co. United States |
MD 30 (Hampstead Bypass) / Business MD 30 (Hanover Pike) (39.58178, -76.84261) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.1498 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Hampstead,
MD Carroll Co. United States |
MD 30 (Hampstead Bypass) / MD 482 (Hampstead Mexico Rd.) (39.61108, -76.86457) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3657 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Hampstead,
MD Carroll Co. United States |
MD-30 (Hampstead Bypass) / Business MD 30 (Hanover Pike) (39.63466, -76.86675) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.6684 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Fayetteville,
NC Cumberland Co. United States |
3499 Footbridge Ln (34.97892, -78.97495) |
Other Existing |
Other None |
3 Approaches 0 Driveways 19.5718 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Picton,
ON Prince Edward Canada |
Loyalist Pkwy. / Sandy Hook Rd. (43.99449, -77.17838) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.3828 |
Other (At-Grade) Single-Lane |
2009 | This was the first highway roundabout in Ontario. Constructed in 2009. https://www.auto123.com/en/news/ontarios-first-roundabout-intersection-opens-near-picton/5652/ ICD estimated from Google Maps linework. |