|
City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
|---|---|---|---|---|---|---|---|
|
Appleton,
WI Calumet Co. United States |
CTH AP (Plank Rd.) / Midway Rd. (44.23008, -88.37485) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.2316 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
|
Sherwood,
WI Calumet Co. United States |
STH 114 / CTH N (44.20024, -88.32381) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.0987 |
Other (At-Grade) Single-Lane |
2011 | High-sped approach roadways. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
|
Oregon,
WI Dane Co. United States |
STH 138 / US 14 WB Ramps (42.91764, -89.36607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2309 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
|
Oregon,
WI Dane Co. United States |
STH 138 / US 14 EB Ramps (42.91774, -89.36817) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1083 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
|
Oregon,
WI Dane Co. United States |
CTH MM / US 14 EB Ramps (42.95128, -89.37859) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7217 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
|
Oregon,
WI Dane Co. United States |
CTH MM / US 14 WB Ramps (42.95272, -89.37769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9591 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
|
Oregon,
WI Dane Co. United States |
CTH MM / CTH M (42.94950, -89.37981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9613 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
|
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Crooks Ave.) / CTE CE (E College Ave.) (44.25803, -88.27377) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9138 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
|
Greenville,
WI Outagamie Co. United States |
STH 15 / CTH CB (Greenville Dr.) (44.28721, -88.50600) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.1525 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Opened August 2013. ICD estimated from Google Maps linework. |
|
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / N Koeller St. / Oshkosh Ave. (44.03258, -88.57882) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2012 | Roundabout relocated to west of previous intersection. Series of 4 roundabouts. Opened June 18, 2012. |
|
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / Brooks Ln. / N Washburn St. (44.03244, -88.58758) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.9435 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened June 8, 2012. Three-lane roundabout. Series of 4 roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 SB Ramps (44.03272, -88.58319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1058 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
|
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 NB Ramps (44.03271, -88.58178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 140.8193 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
|
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 EB Ramps (44.95862, -92.55999) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.1723 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
|
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 WB Ramps (44.96036, -92.55952) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.7061 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
|
Roberts,
WI Saint Croix Co. United States |
STH 65 / CTH TT (Graham St.-80th Ave.) (44.97808, -92.55799) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.5353 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
|
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 130th St. (44.99273, -92.53744) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.8527 |
Other (At-Grade) Single-Lane |
2012 | Opened July 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
|
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 120th St. (44.99254, -92.55791) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.0760 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
|
New Richmond,
WI Saint Croix Co. United States |
STH 65 / CTH G (45.07907, -92.53756) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9508 |
Other (At-Grade) Single-Lane |
2012 | Opened September 2012. ICD estimated from Google Maps linework. |
|
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / Klondike Dr. (44.59813, -90.18018) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.6235 |
Other (At-Grade) Single-Lane |
2012 | Opened November 2012. Free-flow right-turn bypass lane with acceleration lane. ICD estimated from Google Maps linework. |
|
Marshfield,
WI Wood Co. United States |
STH 13 / Heritage Dr. (44.62685, -90.18053) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.6000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
|
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / CTH BB (44.62490, -90.18009) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.3017 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. Free-flow right-turn bypass lane into added lane. ICD estimated from Google Maps linework. |
|
Sherwood,
WI Calumet Co. United States |
STH 114-STH 55 / Stommel Rd. (44.19113, -88.28387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.5360 |
Other (At-Grade) Single-Lane |
2012 | Opened September 24, 2012. ICD estimated from Google Maps linework. |
|
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) (43.38493, -87.92303) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) / Northwood Rd. (43.38498, -87.92057) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Port Washington,
WI Ozaukee Co. United States |
STH 33 (W Grand Ave.) / CTH LL (43.38688, -87.90026) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.6619 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Jackson,
WI Washington Co. United States |
STH 60 / US 45 NB Ramps (43.32441, -88.18568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 19.1147 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
|
Jackson,
WI Washington Co. United States |
STH 60 / US 45 SB Ramps (43.32437, -88.18747) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.5901 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
|
Polk,
WI Washington Co. United States |
STH 60 / CTH C (Hillsdale Rd.) (43.32433, -88.24101) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4426 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
|
Jackson,
WI Washington Co. United States |
STH 60 / Tillie Rd. / Cedar Pkwy (43.32438, -88.19016) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.1475 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 NB Ramps (42.75114, -88.95416) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
|
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 SB Ramps (42.75331, -88.95426) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
|
Green Bay,
WI Brown Co. United States |
Airport Dr. (STH 172) / S. Pine Tree Rd. (44.49955, -88.14986) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.2968 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
|
De Pere,
WI Brown Co. United States |
Chicago St. (CTH G) / Libal St. (44.44026, -88.03812) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.8455 |
Other (At-Grade) Single-Lane |
2001 | Roundabout surrounded by homes, businesses, East De Pere Middle School, and De Pere High School. Roundabout serves as main entrance to the high school. Completed August 2001. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
|
De Pere,
WI Brown Co. United States |
Dickinson Rd. (CTH G) / Swan Rd. (44.43908, -88.03475) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.0241 |
Other (At-Grade) Single-Lane |
2001 | Roundabout is slightly east of the Chicago/Libal roundabout and is surrounded by businesses and East De Pere Middle School. Roundabout serves as the entrance to a medical clinic. Completed August 2001. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
|
Green Bay,
WI Brown Co. United States |
Airport Dr. (STH 172) / Airport Entrance (44.49569, -88.12467) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.1882 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 2011. ICD estimated from Google Maps linework. |
|
Kiel,
WI Manitowoc Co. United States |
STH 67-STH 32 / STH 57 (43.90986, -88.02251) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.0446 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened November 13, 2009. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
De Pere,
WI Brown Co. United States |
Dickinson Rd. (CTH G) / East River Dr. (44.43684, -88.02830) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.7306 |
Other (At-Grade) Single-Lane |
2001 | Roundabout is slightly east of the Chicago/Swan roundabout and is located in a residential area. Roundabout is near East De Pere Middle School and De Pere High School. Completed August 2001. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
|
Howard,
WI Brown Co. United States |
Belmont Rd. / Belle Plane Rd. (44.58361, -88.09459) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.9671 |
Other (At-Grade) Single-Lane |
2000 | Roundabout was constructed in center of residential subdivision south of Lineville Road. Roundabout is slightly smaller than the Lineville roundabouts. Completed August 2000. http://www.co.brown.wi.us/Planning/roundabouts.html Functional Class: Local ICD estimated from Google Maps linework. |
|
Howard,
WI Brown Co. United States |
Velp Ave. (CTH HS) / Woodale Ave. (CTH EB) (44.57293, -88.07800) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.3300 |
Other (At-Grade) Single-Lane |
2002 | Roundabout Located near industrial park, rail line, and the Mountain-Bay Recreational Trail. Roundabout is at the intersection of two county highways and is slightly larger than the roundabouts built in 1999 and 2001 in Howard and De Pere. Completed August 2002. http://www.co.brown.wi.us/Planning/roundabouts.html. Fatal crash June 5, 2011. 11861-05. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
De Pere,
WI Brown Co. United States |
Grant St. (CTH EE) / S 9th St. (44.44506, -88.09000) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 26.4324 |
Other (At-Grade) Single-Lane |
2003 | Roundabout located within residential neighborhood that also contains a few small businesses and a fire station. One of the fire station driveways directly accesses the roundabout. Completed August 2003. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
|
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / Suburban Dr. (44.43055, -88.08604) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4090 |
Other (At-Grade) Single-Lane |
2004 | One of two roundabouts on an arterial street that separates a residential neighborhood from a business park. Many trucks traveling to and from the business park pass through this intersection each day, and the roundabout serves as an attractive entrance to the neighborhood and park. Completed November 2004. http://www.co.brown.wi.us/Planning/roundabouts.html. Series of 6 roundabouts. Opened November 2004. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / S 9th St. / W Matthew Dr. (44.43063, -88.09529) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.8205 |
Other (At-Grade) Single-Lane |
2004 | Second of two roundabouts on an arterial street separating residential neighborhood from a business park. Many trucks pass through this intersection each day. Completed November 2004. http://www.co.brown.wi.us/Planning/roundabouts.html. Series of 6 roundabouts. Opened November 2004. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Howard,
WI Brown Co. United States |
Glendale Ave. / Evergreen Ave. (44.57615, -88.11939) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9252 |
Other (At-Grade) Single-Lane |
2008 | Opened November 2008. ICD estimated from Google Maps linework. |
|
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / I-43 NB Ramps (43.79261, -87.76325) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0714 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | Opened November 2007. http://www.sheboygan-press.com/apps/pbcs.dll/article?AID=/20071028/SHE0101/710280468/1973 ICD estimated from Google Maps linework. |
|
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / I-43 SB Ramps (43.79406, -87.76523) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.9673 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | Opened November 2007. http://www.sheboygan-press.com/apps/pbcs.dll/article?AID=/20071028/SHE0101/710280468/1973 ICD estimated from Google Maps linework. |
|
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / Vanguard Dr. (Walmart entrance) (43.79655, -87.76846) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.5517 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Opened November 2007. Roundabout serves Wal-mart retail center. http://www.sheboygan-press.com/apps/pbcs.dll/article?AID=/20071028/SHE0101/710280468/1973 Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Sheboygan,
WI Sheboygan Co. United States |
8th St. / Indiana Ave. (43.74340, -87.71295) |
Other Existing |
Unknown Unknown |
5 Approaches 0 Driveways 56.9471 |
Other (At-Grade) Unknown |
ICD estimated from Google Maps linework. | |
|
Sheboygan Falls,
WI Sheboygan Co. United States |
STH 28 / STH 32 (43.71747, -87.81612) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.1180 |
Other (At-Grade) Single-Lane |
2006 | Opened September 2006. High speed approach roadways. ICD estimated from Google Maps linework. |
|
Bellevue,
WI Brown Co. United States |
US 141 / Allouez Ave. (44.45882, -87.95038) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4753 |
Other (At-Grade) Single-Lane |
2007 | Railroad is ~110 feet from roundabout. Seasonal summaer crossing and maybe 1 train per day for a short duration. Opened November 2, 2007. ICD estimated from Google Maps linework. |
|
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Perimeter St. (43.01009, -89.72186) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.5667 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Brookwood Dr. (43.00978, -89.71380) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.8068 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Telmark Pkwy. (43.00933, -89.71098) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.6540 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Ridgeview Rd. / Lillehammer Ln. (43.00663, -89.70390) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.4418 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Mount Horeb,
WI Dane Co. United States |
Springdale St. / STH 78 / STH 92 (43.01007, -89.73044) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.9333 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Madison,
WI Dane Co. United States |
Thompson Dr. / STH 30 EB Off-Ramp (43.10506, -89.30066) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.0073 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Opened October 22, 2004. ICD estimated from Google Maps linework. |
|
Madison,
WI Dane Co. United States |
Thompson Dr. / STH 30 WB On-Ramp / Commercial Ave. (43.10643, -89.30084) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.9822 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Opened October 22, 2004. ICD estimated from Google Maps linework. |
|
Madison,
WI Dane Co. United States |
Kendall Ave. / Grand Ave. (43.07145, -89.43156) |
Traffic Calming Circle Existing |
Unknown Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
1997 | |
|
Madison,
WI Dane Co. United States |
New Washburn Way / Dandaneau Trl. / Chautauqua Trl. (43.04669, -89.51501) |
Traffic Calming Circle Existing |
Unknown Unknown |
4 Approaches 0 Driveways 13.9650 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
|
Madison,
WI Dane Co. United States |
Glenway St. / Hillcrest Dr. (43.06437, -89.43896) |
Traffic Calming Circle Existing |
Unknown Unknown |
4 Approaches 0 Driveways 11.3433 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
|
Oshkosh,
WI Winnebago Co. United States |
Jackson St. / Murdock Ave. (44.03947, -88.54265) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | |
|
Howard,
WI Brown Co. United States |
Lineville Rd. (CTH M) / Cardinal Ln. (CTH EB) (44.59090, -88.08430) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.7684 |
Other (At-Grade) Single-Lane |
1999 | Roundabout is near Forest Glen Elementary School, Lineville Intermediate School, and Bay Port High School. Completed October 1999. http://www.co.brown.wi.us/Planning/roundabouts.html Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Howard,
WI Brown Co. United States |
Lineville Rd. (CTH M) / Rockwell Ln. (44.59080, -88.08880) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.0674 |
Other (At-Grade) Single-Lane |
1999 | Roundabout is adjacent to Lineville Intermediate School, Middle School, and High School. School did not allow pedestrian crossings prior to roundabout due to unsafe conditions, now allows crossings using crossing guard. Completed October 1999. http://www.co.brown.wi.us/Planning/roundabouts.html Previously controlled by one-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Green Bay,
WI Brown Co. United States |
Mason St. (STH 32-STH 54) / S. Taylor St. (44.52414, -88.07916) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. Right-turn-only lane on west and east legs. |
|
Green Bay,
WI Brown Co. United States |
Shawano Ave. (STH 29) / Taylor St. (44.53461, -88.07319) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.3783 |
Other (At-Grade) Multilane (3+ Lane) |
2011 | Opened September 2011. ICD estimated from Google Maps linework. |
|
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 NB Ramps (44.52415, -88.08103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.4266 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
|
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 SB Ramps (44.52418, -88.08284) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.9811 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
|
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 SB Ramps (44.43050, -88.11402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.3880 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | Series of 6 roundabouts. Opened September 2011. |
|
De Pere,
WI Brown Co. United States |
Grant St. (CTH EE) / Lawrence Dr. (44.44511, -88.09367) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.8430 |
Other (At-Grade) Single-Lane |
2008 | Opened September 30, 2008. ICD estimated from Google Maps linework. |
|
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 NB Ramps (44.43074, -88.10989) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2011 | Series of 6 roundabouts. Yield-controlled right-turn bypass lane on south leg; merging right-turn bypass lane on east leg. Opened September 2011. Circular central island. |
|
Oshkosh,
WI Winnebago Co. United States |
CTH E (Witzel Ave.) / Koeller St. (44.01805, -88.58098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened September 24, 2010. |
|
Wisconsin Rapids,
WI Wood Co. United States |
STH 54 (2nd Ave.) / Gaynor Ave. / 17th Ave. (44.38025, -89.84447) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.3874 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Opened September 2004. Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Milwaukee,
WI Milwaukee Co. United States |
S. 6th St. / W. Virginia St. / Florida St. (43.02698, -87.91770) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.7816 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2002 | Built as terminal of new bridge. Signal located downstream approximately 150-200 feet away (estimated) that queues back through roundabout during weekday p.m. peak. No lane designations on approach. Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Howard,
WI Brown Co. United States |
Glendale Ave. / Hillcrest Heights (44.56551, -88.09801) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9305 |
Other (At-Grade) Single-Lane |
2008 | Opened August 1, 2008. ICD estimated from Google Maps linework. |
|
Oshkosh,
WI Winnebago Co. United States |
CTH E (Witzel Ave.) / Washburn St. (44.01808, -88.58321) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened September 24, 2010. |
|
West Bend,
WI Washington Co. United States |
Paradise Dr. / CTH G (43.39770, -88.16100) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.5053 |
Other (At-Grade) Single-Lane |
2003 | Completed September 18, 2003 Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Oconomowoc,
WI Waukesha Co. United States |
Wisconsin Ave. / Lake Dr. (43.11224, -88.43968) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.1314 |
Other (At-Grade) Single-Lane |
2002 | Opened October 15, 2002. Previously controlled by one-way stop Functional Class: Local ICD estimated from Google Maps linework. |
|
Kaukauna,
WI Outagamie Co. United States |
CTH J / US 41 NB Ramps (44.30463, -88.24939) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.6070 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Opened October 11, 2010. ICD estimated from Google Maps linework. |
|
Kaukauna,
WI Outagamie Co. United States |
CTH J / US 41 SB Ramps (44.30645, -88.24948) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.8965 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Opened October 11, 2010. ICD estimated from Google Maps linework. |
|
Brookfield,
WI Waukesha Co. United States |
Barker Rd. (CTH Y) / North Ave. (CTH M) (43.06136, -88.16629) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.9042 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Tarnowo Podgórne,
Wielkopolskie Poznański Poland |
Rte 307 (Bukowska) / Rynkowa / Skórzewska (52.41478, 16.79053) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
Turbo roundabout. | |
|
Tarnowo Podgórne,
Wielkopolskie Poznański Poland |
Rte 307 (Bukowska) / Batorowska (52.41287, 16.76619) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
|
Rokietnica,
Wielkopolskie Poznański Poland |
Dojazd / Kierska / Golęcińska (52.50271, 16.76524) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Aleksandrów Łódzki,
Woj. Łódzkie Powiat Zgierski Poland |
ulica Słowiańska / ulica Panska / ulica Koscielna / ulica Aleksandrowska (51.78946, 19.32078) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.5052 |
Other (At-Grade) Single-Lane |
https://www.huffpost.com/entry/roundabout-crash-flying-car_n_5e968401c5b6ead140048120 ICD estimated from Google Maps linework. | |
|
Lodz,
Woj. Łódzkie Lodz Poland |
(unknown) / S14 SB Ramps (51.79700, 19.33578) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Unknown |
||
|
Aleksandrów Łódzki,
Woj. Łódzkie Powiat Zgierski Poland |
(unknown) / S14 NB Ramps (51.79606, 19.33982) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Unknown |
||
|
Cracow,
Woj. Małopolskie Cracow Poland |
Rondo Grzegórzeckie (50.05764, 19.95900) |
Signalized Roundabout/Circle Existing |
Signal Unknown |
4 Approaches 0 Driveways 96.6141 |
Other (At-Grade) Multilane (3+ Lane) |
2008 | Turbo roundabout. Tram rail lines running along medians and intersecting in central island. ICD estimated from Google Maps linework. |
|
Cracow,
Woj. Małopolskie Cracow Poland |
Rondo Kocmyrzowskie Gorzelnego (50.07964, 20.02735) |
Signalized Roundabout/Circle Existing |
Signal Unknown |
4 Approaches 0 Driveways 87.3727 |
Other (At-Grade) Multilane (3+ Lane) |
2005 | Turbo roundabout. Tram rail lines along medians intersect in central island. ICD estimated from Google Maps linework. |
|
Inwood,
WV Berkeley Co. United States |
Gerrardstown Rd. / Winchester Ave. (39.36098, -78.03754) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 49.8644 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
|
Inwood,
WV Berkeley Co. United States |
Middleway Pike / WV-51 / Surveyor Dr. (39.35656, -78.03477) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.5563 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
|
Inwood,
WV Berkeley Co. United States |
WV-51 / (unknown) (39.35929, -78.03503) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.5593 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
|
Ranson,
WV Jefferson Co. United States |
Flowing Springs Rd. / E 5th Ave. (39.30291, -77.84482) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 49.9058 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
|
Ranson,
WV Jefferson Co. United States |
Lancaster Circle (S Fairfax Blvd. / S Mildred St. / W 4th Ave.) (39.29523, -77.86039) |
Other Existing |
All-Way Yield Unknown |
6 Approaches 0 Driveways 52.6841 |
Other (At-Grade) Single-Lane |
Pedestrian access to central island. ICD estimated from Google Maps linework. | |
|
Ranson,
WV Jefferson Co. United States |
Mountain Laurel Blvd. / Watercourse Dr. (39.30585, -77.83853) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.3450 |
Other (At-Grade) Single-Lane |
2005 | Year Completed estimated (2003-2007). ICD estimated from Google Maps linework. |
|
Charles Town,
WV Jefferson Co. United States |
St George St. / Citizens Way / US 340 SB Ramps (39.27528, -77.84935) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 30.5100 |
Freeway Ramps (Grade-Separated) Single-Lane |
2018 | Year Completed estimated (2015-2019). ICD estimated from Google Maps linework. |
|
Morgantown,
WV Monongalia Co. United States |
University Town Center Dr. / I-79 SB Ramps (39.63879, -80.00274) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1471 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2016 | https://www.constructionequipmentguide.com/i-79-interchange-nears-completion-in-morgantown-wva/31295. ICD estimated from Google Maps linework. |
|
Ranson,
WV Jefferson Co. United States |
Fairfax Circle (Fairfax Blvd. / Baker Pl. / Joshua M Freeman Blvd.) (39.31842, -77.85264) |
Rotary Existing |
All-Way Yield None |
5 Approaches 0 Driveways 130.2806 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2005 | Fifth leg stubbed. Oval shape with pond in center island. Year Completed estimated (2003-2007). ICD estimated from Google Maps linework. |
|
Ranson,
WV Jefferson Co. United States |
Brickyard Circle (Baker Pl. / Wallace Way) (39.32036, -77.85489) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.8059 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Two approaches stubbed. ICD estimated from Google Maps linework. |
|
Ranson,
WV Jefferson Co. United States |
Oak Lee Dr. / (unknown) (39.32089, -77.84637) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.1972 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2005 | Two legs stubbed. Year Completed estimated (2003-2007). ICD estimated from Google Maps linework. |
|
Ranson,
WV Jefferson Co. United States |
Dupont Circle (Joshua M Freeman Blvd. / Wallace Way) (39.32132, -77.85274) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 18.4788 |
Other (At-Grade) Single-Lane |
2008 | Painted splitter islands. Year Completed estimated (2007-2008). ICD estimated from Google Maps linework. |