City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Green Bay,
WI Brown Co. United States |
Cardinal Ln. / N Packerland Dr. / Shawano Ave. / STH 32 WB On-Ramp (44.54373, -88.08784) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.3705 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Main Ave. / Lawrence Dr. (44.45167, -88.08749) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 37.5127 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / Suburban Dr. (44.43055, -88.08604) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4090 |
Other (At-Grade) Single-Lane |
2004 | One of two roundabouts on an arterial street that separates a residential neighborhood from a business park. Many trucks traveling to and from the business park pass through this intersection each day, and the roundabout serves as an attractive entrance to the neighborhood and park. Completed November 2004. http://www.co.brown.wi.us/Planning/roundabouts.html. Series of 6 roundabouts. Opened November 2004. Functional Class: Arterial ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Cardinal Ln. / Duck Creek Pkwy. / Elmhurst Ave. (44.54540, -88.08519) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.5596 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Cardinal Ln. / Howard Commons / (church parking) (44.55810, -88.08480) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 50.2094 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Cardinal Ln. (CTH EB) / Woodale Ave. (44.57285, -88.08469) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.6285 |
Other (At-Grade) Single-Lane |
2005 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. (CTH M) / Cardinal Ln. (CTH EB) (44.59090, -88.08430) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.7684 |
Other (At-Grade) Single-Lane |
1999 | Roundabout is near Forest Glen Elementary School, Lineville Intermediate School, and Bay Port High School. Completed October 1999. http://www.co.brown.wi.us/Planning/roundabouts.html Functional Class: Arterial ICD estimated from Google Maps linework. |
Germantown,
WI Washington Co. United States |
STH 145 (Fond du Lac Ave.) / Donges Bay Rd. (43.20656, -88.08297) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5624 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 SB Ramps (44.52418, -88.08284) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.9811 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 NB Ramps (44.52415, -88.08103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.4266 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Shawano Ave. / Duck Creek Pkwy. (44.54055, -88.08010) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0093 |
Other (At-Grade) Multilane (3+ Lane) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Mason St. (STH 32-STH 54) / S. Taylor St. (44.52414, -88.07916) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4266 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Shawano Ave. / I-41 SB Ramps (44.53894, -88.07831) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.3746 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Velp Ave. (CTH HS) / Woodale Ave. (CTH EB) (44.57293, -88.07800) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.3300 |
Other (At-Grade) Single-Lane |
2002 | Roundabout Located near industrial park, rail line, and the Mountain-Bay Recreational Trail. Roundabout is at the intersection of two county highways and is slightly larger than the roundabouts built in 1999 and 2001 in Howard and De Pere. Completed August 2002. http://www.co.brown.wi.us/Planning/roundabouts.html. Fatal crash June 5, 2011. 11861-05. Functional Class: Arterial ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. (CTH M) / Velp Ave. (CTH HS) (44.59094, -88.07787) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.3200 |
Other (At-Grade) Single-Lane |
2005 | Completed summer 2005. Fatal crash October 30, 2005. 11861-05. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
N Ashland Ave. / Glory Rd. / N 8th St. (44.45685, -88.07702) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0668 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Opened August 6, 2010. Functional Class: Arterial ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Shawano Ave. / I-41 NB Ramps (44.53750, -88.07683) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.6732 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Shawano Ave. (STH 29) / Taylor St. (44.53461, -88.07319) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.3783 |
Other (At-Grade) Multilane (3+ Lane) |
2011 | Opened September 2011. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. (CTH M) / Waterway Ct. (44.59112, -88.07314) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.9178 |
Other (At-Grade) Single-Lane |
2007 | Completed summer 2007. ICD estimated from Google Maps linework. |
Hawthorn Woods,
IL Lake Co. United States |
W Schwerman Rd. / Tournament Dr. (42.24819, -88.07133) |
Other Existing |
All-Way Stop Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
De Pere,
WI Brown Co. United States |
Greenleaf Rd. / Heritage Rd. (44.42854, -88.06892) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2333 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2017). ICD estimated from Google Maps linework. |
Mobile,
AL Mobile Co. United States |
Aerospace Dr. / Airbus Way (30.64175, -88.06772) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 52.4058 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Velp Ave. / I-41 SB Ramps (44.55731, -88.06068) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.0611 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2016 | Yield-controlled right-turn bypass lane on off-ramp. Add-lane bypass lane on west leg. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Main Ave.-Wisconsin St. (STH 32) / Broadway (STH 57) (44.44744, -88.06049) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.5995 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Opened July 12, 2007. First multilane roundabout in Wisconsin. ICD estimated from Google Maps linework. |
Schaumburg,
IL Cook Co. United States |
N Plum Grove Rd. / Remington Rd. (42.05300, -88.05996) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 30.1519 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Schaumburg,
IL Cook Co. United States |
E State Pkwy. / N Plum Grove Rd. (42.05607, -88.05992) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2019 | |
Howard,
WI Brown Co. United States |
Velp Ave. / I-41 NB Ramps (44.55664, -88.05906) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.5086 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2016 | Yield-controlled right-turn bypass lane on off-ramp. ICD estimated from Google Maps linework. |
Glen Ellyn,
IL DuPage Co. United States |
Crescent Blvd. / Crescent Ct. / Park Row (41.87975, -88.05899) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.9936 |
Other (At-Grade) Single-Lane |
2015 | Compact urban roundabout - T-intersection with fourth leg between top and stem of T. Providing a means for legal U-turns was an important factor in selection of a roundabout here. |
Hales Corners,
WI Milwaukee Co. United States |
Grange Ave. / 116th St. (42.94460, -88.05808) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.2220 |
Other (At-Grade) Single-Lane |
2003 | Opened October 15, 2003. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Velp Ave. / Memorial Dr. (44.55604, -88.05792) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.4028 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Heritage Rd. / S Broadway St. (44.42806, -88.05654) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.0285 |
Other (At-Grade) Single-Lane |
2013 | Right-turn-only lane on east leg. Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Mobile,
AL Mobile Co. United States |
Broad St. / Canal St. (30.68436, -88.05283) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2021 | https://www.fox10tv.com/first-look-at-new-roundabout/video_72e8587d-217c-5c55-a65c-312584e8a2f7.html |
Yorkville,
WI Racine Co. United States |
US 45 / STH 20 (Washington Ave.) / N Colony Ave. (42.74216, -88.05209) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.8396 |
Other (At-Grade) Single-Lane |
2010 | Opened November 2010. ICD estimated from Google Maps linework. |
Yorkville,
WI Racine Co. United States |
US 45 (S Colony Ave.) / Spring St. (42.70407, -88.05189) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.6176 |
Other (At-Grade) Single-Lane |
2017 | Elliptical shape. ICD estimated from Google Maps linework. |
Suamico,
WI Brown Co. United States |
School Ln. (CTH B) / Velp Ave. (CTH HS) (44.63452, -88.05177) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.7946 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Linefield Rd. / W Deerfield Ave. (44.59129, -88.05171) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.1239 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. / US 141 SB Ramps (44.59134, -88.04995) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.8250 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Two-lane yield-controlled right-turn bypass lane on north leg; free-flow right-turn bypass lane on west leg. Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. / US 141 NB Ramps (44.59141, -88.04751) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.8249 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Yield-controlled right-turn bypass lanes on south and east legs. Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
US 141 / Military Rd. (44.54792, -88.04733) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.8554 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 18, 2011. ICD estimated from Google Maps linework. |
Hales Corners,
WI Milwaukee Co. United States |
STH 24 (W Forest Home Ave.-Janesville Rd.) / W Forest Home Ave. (42.93732, -88.04641) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.0902 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. / E Deerfield Ave. (44.59137, -88.04580) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.9744 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Wauwatosa,
WI Milwaukee Co. United States |
Underwood Pkwy. / N Mayfair Rd. (43.04762, -88.04461) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.2936 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Cedarburg,
WI Ozaukee Co. United States |
STH 60 / Granville Rd. (CR Y) (43.32226, -88.04448) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2020). https://www.rasmith.com/projects/wis-60-eagle-drive-to-wis-181/ |
Bolingbrook,
IL Will Co. United States |
Janes Ave. / (apartment complex entrance) (41.71085, -88.03938) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | East leg stubbed. Year Completed estimated (2006-2007). |
De Pere,
WI Brown Co. United States |
Chicago St. (CTH G) / Libal St. (44.44026, -88.03812) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.8455 |
Other (At-Grade) Single-Lane |
2001 | Roundabout surrounded by homes, businesses, East De Pere Middle School, and De Pere High School. Roundabout serves as main entrance to the high school. Completed August 2001. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Dickinson Rd. (CTH G) / Swan Rd. (44.43908, -88.03475) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.0241 |
Other (At-Grade) Single-Lane |
2001 | Roundabout is slightly east of the Chicago/Libal roundabout and is surrounded by businesses and East De Pere Middle School. Roundabout serves as the entrance to a medical clinic. Completed August 2001. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
Franklin,
WI Milwaukee Co. United States |
Drexel Ave. / Shoppes of Wyndham driveway (42.90494, -88.03474) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 25.3700 |
Other (At-Grade) Single-Lane |
2008 | Opened July 2008. ICD estimated from Google Maps linework. |
Wauwatosa,
WI Milwaukee Co. United States |
N Swan Blvd. / Discovery Pkwy. (43.05192, -88.03430) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | https://www.wauwatosa.net/Home/Components/News/News/1708/166 |
Wauwatosa,
WI Milwaukee Co. United States |
Discovery Pkwy. / (parking lot) (43.04809, -88.03138) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 1 Driveways 29.6749 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2014). ICD estimated from Google Maps linework. |
Ledgeview,
WI Brown Co. United States |
Heritage Rd. / Monroe Rd. (44.41810, -88.02942) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.3300 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Dickinson Rd. (CTH G) / East River Dr. (44.43684, -88.02830) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.7306 |
Other (At-Grade) Single-Lane |
2001 | Roundabout is slightly east of the Chicago/Swan roundabout and is located in a residential area. Roundabout is near East De Pere Middle School and De Pere High School. Completed August 2001. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
US 141 / Atkinson Dr. (44.53348, -88.02827) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.4601 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 17, 2012. ICD estimated from Google Maps linework. |
Allouez,
WI Brown Co. United States |
Hoffman Rd. (CTH XX) / Libal St. (44.46042, -88.02819) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2014 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.46040658672803%2C-88.03253203284055&z=15. |
De Pere,
WI Brown Co. United States |
Monroe Rd. / Ledgeview Rd. / Oak Ridge Cir. (44.42652, -88.02331) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.2642 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Kiel,
WI Manitowoc Co. United States |
STH 67-STH 32 / STH 57 (43.90986, -88.02251) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.0446 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened November 13, 2009. Functional Class: Arterial ICD estimated from Google Maps linework. |
Kiel,
WI Manitowoc Co. United States |
STH 67 / CTH AA (E Park Ave.-Rockville Rd.) (43.92072, -88.02247) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.4329 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Pound, Village of,
WI Marinette Co. United States |
STH 64 / US 141 SB Ramps (45.10962, -88.02036) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 37.0876 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Pound, Village of,
WI Marinette Co. United States |
STH 64 / US 141 NB Ramps (45.10885, -88.01804) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.8889 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Allouez,
WI Brown Co. United States |
Allouez Ave. (CTH O) / Libal St. (44.47738, -88.01638) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.8612 |
Other (At-Grade) Single-Lane |
2006 | Opened July 1, 2006. ICD estimated from Google Maps linework. |
Ledgeview,
WI Brown Co. United States |
Dickinson Rd. (CTH G) / Monroe Rd. (CTH GV) (44.43271, -88.01631) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.0532 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 15, 2009. ICD estimated from Google Maps linework. |
Franklin,
WI Milwaukee Co. United States |
(park entrance road) / (parking) (42.91866, -88.01334) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2014). |
Cedarburg,
WI Ozaukee Co. United States |
Wauwatosa Rd. / Bridge St. (43.30078, -88.00444) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.1600 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Cedarburg,
WI Ozaukee Co. United States |
Wauwatosa Rd. / Western Rd. (43.29349, -88.00431) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 34.7717 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Bristol, Village of,
WI Kenosha Co. United States |
Wilmot Rd. / 160th Ave. (42.53847, -88.00097) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 35.2004 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2010-2013). ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
CR G (Dickinson Rd.) / Scray Hills Rd. / Bower Creek Rd. (44.42502, -87.99870) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | Elliptical shaped. ICD = 150 ft x 125 ft. |
Bellevue,
WI Brown Co. United States |
Monroe Rd. / Landmark Blvd. (44.45864, -87.98951) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 48.5902 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | ICD estimated from Google Maps linework. |
Gurnee,
IL Lake Co. United States |
Almond Rd. / Dada Dr. (42.37601, -87.98463) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | https://www.gurnee.il.us/government/departments/community-development/engineering/almond-and-dada-intersection |
Kenosha,
WI Kenosha Co. United States |
144th Ave. / 72nd St. (42.56879, -87.98186) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2005 | https://wisdot.maps.arcgis.com/apps/webappviewer/index.html?id=106c80b1ec5f42a5a8808e6acad23067 |
Franklin,
WI Milwaukee Co. United States |
S 51st St. / W Drexel Ave. (42.90151, -87.98018) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2019 | |
Saukville,
WI Ozaukee Co. United States |
STH 33 / CTH I (43.39585, -87.97946) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6717 |
Other (At-Grade) Single-Lane |
2022 | |
Homer Glen,
IL Will Co. United States |
Syd Creek Dr. / Blue Mag Rd. (41.59306, -87.97332) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). |
Homer Glen,
IL Will Co. United States |
Syd Creek Dr. / Iz Brook Dr. (41.59490, -87.97263) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). |
Old Mill Creek,
IL Lake Co. United States |
Hunt Club Rd. / Milburn Rd. / W. Simpson Rd. (42.42212, -87.97259) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.9640 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Old Mill Creek,
IL Lake Co. United States |
Hunt Club Rd. / W. Wadsworth Rd. (42.42938, -87.97247) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.4326 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Yorkville,
WI Racine Co. United States |
Washington Ave. / Spring St. (42.72909, -87.96664) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 47.3752 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Milwaukee,
WI Milwaukee Co. United States |
W Locust St. / N 21st St. (43.07156, -87.96447) |
Traffic Calming Circle Existing |
One-Way/Two-Way Stop None |
4 Approaches 0 Driveways 16.1541 |
Other (At-Grade) Single-Lane |
2022 | N 21st St. is one-way northbound. |
Brown Deer,
WI Milwaukee Co. United States |
STH 57 / Teutonia Ave. (43.17202, -87.96338) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2022 | |
Bellevue,
WI Brown Co. United States |
US 141 (Main St.) / CTH JJ (Verlin Rd.) (44.47005, -87.96315) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4669 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Opened September 3, 2010. ICD estimated from Google Maps linework. |
Brown Deer,
WI Milwaukee Co. United States |
N Teutonia Ave. / W Bradley Rd. (43.16315, -87.96311) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 40.9442 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). ICD estimated from Google Maps linework. |
Bellevue,
WI Brown Co. United States |
US 141 / Allouez Ave. (44.45882, -87.95038) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4753 |
Other (At-Grade) Single-Lane |
2007 | Railroad is ~110 feet from roundabout. Seasonal summaer crossing and maybe 1 train per day for a short duration. Opened November 2, 2007. ICD estimated from Google Maps linework. |
Wadsworth,
IL Lake Co. United States |
W Wadsworth Rd. / Dilleys Rd. (42.42897, -87.94581) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.youtube.com/watch?v=R7rA-rscA70 |
Milwaukee,
WI Milwaukee Co. United States |
W Canal St. / N 25th St. (43.03109, -87.94351) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9057 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2005 | Opened September 15, 2005 ICD estimated from Google Maps linework. |
Midtown,
WI Milwaukee Co. United States |
N 21st St. / W Barbee St. (43.05404, -87.93893) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Pedestrian access to central island. | |
Bellevue,
WI Brown Co. United States |
Eaton Rd. (CTH JJ) / Ontario Rd. (44.46616, -87.92782) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.6846 |
Other (At-Grade) Single-Lane |
2008 | Opened November 2008. ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) (43.38493, -87.92303) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) / Northwood Rd. (43.38498, -87.92057) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Milwaukee,
WI Milwaukee Co. United States |
W Winnebago St. / 7th St. / Juneau Ave. (43.04590, -87.92050) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.3694 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Opened November 10, 2010. ICD estimated from Google Maps linework. |
Milwaukee,
WI Milwaukee Co. United States |
S. 6th St. / W. Virginia St. / Florida St. (43.02698, -87.91770) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.7816 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2002 | Built as terminal of new bridge. Signal located downstream approximately 150-200 feet away (estimated) that queues back through roundabout during weekday p.m. peak. No lane designations on approach. Functional Class: Arterial ICD estimated from Google Maps linework. |
Village of Belleview,
WI Brown Co. United States |
STH 29 (Kewaunee Rd.) / S Huron Rd. / Cottage Rd. (44.44412, -87.91760) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.3168 |
Other (At-Grade) Single-Lane |
2019 | ICD estimated from Google Maps linework. |
Bellevue,
WI Brown Co. United States |
Eaton Rd. (CTH JJ) / Cottage Rd. / Huron Rd. (44.46617, -87.91737) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.1275 |
Other (At-Grade) Single-Lane |
2005 | Completed summer 2005. Right-turn bypass lane on NW quadrant. ICD estimated from Google Maps linework. |
Pleasant Prairie, Village of,
WI Kenosha Co. United States |
88th Ave. / Wilmot Rd. (42.56033, -87.91425) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 36.0678 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2015). ICD estimated from Google Maps linework. |
Pleasant Prairie,
WI Kenosha Co. United States |
Bain Station Rd. / 88th Ave. (CR H) (42.55125, -87.91362) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2017 | https://www.rasmith.com/projects/cthh-bain-station-roundabout/ |
Des Plaines,
IL Cook Co. United States |
N. Wolf Rd. / State St. / N. Broadway St. / E. Golf Rd. (42.05374, -87.91028) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 49.3776 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Intersection upgraded by IDOT to roundabout in 2018. |
Milwaukee,
WI Milwaukee Co. United States |
N Hubbard St. / E Reservoir St. (43.05517, -87.90840) |
Traffic Calming Circle Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Milwaukee,
WI Milwaukee Co. United States |
E Reservoir Ave. / N Hubbard St. (43.05516, -87.90840) |
Traffic Calming Circle Existing |
Uncontrolled None |
4 Approaches 0 Driveways 19.2024 |
Other (At-Grade) Single-Lane |
Installed before March 2000. | |
Milwaukee,
WI Milwaukee Co. United States |
E Brown St. / N Hubbard St. (43.05646, -87.90838) |
Traffic Calming Circle Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Milwaukee,
WI Milwaukee Co. United States |
E Brown St. / N Hubbard St. (43.05646, -87.90837) |
Traffic Calming Circle Existing |
Uncontrolled None |
4 Approaches 0 Driveways 19.8120 |
Other (At-Grade) Single-Lane |
Installed before February 2005. | |
Lincolnshire,
IL Lake Co. United States |
Everett Rd. / Riverwoods Rd. (42.22193, -87.90590) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.4539 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Oconto,
WI Oconto Co. United States |
STH 22 (Charles St.) / US 41 SB Ramps (44.89205, -87.90080) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.9203 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 7, 2009. ICD estimated from Google Maps linework. |
Port Washington,
WI Ozaukee Co. United States |
STH 33 (W Grand Ave.) / CTH LL (43.38688, -87.90026) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.6619 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |