City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Richmond Hill,
GA Bryan Co. United States |
GA 144 (Ford Ave.) / I-95 NB Ramps (31.95979, -81.32843) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2021-2022). |
Richmond Hill,
GA Bryan Co. United States |
GA 144 (Ford Ave.) / I-95 SB Ramps (31.96054, -81.32963) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2021-2022). |
(unincorporated),
CO Denver Co. United States |
High Point Blvd. / N Dunkirk St. (39.82169, -104.76259) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Unknown |
2021 | Year Completed estimated (2021-2022). |
Gilroy,
CA Santa Clara Co. United States |
SR 152 (Hecker Pass Rd.) / Plum St. (37.01188, -121.61789) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Asbury Lake,
FL Clay Co. United States |
(unknown) / (unknown) (30.04658, -81.77095) |
Unknown Existing |
Unknown None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Security-Widefield,
CO El Paso Co. United States |
Fountain Mesa Rd. / Caballero Ave. / Fortman Ave. (38.72330, -104.69956) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). https://www.koaa.com/news/covering-colorado/new-roundabout-but-is-it-keeping-children-safe |
Morrisburg,
ON Stormont (Dundas & Glengarry) Canada |
CR 2 / CR 31 / Ottawa St. (44.90050, -75.18542) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). https://www.renewcanada.net/three-levels-of-government-mark-unveiling-of-morrisburg-roundabout/ |
(unincorporated),
SC Spartanburg Co. United States |
SC 11 / Parris Bridge Rd. (35.15971, -81.91854) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). https://www.wspa.com/news/roundabout-proposed-at-hwy-11-parris-bridge-road/ |
Fond du Lac,
WI Fond Du Lac Co. United States |
STH 23 (E Johnson St.) / Wisconsin American Dr. (43.78386, -88.39646) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.4840 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2021-2022). Temporary bypass road on north side for construction staging in 2021. |
Sherwood Park,
AB Division 11 Canada |
Broadway Blvd. / Broadview Dr. (53.54390, -113.31382) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2023). |
New Prague,
MN Le Sueur Co. United States |
Main St. E / Columbus Ave. (44.54358, -93.57342) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | Year Completed estimated (2021-2023). |
Gretna,
NE Sarpy Co. United States |
S 180th St. / Lincoln Rd. (41.15455, -96.19669) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2021-2023). |
Mankato,
MN Blue Earth Co. United States |
CR 12 / Adams St. (44.16990, -93.92685) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2021-2023). |
Brevard,
NC Transylvania Co. United States |
US 64-US 276 (Asheville Hwy.) / Rustling Woods Dr. (35.26900, -82.71022) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2021-2023). |
West Frankfort,
IL Franklin Co. United States |
SR 149 / Ken Gray Blvd. / West Frankfort Plaza (37.89743, -88.95243) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2023). |
Ottawa,
ON Ottawa Canada |
Greenbank Rd. / Half Moon Bay Rd. (45.25555, -75.73742) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Year Completed estimated (2021-2023). |
Lincoln,
NE Lancaster Co. United States |
Wilderness Hills Blvd. / Hohensee Dr. (40.72236, -96.66957) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2021-2023). |
Lincoln,
NE Lancaster Co. United States |
Wilderness Hills Blvd. / Tree Line Dr. (40.71977, -96.66724) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2023). |
Lincoln,
NE Lancaster Co. United States |
S 40th St. / Tiger Lily Rd. (40.70815, -96.66347) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2023). |
Glenwood Springs,
CO Garfield Co. United States |
Airport Rd / MIdland Rd / Four Mile Rd / (unknown) (39.50807, -107.31691) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2023). |
Elk River,
MN Sherburne Co. United States |
Twin Lakes Rd. NW / Tyler St. / Twin Lakes Pkwy. (45.31576, -93.54120) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2021-2023). |
Elk River,
MN Sherburne Co. United States |
Twin Lakes Rd. NW / Line Ave. / 185th Ave. NW (45.30775, -93.54880) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2021-2023). |
Marion,
OH Marion Co. United States |
SR 98 (Columbus-Sandusky Rd. S) / SR 529 (Marion-Cardington Rd. E) (40.54939, -83.05017) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2021-2024). |
Lexington,
SC Lexington Co. United States |
Saint Peters Church Rd. / Old Cherokee Rd. (east) (34.00324, -81.30397) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2021-2025). |
Columbia,
MO Boone Co. United States |
Nocona Pkwy. / Artemis Dr. (38.89292, -92.28649) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Clarksville,
TN Montgomery Co. United States |
Kirkwood Rd. / Campus Dr. (36.56643, -87.20339) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Cedar Rapids,
IA Linn Co. United States |
6th St. SW / Commerce Park Dr. / (parking) (41.88168, -91.67595) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Colorado Springs,
CO El Paso Co. United States |
Tutt Blvd. / Greenway Pl. / (parking) (38.88292, -104.71469) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Maple Grove,
MN Hennepin Co. United States |
101st Ave. N / Troy Ln. N (45.13846, -93.51193) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Ramara,
ON Simcoe Canada |
Hwy 12 / CR 169 / Concession Road 6 (44.57153, -79.18908) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
(unincorporated),
NE Sarpy Co. United States |
S 180th St. / Cornhusker Rd. (41.16150, -96.19661) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Missoula,
MT Missoula Co. United States |
Mullan Rd. / Mary Jane Blvd. (46.88725, -114.05372) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2022-2023). |
Anoka,
MN Anoka Co. United States |
Green Haven Rd. / Jacob Ln. / US 10-US 169 WB Ramps (45.20655, -93.40067) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Anoka,
MN Anoka Co. United States |
W Main St. / US 10-US 169 EB Ramps / Church St. (45.20504, -93.40072) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2022-2023). |
Woodstock,
GA Cherokee Co. United States |
Wiley Bridge Rd. / Cox Rd. (34.09392, -84.43287) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Cumming,
GA Cherokee Co. United States |
Holbrook Campground Rd. / Birmingham Hwy. / County Line Rd. (34.21315, -84.27118) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Freedom,
PA Beaver Co. United States |
SR 989 (Dunlap Hill Rd.) / Freedom Crider Rd. (40.67684, -80.19046) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2022 | Year Completed estimated (2022-2023). |
Austin,
TX Travis Co. United States |
Ausblick Ave. / Peafowl St. (30.14491, -97.71121) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Austin,
TX Travis Co. United States |
Ausblick Ave. / Turaco Trl. (30.14320, -97.70775) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Gretna,
NE Sarpy Co. United States |
S 180th St. / Camelback Ave. (41.15770, -96.19688) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2022-2023). |
Harmony,
PA Butler Co. United States |
Little Creek Rd. / Mercer Rd. (40.81106, -80.12356) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Liberty Lake,
WA Spokane Co. United States |
E Mission Ave. / Kramer Pkwy. (47.67143, -117.12235) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Edina,
MN Hennepin Co. United States |
Eden Ave. / Arcadia Ave. / Normandale Rd. (STH 100 Frontage Rd.) (44.90952, -93.35224) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Year Completed estimated (2022-2023). |
Marmaduke,
AR Greene Co. United States |
US 49 (S 3rd St.) / SR 34 (36.18693, -90.38488) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Year Completed estimated (2022-2023). November 2022: https://www.youtube.com/watch?v=LurUNtZaU7w May 2023: https://www.youtube.com/watch?v=Kmntt4a_kvI |
Indianapolis,
IN Marion Co. United States |
Southeastern Ave. / S Rural St. (39.76005, -86.11647) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | Year Completed estimated (2022-2023). https://citybase-cms-prod.s3.amazonaws.com/409ceae3cbb8413497ef98823962c8d0.pdf |
Perdido Key,
FL Escambia Co. United States |
SR 292 (Perdido Key Dr.) / Johnson Beach Rd. (30.29923, -87.42787) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). https://www.facebook.com/studio850/videos/perdido-key-roundabout-taking-shapesafer-speeds-and-reduced-congestion-are-goals/2442958579185514/ |
Newport,
MI Monroe Co. United States |
Swan Creek Rd. / I-75 NB Ramps (42.00419, -83.31263) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/. |
Armington,
MT Cascade Co. United States |
US 87-SR 200 / US 89 / (parking) (47.34909, -110.89673) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). https://www.youtube.com/watch?v=7jSH18jbyKc |
Farragut,
TN Knox Co. United States |
Iron Plow Dr. / Branch Hook Rd. / Wagon Hitch Rd. (west) (35.84614, -84.18296) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2024). |
Farragut,
TN Knox Co. United States |
Iron Plow Dr. / Branch Hook Rd. / Wagon Hitch Rd. (east) (35.84531, -84.18085) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2024). |
Canton,
OH Stark Co. United States |
Champions Gateway / George Halas Dr. (40.82371, -81.39960) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2022-2024). |
Edmonton,
AB Division 11 Canada |
(unknown) / 28 Ave. SW (53.41041, -113.55315) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2024). |
Shelby,
NC Cleveland Co. United States |
NC-150 (Cherryville Rd.) / Shelby Bypass EB Ramps (35.31324, -81.49081) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2022-2024). |
Shelby,
NC Cleveland Co. United States |
NC-150 (Cherryville Rd.) / Shelby Bypass WB Ramps (35.31432, -81.48908) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2022-2024). |
Oakdale,
MN Washington Co. United States |
40th St. N / Helmo Ave. N (45.00596, -92.95083) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Hugo,
MN Washington Co. United States |
US 61 (Forest Blvd. N) / 159th St. N (45.17901, -92.98769) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Santa Fe,
NM Santa Fe Co. United States |
Beckner Rd. / Calle de la Alegria (35.62406, -106.00463) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Lincoln,
NE Lancaster Co. United States |
Saltillo Rd. / S 77th St. (40.69733, -96.61606) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Ashland,
NE Saunders Co. United States |
US 6 / SR 66 (41.03366, -96.36444) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Wentzville,
MO St. Charles Co. United States |
Veterans Memorial Pkwy. / I-70 EB Ramps / Ruggeri Rd. (38.80935, -90.87713) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Bear,
DE New Castle Co. United States |
Denny Rd. / Lexington Pkwy. / Airdrie Dr. (39.57173, -75.74234) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | Year Completed estimated (2023-2024). |
Town of Maine,
WI Marathon Co. United States |
CR K / CR WW (45.02727, -89.69047) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Hurricane,
UT Washington Co. United States |
100 N / 700 W / Birchview Ln. (37.17802, -113.30065) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
(unincorporated),
GA Paulding Co. United States |
Seven Hills Blvd. / Blackberry Run Dr. / Bent Leaf Dr. (34.02534, -84.78221) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2023-2024). |
Maple Grove,
MN Hennepin Co. United States |
101st Ave. N / Lawndale Ln. (45.13832, -93.50388) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Williamston,
SC Anderson Co. United States |
Cherokee Rd. / Joe Black Rd. (34.63816, -82.52482) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Kaukauna,
WI Outagamie Co. United States |
CR JJ / N Freedom Rd (CR N) (44.31559, -88.31282) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Antigonish,
NS Antigonish Canada |
Hwy. 4 (Old Hwy. 104) / Hwy. 7 (45.61419, -61.99859) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Augusta,
GA Richmond Co. United States |
GA 88 (Patterson Rd.) / Bath Edie Rd. (33.31721, -82.16339) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Greenfield,
IN Hancock Co. United States |
N CR 700W / W CR 200N (39.80860, -85.93402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Scottsdale,
AZ Maricopa Co. United States |
N Hayden Rd. / E Raintree Dr. (33.61963, -111.90776) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2023-2024). https://ww2.scottsdaleaz.gov/construction/project-list/raintree |
Edina,
MN Hennepin Co. United States |
Interlachen Blvd./ Blake Rd. (44.91393, -93.38343) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Year Completed estimated (2023-2024). https://www.youtube.com/watch?v=dm2G51ZohRY |
Hortonville,
WI Outagamie Co. United States |
STH 15 / CR T (44.34801, -88.67547) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2023-2024). https://projects.511wi.gov/wis15expand/full-project-overview/ |
(unincorporated),
CO Jefferson Co. United States |
US 40 / CR 65 / I-70 WB Exit Ramp (39.71621, -105.39166) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Year Completed estimated (2023-2024). https://www.codot.gov/projects/i70floydhill/earlyprojects. |
Bozeman,
MT Gallatin Co. United States |
Baxter Ln. / Collonwood Rd. / Harper Puckett Rd. (45.70022, -111.10372) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). https://www.kbzk.com/news/local-news/baxter-lane-ready-to-reopen-for-traffic-this-week-after-months-of-construction. |
Oak Level Township,
NC Nash Co. United States |
Sunset Ave. / Arrow Rd. (35.97106, -77.89111) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2023-2024). https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html. |
Santa Fe,
NM Santa Fe Co. United States |
Rabbit Rd. / Falcon Way (35.62208, -105.99127) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). https://www.santafecountynm.gov/news/detail/county-celebrates-early-completion-of-landmark-ne-se-connector-roads-project. |
Höör,
Skåne County Höör Sweden |
Gamla torg / Bygatan / Ågatan / Storgatan (55.93052, 13.54751) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
1970 | Year Completed estimated (before 1975). |
Höör,
Skåne County Höör Sweden |
Malmövägen / Frostavallsvägen / Ystadvägen (55.93599, 13.55519) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 85.0000 |
Other (At-Grade) Single-Lane |
1978 | Year Completed estimated (before 1980). |
Hörby,
Skåne County Hörby Sweden |
Rte 13 / Ringsjövägen (55.84953, 13.64542) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 85.0000 |
Other (At-Grade) Single-Lane |
1980 | Year Completed estimated (before 1985). |
Fresno,
CA Fresno Co. United States |
E El Paso Ave. / El Camino (36.84721, -119.78884) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
1996 | Year Completed estimated (before 1998). |
Redding,
CA Shasta Co. United States |
Teton Dr. / Crescent Moon Dr. / Crescent Moon Ct. (40.56422, -122.41552) |
Traffic Calming Circle Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 23.5899 |
Other (At-Grade) Single-Lane |
1997 | Year completed estimated (before 1998). Pedestrian ramps into circulatory roadway. ICD estimated from Google Maps linework. |
Colorado Springs,
CO El Paso Co. United States |
Lake Ave. / Lake Cir. (38.79144, -104.84880) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.2724 |
Other (At-Grade) Single-Lane |
1995 | Year Completed estimated (before 1999). ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
Dayflower Dr. / Starr Grass Dr. (43.03834, -89.51671) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
1999 | Year Completed estimated (before 2000). |
Vaughan,
ON York Canada |
S Park Rd. / S Park Rd. (43.83875, -79.39747) |
Other Existing |
Unknown None |
2 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
1998 | Year Completed estimated (before 2002) |
Vaughan,
ON York Canada |
Cranston Park Ave. / Melville Ave. / Drummond Dr. (43.86528, -79.52939) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.8598 |
Other (At-Grade) Single-Lane |
2000 | Year Completed estimated (before 2002). ICD estimated from Google Maps linework. |
Las Vegas,
NV Clark Co. United States |
W Park Run Dr. / Canyon Pointe (36.16153, -115.33394) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2002 | Year Completed estimated (before 2003). |
Hamilton,
ON Hamilton Canada |
Stonehenge Dr. / Thoroughbred Blvd. (43.21655, -79.95150) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.0000 |
Other (At-Grade) Single-Lane |
1998 | Year Completed estimated (before 2004). |
Hamilton,
ON Hamilton Canada |
Stonehenge Dr. / Meadowlands Blvd. (43.21763, -79.94515) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (before 2004). Flush splitter islands added 2012-2014. Borderline roundabout. |
Brandon,
MB Manitoba Canada |
Maryland Ave. / Magnolia Dr. (49.81997, -99.94982) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0697 |
Other (At-Grade) Single-Lane |
2001 | Year Completed estimated (before 2004). ICD estimated from Google Maps linework. |
Oakville,
ON Halton Canada |
Parkglen Ave. / Kingsridge Dr. (43.44523, -79.75763) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.2862 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (before 2004). ICD estimated from Google Maps linework. |
Saint-Irénée,
QC Charlevoix-Est Regional County Municipality Canada |
Rue Principale / Rang Sainte Madeleine / Rte 362 (47.57896, -70.21538) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 26.5869 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (before 2004). ICD estimated from Google Maps linework. |
Kemptville,
ON United Counties of Leeds and Grenville Canada |
CR 43 / Rideau River Rd. (45.02990, -75.63668) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2000 | Year Completed estimated (before 2004). ICD estimated from Google Maps linework. |
Waterloo,
ON Waterloo Canada |
Hagey Blvd. / Wes Graham Way (43.47997, -80.54992) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 80.0000 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (before 2005). |
Waterloo,
ON Waterloo Canada |
Hagey Blvd. / Frank Trompa Dr. (43.47734, -80.54814) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (before 2005). |
Saguenay,
QC Le Saguenay-et-son-Fjord Canada |
Rue des Mouettes / Rue des Alouettes (48.39737, -71.26184) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
1995 | Year Completed estimated (before 2005). |
Eslöv,
Skåne County Eslöv Sweden |
Sallerupsvägen / Säterivägen (55.82899, 13.28191) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2000 | Year Completed estimated (before 2005). |
Kitchener,
ON Waterloo Canada |
Doon S Dr. / Doon Mills Dr. / Chestnut Hill Crescent (43.38216, -80.42836) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.5128 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (before 2005). ICD estimated from Google Maps linework. |
Saguenay,
QC Saguenay Canada |
Rue Jacques-Cartier E / Boulevard Talbot (48.42400, -71.04228) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 30.1177 |
Other (At-Grade) Single-Lane |
2000 | Year Completed estimated (before 2005). ICD estimated from Google Maps linework. |
Yamachiche,
QC Maskinongé Canada |
Boulevard Saint Laurent E / Route Ste-Anne O / Route du Pays Brûlé (46.26235, -72.87783) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.1111 |
Other (At-Grade) Single-Lane |
2000 | Year Completed estimated (before 2005). ICD estimated from Google Maps linework. |