City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / I-94 EB Ramps (43.06063, -88.44229) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.9046 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / I-94 WB Ramps (43.06174, -88.44228) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.1203 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
Middleton,
WI Dane Co. United States |
Parmenter St. / US 12 WB Off-Ramp / Discovery Dr. (43.10221, -89.51196) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.3928 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2006 | Opened October 2006. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
Reedsburg Rd. / US 12 WB Ramps (43.53249, -89.78612) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5617 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
Reedsburg Rd. / US 12 EB Ramps (43.53258, -89.78800) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.7569 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
STH 33 / US 12 WB Ramps (43.51445, -89.78288) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5741 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
STH 33 / US 12 EB Ramps (43.51449, -89.78516) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.7080 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Cottage Grove,
WI Dane Co. United States |
CTH N / I-94 WB Ramps (43.11037, -89.19930) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.6200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Cottage Grove,
WI Dane Co. United States |
CTH N / I-94 EB Ramps (43.10877, -89.19923) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.3649 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oconto,
WI Oconto Co. United States |
STH 22 (Charles St.) / US 41 NB Ramps (44.89208, -87.89580) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.9203 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 7, 2009. ICD estimated from Google Maps linework. |
Oconto,
WI Oconto Co. United States |
STH 22 (Charles St.) / US 41 SB Ramps (44.89205, -87.90080) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.9203 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 7, 2009. ICD estimated from Google Maps linework. |
Hudson,
WI Saint Croix Co. United States |
Hanley Rd. / STH 35 NB Ramps (44.94889, -92.69390) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.5014 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2005 | Right-turn bypass lane. Opened October 21, 2005. ICD estimated from Google Maps linework. |
Hudson,
WI Saint Croix Co. United States |
Hanley Rd. / STH 35 SB Ramps (44.94890, -92.69675) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0372 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2005 | Right-turn bypass lane. Opened October 21, 2005. ICD estimated from Google Maps linework. |
Milton,
WI Rock Co. United States |
STH 59 / STH 26 NB Ramps (42.76902, -88.92310) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 2009. |
Milton,
WI Rock Co. United States |
STH 59 / STH 26 SB Ramps (42.76911, -88.92484) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 2009. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / I-43 NB Ramps (42.53960, -88.94841) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.6798 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / I-43 SB Ramps (42.54142, -88.94933) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.0787 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 EB Ramps (43.55774, -89.77940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.6788 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 WB Ramps (43.55867, -89.78077) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5437 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 WB Ramps (42.91764, -89.36607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2309 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 EB Ramps (42.91774, -89.36817) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1083 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 EB Ramps (42.95128, -89.37859) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7217 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 WB Ramps (42.95272, -89.37769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9591 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 SB Ramps (44.03272, -88.58319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1058 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 NB Ramps (44.03271, -88.58178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 140.8193 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 EB Ramps (44.95862, -92.55999) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.1723 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 WB Ramps (44.96036, -92.55952) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.7061 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 NB Ramps (43.32441, -88.18568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 19.1147 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 SB Ramps (43.32437, -88.18747) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.5901 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 NB Ramps (42.75114, -88.95416) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 SB Ramps (42.75331, -88.95426) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
Cottage Grove,
MN Washington Co. United States |
Jamaica Ave. / US 10-US 61 EB Ramps / W Point Douglas Rd. (44.81452, -92.93504) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 57.6128 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Cottage Grove,
MN Washington Co. United States |
Jamaica Ave. / US 10-US 61 WB Ramps (44.81586, -92.93379) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.2780 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Prescott,
AZ Yavapai Co. United States |
Grande Dame Pkwy. / SR 89A EB Ramps (34.63499, -112.39830) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 52.0821 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Prescott,
AZ Yavapai Co. United States |
Grande Dame Pkwy. / SR 89A WB Ramps (34.63643, -112.39710) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.0985 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Mesa,
AZ Maricopa Co. United States |
E McKellips Rd. / Loop 202 SB Ramps (33.45145, -111.67100) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.8421 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Mesa,
AZ Maricopa Co. United States |
E McKellips Rd. / Loop 202 NB Ramps (33.45142, -111.66850) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.8492 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Edwards,
CO Eagle Co. United States |
Edwards Access Rd. / Beard Creek Rd. / I-70 WB Ramps (39.64991, -106.58720) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.3812 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | ICD estimated from Google Maps linework. |
Edwards,
CO Eagle Co. United States |
Edwards Access Rd. / I-70 EB Ramps (39.64891, -106.58780) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7034 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | ICD estimated from Google Maps linework. |
Avoca Borough,
PA Luzerne Co. United States |
William St. / I-81 SB Ramps (41.33570, -75.73790) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2188 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Avoca Borough,
PA Luzerne Co. United States |
SR 315 / I-81 SB Ramps (41.33392, -75.73889) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 65.5320 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2016 | |
Avoca Borough,
PA Luzerne Co. United States |
SR 315 / I-81 NB Ramps / Navy Way Rd. (41.33429, -75.73450) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.4971 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2015 | Fifth leg is departure only to I-81 NB on-ramp. ICD estimated from Google Maps linework. |
Moon Township,
PA Allegheny Co. United States |
SR 3070 / Resurrection Rd. / I-376 SB Ramps (40.48070, -80.20240) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.4290 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Previously controlled by two-way stop ICD estimated from Google Maps linework. |
Warrensburg,
MO Johnson Co. United States |
SR 13 / US 50 WB Ramps (38.77480, -93.68554) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.9690 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Warrensburg,
MO Johnson Co. United States |
SR 13 / US 50 EB Ramps (38.77151, -93.68568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.9709 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
Clay Terrace Blvd. / Circle Dr. / Range Line Rd. / US 31 SB Off-Ramp (39.99264, -86.12840) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | |
Carmel,
IN Hamilton Co. United States |
E Main St. / Keystone Pkwy. SB Ramps (39.97844, -86.11319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Raindrop shaped. Year Completed estimated (2008-2010). |
Carmel,
IN Hamilton Co. United States |
E Main St. / Keystone Pkwy. NB Ramps (39.97843, -86.11238) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Raindrop shaped. Year Completed estimated (2008-2010). |
Westfield,
IN Hamilton Co. United States |
E 161st St. / US 31 NB Ramps (40.02195, -86.13092) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2013 | Raindrop shaped. Series of 3 roundabouts. |
Westfield,
IN Hamilton Co. United States |
E 161st St. / US 31 SB Ramps (40.02183, -86.13259) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2013 | Raindrop shaped. Series of 3 roundabouts. |
Medford,
MA Middlesex Co. United States |
Fellsway W. / Forest St. / S Border Rd. / I-93 Ramps (42.42933, -71.10333) |
Rotary Existing |
Unknown Unknown |
4 Approaches 0 Driveways 132.2319 |
Freeway Ramps (Grade-Separated) Unknown |
ICD estimated from Google Maps linework. | |
Westwood,
MA Norfolk Co. United States |
East St. / US 95 Ramps / Canton St. / Allied St. (42.22317, -71.17071) |
Rotary Existing |
Unknown Unknown |
6 Approaches 0 Driveways 86.6751 |
Freeway Ramps (Grade-Separated) Unknown |
ICD estimated from Google Maps linework. | |
Carmel,
IN Hamilton Co. United States |
W Main St. / US 31 NB Ramps (39.97797, -86.15668) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2015 | Raindrop shaped. |
Carmel,
IN Hamilton Co. United States |
W Main St. / US 31 SB Ramps (39.97787, -86.15802) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2015 | Raindrop shaped. |
Carmel,
IN Hamilton Co. United States |
Old Meridian St. / US 31 SB Ramps (39.98504, -86.14209) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | |
Carmel,
IN Hamilton Co. United States |
Old Meridian St. / US 31 NB Ramps (39.98429, -86.14154) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2015 | |
Eagle,
CO Eagle Co. United States |
Eby Creek Rd. / I-70 EB Ramps (39.65961, -106.82719) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 37.6976 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Right-turn bypass lane in southeast quadrant. Estimated year completed; built sometime between 2011 and 2015. ICD estimated from Google Maps linework. |
Eagle,
CO Eagle Co. United States |
Eby Creek Rd. / I-70 WB Ramps (39.66068, -106.82819) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.1804 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Estimated year completed; built sometime between 2011 and 2015. ICD estimated from Google Maps linework. |
Buffalo,
NY Erie Co. United States |
Tifft St. / Rte 5 NB Ramps (42.83952, -78.85611) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.4029 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Grand Island,
NY Erie Co. United States |
Rte 324 / Staley Rd. (43.00727, -78.94897) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 35.8083 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Fort Worth,
TX Tarrant Co. United States |
Harmon Rd. / US 81-US 287 NB Frontage Road (32.90026, -97.33182) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | . |
Fort Worth,
TX Tarrant Co. United States |
Harmon Rd. / US 81-US 287 SB Frontage Road (32.89689, -97.33177) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | . |
Ann Arbor,
MI Washtenaw Co. United States |
Geddes Rd. / US 23 NB Ramps (42.27440, -83.67437) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | |
Ann Arbor,
MI Washtenaw Co. United States |
Geddes Rd. / US 23 SB Ramps (42.27450, -83.67833) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Add-lane right-turn bypass lane in northwest quadrant. |
West Gardiner,
ME Kennebec Co. United States |
Rte 9-Rte 126 / I-95 NB Ramps / Service Plaza Dr. (44.20896, -69.82823) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 40.2365 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Windsor,
NS Hants Canada |
Wentworth Rd. / Highway 101 NB Ramps / Morrison Dr. (44.99165, -64.11267) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.5231 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Cape Breton,
NS Cape Breton Canada |
Alexandra St. / Kenwood / Highway125 WB Ramps / Kenwood Dr. (46.10623, -60.20218) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.4978 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Stellarton,
NS Pictou Canada |
Foord St. / Highway 104 EB Ramps / Lawrence Blvd. (45.56897, -62.65945) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.8541 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Anchorage,
AK Anchorage United States |
Huffman Rd. / Seward Hwy SB Ramps (61.10854, -149.85175) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0848 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Anchorage,
AK Anchorage United States |
Huffman Rd. / Seward Hwy NB Ramps-Brayton Dr. (61.10858, -149.84928) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.2781 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Mount Pearl,
NL Newfoundland and Labrador Canada |
Ruth Ave. / Route 2 EB Ramps (47.50767, -52.82461) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9515 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Trumbull,
CT Fairfield Co. United States |
Park Ave. / Rte. 15 (Merritt Pkwy) WB Ramps (41.22857, -73.24581) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.7436 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | Constructed by private developer. ICD estimated from Google Maps linework. |
Ferndale,
WA Whatcom Co. United States |
Slater Rd. / I-5 SB Ramps (48.81707, -122.55050) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 26.7384 |
Freeway Ramps (Grade-Separated) Single-lane w/ Traversable Central Island |
2014 | Includes a yield-controlled right-turn bypass lane. Open November 2014. ICD estimated from Google Maps linework. |
Ferndale,
WA Whatcom Co. United States |
Slater Rd. / I-5 NB Ramps (48.81737, -122.54604) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.5247 |
Freeway Ramps (Grade-Separated) Single-lane w/ Traversable Central Island |
2014 | Includes yield-controlled right-turn bypass lanes. Open November 2014. ICD estimated from Google Maps linework. |
Sanford,
NC Lee Co. United States |
Us 15-US 501 / US 1 NB Ramps (35.52254, -79.18323) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.7701 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | Right-turn bypass lane from freeway off-ramp. ICD estimated from Google Maps linework. |
Sanford,
NC Lee Co. United States |
US 1-US 501 / US 1 SB Ramps (35.52491, -79.18452) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.7969 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | Right-turn bypass lane onto freeway on-ramp. ICD estimated from Google Maps linework. |
Winston-Salem,
NC Forsyth Co. United States |
Clemmonsville Rd. / NC 150 (Peters Creek Pkwy) SB Ramps (36.04060, -80.26085) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.3553 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Winston-Salem,
NC Forsyth Co. United States |
Clemmonsville Rd. / NC 150 (Peters Creek Pkwy) NB Ramps (36.04092, -80.25919) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.6292 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Charlotte,
NC Mecklenburg Co. United States |
Prosperity Ridge Rd. / Robert Helms Rd. (I-485 EB Ramps) (35.36809, -80.78005) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.1914 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | Right-turn bypass lane on south leg. ICD estimated from Google Maps linework. |
Charlotte,
NC Mecklenburg Co. United States |
Prosperity Ridge Rd. / Craven Thomas Rd. (I-485 WB Ramps) (35.36948, -80.77995) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.2170 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | Right-turn-only lanes on north and west legs. ICD estimated from Google Maps linework. |
Charlotte,
NC Mecklenburg Co. United States |
Prosperity Church Rd. / Robert Helms Rd. (I-485 EB Ramps) (35.36824, -80.78449) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.1652 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | Project R-2248E. ICD estimated from Google Maps linework. |
Charlotte,
NC Mecklenburg Co. United States |
Prosperity Church Rd. / Craven Thomas Rd. (I-485 WB Ramps) (35.36961, -80.78436) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.1908 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | Right-turn-only lanes on north and east legs. ICD estimated from Google Maps linework. |
Charlotte,
NC Mecklenburg Co. United States |
Benfield Rd. / Robert Helms Rd. (I-485 EB Ramps) (35.36840, -80.78956) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.1913 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | Right-turn-only lanes on west and south legs. ICD estimated from Google Maps linework. |
Charlotte,
NC Mecklenburg Co. United States |
Benfield Rd. / Craven Thomas Rd. (I-485 WB Ramps) (35.36979, -80.78944) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.1646 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Mankato,
MN Blue Earth Co. United States |
CSAH 12 / US 14 EB Ramps (44.17221, -93.92420) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 59.9641 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Mankato,
MN Blue Earth Co. United States |
CSAH 12 / US 14 WB Ramps (44.17518, -93.92303) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.9650 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Osseo,
MN Hennepin Co. United States |
Zachary Ln. N / TH 610 EB Ramps / 96th Ave. (45.12930, -93.42241) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.5566 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Osseo,
MN Hennepin Co. United States |
Zachary Ln. N / TH 610 WB Ramps (45.13128, -93.42254) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.6568 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Osseo,
MN Hennepin Co. United States |
Elm Creek Blvd. / 99th Ave. / James Deane Blvd. / TH 610 WB Off-Ramp (45.13323, -93.44083) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.3403 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Nisswa,
MN Crow Wing Co. United States |
CSAH 18 / S. Main St. / Smiley Rd. (46.51638, -94.28400) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 44.3812 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
St Paul,
MN Washington Co. United States |
Hilton Trl. / TH 36 EB Ramps / Viking Dr. (45.03529, -92.95032) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 28.6959 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
St Paul,
MN Washington Co. United States |
Hilton Trl. / TH 36 WB On-Ramp / 60th St. N (45.03645, -92.95099) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.1708 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Utica,
MI Macomb Co. United States |
26 Mile Rd. / M-53 SB Ramps (42.71388, -83.02834) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 44.7542 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Utica,
MI Macomb Co. United States |
26 Mile Rd. / M-53 NB Ramps (42.71396, -83.02374) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 42.9991 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Replaced back-to-back loop ramps on northbound M-53. ICD estimated from Google Maps linework. |
New Waverly,
TX Walker Co. United States |
FM 1375 Rd. / I-45 SB Frontage Rd. (30.53485, -95.49678) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8630 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | . |
New Waverly,
TX Walker Co. United States |
FM 1375 Rd. / I-45 NB Frontage Rd. (30.53557, -95.49278) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | . |
South Saint Paul,
MN Dakota Co. United States |
E Wentworth Ave. (CR 8) / Waterloo Ave. / US 52 SB Onramp (44.89797, -93.06674) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.1488 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
South Saint Paul,
MN Dakota Co. United States |
E Wentworth Ave. / US 52 NB Offramp / Lafayette Ave. (44.89795, -93.06533) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.1488 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Worthington,
MN Nobles Co. United States |
US 59-TH 60 / I-90 EB Ramps (43.63559, -95.56880) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.1852 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Sauk Rapids,
MN Benton Co. United States |
CSAH 3 (Golden Spike Rd NE) / US 10 WB Ramps / Quarry Rd. (45.59872, -94.14657) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.7823 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Combined two stop-controlled intersections into one. ICD estimated from Google Maps linework. |