City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Anderson,
SC Anderson Co. United States |
Brown Rd. / Kings Rd. / Frances Cannon Dr. (34.56968, -82.66937) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.6029 |
Other (At-Grade) Single-Lane |
2018 | Intersection moved about 100 ft south; Frances Cannon Dr rerouted to the roundabout. Truck apron takes up almost the entire center island. https://www.independentmail.com/story/news/local/2017/12/28/roundabouts-coming-anderson-two-years-after-they-were-announced/871867001/ ICD estimated from Google Maps linework. |
Granite Falls,
NC Caldwell Co. United States |
SR 1106 (Duke St.) / Hunters Creek Dr. (35.79164, -81.42955) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.8760 |
Other (At-Grade) Single-Lane |
2018 | ICD = 130 ft. ICD estimated from Google Maps linework. |
Hibriten,
NC Caldwell Co. United States |
US 64-NC 90 / Moose Lodge Rd. / Hibriten Middle School Entrance (35.92140, -81.49903) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 19.3439 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Woodbury,
MN Washington Co. United States |
Bailey Lake Rd. / Copper Ridge Dr. (44.88115, -92.93047) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.5433 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Mocksville,
NC Davie Co. United States |
Farmington Rd. / I-40 EB Ramps (35.95570, -80.53159) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 15.4684 |
Freeway Ramps (Grade-Separated) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Maple Lake,
MN Wright Co. United States |
Division St. / Elm Ave. / CR 8 (45.22951, -93.99437) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 25.2338 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | http://www.minnesotatzd.org/events/conference/2019/documents/powerpoints/27_Stein.pdf -- https://maplelakemessenger.com/2018/07/work-begins-on-mini-roundabout/ ICD estimated from Google Maps linework. |
Rochester,
MN Olmsted Co. United States |
18th Ave. NW / 48th St. NW (44.07167, -92.48888) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.3103 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | https://kttc.com/2018/08/18/rochesters-first-mini-roundabout-set-to-debut-thursday-on-18th-avenue-nw/ ICD estimated from Google Maps linework. |
Airdrie,
AB Alberta Canada |
Reynolds Gate SW / Hillcrest Gate SW (51.25430, -114.01318) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.8794 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2020). ICD estimated from Google Maps linework. |
Augusta,
GA Richmond Co. United States |
Druid Park Ave. / Laney Walker Blvd. (33.47145, -81.99638) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.8953 |
Other (At-Grade) Single-Lane |
2018 | https://www.wrdw.com/content/news/Roundabouts-nearing-completion-across-Augusta-491061611.html ICD estimated from Google Maps linework. |
Augusta,
GA Richmond Co. United States |
Twiggs St. / Old Savannah Rd. / Martin Luther King Jr Blvd. / Picquet Ave. (33.45716, -81.97994) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.8642 |
Other (At-Grade) Single-Lane |
2018 | Combined two three-way intersections, one previously controled by a single Yield, the other controlled by a single Stop. https://www.wrdw.com/content/news/Roundabouts-nearing-completion-across-Augusta-491061611.html ICD estimated from Google Maps linework. |
Perris,
CA Riverside Co. United States |
Harley Knox Blvd. / N Webster Ave. (33.85732, -117.24380) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 68.4344 |
Other (At-Grade) Multilane (3+ Lane) |
2018 | Right-turn-only lane on west leg shares circulatory roadway with adjacent through lanes though separated from adjacent through lanes. Narrow pedestrian refuge between right-turn-only lane and adjacent through lane. ICD estimated from Google Maps linework. |
Bear,
DE New Castle Co. United States |
Howell School Rd. / Robert C Peoples Blvd. (39.57198, -75.72068) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.7453 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2016-2019). ICD estimated from Google Maps linework. |
Dover,
DE Kent Co. United States |
Willow Grove Rd. (SR 10) / Dundee Rd. (SR 15) (39.09429, -75.58103) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.5657 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). ICD estimated from Google Maps linework. |
New Minas,
NS Kings Canada |
Granite Dr. / Silver Fox Ave. / (parking lot) (45.06720, -64.43992) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 46.3940 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://nstir.maps.arcgis.com/apps/webappviewer/index.html?id=628766dbddc946bfb1d4985bfa0e5d8c ICD estimated from Google Maps linework. |
New Minas,
NS Kings Canada |
Granite Dr. / Rte 101 WB Ramps (45.06583, -64.43396) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.6806 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2018 | https://nstir.maps.arcgis.com/apps/webappviewer/index.html?id=628766dbddc946bfb1d4985bfa0e5d8c ICD estimated from Google Maps linework. |
New Minas,
NS Kings Canada |
Granite Dr. / Rte 101 EB Ramps (45.06404, -64.43281) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.9273 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2018 | https://nstir.maps.arcgis.com/apps/webappviewer/index.html?id=628766dbddc946bfb1d4985bfa0e5d8c ICD estimated from Google Maps linework. |
Tigard,
OR Washington Co. United States |
SW Bull Mountain Rd. / SW River Terrace Blvd. (45.41486, -122.84922) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7271 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Rouyn-Noranda,
QC Rouyn-Noranda Canada |
Rue Saguenay (Rte 101) / Chemin du Golf (48.26538, -79.01720) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.4976 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://dixquatre.com/2018/10/26/rue-saguenay-le-carrefour-giratoire-est-enfin-operationnel/ ICD estimated from Google Maps linework. |
Nampa,
ID Canyon Co. United States |
Robinson Rd. / E Victory Rd. (43.57596, -116.49388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
Gurnee,
IL Lake Co. United States |
Almond Rd. / Dada Dr. (42.37601, -87.98463) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | https://www.gurnee.il.us/government/departments/community-development/engineering/almond-and-dada-intersection |
Cottonwood,
AZ Yavapai Co. United States |
Camp Verde Bridgeport Hwy (AZ 260) / Camino Real / E Thousand Trails Rd. (34.66105, -111.96492) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://azdot.gov/adot-news/state-route-260-project-homestretch-completion-fall |
Cottonwood,
AZ Yavapai Co. United States |
Camp Verde Bridgeport Hwy (AZ 260) / E Coury Dr. / Hayfield Draw Dr. (34.65163, -111.95746) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://azdot.gov/adot-news/state-route-260-project-homestretch-completion-fall |
Camp Verde,
AZ Yavapai Co. United States |
Camp Verde Bridgeport Hwy (AZ 260) / N Aultman Pkwy. (34.62859, -111.93376) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://azdot.gov/adot-news/state-route-260-project-homestretch-completion-fall |
Camp Verde,
AZ Yavapai Co. United States |
Camp Verde Bridgeport Hwy (AZ 260) / (unknown) (34.62054, -111.92272) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://azdot.gov/adot-news/state-route-260-project-homestretch-completion-fall |
Sherbrooke,
QC Sherbrooke Canada |
Boulevard René-Lévesque / Rue Matisse / Rue Luce-Dufresne (45.38324, -71.99812) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2018 | |
Sherbrooke,
QC Sherbrooke Canada |
Boulevard René-Lévesque / Rue Sainte Claire / Rue Magnelli (45.38799, -71.99469) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2018 | |
Waterloo,
ON Waterloo Canada |
Columbia St. W / Bennington Gate / Chancery Ln. (43.46485, -80.57403) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Year Completed estimated (2016-2018). |
Mankato,
MN Blue Earth Co. United States |
CR 12 (586th Ave.) / Hoffman Rd. (44.15578, -93.93909) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2015-2019). |
Mankato,
MN Blue Earth Co. United States |
Hoffman Rd. / Prairie Winds Dr. (44.15592, -93.94483) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2015-2019). |
Watford City,
ND McKenzie Co. United States |
12th St. SE / 6th Ave. SE (47.79584, -103.26239) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Lincoln,
NE Lancaster Co. United States |
S 90th St. / Red Sky Ln. (40.81189, -96.59797) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Lincoln,
NE Lancaster Co. United States |
N 66th St. / Fremont St. (40.84863, -96.63043) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | Year Completed estimated (2018-2019). |
North Vernon,
IN Jennings Co. United States |
US 50 / Walnut St. / CR 400 W (38.98696, -85.68113) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | https://www.facebook.com/NVPDS/photos/west-end-bypass-roundabout-opens-six-months-after-construction-started-the-new-w/2385364561504366/ |
North,
SC Orangeburg Co. United States |
Ninety Six Rd. (SC 389) / Capital Way (SC 3) (33.59089, -81.23102) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | |
Lethbridge,
AB Alberta Canada |
7 Ave. S / 4 St. S (49.68878, -112.84127) |
Traffic Calming Circle Existing |
All-Way Yield None |
3 Approaches 0 Driveways 20.0000 |
Other (At-Grade) Single-Lane |
2018 | Painted splitter islands. Signs in central island that would require contraflow left-turn movements for large vehicles. |
Lethbridge,
AB Alberta Canada |
7 Ave. S / 6 St. S (49.68895, -112.83803) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.0000 |
Other (At-Grade) Single-Lane |
2018 | Painted splitter islands. Signs in central island that would require contraflow left-turn movements for large vehicles. |
Lethbridge,
AB Alberta Canada |
7 Ave. S / 8 St. S (49.68909, -112.83484) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 20.0000 |
Other (At-Grade) Single-Lane |
2018 | Painted splitter islands. Signs in central island that would require contraflow left-turn movements for large vehicles. |
Lethbridge,
AB Alberta Canada |
7 Ave. S / 10 St. S (49.68922, -112.83169) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.0000 |
Other (At-Grade) Single-Lane |
2018 | Painted splitter islands. Signs in central island that would require contraflow left-turn movements for large vehicles. |
Lethbridge,
AB Alberta Canada |
7 Ave. S / 12 St. S (49.68935, -112.82853) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.0000 |
Other (At-Grade) Single-Lane |
2018 | Painted splitter islands. Signs in central island that would require contraflow left-turn movements for large vehicles. |
Lethbridge,
AB Alberta Canada |
7 Ave. S / 14 St. S (49.68949, -112.82257) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 16.0000 |
Other (At-Grade) Single-Lane |
2018 | Painted splitter islands. Signs in central island that would require contraflow left-turn movements for large vehicles. |
Lethbridge,
AB Alberta Canada |
7 Ave. S / 16 St. S (49.68948, -112.81940) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.0000 |
Other (At-Grade) Single-Lane |
2018 | Painted splitter islands. Signs in central island that would require contraflow left-turn movements for large vehicles. |
Lethbridge,
AB Alberta Canada |
7 Ave. S / 20 St. S (49.68947, -112.81307) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.0000 |
Other (At-Grade) Single-Lane |
2018 | Painted splitter islands. Signs in central island that would require contraflow left-turn movements for large vehicles. |
Lethbridge,
AB Alberta Canada |
Metis Trl. / Country Meadows Blvd. W (49.69571, -112.90888) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | |
Richmond,
VA Chesterfield Co. United States |
N Arch Rd. / Arboretum Pkwy. (37.49494, -77.57103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Lynchburg,
VA Lynchburg City Co. United States |
University Blvd. / Liberty University Dr. (37.35297, -79.17498) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2019). |
Brighton City,
UT Salt Lake Co. United States |
Big Cottonwood Canyon Rd. / Brighton Loop (40.60362, -111.58264) |
Other Existing |
All-Way Yield None |
2 Approaches 0 Driveways 27.4317 |
Other (At-Grade) Single-Lane |
2018 | Entry roundabout to ski resort at end of County Road. No splitter islands on two-way leg or geometric deflection of two entries. Road splits into one-way couplet; circle facilitates U-turns. |
Salt Lake City,
UT Salt Lake Co. United States |
Campus Center Dr. / (parking) (40.76148, -111.84247) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-Lane |
2018 | On college campus of University of Utah. Year Completed estimated (2017-2018). |
New Ulm,
MN Brown Co. United States |
US 14 / Front St. Connector (44.32395, -94.45755) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2015-2020). Replaced ramps of PARCLO AB interchange. https://www.isginc.com/portfolio/us-highway-14-roundabout |
Courtland,
VA Southampton Co. United States |
US 58 Business (Main St. [Jerusalem Rd.]) / US 58 WB Ramps (36.69722, -77.04116) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
2018 | https://www.virginiadot.org/newsroom/hampton_roads/2018/major_milestone_met_months129525.asp |
Franklin,
VA Southampton Co. United States |
Old Bridge Rd. / US 58 EB Ramps (36.69339, -77.04150) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
2018 | https://www.virginiadot.org/newsroom/hampton_roads/2018/major_milestone_met_months129525.asp |
Ak-Chin Village,
AZ Pinal Co. United States |
N Ban Ln. / (unknown) (33.02543, -112.04956) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 1 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Yield-controlled right-turn bypass lane on south leg. First of several planned roundabouts on the Ak-Chin Indian Community casino expansion. |
Sherbrooke,
QC Sherbrooke Canada |
Rue James-Quintin / (unknown) / (parking lot) (45.44661, -71.87316) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2019). |
Waxhaw,
NC Union Co. United States |
Lancaster Hwy. (SR 200) / Providence Rd. (34.86038, -80.70312) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.4201 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). ICD estimated from Google Maps linework. |
Gainesville,
FL Alachua Co. United States |
SE 7th St. / SE 7th Ave. / SE Depot Ave. (29.64579, -82.31793) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.4437 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). ICD estimated from Google Maps linework. |
Berthoud,
CO Larimer Co. United States |
N Berthoud Pkwy. / Grand Market Ave. / Urban Pl. (40.33801, -105.09346) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.6078 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Year Completed estimated (2018-2019). ICD estimated from Google Maps linework. |
Clayton,
NC Johnston Co. United States |
Wethergate Dr. / Wrenwood Dr. (35.65059, -78.39829) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.0558 |
Other (At-Grade) Single-Lane |
2018 | No splitter islands. ICD estimated from Google Maps linework. |
Wake Forest,
NC Wake Co. United States |
Longleaf Estates Dr. / Rainy Lake St. / Table Mountain Pine Dr. (35.90314, -78.51040) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.2506 |
Other (At-Grade) Single-Lane |
2018 | No splitter islands. Year Completed estimated (2017-2018). ICD estimated from Google Maps linework. |
Kimball,
MI St. Clair Co. United States |
Lapeer Rd. / Allen Rd. (42.98365, -82.52408) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9380 |
Other (At-Grade) Single-Lane |
2018 | https://www.thetimesherald.com/story/news/local/2018/08/01/lapeer-roundabout-opening-traffic-thursday/881947002/ ICD estimated from Google Maps linework. |
Toledo,
OH Lucas Co. United States |
Old Promedica Pkwy. / (unknown) (41.67440, -83.59427) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 21.4101 |
Other (At-Grade) Single-Lane |
2018 | https://www.toledoblade.com/local/2016/08/19/Traffic-patterns-shift-on-ProMedica-Parkway.html ICD estimated from Google Maps linework. |
Perrysburg,
OH Wood Co. United States |
W River Rd. / Mechanic St. (41.49972, -83.70946) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.7801 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Richmond,
VA Richmond City Co. United States |
Idlewood Ave. / VA 195 EB Off-ramp (37.54200, -77.45536) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 26.5158 |
Freeway Ramps (Grade-Separated) Single-Lane |
2018 | http://www.richmondgov.com/PublicWorks/documents/press20180209_NewIdlewoodRoundaboutAffordsEasierAccessToVCU.pdf ICD estimated from Google Maps linework. |
Irvine,
CA Orange Co. United States |
Cadence / Pusan Way (33.67736, -117.72078) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.7494 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). ICD estimated from Google Maps linework. |
Milton,
GA Fulton Co. United States |
Morris Rd. / Webb Rd. (34.09740, -84.25961) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.6372 |
Other (At-Grade) Single-Lane |
2018 | Painted splitter islands on three legs. http://miltonintersectionprojects.com/morris-road/ ICD estimated from Google Maps linework. |
McMinnville,
OR Yamhill Co. United States |
NW Hill Rd. / NW Wallace Rd. (45.21798, -123.22773) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.6042 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2019). ICD estimated from Google Maps linework. |
Bluffdale,
UT Salt Lake Co. United States |
2200 W / 14400 S (40.48960, -111.94834) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 20.8913 |
Other (At-Grade) Single-Lane |
2018 | City Hall roundabout. ICD estimated from Google Maps linework. |
Roanoke,
VA Roanoke City Co. United States |
Colonial Ave. SW / Winding Way Rd. SW (37.24543, -79.97470) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 19.9657 |
Other (At-Grade) Single-Lane |
2018 | https://www.roanoke.com/news/local/roundabout-makeover-starts-tuesday-on-colonial-avenue-by-community-college/article_975d6b20-fc2e-50c5-95d0-680a8e9686ce.html ICD estimated from Google Maps linework. |
Roswell,
GA Fulton Co. United States |
Old Alabama Rd. / River Ridge Blvd. (34.01207, -84.32823) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.6401 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://www.ajc.com/news/local/roswell-starting-old-alabama-roundabout/1AmaIn7TXyP5CAnBWQ4K6M/ ICD estimated from Google Maps linework. |
Oxford,
MS Lafayette Co. United States |
S Lamar Blvd. / Belk Blvd. (34.34730, -89.52118) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.4013 |
Unknown Single-Lane |
2018 | Intersection moved about 100 feet north. https://www.oxfordeagle.com/2018/07/13/construction-continues-on-south-lamar-roundabout/ ICD estimated from Google Maps linework. |
Fayetteville,
GA Fayette Co. United States |
Veterans Pkwy. / Sandy Creek Rd. / Arthur Rank Ave. (33.47251, -84.50923) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.8425 |
Other (At-Grade) Single-Lane |
2018 | Right turn only lanes on north and south legs. Add lane right-turn bypass on west leg. https://thecitizen.com/2018/02/09/fayettevilles-5th-roundabout-operation-june/ ICD estimated from Google Maps linework. |
Fishers,
IN Hamilton Co. United States |
E 113th St. / Florida Rd. (39.95354, -85.88968) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.1281 |
Other (At-Grade) Single-Lane |
2018 | https://readthereporter.com/florida-road-roundabout-open-in-fishers/ ICD estimated from Google Maps linework. |
Dalton,
GA Whitfield Co. United States |
Carbondale Rd. SW / I-75 SB Ramps (34.65311, -84.98468) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.1233 |
Freeway Ramps (Grade-Separated) Single-Lane |
2018 | https://www.dailycitizen.news/news/local_news/expect-traffic-shift-onto-new-carbondale-road-roundabout/article_c6b0ed90-9a72-11e7-9b0e-171be0ee215b.html ICD estimated from Google Maps linework. |
Dalton,
GA Whitfield Co. United States |
Carbondale Rd. SW / I-75 NB Ramps (34.65372, -84.98301) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.2457 |
Freeway Ramps (Grade-Separated) Single-Lane |
2018 | https://www.dailycitizen.news/news/local_news/expect-traffic-shift-onto-new-carbondale-road-roundabout/article_c6b0ed90-9a72-11e7-9b0e-171be0ee215b.html ICD estimated from Google Maps linework. |
Dalton,
GA Whitfield Co. United States |
US 41 (S Dixie Rd.) /Carbondale Rd. SW / Tilton Rd. SE (34.65534, -84.97859) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.1220 |
Other (At-Grade) Single-Lane |
2018 | Striped out inner circulating lane and inner entry and exit lanes on north, south, and west legs. ICD estimated from Google Maps linework. |
Woodland,
CA Yolo Co. United States |
Harry Lorenzo Ave. / Patriot Way (38.65914, -121.74722) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 13.9893 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Long Beach,
CA Los Angeles Co. United States |
W 4th St. / Daisy Ave. (33.77173, -118.19939) |
Traffic Calming Circle Existing |
All-Way Stop None |
4 Approaches 0 Driveways 15.8847 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Long Beach,
CA Los Angeles Co. United States |
W 5th St. / Daisy Ave. (33.77292, -118.19939) |
Traffic Calming Circle Existing |
All-Way Stop None |
4 Approaches 0 Driveways 13.8990 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Long Beach,
CA Los Angeles Co. United States |
W 8th St. / Daisy Ave. (33.77658, -118.19939) |
Traffic Calming Circle Existing |
All-Way Stop None |
4 Approaches 0 Driveways 15.8838 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Long Beach,
CA Los Angeles Co. United States |
W 9th St. / Daisy Ave. (33.77776, -118.19939) |
Traffic Calming Circle Existing |
All-Way Stop None |
4 Approaches 0 Driveways 9.9273 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Long Beach,
CA Los Angeles Co. United States |
W 10th St. / Daisy Ave. (33.77898, -118.19939) |
Traffic Calming Circle Existing |
All-Way Stop None |
4 Approaches 0 Driveways 11.9125 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Middletown,
DE New Castle Co. United States |
(Summit Bridge Rd. connector) / US 301 NB Ramps (39.48404, -75.72131) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.1060 |
Freeway Ramps (Grade-Separated) Single-Lane |
2018 | Raindrop shape. ICD estimated from Google Maps linework. |
Union,
KY Boone Co. United States |
Mt Zion Rd. / (unknown) (38.94650, -84.67308) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8033 |
Other (At-Grade) Single-Lane |
2018 | http://www.cityofunionky.org/ky-536mount-zion-road-update/ ICD estimated from Google Maps linework. |
New Albany,
OH Franklin Co. United States |
Morse Rd. / Kitzmiller Rd. (40.05268, -82.80306) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2019). |
Blaine,
MN Anoka Co. United States |
105th Ave. NE / Irvin Pkwy. (45.16076, -93.22538) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.6337 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://blainemn.gov/Blog.aspx?IID=37&ARC=20 ICD estimated from Google Maps linework. |
Blaine,
MN Anoka Co. United States |
105th Ave. NE/(National Sports Center entry) (45.16079, -93.22210) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.8436 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://blainemn.gov/Blog.aspx?IID=37&ARC=20 ICD estimated from Google Maps linework. |
Mechanicsville,
VA Hanover Co. United States |
Studley Rd. / Rural Point Rd. (37.66768, -77.34019) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.4710 |
Other (At-Grade) Single-Lane |
2018 | Replaced highly skewed stop-controlled intersection. https://www.facebook.com/HanoverCountyVA/videos/studley-road-and-rural-point-road-roundabout/1801687246541853/ ICD estimated from Google Maps linework. |
Wenatchee,
WA Chelan Co. United States |
N Western Ave. / Springwater Ave. (47.43706, -120.34620) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | https://www.wenatcheeworld.com/news/local/wenatchee-moves-forward-with-mini-roundabout/article_7f3a17d4-e6b6-5cff-8041-8825b741f221.html |
West Lafayette,
IN Tippecanoe Co. United States |
McCormick Rd. / W Stadium Ave. (40.43063, -86.93198) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.4557 |
Other (At-Grade) Single-Lane |
2018 | https://www.purdueexponent.org/campus/public_safety/article_602c0950-9bdf-11e8-98b2-73ffea2f5242.html ICD estimated from Google Maps linework. |
St John’s,
NL Newfoundland and Labrador Canada |
Blackmarsh Rd. / Redmond's Rd. / Empire Ave. (47.54064, -52.76583) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.0189 |
Other (At-Grade) Single-Lane |
2018 | Right-turn bypass lane on west leg. ICD estimated from Google Maps linework. |
Littleton,
CO Jefferson Co. United States |
S Platte Canyon Rd. / S Kendall Blvd. / W Chatfield Ave. (39.56787, -105.06207) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.3029 |
Other (At-Grade) Single-Lane |
2018 | Merging right-turn bypass lanes on west and south legs. Year Completed estimated (2017-2018). ICD estimated from Google Maps linework. |
Roswell,
GA Fulton Co. United States |
Sun Valley Dr. / Finchley Dr. / Timbercreek Pkwy. (34.04666, -84.33177) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2018 | |
Jonesboro,
GA Henry Co. United States |
Jodeco Rd. / Blackhall Rd. / Longwood Dr. (33.50911, -84.27798) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://movinghenryforward.org/2018/07/03/jodeco-blackhall-closure-for-final-construction/ |
Snellville,
GA Gwinnett Co. United States |
Pharrs Rd. / North Rd. (33.87986, -84.00796) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2018 | https://www.facebook.com/118447561441/posts/the-pharrs-north-roundabout-from-the-fifth-floor-of-the-new-hampton-inn-and-suit/10155529096506442/ |
Missoula,
MT Missoula Co. United States |
Paxson St/Southgate Mall Access (46.84396, -114.02899) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | Year Completed estimated (2016-2019). |
Londonderry,
NH Rockingham Co. United States |
Michels Way / Main St. (42.87228, -71.35008) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
Londonderry,
NH Rockingham Co. United States |
Michels Way / First Ave. (42.87405, -71.35055) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Buda,
TX Hays Co. United States |
Sunfield Pkwy. / Promenade Pkwy. (30.07771, -97.79747) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
Oakland,
CA Alameda Co. United States |
E 29th Ave. / E 9th St. / I-880 NB Onramp (37.77536, -122.23293) |
Roundabout Existing |
All-Way Yield Metering Signal |
2 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2018 | Ramp meter on south leg upstream of roundabout to meter freeway entrance ramp. |
Sparks,
NV Washoe Co. United States |
La Posada Dr. / Omni Dr. / Stonebrook Pkwy. (39.63607, -119.69943) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | |
Franklin,
IN Johnson Co. United States |
E King St. / Eastview Dr. (39.48269, -86.03241) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2018 | Right-turn-only lanes on north and east legs. |
Warsaw,
IN Kosciusko Co. United States |
Husky Trl. / Mariners Dr. (41.25055, -85.82346) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2016-2020). |