City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
La Crosse,
WI La Crosse Co. United States |
STH 35 / Sunnyside Rd. (43.74798, -91.20032) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2022 | https://www.wizmnews.com/2022/04/06/100-people-show-to-meeting-on-wisconsin-dots-hwy-35-roundabout-plan-in-la-crosse/ |
Prescott,
AZ Yavapai Co. United States |
Pioneer Pkwy. / Commerce Dr. (34.61926, -112.46300) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Vane islands between entry lanes on southwest and northeast legs. https://theprescotttimes.com/news/pioneer-parkway-roundabout-at-commerce-drive-now-open/article_cadc897a-c7f2-11ed-9c52-7f6ff032e143.html |
Conway,
AR Faulkner Co. United States |
Prince St. / Donaghey Ave. (35.09199, -92.45371) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.youtube.com/watch?v=KAVF6wXZ-q8 |
Albuquerque,
NM Bernalillo Co. United States |
Menaul Blvd. NW / 12th St. NW (35.11233, -106.65798) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Albuquerque,
NM Bernalillo Co. United States |
Turquoise St. / Eagle Way (35.11020, -106.65682) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2017 | |
Albuquerque,
NM Bernalillo Co. United States |
Tiburon St. NE / Masthead St. NE (35.16580, -106.59443) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2001 | Year Completed estimated (1996-2002). |
Rio Rancho,
NM Sandoval Co. United States |
Chayote Rd. NE / Lincoln Ave. NE (35.31689, -106.60549) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2021 | Striped out right side of entries on east and west leg with evidence of driver encroachment over stripes. Year Completed estimated (2020-2023). |
Bend,
OR Deschutes Co. United States |
NW Shevlin Park Rd. / NW Skyline Ranch Rd. (44.07392, -121.36190) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | |
Juneau,
AK Juneau Borough United States |
Glacier Hwy. / Renninger St. (58.35931, -134.51254) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | |
Seattle,
WA King Co. United States |
S Atlantic St. / Sturgus Ave. S (47.59000, -122.31165) |
Traffic Calming Circle Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Rio Rancho,
NM Sandoval Co. United States |
Loma Colorado Blvd. NE / Red Hill Ct. NE (35.27261, -106.65753) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2007-2009). |
Rio Rancho,
NM Sandoval Co. United States |
Loma Colorado St. NE / Terraza Blvd. NE (35.26972, -106.66078) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2007-2009). |
Whitestown,
IN Boone Co. United States |
E 550 S / S 475 E (39.96035, -86.37942) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Unknown |
2023 | |
(unincorporated),
SC Lancaster Co. United States |
SC 522 (Rocky River Rd.) / SC 123 (Taxahaw Rd.) (34.71569, -80.62095) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | http://info2.scdot.org/projects/ViewerFiles/P030240%20-%20PIM%20Handout.pdf |
Albuquerque,
NM Bernalillo Co. United States |
Silver Ave. SE / Cornell Dr. SE (35.07913, -106.61957) |
Traffic Calming Circle Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Albuquerque,
NM Bernalillo Co. United States |
Silver Ave. SE / Princeton Dr. SE (35.07912, -106.61582) |
Traffic Calming Circle Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Monroe Township,
OH Madison Co. United States |
SR 29 / SR 38 (39.99322, -83.42057) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2022 | Approaching roadways have speed limits of 55 mph. https://www.columbusmessenger.com/roundabout-slated-for-intersection-at-38-and-29.html |
(unincorporated),
SC Dorchester Co. United States |
SC 61 (Beech Hill Rd.) / Summers Dr. (32.95271, -80.26081) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2015 | |
Iron Junction,
MN St. Louis Co. United States |
STH 37 / CR 7 (47.40163, -92.60114) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.dot.state.mn.us/d1/projects/th-37/index.html |
(unincorporated),
MN Scott Co. United States |
STH 13 (Langford Ave.) / CR 8 (E 220th St.) (44.63049, -93.50170) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.dot.state.mn.us/metro/projects/hwy13-spring-lake-cedar/index.html |
Knowlton,
WI Marathon Co. United States |
STH 34 / Old Hwy. 51 / CR DB (44.72668, -89.68312) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2022 | Elliptical shaped. ICD = 160 ft x 145 ft. https://www.wsaw.com/2022/07/28/project-redesign-knowlton-interesection-begin-aug-8/ |
Hanover Township,
OH Butler Co. United States |
Stahlheber Rd. / Morman Rd. (39.42038, -84.64629) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2023 | |
San Tan Valley,
AZ Pinal Co. United States |
Whitewing Blvd. / W Sterling St. (33.13194, -111.57163) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2017 | No splitter islands on east and west legs. |
Desert View,
AZ Maricopa Co. United States |
E Lone Cactus Dr. / N Aviano Way (33.68254, -111.99673) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2007 | 30 foot wide single, circulating lane and absent of a truck apron. Year Completed estimated (2006-2007). |
Desert View,
AZ Maricopa Co. United States |
E Marriott Dr. / E Pathfinder Dr. (33.68448, -111.97050) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.4904 |
Other (At-Grade) Single-Lane |
2002 | Striped truck apron. Year Completed estimated (2002-2003). |
North Scottsdale,
AZ Maricopa Co. United States |
E Silverstone Dr. / N 74th St. (33.69438, -111.92100) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2007-2009). |
South Scottsdale,
AZ Maricopa Co. United States |
N 76th Pl. / E Coolidge Ave. (33.50561, -111.91667) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.1104 |
Other (At-Grade) Single-Lane |
1997 | No splitter islands. |
Prescott Valley,
AZ Yavapai Co. United States |
N Vidal St. / N Cortina St. / E Casa Bella Ave. / (parking) (34.54848, -112.24294) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0037 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2003-2007). |
Sierra Vista,
AZ Cochise Co. United States |
Smith Ave. / Winrow Ave. / Cushing St. (31.55504, -110.36013) |
Rotary Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
1992 | On base of Fort Huachuca. No truck apron. Very little speed control on east leg. Year Completed estimated (1985-1992). |
Sierra Vista,
AZ Cochise Co. United States |
Derum St. / Rucker St. / Smith Ave. / Winrow Rd. (31.55118, -110.34837) |
Rotary Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2011 | On base of Fort Huachuca. No truck apron. |
Sierra Vista,
AZ Cochise Co. United States |
Rucker St. / Cooney St. / Jeffords St. (31.55599, -110.34628) |
Other Existing |
All-Way Stop None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2010 | Stop line at each entry. Pedestrian crossings within circulatory roadway. |
Sierra Vista,
AZ Cochise Co. United States |
Jeffords St. / Cushing St. (31.55698, -110.33997) |
Other Existing |
All-Way Stop None |
4 Approaches 0 Driveways 37.7952 |
Other (At-Grade) Single-Lane |
2010 | Stop line at each entry. Pedestrian crossings within circulatory roadway. |
Hilliard,
OH Franklin Co. United States |
Cosgray Rd. / Woodsview Way (40.04172, -83.17984) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2023 | |
Glendale,
AZ Maricopa Co. United States |
N 87th Ave. / W Montebello Ave. / (parking) (33.51695, -112.24749) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2019 | New city collector street, private developer funded. |
Glendale,
AZ Maricopa Co. United States |
W Luke Ave. / N 89th Ave. (33.51770, -112.25141) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4317 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | Single lane, fully mountable central island, mini-roundabout with a 17' wide circulating lane. |
Glendale,
AZ Maricopa Co. United States |
W Montebello Ave. / N 89th Ave. (33.51876, -112.25064) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2023 | Single lane roundabout with 18' wide circulating lane on a new city collector street. Developer funded. |
Glendale,
AZ Maricopa Co. United States |
N 89th Ave. / W Vermont Ave. (33.51450, -112.25158) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4317 |
Other (At-Grade) Single-Lane |
2023 | |
Armington,
MT Cascade Co. United States |
US 87-SR 200 / US 89 / (parking) (47.34909, -110.89673) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). https://www.youtube.com/watch?v=7jSH18jbyKc |
Summerville,
SC Berkeley Co. United States |
Lindera Preserve Blvd. / Whispering Breeze Ln. / Beautyberry Rd. (33.12670, -80.11247) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2015 | |
Summerville,
SC Berkeley Co. United States |
Cane Bay Blvd. / Fair Winds Blvd. (33.14374, -80.10819) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2020 | Constructed as multilane rotary in 2017 with lane change required to exit from east to south. West leg added 2018. Converted to single-lane roundabout in 2019-2020 with some striping glitches remaining. |
Kihei,
HI Maui Co. United States |
SR 31 (Piilani Hwy.) / Kulanihakoi St. (20.76193, -156.44992) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lanes on north and south legs; merging right-turn bypass lane on west leg. Raised crosswalks on right-turn bypass lanes. https://www.youtube.com/watch?v=CD8W-p-qjhc |
Creston,
MI Kent Co. United States |
Monroe Ave. NW / Knapp St. NE / Riverside Park Dr. NE (42.99924, -85.67037) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4317 |
Other (At-Grade) Single-Lane |
2014 | https://www.mlive.com/news/grand-rapids/2013/06/4_roundabouts_cycle_track_plan.html |
Byron Center,
MI Kent Co. United States |
84th St. SE / Kalamazoo Ave. SE (42.81191, -85.62478) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.mlive.com/news/grand-rapids/2023/08/roundabout-the-first-of-its-kind-in-kent-county-opens-ahead-of-schedule.html |
Bellwood Estates,
MI Oakland Co. United States |
Bell Rd. / Coventry Woods Ln. (42.49306, -83.27073) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.3944 |
Other (At-Grade) Single-Lane |
2017 | Circulating edge line extensions across exits. |
Beverly Hills,
MI Oakland Co. United States |
Greenfield Rd. / Normandy Rd. / Beverly Rd. (42.52471, -83.20409) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2023 | Opened August 26, 2023. https://www.rcocweb.org/655/GreenfieldNormandy-Beverly-Roundabout-CO |
Stoughton,
WI Dane Co. United States |
US 51 / Deer Point Rd. / Roby Rd. (42.92732, -89.25042) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | https://isthmus.com/events/u-s-highway-51-construction/ |
West Brandywine Township,
PA Chester County United States |
SR 82 (Manor Rd.) / Reeceville Rd. / Cedar Knoll Rd. (40.02987, -75.81194) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6717 |
Other (At-Grade) Single-Lane |
2023 | This roundabout was identified by PennDOT Engineering District 6-0 roundabout program which prioritized intersection safety in the District. https://l.facebook.com/l.php?u=https%3A%2F%2Fwww.penndot.pa.gov%2FRegionalOffices%2Fdistrict-6%2Fpages%2Fdetails.aspx%3Fnewsid%3D8663%26fbclid%3DIwAR0D-DLtAqawn4Y9qrLc2Z1P9Wg9EiPQ8Qtygxo3D1CZ2I9AZKZESy1xrtA&h=AT1V9mJZNgdRPHQSEA54NWNsfD9cryJImU-zuYat7ZUtFIe4W26n4T4EhvP2AUJgqIWAyUq3yWj4rc0jZF3MZsChiyJuzF2SuFisq2yvR7atZ0JYsrZpa_2tkPxszxSU1A&__tn__=-UK-R&c[0]=AT2fetSJAp3UUVdZcP21p_ESXg76cdVFAJjPu5tjhRuSJo5f2WFavdj1F3aVubzVB1my43fGPnkjJHOU5pE-SIGQJ5644AyQP8gi5xx8o3wc6VNQqbWGXrxi9yNo_5Wmt83ZL9Esd9oIiQmluC-OEgB9z2Fu5Q0GTShp0KPa5MXL6OY-oKjAC5xuOidDSF7rs3HNnTEvntBvjav9zWl4vbLo_1Y |
Vinbergs kyrkby,
Halland County Falkenbergs kommun Sweden |
Rte 154 / E6-E20 NB Ramps (56.93274, 12.51676) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | Year Completed estimated (2014-2015). |
Vinbergs kyrkby,
Halland County Falkenbergs kommun Sweden |
Rte 154 / Blackebergsvägen / Torsholmsvägen (56.93493, 12.51933) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
Completed before 2006. | |
Örja kyrkby,
Skåne County Landskrona kommun Sweden |
Rte 17 (Eslövsvägen) / Vadensjövägen (55.87637, 12.88724) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2021 | Concentric striped circulatory roadway. |
Snogeröd,
Skåne County Höörs kommun Sweden |
Rte 23 / Rte 17 (Snogerödsvägen) (55.84062, 13.49690) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2008 | Built before 2008. |
Blackeberg,
Halland County Falkenbergs kommun Sweden |
Rte 154 / Kilavägen (56.92321, 12.50801) |
Unknown Existing |
All-Way Yield Metering Signal |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2009 | Completed fall 2009 or spring 2010. |
Liberty Lake,
WA Spokane Co. United States |
E Mission Ave. / Kramer Pkwy. (47.67143, -117.12235) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Show Low,
AZ Navajo Co. United States |
S Summit Trl. / W Sugar Pine Way / Spirea Ln. (34.24039, -110.07928) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.0896 |
Other (At-Grade) Single-Lane |
2007 | No splitter islands on two legs, and diverging double yellow lines on two legs. |
Show Low,
AZ Navajo Co. United States |
S Summit Trl. / Falling Leaf Rd. (34.23781, -110.07255) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2007 | No splitter islands on two legs, and diverging double yellow lines on two legs. |
Show Low,
AZ Navajo Co. United States |
S Summit Trl. / (parking) (34.23113, -110.06795) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2007 | No splitter islands on two legs, and diverging double yellow lines on two legs. |
Flagstaff,
AZ Coconino Co. United States |
Resort Blvd. / (parking) / (unknown) (35.16563, -111.27053) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6717 |
Other (At-Grade) Single-Lane |
2013 | West leg stubbed. Year Completed estimated (2012-2013). |
New Prague,
MN Le Sueur Co. United States |
Main St. E / Columbus Ave. (44.54358, -93.57342) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | Year Completed estimated (2021-2023). |
New Prague,
MN Le Sueur Co. United States |
Main St. E / 1st Ave. NE-1st Ave. SE (44.54359, -93.57559) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | |
New Prague,
MN Scott Co. United States |
7th St. NE / Columbus Ave. N (44.55087, -93.57378) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | Year Completed estimated (2018-2019). |
New Prague,
MN Scott Co. United States |
12th St. NE / Columbus Ave. N (44.55790, -93.57412) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | https://www.scottcountymn.gov/DocumentCenter/View/12888/Project-Update14 |
Stoughton,
WI Dane Co. United States |
US 51-STH 138 / Hoel Ave. / Silverado Dr. (42.91814, -89.24587) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://isthmus.com/events/u-s-highway-51-construction/ |
Varberg,
Halland County Varbergs kommun Sweden |
Västkustvägen / Hobbyvägen (57.08522, 12.27299) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2005 | Completed 2005 or earlier |
Varberg,
Halland County Varbergs kommun Sweden |
Marmorgatan / Brearedsvägen / Täljstensgatan (57.08555, 12.27473) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2005 | Completed 2005 or earlier. |
Varberg,
Halland County Varbergs kommun Sweden |
Ranelidsrondellen (57.09010, 12.26480) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Single-Lane |
2005 | Completed before 2005. |
Varberg,
Halland County Varbergs kommun Sweden |
Almers väg / Katteattsvögen (57.09456, 12.25753) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2018 | |
Falkenberg,
Halland County Falkenbergs kommun Sweden |
Industrivägen and Göteborgsvägen (56.90852, 12.46575) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2008 | Merging right-turn bypass lane on east leg. Year Completed estimated (2007-2009). |
Falkenberg,
Halland County Falkenbergs kommun Sweden |
Göteborgsvägen / Arvidstorpsvägen (56.91121, 12.48304) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2007 | |
Södertälje,
Stockholm County Södertälje kommun Sweden |
Genetaleden / (connector to parking) (59.18634, 17.57663) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2011-2017). |
Varberg,
Halland County Varbergs kommun Sweden |
Österleden / Österängsvägen (57.10055, 12.29502) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2007-2009). |
Varberg,
Halland County Varbergs kommun Sweden |
Vallinsvägen / Österleden / Träslov (57.08872, 12.28992) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2019 | |
Grand Mound,
WA Thurston Co. United States |
US 12 / Sargent Rd. SW (46.80249, -123.01756) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2023 | https://public-works-projects-thurston.hub.arcgis.com/pages/us-12-sargent-road |
Indian Trail,
NC Union Co. United States |
Lawyers Rd. W / MIll Grove Rd. (35.12678, -80.60057) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2023 | https://www.facebook.com/photo?fbid=638865161614120&set=pcb.638865178280785 |
Keene,
NH Cheshire Co. United States |
Winchester St. / Key Rd. / (parking) (42.92459, -72.28941) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | https://www.keenewinchesterstreet.com/ |
Kitchener,
ON Waterloo Canada |
Fischer-Hallman Rd. / Bleams Rd. (43.40176, -80.49651) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | Originally constructed as 3x2 roundabout with additional southbound through lane that is marked off by striping and delineators. https://kitchener.ctvnews.ca/kitchener-s-newest-roundabout-closing-for-overnight-paving-1.5935760 |
Landskrona,
Skåne County Landskrona kommun Sweden |
Ringvägen / Pilåkersgatan (55.88535, 12.83970) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2017 | Built before 2017. |
Dalby,
Skåne County Lund Municipality Sweden |
Dalbyvägen / Malmövägen (55.66154, 13.33389) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2005 | Concentric striped circulatory roadway. Merging right-turn bypass lane on west leg. Completed as single-lane roundabout before 2005. Converted to two-lane roundabout in 2015-2018. |
Dalby,
Skåne County Lund Municipality Sweden |
Norrevångsvägen / Lundavägen (55.66672, 13.33263) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2005 | Year Completed estimated (2003-2007). |
Dalby,
Skåne County Lund Municipality Sweden |
Veberödsvägen / Pinnmöllevägen (55.66215, 13.35836) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2012-2015). |
Sjöbo,
Skåne County Sjöbo kommun Sweden |
Brytjärnsgatan / Såggatan (55.63593, 13.67963) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2021). |
Sjöbo,
Skåne County Sjöbo kommun Sweden |
Brytjärnsgatan / Rotgatan / Stockgatan (55.63607, 13.67733) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2002-2010). |
Sjöbo,
Skåne County Sjöbo kommun Sweden |
Planteringsgatan / Västergatan (55.63439, 13.68484) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2012 | |
Omma,
Skåne County Sjöbo kommun Sweden |
Rte 13 / Ommadalsvägen / Esplanaden (55.64274, 13.68669) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2015 | Completed between 2012 and 2015 |
Sjöbo,
Skåne County Sjöbo kommun Sweden |
Asumsgatan / Föreningsgatan / Nygatan (55.63680, 13.70657) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Completed on or before 2002. | |
Spjälla,
Skåne County Sjöbo kommun Sweden |
Rte 11 (Ringvägen - Tomelillavägen) / Rte 13 (Ystadsvägen) / Södergatan (55.62237, 13.70513) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 79.2480 |
Other (At-Grade) Single-Lane |
Completed before 2002. | |
Hörby,
Skåne County Hörby kommun Sweden |
Storgatan / Västervångsvägen / Kristianstadsvägen / Parkgatan (55.85707, 13.67507) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2002 | Year Completed estimated (2002-2006). |
Slagtofta,
Skåne County Hörby kommun Sweden |
Kristianstadsvägen / E22 Ramps (55.86490, 13.69484) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | |
South Overton,
TX Lubbock Co. United States |
15th St. / Avenue W (33.58171, -101.86620) |
Traffic Calming Circle Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Arlington,
FL Duval Co. United States |
SR 109 (University Blvd. N) / Colcord Ave. / Alt US 90-SR 115 EB Exit Ramp (30.32669, -81.60476) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2014 | Replaced loop ramp in one quadrant of full cloverleaf interchange. |
Halmstad,
Halland County Halmstads kommun Sweden |
Rte 26 (Nissastigen) / E6-E20 NB Ramps (56.71150, 12.89011) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Year Completed estimated (2009-2012). Add-lane right-turn bypass lane on south leg; yielding right-turn bypass lane on west leg. |
Halmstad,
Halland County Halmstads kommun Sweden |
Enslövsvägen / Malcusgatan (56.67310, 12.87641) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2006). |
Halmstad,
Halland County Halmstads kommun Sweden |
Växjövägen / Wrangelsgatan (56.67343, 12.88196) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
Completed before 2002. | |
Aubrey,
TX Denton Co. United States |
Sandbrock Pkwy. / Aubrey Pkwy. (33.26742, -96.89741) |
Rotary Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 91.4400 |
Other (At-Grade) Single-Lane |
2018 | |
McKinney,
TX Collin Co. United States |
CR 161 / CR 124 (33.23289, -96.69748) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | |
Allen,
TX Collin Co. United States |
Allen Dr. / US 75-TX 36 (North Central Expressway) NB Frontage Rd. (33.11162, -96.67259) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2023 | Right-turn-only lane on east leg. No left turn arrows marked on entry. |
Allen,
TX Collin Co. United States |
Montgomery Blvd. / Miller Rd. (33.08474, -96.68698) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2016 | Merging right-turn bypass lane on west leg. |
Dallas,
TX Dallas Co. United States |
Snider Plaza / Milton Ave. (32.84849, -96.78790) |
Other Existing |
All-Way Stop None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
1995 | |
McKinney,
TX Collin Co. United States |
N Sweetwater Cove / Lady Bird Dr. (33.28895, -96.61520) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2018 | |
McKinney,
TX Collin Co. United States |
N Sweetwater Cove / Middle Creek Dr. (33.29212, -96.61664) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2018 | |
South Mountain,
AZ Maricopa Co. United States |
S 20th St. / E Euclid St. (33.36686, -112.04021) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 19.2024 |
Other (At-Grade) Single-Lane |
2015 | Installed initially as traffic calming circle in 2007-2009. Converted to roundabout 2014-2015. |