City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Howard,
WI Brown Co. United States |
Shawano Ave. / I-41 SB Ramps (44.53894, -88.07831) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.3746 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Shawano Ave. / Duck Creek Pkwy. (44.54055, -88.08010) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0093 |
Other (At-Grade) Multilane (3+ Lane) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Cardinal Ln. / Duck Creek Pkwy. / Elmhurst Ave. (44.54540, -88.08519) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.5596 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Cardinal Ln. / N Packerland Dr. / Shawano Ave. / STH 32 WB On-Ramp (44.54373, -88.08784) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.3705 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
N Packerland Dr. / STH 32 EB Off-Ramp (44.54289, -88.08979) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.2639 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Hobart, Village of,
WI Brown Co. United States |
N Packerland Dr. / Badgerland Dr. (44.54245, -88.09075) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.9667 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Cincinnati,
OH Hamilton Co. United States |
Roebling Way / Theodore M Berry Way / Walnut St. (39.09641, -84.51076) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 16.6842 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Terre Haute,
IN Vigo Co. United States |
IN-42 / Swalls Dr. (39.46157, -87.28667) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.8833 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2014). ICD estimated from Google Maps linework. |
Cary,
NC Wake Co. United States |
Ledsome Ln. / (parking lots) (35.76283, -78.74796) |
Other Existing |
All-Way Stop None |
4 Approaches 0 Driveways 17.4443 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Baton Rouge,
LA East Baton Rouge Par. United States |
Dalrymple Dr. / Isaac Cline Dr. / W Lakeshore Dr. (30.41647, -91.17170) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.7188 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Liberty Township,
OH Butler Co. United States |
Kyles Station Rd. / Yankee Rd. (39.41489, -84.38421) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.5988 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Liberty Township,
OH Butler Co. United States |
Millikin Rd. / Maud Hughes Rd. (39.40153, -84.40943) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6837 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Conway,
AR Faulkner Co. United States |
Washington Ave. / Fleming St. / Clifton St. (35.10640, -92.44487) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 36.1513 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Welland,
ON Niagara Canada |
Hwy 27 (E Main St.) / Hwy 406 (42.99357, -79.22298) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 57.6555 |
Other (At-Grade) Multilane (3+ Lane) |
2013 | Year Completed estimated (2010-2015). ICD estimated from Google Maps linework. |
Great Falls,
MT Cascade Co. United States |
Division Rd. / Smelter Ave. NW (47.52454, -111.31037) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0990 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Berryville,
VA Clarke Co. United States |
SR 636 (Westwood Rd) / SR 7 Business (W Main St) (39.16190, -77.99695) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 31.4854 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
High Point,
NC Guilford Co. United States |
Lindsay St. / N Elm St. / W Parkway Ave. (35.96684, -80.01495) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.6989 |
Other (At-Grade) Single-Lane |
2013 | Non-circular. Pedestrian access to center island. ICD estimated from Google Maps linework. |
Ottawa,
ON Ottawa Canada |
King Edward Ave. / Union St. (45.43738, -75.69400) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 20.9512 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Cape Girardeau,
MO Cape Girardeau Co. United States |
Rte W (Cape La Croix Rd.) / Lexington Ave. / Kingsway Dr. (37.33345, -89.57061) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.6328 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Denver,
CO Denver Co. United States |
Pecos St. / I-70 WB Ramps / W 48th Ave. (39.78374, -105.00637) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 52.3146 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Denver,
CO Denver Co. United States |
Pecos St. / I-70 EB Ramps (39.78281, -105.00640) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.2194 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Purcellville,
VA Loudoun Co. United States |
VA 287 / Main Street (39.13559, -77.69229) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.9082 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Mount Pleasant,
SC Charleston Co. United States |
Mathis Ferry Rd. / 7th Ave. / Walt Miller St. (32.80825, -79.89030) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.1069 |
Other (At-Grade) Single-Lane |
2013 | Replaced two offset T-intersections. ICD estimated from Google Maps linework. |
Chehalis,
WA Lewis Co. United States |
NW Louisiana Ave. / Car Dealership Access (46.68261, -122.97338) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.5097 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Williston,
ND Williams Co. United States |
26th St. W / Pheasant Run Pkwy. (48.16870, -103.65330) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.6065 |
Other (At-Grade) Single-Lane |
2013 | Right-turn only lane on east leg. ICD estimated from Google Maps linework. |
Worthington,
MN Nobles Co. United States |
US 59-TH 60 / Oxford St. (43.63086, -95.57674) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.4939 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Worthington,
MN Nobles Co. United States |
US 59-TH 60 / I-90 EB Ramps (43.63559, -95.56880) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.1852 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Woodbury,
MN Washington Co. United States |
CSAH 19 (Woodbury Dr.) / Lake Rd. (44.90298, -92.90346) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.6054 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Woodbury,
MN Washington Co. United States |
CSAH 19 (Woodbury Dr.) / CSAH 18 (Bailey Rd.) (44.89088, -92.90336) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.1524 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Woodbury,
MN Washington Co. United States |
Pioneer Dr. / Plymouth Rd. (44.88405, -92.92480) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0801 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Thief River Falls,
MN Pennington Co. United States |
Greenwood St. E / Pennington Ave. (48.10839, -96.17642) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.6967 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Waconia,
MN Carver Co. United States |
TH 284 / 10th St (44.84004, -93.78853) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.5686 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Anchorage,
AK Anchorage United States |
Piper St. / E 40th Ave. (61.18451, -149.82323) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2013 | Located at entrance to Providence Medical Center hospital. |
Portland,
OR Multnomah Co. United States |
NE 7th Ave. / NE Morris St. (45.54468, -122.65860) |
Traffic Calming Circle Removed |
One-Way/Two-Way Stop None |
3 Approaches 0 Driveways 128.8135 |
Other (At-Grade) Single-Lane |
2013 | Neighborhood traffic circle was installed 1/9/1992. Removed in 2013 as part of upgrades to the Neighborhood Greenway. Added speed humps nearby. ICD estimated from Google Maps linework. |
Lakeville,
MN Scott Co. United States |
CSAH 46 / CSAH 29 (44.62354, -93.29316) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.5024 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Palmer,
AK Matanuska-Susitna United States |
Trunk Rd. / E Colony Schools Dr. (61.61298, -149.23757) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.5354 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Rochester,
MN Olmsted Co. United States |
Badger Hills Dr. / Superior Dr. NW (44.06325, -92.52762) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.1867 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Rochester,
MN Olmsted Co. United States |
Badger Hills Dr. / (unknown) (44.06449, -92.53671) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7605 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Columbus,
OH Franklin Co. United States |
Groveport Rd. / Old Rathmell Ct. / Alum Creek Dr. access (39.86733, -82.93329) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.9175 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Part of intersection complex with grade separation. Right-turn bypass lane on south leg. Year Completed estimated (2012-2014). ICD estimated from Google Maps linework. |
Columbus,
OH Franklin Co. United States |
Groveport Rd. / Alum Creek Rd. access / (parking lot) (39.86872, -82.93737) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.5833 |
Other (At-Grade) Single-Lane |
2013 | Right-turn bypass lane on west leg. Year Completed estimated (2012-2014). ICD estimated from Google Maps linework. |
Blue Hill,
ME Hancock Co. United States |
Beech Hill Rd. / Mines Rd. / Tenney Hill / South St. (44.40825, -68.59763) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4214 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
(unincorporated),
OH Franklin Co. United States |
Harlem Rd. / Smothers Rd. (40.12927, -82.84332) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2014). |
Dublin,
OH Franklin Co. United States |
Cosgray Rd. / Shier Rings Rd. (40.09346, -83.18686) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.9418 |
Other (At-Grade) Single-Lane |
2013 | Right-turn-only lane on west leg. Year Completed estimated (2011-2014). ICD estimated from Google Maps linework. |
New Albany,
OH Franklin Co. United States |
Fodor Rd. / New Albany Rd. (40.08818, -82.82324) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 34.7216 |
Other (At-Grade) Single-Lane |
2013 | Right-turn lanes on north and east legs. Year Completed estimated (2011-2014). ICD estimated from Google Maps linework. |
(unincorporated),
OH Delaware Co. United States |
Olentangy River Rd. / W Orange Rd. / Carriage Rd. (40.17575, -83.04679) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2014). |
Dublin,
OH Franklin Co. United States |
Brand Rd. / Coffman Rd. (40.11862, -83.13164) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.7061 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2014). Right-turn bypass lane on west leg. ICD estimated from Google Maps linework. |
Hilliard,
OH Franklin Co. United States |
Britton Pkwy. / All Seasons Dr. / Lyman Ct. (40.03655, -83.13115) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD = 180 ft in two-lane section, 160 feet in one-lane section. |
Augusta,
ME Kennebec Co. United States |
Rte 3 / I-95 NB Ramps (44.35353, -69.78083) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.1156 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Augusta,
ME Kennebec Co. United States |
Rte 3 / I-95 SB Ramps / Old Belgrade Rd. (44.35796, -69.78470) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.1121 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
McKinleyville,
CA Humboldt Co. United States |
School Rd. / Salmon Ave. / McKinleyville Ave. (40.93439, -124.11240) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.0680 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2014). ICD estimated from Google Maps linework. |
Vancouver,
WA Clark Co. United States |
NE 32nd Cir. / NE 138th Ave. (45.64517, -122.53057) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0778 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Vancouver,
WA Clark Co. United States |
NE 39th St. / NE 137th Ave. / NE 138th Ave. (45.65025, -122.53209) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.4044 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
(unincorporated),
OH Delaware Co. United States |
Cheshire Rd. / TR 35 (40.23802, -82.93950) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2013 | Rural, high-speed approaches. Year Completed estimated (2011-2014). |
Vancouver,
WA Clark Co. United States |
NE 44th St. / NE 137th Ave. (45.65377, -122.53207) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.8796 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
(unincorporated),
OH Delaware Co. United States |
Home Rd. / Concord Rd. (40.19585, -83.16441) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.6666 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2014). ICD estimated from Google Maps linework. |
Dublin,
OH Union Co. United States |
Hyland Croy Rd. / Mitchell Dewitt Rd. (40.13341, -83.17931) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.8297 |
Other (At-Grade) Single-Lane |
2013 | Right-turn-only lanes on north and south legs. Year Completed estimated (2011-2014). ICD estimated from Google Maps linework. |
Centennial,
CO Arapahoe Co. United States |
S Peoria St. / E Peakview Ave. (39.59674, -104.84809) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.8116 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Chattanooga,
TN Hamilton Co. United States |
(shopping mall perimeter rd) / (shopping mall access rd) (35.03304, -85.15518) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 184.8309 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Bellingham,
WA Whatcom Co. United States |
N State St. / Wharf St. / N Forest St. / Boulevard (48.74361, -122.48473) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.8297 |
Other (At-Grade) Single-Lane |
2013 | Open October 2013. ICD estimated from Google Maps linework. |
Bellingham,
WA Whatcom Co. United States |
Haxton Way / Kwina Rd. (48.79386, -122.63408) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2013 | Oblong shape. ICD = 170 ft x 135 ft. Open August 2013. Lummi Indian Reservation. |
Bellingham,
WA Whatcom Co. United States |
Northwest Blvd. / McLeod Rd. (48.78262, -122.50297) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.6614 |
Other (At-Grade) Single-Lane |
2013 | Open June 2013. ICD estimated from Google Maps linework. |
Chattanooga,
TN Hamilton Co. United States |
4th Ave. / E 37th St (35.00101, -85.28883) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.3714 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2013 | ICD estimated from Google Maps linework. |
Sedro-Woolley,
WA Skagit Co. United States |
Cook Rd. / Ferry St. / Washington St. / Edward R Murrow St. (48.50715, -122.24729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 69.6321 |
Other (At-Grade) Single-Lane |
2013 | Open October 2013. ICD estimated from Google Maps linework. |
Lynden,
WA Whatcom Co. United States |
SR 546 / Bender Rd. (48.96442, -122.44116) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.2849 |
Other (At-Grade) Single-Lane |
2013 | Open August 2013. ICD estimated from Google Maps linework. |
Lynden,
WA Whatcom Co. United States |
SR 546 / Depot Rd. (48.96478, -122.45217) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2052 |
Other (At-Grade) Single-Lane |
2013 | Open August 2013. ICD estimated from Google Maps linework. |
Anacortes,
WA Skagit Co. United States |
R Ave. / 22nd St. (48.50423, -122.60992) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.6011 |
Other (At-Grade) Single-Lane |
2013 | Open December 2013. ICD estimated from Google Maps linework. |
Mount Vernon,
WA Skagit Co. United States |
Anderson Rd. / Cedardale Rd. (48.39943, -122.32812) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2013 | Open November 2013. |
Pound, Village of,
WI Marinette Co. United States |
STH 64 / US 141 NB Ramps (45.10885, -88.01804) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.8889 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
(unincorporated),
AB Strathcona Co. Canada |
Buckingham Dr. / Broadview Dr. (53.55028, -113.31260) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.7690 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Palmyra,
VA Fluvanna Co. United States |
VA-53 (Thomas Jefferson Pkwy.) / S. Boston Rd. (37.88422, -78.32120) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.8199 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2013-2014). ICD estimated from Google Maps linework. |
Telluride,
CO San Miguel Co. United States |
CO-145 / CO-145 Spur (37.95036, -107.87135) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.6712 |
Other (At-Grade) Single-Lane |
2013 | Through bypass lane along top of T-intersection. Year Completed estimated (2011-2014). ICD estimated from Google Maps linework. |
Carbondale,
CO Garfield Co. United States |
CO-133 / Main St. (39.40113, -107.21968) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 42.4526 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
West Jefferson,
OH Madison Co. United States |
OH 29 / I-70 WB Ramps (39.95992, -83.34680) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.7576 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | Year Completed estimated (2011-2014). ICD estimated from Google Maps linework. |
Belleville,
IL St. Clair Co. United States |
Centreville Ave. / SR 15 NB Ramps / S Belt W (38.50591, -90.00011) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 47.6653 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Belleville,
IL St. Clair Co. United States |
Centreville Ave. / SR 15 SB Ramps / Whiskey Dr. (38.50516, -90.00173) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 35.5157 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Sylvania Township,
OH Lucas Co. United States |
W Sylvania Ave. / Mitchaw Rd. (41.68780, -83.76150) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.6760 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Kansas City,
MO Clay Co. United States |
NW 96th St. / US 169 SB Ramps (39.26994, -94.58598) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.6831 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Clayton,
NC Johnston Co. United States |
E Front St. / Bent Branch Loop Rd. (35.64089, -78.44504) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 34.9421 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Janesville,
WI Rock Co. United States |
E Racine St. / I-90 WB-I-39 NB Ramps (42.67077, -88.98221) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 55.3230 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Replaced cloverleaf interchange. ICD estimated from Google Maps linework. |
Janesville,
WI Rock Co. United States |
E Racine St. / I-90 EB-I-39 SB Ramps (42.67098, -88.98493) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8102 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Replaced cloverleaf interchange. ICD estimated from Google Maps linework. |
Kansas City,
MO Clay Co. United States |
NW 108th St. / US 169 NB Ramps (39.28944, -94.58446) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.5961 |
Unknown Multilane (2 Lane, unspecified) |
2013 | Diamond interchange replaced signalized intersection. Series of three roundabouts. ICD estimated from Google Maps linework. |
Kansas City,
MO Clay Co. United States |
NW 108th St. / US 169 SB Ramps (39.28944, -94.58625) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 43.4449 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Diamond interchange replaced signalized intersection. Series of three roundabouts. ICD estimated from Google Maps linework. |
Kansas City,
MO Clay Co. United States |
NW 108th St. / N Summit St. (39.28953, -94.58976) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.6717 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Series of three roundabouts. ICD estimated from Google Maps linework. |
Raymore,
MO Cass Co. United States |
S Dean Ave. / W Lucy Webb Rd. (38.79819, -94.49394) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 28.8551 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Kearney,
MO Clay Co. United States |
Rte 92-W 6th St. / Sam Barr Dr. (39.36785, -94.38055) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.0895 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Kearney,
MO Clay Co. United States |
Rte 92-W 6th St. / Nation Rd. (39.36791, -94.38893) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.8594 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Kansas City,
MO Clay Co. United States |
Tiffany Springs Pkwy. / NW 96th St. / US 169 NB Ramps (39.26998, -94.58361) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.6077 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Kansas City,
MO Clay Co. United States |
NW 96th St. / N Summit St. (39.26988, -94.58925) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.6078 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Jefferson City,
MO Cole Co. United States |
Mission Dr. / Rolling Hills Dr. / St. Marys Health Center access / (future road) / (future road) (38.56022, -92.21954) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 57.9024 |
Other (At-Grade) Single-Lane |
2013 | Access to hospital. ICD estimated from Google Maps linework. |
Franklin,
IN Johnson Co. United States |
N Main St. / Oliver Ave. / Clark St. / Walnut St. (39.49008, -86.05955) |
Other Existing |
All-Way Yield None |
5 Approaches 1 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2013 | Circular intersection with roundabout characteristics on all legs but one, which is stop-controlled and has no splitter island (raised or painted). Elliptical shaped. ICD 170 feet x 120 feet. Year Completed estimated (2012-2014). |
Greenfield,
IN Hancock Co. United States |
E 200 N / N Franklin St. (39.81371, -85.78994) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2013 | Yield-controlled right-turn bypass lanes on north and south legs. Skewed intersection. Year Completed estimated (2012-2013). |
Austin,
TX Travis Co. United States |
Trissino Dr. / Escarpment Blvd. (30.17229, -97.91003) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2013 | |
Alpharetta,
GA Fulton Co. United States |
Haynes Bridge Rd. / Thompson St. / (parking) (34.07226, -84.29312) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2013). |
Claycomo,
MO Clay Co. United States |
Ford Motor Plant No 4 Rd. / (parking) (39.20602, -94.47845) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2012-2013). Reconfiguration of factory entrance and parking circulation. |
Victoria,
BC Capital Canada |
Finnerty Rd. / McKenzie Ave. / Sinclair Rd. (48.46700, -123.30764) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.3003 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Rocky Mount,
NC Nash Co. United States |
(unknown) / (unknown) (35.97515, -77.89903) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.7953 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
West Valley City,
UT Salt Lake Co. United States |
Lake Park Blvd. / S 5370 W (40.71239, -112.01958) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 45.2647 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Orange County Great Park,
CA Orange Co. United States |
Ridge Valley / Pavillion Park (33.69527, -117.72962) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.6525 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Lake Forest,
CA Orange Co. United States |
Catalina / Monarch Blvd. / Dimension Dr. (33.67041, -117.67663) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.7648 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2013-2014). ICD estimated from Google Maps linework. |
Knightdale,
NC Wake Co. United States |
Wilder Nursery Trl. / Whistle Post Way (35.79498, -78.47446) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.1247 |
Other (At-Grade) Single-Lane |
2013 | One-stage pedestrian crossings behind very small splitter islands. Year Completed estimated (2013-2014). ICD estimated from Google Maps linework. |