City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Kiel,
WI Manitowoc Co. United States |
STH 67-STH 32 / STH 57 (43.90986, -88.02251) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.0446 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened November 13, 2009. Functional Class: Arterial ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Dickinson Rd. (CTH G) / East River Dr. (44.43684, -88.02830) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.7306 |
Other (At-Grade) Single-Lane |
2001 | Roundabout is slightly east of the Chicago/Swan roundabout and is located in a residential area. Roundabout is near East De Pere Middle School and De Pere High School. Completed August 2001. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Belmont Rd. / Belle Plane Rd. (44.58361, -88.09459) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.9671 |
Other (At-Grade) Single-Lane |
2000 | Roundabout was constructed in center of residential subdivision south of Lineville Road. Roundabout is slightly smaller than the Lineville roundabouts. Completed August 2000. http://www.co.brown.wi.us/Planning/roundabouts.html Functional Class: Local ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Velp Ave. (CTH HS) / Woodale Ave. (CTH EB) (44.57293, -88.07800) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.3300 |
Other (At-Grade) Single-Lane |
2002 | Roundabout Located near industrial park, rail line, and the Mountain-Bay Recreational Trail. Roundabout is at the intersection of two county highways and is slightly larger than the roundabouts built in 1999 and 2001 in Howard and De Pere. Completed August 2002. http://www.co.brown.wi.us/Planning/roundabouts.html. Fatal crash June 5, 2011. 11861-05. Functional Class: Arterial ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Grant St. (CTH EE) / S 9th St. (44.44506, -88.09000) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 26.4324 |
Other (At-Grade) Single-Lane |
2003 | Roundabout located within residential neighborhood that also contains a few small businesses and a fire station. One of the fire station driveways directly accesses the roundabout. Completed August 2003. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / Suburban Dr. (44.43055, -88.08604) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4090 |
Other (At-Grade) Single-Lane |
2004 | One of two roundabouts on an arterial street that separates a residential neighborhood from a business park. Many trucks traveling to and from the business park pass through this intersection each day, and the roundabout serves as an attractive entrance to the neighborhood and park. Completed November 2004. http://www.co.brown.wi.us/Planning/roundabouts.html. Series of 6 roundabouts. Opened November 2004. Functional Class: Arterial ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / S 9th St. / W Matthew Dr. (44.43063, -88.09529) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.8205 |
Other (At-Grade) Single-Lane |
2004 | Second of two roundabouts on an arterial street separating residential neighborhood from a business park. Many trucks pass through this intersection each day. Completed November 2004. http://www.co.brown.wi.us/Planning/roundabouts.html. Series of 6 roundabouts. Opened November 2004. Functional Class: Arterial ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Glendale Ave. / Evergreen Ave. (44.57615, -88.11939) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9252 |
Other (At-Grade) Single-Lane |
2008 | Opened November 2008. ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / I-43 NB Ramps (43.79261, -87.76325) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0714 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | Opened November 2007. http://www.sheboygan-press.com/apps/pbcs.dll/article?AID=/20071028/SHE0101/710280468/1973 ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / I-43 SB Ramps (43.79406, -87.76523) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.9673 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | Opened November 2007. http://www.sheboygan-press.com/apps/pbcs.dll/article?AID=/20071028/SHE0101/710280468/1973 ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / Vanguard Dr. (Walmart entrance) (43.79655, -87.76846) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.5517 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Opened November 2007. Roundabout serves Wal-mart retail center. http://www.sheboygan-press.com/apps/pbcs.dll/article?AID=/20071028/SHE0101/710280468/1973 Functional Class: Arterial ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
8th St. / Indiana Ave. (43.74340, -87.71295) |
Other Existing |
Unknown Unknown |
5 Approaches 0 Driveways 56.9471 |
Other (At-Grade) Unknown |
ICD estimated from Google Maps linework. | |
Sheboygan Falls,
WI Sheboygan Co. United States |
STH 28 / STH 32 (43.71747, -87.81612) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.1180 |
Other (At-Grade) Single-Lane |
2006 | Opened September 2006. High speed approach roadways. ICD estimated from Google Maps linework. |
Bellevue,
WI Brown Co. United States |
US 141 / Allouez Ave. (44.45882, -87.95038) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4753 |
Other (At-Grade) Single-Lane |
2007 | Railroad is ~110 feet from roundabout. Seasonal summaer crossing and maybe 1 train per day for a short duration. Opened November 2, 2007. ICD estimated from Google Maps linework. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Perimeter St. (43.01009, -89.72186) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.5667 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Brookwood Dr. (43.00978, -89.71380) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.8068 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Telmark Pkwy. (43.00933, -89.71098) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.6540 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Ridgeview Rd. / Lillehammer Ln. (43.00663, -89.70390) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.4418 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / STH 78 / STH 92 (43.01007, -89.73044) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.9333 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
Thompson Dr. / STH 30 EB Off-Ramp (43.10506, -89.30066) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.0073 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Opened October 22, 2004. ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
Thompson Dr. / STH 30 WB On-Ramp / Commercial Ave. (43.10643, -89.30084) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.9822 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Opened October 22, 2004. ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
Kendall Ave. / Grand Ave. (43.07145, -89.43156) |
Traffic Calming Circle Existing |
Unknown Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
1997 | |
Madison,
WI Dane Co. United States |
New Washburn Way / Dandaneau Trl. / Chautauqua Trl. (43.04669, -89.51501) |
Traffic Calming Circle Existing |
Unknown Unknown |
4 Approaches 0 Driveways 13.9650 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Madison,
WI Dane Co. United States |
Glenway St. / Hillcrest Dr. (43.06437, -89.43896) |
Traffic Calming Circle Existing |
Unknown Unknown |
4 Approaches 0 Driveways 11.3433 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Oshkosh,
WI Winnebago Co. United States |
Jackson St. / Murdock Ave. (44.03947, -88.54265) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | |
Howard,
WI Brown Co. United States |
Lineville Rd. (CTH M) / Cardinal Ln. (CTH EB) (44.59090, -88.08430) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.7684 |
Other (At-Grade) Single-Lane |
1999 | Roundabout is near Forest Glen Elementary School, Lineville Intermediate School, and Bay Port High School. Completed October 1999. http://www.co.brown.wi.us/Planning/roundabouts.html Functional Class: Arterial ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. (CTH M) / Rockwell Ln. (44.59080, -88.08880) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.0674 |
Other (At-Grade) Single-Lane |
1999 | Roundabout is adjacent to Lineville Intermediate School, Middle School, and High School. School did not allow pedestrian crossings prior to roundabout due to unsafe conditions, now allows crossings using crossing guard. Completed October 1999. http://www.co.brown.wi.us/Planning/roundabouts.html Previously controlled by one-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Mason St. (STH 32-STH 54) / S. Taylor St. (44.52414, -88.07916) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4266 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Shawano Ave. (STH 29) / Taylor St. (44.53461, -88.07319) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.3783 |
Other (At-Grade) Multilane (3+ Lane) |
2011 | Opened September 2011. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 NB Ramps (44.52415, -88.08103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.4266 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 SB Ramps (44.52418, -88.08284) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.9811 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 SB Ramps (44.43050, -88.11402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.3880 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | Series of 6 roundabouts. Opened September 2011. |
De Pere,
WI Brown Co. United States |
Grant St. (CTH EE) / Lawrence Dr. (44.44511, -88.09367) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.8430 |
Other (At-Grade) Single-Lane |
2008 | Opened September 30, 2008. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 NB Ramps (44.43074, -88.10989) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2011 | Series of 6 roundabouts. Yield-controlled right-turn bypass lane on south leg; merging right-turn bypass lane on east leg. Opened September 2011. Circular central island. |
Oshkosh,
WI Winnebago Co. United States |
CTH E (Witzel Ave.) / Koeller St. (44.01805, -88.58098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened September 24, 2010. |
Wisconsin Rapids,
WI Wood Co. United States |
STH 54 (2nd Ave.) / Gaynor Ave. / 17th Ave. (44.38025, -89.84447) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.3874 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Opened September 2004. Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Milwaukee,
WI Milwaukee Co. United States |
S. 6th St. / W. Virginia St. / Florida St. (43.02698, -87.91770) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.7816 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2002 | Built as terminal of new bridge. Signal located downstream approximately 150-200 feet away (estimated) that queues back through roundabout during weekday p.m. peak. No lane designations on approach. Functional Class: Arterial ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Glendale Ave. / Hillcrest Heights (44.56551, -88.09801) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9305 |
Other (At-Grade) Single-Lane |
2008 | Opened August 1, 2008. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
CTH E (Witzel Ave.) / Washburn St. (44.01808, -88.58321) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened September 24, 2010. |
West Bend,
WI Washington Co. United States |
Paradise Dr. / CTH G (43.39770, -88.16100) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.5053 |
Other (At-Grade) Single-Lane |
2003 | Completed September 18, 2003 Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Oconomowoc,
WI Waukesha Co. United States |
Wisconsin Ave. / Lake Dr. (43.11224, -88.43968) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.1314 |
Other (At-Grade) Single-Lane |
2002 | Opened October 15, 2002. Previously controlled by one-way stop Functional Class: Local ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
CTH J / US 41 NB Ramps (44.30463, -88.24939) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.6070 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Opened October 11, 2010. ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
CTH J / US 41 SB Ramps (44.30645, -88.24948) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.8965 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Opened October 11, 2010. ICD estimated from Google Maps linework. |
Brookfield,
WI Waukesha Co. United States |
Barker Rd. (CTH Y) / North Ave. (CTH M) (43.06136, -88.16629) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.9042 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Functional Class: Arterial ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Main Ave. / Lawrence Dr. (44.45167, -88.08749) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 37.5127 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Kimberly,
WI Outagamie Co. United States |
S Railroad St. / W Kennedy Ave. (44.26087, -88.33906) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 17.1068 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2011). ICD estimated from Google Maps linework. |
Brown Deer,
WI Milwaukee Co. United States |
N Teutonia Ave. / W Bradley Rd. (43.16315, -87.96311) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 40.9442 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). ICD estimated from Google Maps linework. |
Fitchburg,
WI Dane Co. United States |
Lacy Rd. / Fahey Glen (43.00174, -89.41176) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.4443 |
Other (At-Grade) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Fitchburg,
WI Dane Co. United States |
Woods Hollow Rd / Gunflint Trail / Fontana Ct (43.00927, -89.42246) |
Other Existing |
Uncontrolled Unknown |
3 Approaches 0 Driveways 26.2003 |
Other (At-Grade) Single-Lane |
2002 | No control. Year Completed estimated (2000-2004). ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
CR T / CR Y (44.08259, -88.58346) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.1697 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. / E Deerfield Ave. (44.59137, -88.04580) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.9744 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. / US 141 NB Ramps (44.59141, -88.04751) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.8249 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Yield-controlled right-turn bypass lanes on south and east legs. Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. / US 141 SB Ramps (44.59134, -88.04995) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.8250 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Two-lane yield-controlled right-turn bypass lane on north leg; free-flow right-turn bypass lane on west leg. Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Linefield Rd. / W Deerfield Ave. (44.59129, -88.05171) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.1239 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Apple River,
WI Polk Co. United States |
US 8 / STH 46 / 131st Ave. (45.39584, -92.35625) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.6105 |
Other (At-Grade) Single-Lane |
2013 | Yield-controlled right-turn bypass lane on west leg. Free-flow right-turn bypass lane on south leg. Year Completed estimated (2012-2015). ICD estimated from Google Maps linework. |
Grand Chute,
WI Outagamie Co. United States |
Olde Casaloma Dr. / W Converters Dr. / N Victory Dr. (44.28936, -88.47671) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 34.1971 |
Other (At-Grade) Unknown |
2018 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Velp Ave. / Memorial Dr. (44.55604, -88.05792) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.4028 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Velp Ave. / I-41 NB Ramps (44.55664, -88.05906) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.5086 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2016 | Yield-controlled right-turn bypass lane on off-ramp. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Velp Ave. / I-41 SB Ramps (44.55731, -88.06068) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.0611 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2016 | Yield-controlled right-turn bypass lane on off-ramp. Add-lane bypass lane on west leg. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Cardinal Ln. / Howard Commons / (church parking) (44.55810, -88.08480) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 50.2094 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | ICD estimated from Google Maps linework. |
Hales Corners,
WI Milwaukee Co. United States |
STH 24 (W Forest Home Ave.-Janesville Rd.) / W Forest Home Ave. (42.93732, -88.04641) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.0902 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Yorkville,
WI Racine Co. United States |
Washington Ave. / Spring St. (42.72909, -87.96664) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 47.3752 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Bellevue,
WI Brown Co. United States |
Monroe Rd. / Landmark Blvd. (44.45864, -87.98951) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 48.5902 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Monroe Rd. / Ledgeview Rd. / Oak Ridge Cir. (44.42652, -88.02331) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.2642 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Ledgeview,
WI Brown Co. United States |
Heritage Rd. / Monroe Rd. (44.41810, -88.02942) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.3300 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Heritage Rd. / S Broadway St. (44.42806, -88.05654) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.0285 |
Other (At-Grade) Single-Lane |
2013 | Right-turn-only lane on east leg. Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Greenleaf Rd. / Heritage Rd. (44.42854, -88.06892) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2333 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2017). ICD estimated from Google Maps linework. |
Stevens Point,
WI Portage Co. United States |
Division St. / Northpoint Dr. (44.54109, -89.57577) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.9678 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Eau Claire,
WI Eau Claire Co. United States |
CR Q (North Crossing-Olson Dr.) / Black Ave. / Princeton Crossing (44.83396, -91.44714) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.2768 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Lafayette,
WI Chippewa Co. United States |
CTH X / CR J (44.92409, -91.32223) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.8254 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2014). ICD estimated from Google Maps linework. |
Manitowoc,
WI Manitowoc Co. United States |
STH 42 / Maritime Dr. / Waldo Blvd. (44.10825, -87.64308) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.4448 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | Completed November 8, 2019. https://projects.511wi.gov/waldo/full-project-overview/ ICD estimated from Google Maps linework. |
Waunakee,
WI Dane Co. United States |
W Main St. / Century Ave. (43.19206, -89.46181) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.2174 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2014-2018). ICD estimated from Google Maps linework. |
Greenville,
WI Outagamie Co. United States |
CR CB / Greenville Dr. / Wally Way (44.28549, -88.50618) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4894 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Year Completed estimated (2011-2012). ICD estimated from Google Maps linework. |
Troy,
WI St. Croix Co. United States |
Radio Rd. / STH 35 NB Ramps (44.89914, -92.64804) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.2222 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Two-lane yield-controlled right-turn bypass lane on off-ramp. Merging right-turn bypass lane on north leg onto on-ramp. Year Completed estimated (2012-2016). ICD estimated from Google Maps linework. |
River Falls,
WI St. Croix Co. United States |
Radio Rd. / STH 35 SB Ramps (44.89762, -92.64890) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.6854 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Two-lane yield-controlled right-turn bypass lane on off-ramp. Merging right-turn bypass lane oon south leg. Year Completed estimated (2012-2016). ICD estimated from Google Maps linework. |
River Falls,
WI St. Croix Co. United States |
Radio Rd. / Paulson Rd. (44.89510, -92.64967) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.4559 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Fourth (west) leg stubbed. Year Completed estimated (2012-2016). ICD estimated from Google Maps linework. |
Portage,
WI Columbia Co. United States |
W Wisconsin St. (STH 16) / Columbia Dr. (STH 127) / I-39 SB Ramps (43.56023, -89.49496) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.9282 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2018 | https://www.wiscnews.com/portagedailyregister/news/local/dot-nearly-ready-to-open-portage-s-first-roundabout-to/article_bdd0df9d-4e73-52b4-99de-252ab92cf7c8.html#4 ICD estimated from Google Maps linework. |
DeForest,
WI Dane Co. United States |
CR V / US 51 NB Ramps (43.25270, -89.32322) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.0214 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | date: https://www.oesllc.com/portfolio-items/ush-51-expansion-and-interchange-madison-deforest-dane-county-wi/ ICD estimated from Google Maps linework. |
Windsor,
WI Dane Co. United States |
CR V / US 51 SB Ramps (43.25275, -89.32500) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.9732 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | date: https://www.oesllc.com/portfolio-items/ush-51-expansion-and-interchange-madison-deforest-dane-county-wi/ ICD estimated from Google Maps linework. |
DeForest,
WI Dane Co. United States |
CR V (E North St.) / North Towne Rd. / Ball Ct. (43.25277, -89.32677) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.8431 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | date: https://www.oesllc.com/portfolio-items/ush-51-expansion-and-interchange-madison-deforest-dane-county-wi/ ICD estimated from Google Maps linework. |
Windsor,
WI Dane Co. United States |
Windsor Rd. / US 51 NB Ramps (43.21629, -89.32191) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.3902 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2013-2014). Under construction in 2013 per Streetview. ICD estimated from Google Maps linework. |
Windsor,
WI Dane Co. United States |
Windsor Rd. / US 51 SB Ramps (43.21641, -89.32400) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.2973 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2013-2014). ICD estimated from Google Maps linework. |
Windsor,
WI Dane Co. United States |
Windsor Rd. / N Towne Rd. (43.21636, -89.32789) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.9085 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2013-2014). ICD estimated from Google Maps linework. |
Dale,
WI Outagamie Co. United States |
US 45 / STH 96 (Wisconsin Rd.) (44.27234, -88.73946) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 35.0622 |
Other (At-Grade) Single-Lane |
2018 | date: https://www.whby.com/2018/04/15/roundabout-project-to-start-at-hwys-45-96/# ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
Holy Hill Rd. / Appleton Ave. (43.25080, -88.19111) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4466 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2017). ICD estimated from Google Maps linework. |
Turtle Lake,
WI Barron Co. United States |
US 8 / US 63 / Maple St. (45.39994, -92.14205) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.6073 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=45.3742088814016%2C-92.07809042445086&z=12 ICD estimated from Google Maps linework. |
Turtle Lake,
WI Barron Co. United States |
US 8 / Norway St. / Martin Ave. (45.39574, -92.15154) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.4172 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Cylon,
WI St. Croix Co. United States |
US 63 / STH 46 / STH 64 (45.13661, -92.38388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 64.0301 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
St Joseph,
WI St. Croix Co. United States |
CTH E / STH 64 NB Ramps (45.06005, -92.77939) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.3998 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
St Joseph,
WI St. Croix Co. United States |
STH 35 / CR E / STH 64 SB Ramps (45.05953, -92.78237) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.4002 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
St Joseph,
WI St. Croix Co. United States |
STH 35 / Main St. (45.05597, -92.79070) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.4031 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Baldwin,
WI St. Croix Co. United States |
CTH T / I-94 WB Ramps (44.94316, -92.43558) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.7317 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Central island designed for OSOW bypass of freeway. ICD estimated from Google Maps linework. |
Hammond,
WI St. Croix Co. United States |
CTH T / I-94 EB Ramps (44.94155, -92.43564) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.7328 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Central island designed for OSOW bypass of freeway. ICD estimated from Google Maps linework. |
Cady,
WI St. Croix Co. United States |
STH 128 / I-94 WB Ramps (44.93429, -92.19686) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.3472 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Cady,
WI St. Croix Co. United States |
STH 128 / I-94 EB Ramps (44.93265, -92.19704) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.5030 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Keshena,
WI Menominee Co. United States |
STH 47-STH 55 / Standing Pines Dr. (44.85970, -88.62769) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 26.2441 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.859088195652475%2C-88.62733226609475&z=17 ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
CTH C (Shawano Ave.) / CTH FF (Sherwood St.) (44.56660, -88.12972) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.7370 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
CTH FF (Sherwood St.) / STH 29 WB Ramps (44.56134, -88.13042) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.7403 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
CTH FF (Hillcrest Rd.) / STH 29 EB Ramps (44.55969, -88.13035) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.4432 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
CTH FF(Hillcrest Rd.) / Centennial Centre Blvd. / Navajo Trl. (44.55505, -88.13014) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5952 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2012-2015). ICD estimated from Google Maps linework. |