City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Chippewa Falls,
WI Chippewa Co. United States |
Parkland Dr. / Wissota Green Blvd. (44.95308, -91.35039) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.7371 |
Other (At-Grade) Single-Lane |
2006 | Functional Class: Local ICD estimated from Google Maps linework. |
Chippewa Falls,
WI Chippewa Co. United States |
STH 124 / BUS 29 (44.93498, -91.39065) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.5100 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Chippewa Falls,
WI Chippewa Co. United States |
Chippewa Crossing Blvd. / Alexander St. (44.92215, -91.37238) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.3572 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | ICD estimated from Google Maps linework. |
Chippewa Falls,
WI Chippewa Co. United States |
STH 124 / CTH S (44.96735, -91.38851) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.7849 |
Other (At-Grade) Single-Lane |
2005 | Opened October 2005. ICD estimated from Google Maps linework. |
Chippewa Falls,
WI Chippewa Co. United States |
STH 178 / CTH S (44.96615, -91.36333) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.1807 |
Other (At-Grade) Single-Lane |
2009 | Right turn bypass lanes on two corners. Opened October 2009. ICD estimated from Google Maps linework. |
St. Croix Falls,
WI Polk Co. United States |
US 8 / 208th St. (45.39731, -92.58540) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.2548 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened March 8, 2011. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
Reedsburg Rd. / US 12 WB Ramps (43.53249, -89.78612) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5617 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
Reedsburg Rd. / US 12 EB Ramps (43.53258, -89.78800) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.7569 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
STH 33 / US 12 WB Ramps (43.51445, -89.78288) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5741 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
STH 33 / US 12 EB Ramps (43.51449, -89.78516) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.7080 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Cottage Grove,
WI Dane Co. United States |
CTH N / CTH TT (43.11198, -89.19907) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.2597 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Cottage Grove,
WI Dane Co. United States |
CTH N / I-94 WB Ramps (43.11037, -89.19930) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.6200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Cottage Grove,
WI Dane Co. United States |
CTH N / I-94 EB Ramps (43.10877, -89.19923) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.3649 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Monona,
WI Dane Co. United States |
S Towne Dr. / Industrial Dr. (43.04082, -89.35458) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.9158 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Near Super-Walmart. Opened August 7, 2007. ICD estimated from Google Maps linework. |
Wisconsin Dells,
WI Columbia Co. United States |
Waubeek Rd. / River Rd. (43.63800, -89.76709) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.2523 |
Other (At-Grade) Single-Lane |
2007 | Opened November 2007. ICD estimated from Google Maps linework. |
Whitewater,
WI Jefferson Co. United States |
Burr Oak Trl. / N Acorn Ridge (42.85569, -88.74258) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.6434 |
Other (At-Grade) Single-Lane |
2007 | Opened October 2007. Functional Class: Local ICD estimated from Google Maps linework. |
Whitewater,
WI Jefferson Co. United States |
Burr Oak Trl. / (unknown) (42.85222, -88.74105) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7695 |
Other (At-Grade) Single-Lane |
2007 | Opened November 2007. Functional Class: Local ICD estimated from Google Maps linework. |
Janesville,
WI Rock Co. United States |
Morse St. / Menards Access (42.72334, -88.99679) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.3412 |
Other (At-Grade) Single-Lane |
2007 | Functional Class: Local ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
Millington Rd. / Kerry America Corp. Entrance (42.52895, -88.97019) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.5653 |
Other (At-Grade) Single-Lane |
2008 | Opened November 2008. ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH LP (Lake Park Rd.) / Midway Rd. (44.22892, -88.36319) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.2323 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH LP (Lake Park Rd.) / S Kensington Dr. (44.23956, -88.36281) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.0922 |
Other (At-Grade) Single-Lane |
2007 | Opened October 2007. ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH LP (Lake Park Rd.) / CTH AP (Plank Rd.) (44.22174, -88.36319) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0923 |
Other (At-Grade) Single-Lane |
2007 | Opened November 2007. ICD estimated from Google Maps linework. |
Waupaca,
WI Waupaca Co. United States |
STH 22 / STH 54 (Royalton St.) (44.35154, -89.03481) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.7229 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Right turn bypass lane. Opened September 2008. ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
CTH O (Superior Ave.) / CTH AB (N 40th St.-Wilgus Ave.) (43.76096, -87.75878) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.6026 |
Other (At-Grade) Single-Lane |
2007 | Opened November 2007. ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
CTH N (S Washington St.) / Emons Rd. / Buchanan Rd. (44.25141, -88.32418) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.6527 |
Other (At-Grade) Single-Lane |
2007 | Opened August 2007. ICD estimated from Google Maps linework. |
Eau Claire,
WI Eau Claire Co. United States |
Golf Rd. / Rudolph Rd. (44.77115, -91.47843) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.4590 |
Other (At-Grade) Single-Lane |
2007 | Opened September 2007. ICD estimated from Google Maps linework. |
Harrison,
WI Calumet Co. United States |
US 10 / STH 55 (44.21376, -88.28327) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.0893 |
Other (At-Grade) Single-Lane |
2009 | Opened September 2009. High speed approach roadways. ICD estimated from Google Maps linework. |
Oconto,
WI Oconto Co. United States |
STH 22 (Charles St.) / US 41 NB Ramps (44.89208, -87.89580) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.9203 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 7, 2009. ICD estimated from Google Maps linework. |
Oconto,
WI Oconto Co. United States |
STH 22 (Charles St.) / US 41 SB Ramps (44.89205, -87.90080) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.9203 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 7, 2009. ICD estimated from Google Maps linework. |
(unincorporated),
WI Manitowoc Co. United States |
STH 310 / CTH B (44.15364, -87.66055) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.4174 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. High-speed approach roadways. ICD estimated from Google Maps linework. |
(unincorporated),
WI Manitowoc Co. United States |
STH 310 / CTH Q (44.15357, -87.67864) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7037 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. High-speed approach roadways. ICD estimated from Google Maps linework. |
Kiel,
WI Manitowoc Co. United States |
STH 67 / CTH AA (E Park Ave.-Rockville Rd.) (43.92072, -88.02247) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.4329 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
(unincorporated),
WI Manitowoc Co. United States |
STH 310 / CTH R (44.15350, -87.70831) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7037 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. High-speed approach roadways. ICD estimated from Google Maps linework. |
Lannon,
WI Waukesha Co. United States |
CTH V (Town Line Rd.) / W Good Hope Rd. (43.14820, -88.18388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.0124 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Deforest,
WI Dane Co. United States |
Savannah Dr. / Williamsburg Way (43.19280, -89.31834) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0536 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Hudson,
WI Saint Croix Co. United States |
Hanley Rd. / STH 35 NB Ramps (44.94889, -92.69390) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.5014 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2005 | Right-turn bypass lane. Opened October 21, 2005. ICD estimated from Google Maps linework. |
Hudson,
WI Saint Croix Co. United States |
Hanley Rd. / STH 35 SB Ramps (44.94890, -92.69675) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0372 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2005 | Right-turn bypass lane. Opened October 21, 2005. ICD estimated from Google Maps linework. |
Harrison,
WI Calumet Co. United States |
STH 55 (Crooks Ave.-Friendship Dr.) / CTH KK (Calumet St.) (44.24297, -88.27441) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.3469 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Whitewater,
WI Walworth Co. United States |
BUS 12-STH 59 (E Milwaukee St.-Elkhorn Rd.) / Bluff Rd. / Clay St. (42.83102, -88.71045) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.2833 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Opened October 2007. ICD estimated from Google Maps linework. |
Milton,
WI Rock Co. United States |
STH 59 / STH 26 NB Ramps (42.76902, -88.92310) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 2009. |
Milton,
WI Rock Co. United States |
STH 59 / STH 26 SB Ramps (42.76911, -88.92484) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 2009. |
Milton,
WI Rock Co. United States |
STH 59 / CTH M (42.76886, -88.91364) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.5632 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
CTH EE / CTH OK (43.70249, -87.74506) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9907 |
Other (At-Grade) Single-Lane |
2011 | Opened July 28, 2011. ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / CTH Y (43.80647, -87.78098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9247 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / CTH JJ (43.81919, -87.79837) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.3314 |
Other (At-Grade) Single-Lane |
2009 | High-speed approach roadways. Opened October 2009. ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
CTH CE (College Ave.) / CTH KK (Walter Ave.-E John St.) (44.25859, -88.38350) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.2026 |
Other (At-Grade) Single-Lane |
2008 | Opened November 2008. ICD estimated from Google Maps linework. |
Eau Claire,
WI Eau Claire Co. United States |
STH 53 / Old Town Hall Rd. / Scully Rd. (44.76384, -91.41872) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.4875 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Opened October 2008. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / CTH X / Gateway Blvd. (42.53840, -88.94769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.7205 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / I-43 NB Ramps (42.53960, -88.94841) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.6798 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / I-43 SB Ramps (42.54142, -88.94933) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.0787 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / Moon Rd. / Giebel Ct. (43.56057, -89.78316) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.8114 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / Timothy Ln. (43.55597, -89.77811) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 39.8145 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 EB Ramps (43.55774, -89.77940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.6788 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 WB Ramps (43.55867, -89.78077) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5437 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
Moon Rd. / Timothy Ln. (43.56132, -89.77681) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.0800 |
Other (At-Grade) Single-Lane |
2010 | Fatal crash July 10, 2010. ICD estimated from Google Maps linework. |
Baraboo,
WI Sauk Co. United States |
Old US 12 / CTH BD (43.48896, -89.77718) |
Roundabout Removed |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2010 | Constructed in 2010. Removed in 2017(?) due to bypass expansion. |
Merrill,
WI Lincoln Co. United States |
STH 64 (1st St. E) / N Center Ave. (45.18173, -89.68332) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.5152 |
Other (At-Grade) Single-Lane |
2010 | Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Marinette,
WI Marinette Co. United States |
STH 64 (Hall Ave.) / STH 180 / CTH T (45.09968, -87.66032) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.8788 |
Other (At-Grade) Single-Lane |
2010 | Opened November 17, 2010. ICD estimated from Google Maps linework. |
(unincorporated),
WI Outagamie Co. United States |
STH 76 / CTH O (44.35172, -88.53697) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.1389 |
Other (At-Grade) Single-Lane |
2010 | Opened September 24, 2010. High-speed approach roadways. ICD estimated from Google Maps linework. |
Platteville,
WI Grant Co. United States |
Chestnut St. / Markee Ave. (42.72607, -90.48517) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.6039 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
CTH M (Pleasant View Rd.) / CTH S (Mineral Point Rd.) (43.06030, -89.53722) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.2298 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened June 27, 2011. ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
CTH M (Pleasant View Rd.) / Valley View Rd. / Junction Rd. (43.04614, -89.53278) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.1149 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened July 17, 2011. ICD estimated from Google Maps linework. |
Pleasant Prairie,
WI Kenosha Co. United States |
STH 165 (104th St.) / CTH EZ (39th Ave.) (42.52248, -87.85383) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.5327 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened August 8, 2011. ICD estimated from Google Maps linework. |
Pleasant Prairie,
WI Kenosha Co. United States |
STH 165 (104th St.) / CTH ML (Springbrook Rd.) (42.52253, -87.86031) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.8919 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 7, 2011. Yield-controlled right-turn bypass lanes. ICD estimated from Google Maps linework. |
Mukwonago,
WI Waukesha Co. United States |
STH 83 / CTH I (River Rd.) (42.92252, -88.34597) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.3560 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 23, 2011. ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH LP (Lake Park Rd.) / CTH AP (Plank Rd.) (44.23572, -88.36309) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9297 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH AP (Plank Rd.) / Midway Rd. (44.23008, -88.37485) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.2316 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Sherwood,
WI Calumet Co. United States |
STH 114 / CTH N (44.20024, -88.32381) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.0987 |
Other (At-Grade) Single-Lane |
2011 | High-sped approach roadways. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 WB Ramps (42.91764, -89.36607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2309 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 EB Ramps (42.91774, -89.36817) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1083 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 EB Ramps (42.95128, -89.37859) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7217 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 WB Ramps (42.95272, -89.37769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9591 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / CTH M (42.94950, -89.37981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9613 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Crooks Ave.) / CTE CE (E College Ave.) (44.25803, -88.27377) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9138 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Greenville,
WI Outagamie Co. United States |
STH 15 / CTH CB (Greenville Dr.) (44.28721, -88.50600) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.1525 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Opened August 2013. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / N Koeller St. / Oshkosh Ave. (44.03258, -88.57882) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2012 | Roundabout relocated to west of previous intersection. Series of 4 roundabouts. Opened June 18, 2012. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / Brooks Ln. / N Washburn St. (44.03244, -88.58758) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.9435 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened June 8, 2012. Three-lane roundabout. Series of 4 roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 SB Ramps (44.03272, -88.58319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1058 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 NB Ramps (44.03271, -88.58178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 140.8193 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 EB Ramps (44.95862, -92.55999) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.1723 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 WB Ramps (44.96036, -92.55952) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.7061 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / CTH TT (Graham St.-80th Ave.) (44.97808, -92.55799) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.5353 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 130th St. (44.99273, -92.53744) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.8527 |
Other (At-Grade) Single-Lane |
2012 | Opened July 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 120th St. (44.99254, -92.55791) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.0760 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
New Richmond,
WI Saint Croix Co. United States |
STH 65 / CTH G (45.07907, -92.53756) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9508 |
Other (At-Grade) Single-Lane |
2012 | Opened September 2012. ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / Klondike Dr. (44.59813, -90.18018) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.6235 |
Other (At-Grade) Single-Lane |
2012 | Opened November 2012. Free-flow right-turn bypass lane with acceleration lane. ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / Heritage Dr. (44.62685, -90.18053) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.6000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / CTH BB (44.62490, -90.18009) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.3017 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. Free-flow right-turn bypass lane into added lane. ICD estimated from Google Maps linework. |
Sherwood,
WI Calumet Co. United States |
STH 114-STH 55 / Stommel Rd. (44.19113, -88.28387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.5360 |
Other (At-Grade) Single-Lane |
2012 | Opened September 24, 2012. ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) (43.38493, -87.92303) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) / Northwood Rd. (43.38498, -87.92057) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Port Washington,
WI Ozaukee Co. United States |
STH 33 (W Grand Ave.) / CTH LL (43.38688, -87.90026) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.6619 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 NB Ramps (43.32441, -88.18568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 19.1147 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 SB Ramps (43.32437, -88.18747) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.5901 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Polk,
WI Washington Co. United States |
STH 60 / CTH C (Hillsdale Rd.) (43.32433, -88.24101) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4426 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / Tillie Rd. / Cedar Pkwy (43.32438, -88.19016) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.1475 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 NB Ramps (42.75114, -88.95416) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 SB Ramps (42.75331, -88.95426) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
Jupiter,
FL Palm Beach Co. United States |
N Jog Rd. / Donald Ross Rd. (26.88178, -80.14438) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 36.2192 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Coral Springs,
FL Broward Co. United States |
Blue Sage Way / Bay Leaf Ct. / Eden Manor (26.33207, -80.25658) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 58.8722 |
Other (At-Grade) Single-Lane |
2005 | Functional Class: Local ICD estimated from Google Maps linework. |