City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Modesto,
CA Stanislaus Co. United States |
Student Center Dr. / 6th St. (37.66402, -121.03414) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2017 | Y-shaped intersection. Bike lane striped in circulatory roadway. 28181. |
Modesto,
CA Stanislaus Co. United States |
6th St. / B St. (37.66152, -121.03413) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2017 | On campus of Modesto Junior College West Campus. Bike lanes striped within circulatory roadway. Year Completed estimated (2016-2017). |
Modesto,
CA Stanislaus Co. United States |
4th St. / E St. (37.66411, -121.03798) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2017 | On campus of Modesto Junior College West Campus. Bike lanes striped in circulatory roadway. Painted splitter island on south leg. Year Completed estimated (2016-2017). |
Modesto,
CA Stanislaus Co. United States |
Hillglen Ave. / Sorrel Wood Dr. (37.68533, -120.95336) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2010 | |
Modesto,
CA Stanislaus Co. United States |
Kodiak Dr. / Lincoln Oak Dr. (37.68164, -120.94799) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2015-2016). |
Manteca,
CA San Joaquin Co. United States |
E Woodward Ave. / Shoreline Dr. / McKinley Ave. (37.77547, -121.27071) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2021 | No splitter island on north leg (rural). Year Completed estimated (2021-2022). |
Manteca,
CA San Joaquin Co. United States |
Galleria Dr. / Diablo View Dr. (37.77254, -121.26299) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Stockton,
CA San Joaquin Co. United States |
E Swain Rd. / Montauban Ave. (38.01248, -121.29015) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
Stockton,
CA San Joaquin Co. United States |
Montauban Ave. / Hammertown Dr. (38.01652, -121.28893) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2022 | |
Stockton,
CA San Joaquin Co. United States |
Buddy Holly Dr. / Nash Dr. (38.04691, -121.27337) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Stockton,
CA San Joaquin Co. United States |
Ocean Mist Way / A G Spanos Blvd. (38.05497, -121.34964) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2006 | |
Stockton,
CA San Joaquin Co. United States |
Breaker Way / Sand Castle Way (38.05649, -121.34750) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2006 | |
Stockton,
CA San Joaquin Co. United States |
Swainsons Hawk St. / Lands End Dr. (38.05429, -121.34275) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 2 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2006 | |
Sacramento,
CA Sacramento Co. United States |
New Market Dr. / Town Center Dr. (38.65823, -121.52205) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Single-Lane |
2002 | Bike lane around circulatory roadway. East leg added 2019-2020. |
Windsor,
CA Sonoma Co. United States |
Windsor River Rd. / Windsor Rd. (38.54725, -122.81687) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling all approaches) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Rail line through central island. |
Jamestown,
CA Tuolumne Co. United States |
SR 108 / People of the Mountain Rd. (MacKey Ranch Rd.) / Sierra Rock Rd. (37.92569, -120.44641) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.uniondemocrat.com/news/local/article_c858c6e0-40ee-11ed-b07d-6b13ef882d63.html |
Tracy,
CA San Joaquin Co. United States |
W Byron Rd. / W Grant Line Rd. (37.75831, -121.49221) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2018 | Temporary installation using striping and raised dividers and barriers. |
Lincoln,
CA Placer Co. United States |
E Joiner Pkwy. / Fieldstone Dr. (38.84770, -121.28659) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lane on northwest leg. https://www.lincolnca.gov/en/our-government/east-joiner-parkway-widening-project.aspx |
Rocklin,
CA Placer Co. United States |
Whitney Ranch Pkwy. / W Oaks Blvd. / Songbird Way (38.83190, -121.26676) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Roseville,
CA Placer Co. United States |
Campus Pkwy. / Crimson Ridge Way (38.78933, -121.32544) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2018). |
Big Bear Lake,
CA San Bernardino Co. United States |
Moonridge Rd. / Elm St. (34.24075, -116.87464) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.youtube.com/watch?v=wfZy_7SYJvg (starts at 1:10) |
Big Bear Lake,
CA San Bernardino Co. United States |
Moonridge Rd. / Rathbun Dr. / Club View Dr. (34.23967, -116.86952) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Peanut shaped. https://www.youtube.com/watch?v=wfZy_7SYJvg (starts at 2:10) |
Fillmore,
CA Ventura Co. United States |
Heritage Valley Pkwy. / Central Ave. (34.39351, -118.91237) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | Painted splitter islands. Initial unfinished construction around 2014. Year Completed estimated (2021-2022). |
Fillmore,
CA Ventura Co. United States |
Heritage Valley Pkwy. / Mountain View St. (34.39380, -118.90777) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2020 | Painted splitter islands on west and southeast legs. Initially constructed as traffic circle with pedestrian access to central island. Year Completed estimated (2019-2021). |
Madera,
CA Madera Co. United States |
Root Creek Pkwy. W / Riverstone Blvd. SE (36.91441, -119.80757) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Madera,
CA Madera Co. United States |
Riverstone Blvd. SE / Market Ave. W (36.91787, -119.80758) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Madera,
CA Madera Co. United States |
Market Ave. W / Mission Dr. (36.91788, -119.81209) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Madera,
CA Madera Co. United States |
Riverstone Blvd. SW / Market Ave. W (36.91791, -119.81547) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2018-2020). |
Madera,
CA Madera Co. United States |
Market Ave. W / Lodge Rd. (36.91915, -119.80219) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2017 | |
Madera,
CA Madera Co. United States |
Root Creek Pkwy. W / Riverstone Blvd. SW (36.90613, -119.81664) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Woodlake,
CA Tulare Co. United States |
E Sierra Ave. / Castle Rock St. (36.42102, -119.08984) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2022 | |
Redding,
CA Shasta Co. United States |
S Bonnyview Rd. / Bechelli Ln. (40.53910, -122.35470) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Serves as a primary intersection for a Costco store. https://krcrtv.com/news/local/south-bonnyview-and-bechelli-lane-roadabout-update |
Camino,
CA El Dorado Co. United States |
Pondorado Rd. / (US 50 underpass) / (future road) (38.73683, -120.70547) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | North leg passes under US 50. Future east leg not built. https://dot.ca.gov/caltrans-near-me/district-3/d3-projects/d3-us-50-camino-safety-4e620 |
Woodland,
CA Yolo Co. United States |
Road 25A / Parkland Ave. (38.64099, -121.74450) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2020 | |
Woodland,
CA Yolo Co. United States |
Road 25A / Miekle Ave. (38.64078, -121.73624) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Woodland,
CA Yolo Co. United States |
Hunt St. / Heritage Pkwy. (38.64945, -121.74580) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Stockton,
CA San Joaquin Co. United States |
E Miner Ave. / N San Joaquin St. (37.95611, -121.28804) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2021 | Bicycle lanes leading into roundabout with bicycle sharrows on outer edge of circulatory roadway beyond each entry. https://twitter.com/stocktonupdates/status/1407046118156947458 |
Santa Clara,
CA Santa Clara Co. United States |
(shopping center entrance) / (parking) (37.35667, -121.93755) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://www.svvoice.com/coleman-costco-installing-roundabout/ |
Truckee,
CA Nevada Co. United States |
Cold Creek Cir. / Summer Camp Way (39.32143, -120.22793) |
Unknown Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Truckee,
CA Nevada Co. United States |
Donner Pass Rd. / Cold Stream Rd. / I-80 EB Ramps (39.32359, -120.22747) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Folsom,
CA Sacramento Co. United States |
Grand Prairie Rd. / Rustic Ridge Dr. (38.63617, -121.09165) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
Folsom,
CA Sacramento Co. United States |
Grand Prairie Rd. / Rustic Ridge Dr. / Alder Creek Pkwy (38.64059, -121.09212) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
Avila Beach,
CA San Luis Obispo Co. United States |
Avila Beach Dr. / Palisades Rd. / US 101 SB Ramps (35.17977, -120.70042) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening in fall of 2024. | |
Santa Barbara,
CA Santa Barbara Co. United States |
Olive Mill Rd. / Coast Village Rd. / N Jameson Ln. / US 101 Ramps (34.42156, -119.63993) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 46.3296 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Opened May 2024. https://www.youtube.com/watch?v=QKQzLS7q3iw |
Montecito,
CA Santa Barbara Co. United States |
San Ysidro Rd. / N Jameson Ln. / US 101 NB Ramps (34.42287, -119.63152) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 53.6445 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | This is an unique kidney shaped single-lane roundabout (approx. varying ICD 176' x 116'). Opened May 2024. https://www.youtube.com/watch?v=QKQzLS7q3iw |
San Juan Bautista,
CA San Benito Co. United States |
SR 156 (San Juan Hollister Rd.) / Bixby Rd. (36.84096, -121.49042) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 68.2749 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
ICD 224 ft x 211 ft. Anticipated opening year in 2025. | |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 EB Ramps (36.76908, -121.73823) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.7573 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. Future 3rd leg is planned to connect to BlackieRd. | |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 WB Ramps (36.77058, -121.73771) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. | |
Castroville,
CA Monterey Co. United States |
Castroville Blvd. / (unknown) (36.77419, -121.74051) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 49.3776 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2025. | |
Fisherman Flats,
CA Monterey Co. United States |
SR 68 / Josselyn Canyon Rd. (36.58359, -121.85655) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.7868 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Monterey,
CA Monterey Co. United States |
SR 68 / Olmsted Rd. (36.58399, -121.84976) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.6344 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Del Rey Oaks,
CA Monterey Co. United States |
SR 68 / Canyon del Rey Blvd. / Monterra Rd. (36.58090, -121.82797) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 52.5780 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Anticipated opening year 2029. | |
Monterey,
CA Monterey Co. United States |
SR 68 / York Rd. (36.57156, -121.80839) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.7868 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 ./ Pasadera Dr. / Boots Rd. (36.56766, -121.77857) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.9087 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / Laureles Grade Rd. (36.56964, -121.75566) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.5427 |
Other (At-Grade) Single-Lane |
Future 4th leg connects to Laguna Seca Entrance. Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / Corral de Tierra Rd. / Cypress Church Dr. (36.57854, -121.72709) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.1772 |
Other (At-Grade) Single-Lane |
Oval shaped. ICD = 151.5 ft x 141.5 ft. Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / San Benancio Rd. (36.57977, -121.72073) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.2323 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 NB Ramps (35.56543, -120.70151) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 56.0829 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 184 ft x 157 ft. Anticipated opening year 2030. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 SB Ramps / Theatre Dr. (35.56644, -120.70261) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.8909 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2030. | |
Morro Bay,
CA San Luis Obispo Co. United States |
Atascadero Rd. / US 101 NB Ramps / Main St. (35.38023, -120.85489) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 160 ft x 130 ft. Anticipated opening year 2026. | |
Rocklin,
CA Placer Co. United States |
Rocklin Rd. / Pacific St. (38.79073, -121.23610) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | Yield-controlled right-turn bypass lanes on west and south legs; add-lane right-turn bypass lane on east leg. https://www.rocklin.ca.us/roundabout |
Encinitas,
CA San Diego Co. United States |
North Coast Highway 101 / El Portal St. (33.05666, -117.29828) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.encinitasca.gov/government/departments/engineering/capital-improvements/north-highway-101-projects |
San Marcos,
CA San Diego Co. United States |
N City Dr. / June Way (33.13429, -117.16177) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2019 | Yield-controlled right-turn bypass lanes on west and south legs. Year Completed estimated (2018-2019). |
San Marcos,
CA San Diego Co. United States |
N City Dr. / Campus Way (33.13473, -117.15999) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2016 | |
Berkeley,
CA Alameda Co. United States |
University Ave. / Marina Blvd. (37.86518, -122.31113) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.berkeleyside.org/2022/06/16/berkeley-marina-university-avenue-repaved |
Kingsburg,
CA Fresno Co. United States |
S Bethel Ave. / E Conejo Ave. (Sierra St.) (36.51795, -119.57532) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | Fire station in southeast quadrant. https://www.cityofkingsburg-ca.gov/DocumentCenter/View/1930/Kingsburg-Roundabout-4-1-22?bidId= |
El Cerrito,
CA Contra Costa Co. United States |
Lynn Ave. / Ramona Ave. (37.90057, -122.29100) |
Traffic Calming Circle Existing |
One-Way/Two-Way Stop Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
El Cerrito,
CA Contra Costa Co. United States |
Lynn Ave. / Carmel Ave. (37.90074, -122.29015) |
Traffic Calming Circle Existing |
One-Way/Two-Way Stop Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Vacaville,
CA Solano Co. United States |
Carroll Way / Primrose Dr. (38.34930, -121.92726) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2019-2020). |
San Diego,
CA San Diego Co. United States |
Florida Dr. / Morley Field Dr. (32.73983, -117.14367) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Modular (quick build) construction. https://www.californiaconstructionnews.com/2022/10/01/construction-starts-on-modular-roundabout-quick-build/ |
Weedpatch,
CA Kern Co. United States |
SR 184 (Weedpatch Hwy.) / Sunset Blvd. (35.22330, -118.91449) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2023 | https://bakersfieldnow.com/news/local/roundabouts-on-hwy-184-bring-safety-to-students-farmworkers |
Santa Maria,
CA Santa Barbara Co. United States |
Bethel Ln. / Marsala Ave. (34.92790, -120.45579) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2002 | Year Completed estimated (2001-2002). North leg added 2003-2004. |
Folsom,
CA Sacramento Co. United States |
Prairie City Rd. / Scott Rd. (38.61225, -121.14817) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.facebook.com/CityofFolsom/videos/6294236023941862/ |
Berkeley,
CA Alameda Co. United States |
Gilman St. / I-80 EB Ramps / Eastshore Hwy. (37.87826, -122.30681) |
Roundabout Unknown |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
Opening 2024 https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/d4-alameda-80-gilman-interchange-improvement-project | |
Berkeley,
CA Alameda Co. United States |
Gilman St. / I-80 WB Ramps / Frontage Rd. (37.87808, -122.30769) |
Roundabout Unknown |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
Opening 2024 https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/d4-alameda-80-gilman-interchange-improvement-project | |
Lodi,
CA San Joaquin Co. United States |
Cherokee Ln. / SR 99 SB Exit Ramp / (connector to E Turner Rd.) (38.14475, -121.26156) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. https://www.youtube.com/watch?v=K4bMgmfZOPg |
Roseville,
CA Placer Co. United States |
Washington Blvd. / All America City Blvd. / Lincoln St. (38.75716, -121.28871) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Lincoln St. has been converted to one-way in the vicinity of the roundabout, going away from the roundabout, with a separate right-in/right-out connection to Washington Blvd. https://www.roseville.ca.us/government/departments/public_works/roadways_traffic/current_projects/roundabout_washington_allamericacity_lincoln |
Sacramento,
CA Sacramento Co. United States |
Crossfield Dr. / Lindbergh Dr. / Airport Blvd. SB Ramps (38.67892, -121.59240) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Serves Sacramento International Airport. https://sacramento.aero/scas/about/news-and-events/upcoming-smf-construction-plan-ahead-for-improved-travel-experience |
Sacramento,
CA Sacramento Co. United States |
Crossfield Dr. / Meister Way / Airport Blvd. NB Ramps (38.67890, -121.58937) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Serves Sacramento International Airport. https://sacramento.aero/scas/about/news-and-events/upcoming-smf-construction-plan-ahead-for-improved-travel-experience |
Los Angeles,
CA Los Angeles Co. United States |
MIssion Rd. / Myers St. / Jesse St. (34.03637, -118.22567) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2023 | https://la.streetsblog.org/2023/12/19/eyes-on-the-street-boyle-heights-myers-mission-roundabout-completed-short-bike-paths-open |
Davis,
CA Yolo Co. United States |
Hutchison Dr. / Bioletti Way (38.53915, -121.75619) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 19.8120 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2012 | Oval shaped. ICD = 65 ft x 55 ft. Painted and marked central and splitter islands. |
Davis,
CA Yolo Co. United States |
Engineering Bikeway / (unknown) (38.53777, -121.75421) |
Other Existing |
Uncontrolled Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Open to bicycles and pedestrians only. | |
Davis,
CA Yolo Co. United States |
Acer St. / Celadon St. (38.54316, -121.77348) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Davis,
CA Yolo Co. United States |
Acer St. / Citron St. (38.54317, -121.77625) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Davis,
CA Yolo Co. United States |
Tilia St. / Citron St. (38.54207, -121.77631) |
Other Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands on two legs. | |
Davis,
CA Yolo Co. United States |
Hutchison Dr. / (unknown) (38.53911, -121.75507) |
Other Existing |
Other Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Yield control only on side street. | |
Davis,
CA Yolo Co. United States |
Hutchison Dr. / (unknown) (38.53910, -121.75450) |
Other Existing |
Other Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Yield control only on side street. | |
Davis,
CA Yolo Co. United States |
California Ave. / Shields Ave. (38.53989, -121.75222) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Painted and marked central island and splitter islands on north and south legs. No splitter island on east leg. | |
Davis,
CA Yolo Co. United States |
Tercero Hall Cir. / Bioletti Way (38.53743, -121.75582) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Oval shaped. Painted and marked central and splitter islands. | |
Davis,
CA Yolo Co. United States |
Bioletti Way / Bainer Hall Dr. (38.53608, -121.75682) |
Other Existing |
Uncontrolled Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Painted and marked central and splitter islands. | |
Davis,
CA Yolo Co. United States |
Bainer Hall Dr. / (unknown) (38.53655, -121.75405) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Painted splitter islands. | |
Sundale,
CA Alameda Co. United States |
Walnut Ave. / Argonaut Way / Parkhurst Dr. (37.54260, -121.98521) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 33.5277 |
Other (At-Grade) Single-Lane |
2015 | Raised crosswalks. Year Completed estimated (2014-2015). |
Dinuba,
CA Tulare Co. United States |
Rosemary Ave. / Viscaya Pkwy. (36.55671, -119.40398) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2006 | No truck apron. 2011 or earlier (SV) |
Dinuba,
CA Tulare Co. United States |
Nebraska Ave. (Avenue 424) / N Alta Ave. (Road 80) (36.56040, -119.39519) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2022 | https://www.facebook.com/cityofdinuba/videos/the-alta-nebraska-roundabout-project-is-completed-and-the-roadway-is-now-openthi/779884746555640/ |
Dinuba,
CA Tulare Co. United States |
Ridge Creek Dr. / Ridge Creek Estates Way (36.54539, -119.43504) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2006-2009). |
Truckee,
CA Nevada Co. United States |
Soaring Way / Joerger Dr. (39.32058, -120.15540) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2019-2020). |
Bakersfield,
CA Kern Co. United States |
SR 43 (Enos Ln.) / Stockdale Hwy. (35.35452, -119.25223) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://transportationfoundation.org/transportation-awards/ |
Bakersfield,
CA Kern Co. United States |
SR 119 (Taft Hwy.) / SR 43 (Enos Ln.) (35.26736, -119.25267) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | https://www.bakersfield.com/news/two-roundabouts-going-in-on-highway-43-west-of-bakersfield/article_323d5924-ae51-11e9-a377-b70d0742572b.html |
La Quinta,
CA Riverside Co. United States |
Calle Sinaloa / Avenida 52 / Avenida Bermudas (33.67259, -116.30364) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2020 | http://lqcompletestreets.com/overview |
La Quinta,
CA Riverside Co. United States |
Eisenhower Dr. / Avenida Montezuma (33.67616, -116.30798) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2020 | http://lqcompletestreets.com/overview |