City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Bayfield,
CO La Plata Co. United States |
N Mountain View Dr. / E Lakeside Dr. / E Oak Dr. (37.23990, -107.59445) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 18.0655 |
Other (At-Grade) Single-Lane |
2018 | Combined two close intersections. ICD estimated from Google Maps linework. |
Bayfield,
CO La Plata Co. United States |
CR 501 / Bayfield Center Dr. (37.23393, -107.60191) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2001 | Bayfield Center Drive is a new roadway. Completed Fall 2001. |
Silt,
CO Garfield Co. United States |
US 6 (Main St. / ) / 9th St. (39.54703, -107.65360) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.1028 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Rifle,
CO Garfield Co. United States |
Taughenbaugh Blvd. / 7th St. / Airport Rd. (39.52260, -107.77673) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.8509 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Rifle,
CO Garfield Co. United States |
Taughenbaugh Blvd. / I-70 EB Ramps (39.52339, -107.77710) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.6695 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Durango,
CO La Plata Co. United States |
(Mercy Regional Medical Center ring road) / (unknown) (37.23677, -107.82050) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.2308 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Telluride,
CO San Miguel Co. United States |
W. Colorado Ave. / Mahoney Dr. / Brewery Rd. (37.94135, -107.82080) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.9083 |
Other (At-Grade) Single-Lane |
2005 | ICD estimated from Google Maps linework. |
Durango,
CO La Plata Co. United States |
Wilson Gulch Dr. / Three Springs Blvd. (37.23339, -107.82310) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | |
Durango,
CO La Plata Co. United States |
US 550 / US 160 WB Ramps / US 160 EB Exit Ramp / Wilson Gulch Dr. (37.22978, -107.83943) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 64.0080 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2014 | Year Completed estimated (2011-2014). North leg added 2014-2017. US 550 added in 2024, although that uses the same leg as US 160 EB. https://www.durangoherald.com/articles/u-s-highway-550-connection-finally-opens-in-durango/ |
Durango,
CO La Plata Co. United States |
Wilson Gulch Dr. / US 160 Ramps (37.22979, -107.83946) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Year Completed estimated (2011-2014). North leg added 2015-2017. https://www.codot.gov/projects/archived-project-sites/us-160-wilson-gulch-road-extension |
Durango,
CO La Plata Co. United States |
US 550 / US 160 EB Entrance Ramp (37.22666, -107.83949) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
2024 | https://www.facebook.com/coloradodot/videos/grandview-interchange-us-550-us-160-durango-on-monday-715-many-motorists-travele/853241030015092/ |
Durango,
CO La Plata Co. United States |
Jenkins Ranch Rd. / Kennebec Dr. (37.29216, -107.84010) |
Roundabout Existing |
Unknown Unknown |
4 Approaches 0 Driveways 23.7539 |
Other (At-Grade) Single-Lane |
2003 | ICD estimated from Google Maps linework. |
Durango,
CO La Plata Co. United States |
Jenkins Ranch Rd. / Lizard Head (north) (37.28920, -107.84310) |
Roundabout Existing |
Unknown Unknown |
3 Approaches 0 Driveways 27.5556 |
Other (At-Grade) Single-Lane |
2004 | ICD estimated from Google Maps linework. |
Durango,
CO La Plata Co. United States |
Jenkins Ranch Rd. / Lizard Head (south) (37.28605, -107.84710) |
Roundabout Existing |
Unknown Unknown |
3 Approaches 0 Driveways 24.7061 |
Other (At-Grade) Single-Lane |
2004 | ICD estimated from Google Maps linework. |
Durango,
CO La Plata Co. United States |
Jenkins Ranch Rd. / Ophir Dr. (37.28321, -107.85120) |
Roundabout Existing |
Unknown Unknown |
3 Approaches 0 Driveways 26.6075 |
Other (At-Grade) Single-Lane |
2004 | ICD estimated from Google Maps linework. |
Durango,
CO La Plata Co. United States |
Jenkins Ranch Rd. / Molas Dr. (37.28099, -107.85550) |
Roundabout Existing |
Unknown Unknown |
3 Approaches 0 Driveways 28.5089 |
Other (At-Grade) Single-Lane |
2004 | ICD estimated from Google Maps linework. |
Montrose,
CO Montrose Co. United States |
S Hillcrest Dr. / Sunnyside Rd. (38.47450, -107.85663) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 15.8954 |
Other (At-Grade) Single-Lane |
2016 | date: https://www.cityofmontrose.org/CivicAlerts.aspx?AID=1235 ICD estimated from Google Maps linework. |
Montrose,
CO Montrose Co. United States |
Miami Rd. / Hillcrest Dr. (38.48179, -107.85677) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2019 | https://www.cityofmontrose.org/701/Miami-Hillcrest-Roundabout-Project |
Durango,
CO La Plata Co. United States |
CR 238 / Fort Lewis Dr. / College Dr. (37.27940, -107.85940) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.7643 |
Other (At-Grade) Single-Lane |
2007 | ICD estimated from Google Maps linework. |
Montrose,
CO Montrose Co. United States |
Ogden Rd. / Woodgate Rd. (38.45096, -107.86297) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.7365 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2011-2012). ICD estimated from Google Maps linework. |
Durango,
CO La Plata Co. United States |
Florida Rd. / Riverview Dr. (37.28319, -107.86900) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4086 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Telluride,
CO San Miguel Co. United States |
CO-145 / CO-145 Spur (37.95036, -107.87135) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.6712 |
Other (At-Grade) Single-Lane |
2013 | Through bypass lane along top of T-intersection. Year Completed estimated (2011-2014). ICD estimated from Google Maps linework. |
Parachute,
CO Garfield Co. United States |
Old Hwy 6 / I-70 EB Ramps / (unknown) (39.42828, -108.07440) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | |
Parachute,
CO Garfield Co. United States |
Old Hwy 6 / I-70 WB Ramps (39.42982, -108.07610) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | |
Farmington,
NM San Juan Co. United States |
Foothills Dr. / Rinconada St. (36.79144, -108.13909) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2015-2019). |
Farmington,
NM San Juan Co. United States |
E Main St. / S Miller Ave. (36.72910, -108.20333) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | |
Farmington,
NM San Juan Co. United States |
Main St. / Orchard Ave. (36.72905, -108.20540) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | Oblong shaped. https://durangoherald.com/articles/332836 |
Farmington,
NM San Juan Co. United States |
W Main St. / Behrend Ave. (36.72906, -108.20803) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.facebook.com/downtownfarmingtonnm/videos/main-st-phase-2-reopened-to-vehicles-on-november-24th-2020/170344904783299/ |
Farmington,
NM San Juan Co. United States |
W Main St. / Auburn Ave. (36.72905, -108.21064) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | |
Mancos,
CO Montezuma Co. United States |
Ruins Rd. / (entrance to visitor center) / (service road) (37.33917, -108.41185) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Entrance to Mesa Verde National Park. Year Completed estimated (2020-2023). Previous control was mix of stop and uncontrolled movements. |
Billings,
MT Yellowstone Co. United States |
Five Mile Rd. / Mary St. / (Billings Bypass) (45.84863, -108.42492) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2021 | https://www.yourbigsky.com/local-news-2/billings-bypass-project-roundabout-opening-on-november-24/ |
Billings,
MT Yellowstone Co. United States |
Old US 312 / Five Mile Rd. (45.86957, -108.42768) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.mdt.mt.gov/pubinvolve/billingsbypass/fmr.shtml |
Bozeman,
MT Yellowstone Co. United States |
Bench Blvd. / Hilltop Rd. / Yellowstone River Rd. (45.81289, -108.46580) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.1305 |
Other (At-Grade) Single-Lane |
2013 | Right-turn-only lane on south leg. ICD estimated from Google Maps linework. |
Grand Junction,
CO Mesa Co. United States |
Aviators Way / Eagle Dr. (39.11972, -108.52625) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2006-2011). |
Grand Junction,
CO Mesa Co. United States |
Horizon Dr. / H Rd. / Eagle Dr. (39.11827, -108.52976) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.2299 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Year Completed estimated (2006-2011). Slight elliptical shape. Right-turn bypass lane on west leg. ICD estimated from Google Maps linework. |
Grand Junction,
CO Mesa Co. United States |
Falcon Way / Sunstrand Way (39.12315, -108.53169) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2006-2011). |
Billings,
MT Yellowstone Co. United States |
Hwy 3 / 27th St. / Airport Rd. (45.80209, -108.53540) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7937 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Located at Billings airport. Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Grand Junction,
CO Mesa Co. United States |
Horizon Dr. / I-70 WB Ramps (39.11215, -108.53938) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0415 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Grand Junction,
CO Mesa Co. United States |
Horizon Dr. / I-70 EB Ramps / Horizon 70 Ct. (39.11140, -108.54051) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0420 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Grand Junction,
CO Mesa Co. United States |
Main St. / N 13th St. / S 13th St. (39.06731, -108.55072) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | https://www.gjsentinel.com/news/western_colorado/mini-roundabout-installed-at-13th-and-main/article_bbcc8188-a4fb-11ee-bc44-b755269e8d08.html |
Grand Junction,
CO Mesa Co. United States |
Horizon Dr. / 12th St. (39.10165, -108.55234) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 1 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
1998 | Bicycle-only (bike-only) driveway into circulatory roadway in northeast quadrant, leading into bicycle (bike) roundabout. |
Grand Junction,
CO Mesa Co. United States |
Main St. / 7th St. (39.06731, -108.56104) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.8912 |
Other (At-Grade) Single-Lane |
2007 | ICD estimated from Google Maps linework. |
Grand Junction,
CO Mesa Co. United States |
Colorado Ave. / S. 2nd St. (39.06636, -108.56950) |
Roundabout Existing |
Unknown Unknown |
3 Approaches 0 Driveways 25.9643 |
Other (At-Grade) Single-Lane |
2002 | ICD estimated from Google Maps linework. |
Grand Junction,
CO Mesa Co. United States |
Grand Ave. / N 1st St. / SR 340 (Broadway) / I-70 Business Loop (39.07031, -108.57097) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2022 | https://www.codot.gov/news/2021/august-2021/1st-street-roundabout-project-enters-new-phase |
Grand Junction,
CO Mesa Co. United States |
Park Dr. / Meander Dr. / Meander Ct. (39.09085, -108.57322) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2006-2011). |
Grand Junction,
CO Mesa Co. United States |
Independent Ave. / Sams Club entrance (39.08170, -108.58310) |
Roundabout Existing |
Unknown Unknown |
3 Approaches 0 Driveways 33.3754 |
Other (At-Grade) Single-Lane |
2003 | Serves commercial development parking lot. ICD estimated from Google Maps linework. |
Grand Junction,
CO Mesa Co. United States |
G Rd. / 25th Rd. (39.10636, -108.58940) |
Roundabout Existing |
Unknown Unknown |
4 Approaches 0 Driveways 30.5834 |
Other (At-Grade) Single-Lane |
2002 | ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Meadow View Dr. / Meadow View Dr. (45.78325, -108.59372) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2017 | South leg stubbed. Year Completed estimated (2015-2018). |
Grand Junction,
CO Mesa Co. United States |
G Rd. / 24 1 / 2 Rd. (39.10635, -108.59870) |
Roundabout Existing |
Unknown Unknown |
4 Approaches 0 Driveways 34.2905 |
Other (At-Grade) Single-Lane |
2005 | ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
MT Hwy 3 / Zimmerman Trl. (45.80647, -108.59981) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 44.1250 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Grand Ave. / 36th St. W (45.78403, -108.60541) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 50.8058 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Year Completed estimated (2015-2019). ICD estimated from Google Maps linework. |
West End,
MT Yellowstone Co. United States |
Central Ave. / S 36th St. W (45.76949, -108.60726) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | |
Grand Junction,
CO Mesa Co. United States |
24 Rd. / G Rd. (39.10637, -108.60819) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | https://www.westernslopenow.com/news/local-news/the-artist-for-the-24-rd-roundabout-is-picked/ |
Grand Junction,
CO Mesa Co. United States |
24 Rd. / I-70 WB Ramps (39.11454, -108.60820) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.7732 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2006 | ICD estimated from Google Maps linework. |
Grand Junction,
CO Mesa Co. United States |
24 Rd. / I-70 EB Ramps (39.11333, -108.60820) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.0672 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2006 | ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Grand Ave. / 38th St. W (45.78400, -108.61111) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.9757 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | Fourth leg stubbed. ICD estimated from Google Maps linework. |
West End,
MT Yellowstone Co. United States |
Central Ave. / S 38th St. W (45.76969, -108.61240) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | |
Billings,
MT Yellowstone Co. United States |
King Ave. / Olympic Blvd. (45.75507, -108.61360) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.1658 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Near Kohl's retail shopping center. Previously controlled by one-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Crossing Blvd. / Olympic Blvd. (45.75216, -108.61570) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.1677 |
Other (At-Grade) Single-Lane |
2009 | Functional Class: Local ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / Hesper Rd. (45.74060, -108.61740) |
Roundabout Existing |
Unknown Unknown |
4 Approaches 0 Driveways 43.3436 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 8 roundabouts. Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / Zoo Dr. (45.73609, -108.61740) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.6799 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 8 roundabouts. Previously controlled by two-way stop Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / (Local Access) (45.74776, -108.61750) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 37.5041 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 8 roundabouts. Main access to construction materials facility (600+ trucks per day). Previously controlled by two-way stop Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / Grand Ave. (45.78407, -108.61760) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.1455 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 8 roundabouts. Fatal crash 2012. 11861-05. Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / Broadwater Ave. (45.77685, -108.61760) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.9815 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 8 roundabouts. Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / Central Ave. (45.76963, -108.61760) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3183 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 8 roundabouts. Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / Monad Rd. (45.76236, -108.61760) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.6596 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 8 roundabouts. Previously controlled by two-way stop Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / King Ave. (45.75507, -108.61760) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 58.3321 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 8 roundabouts. Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Henry Chapple St. / St Vincent Way (45.75948, -108.61935) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.6630 |
Other (At-Grade) Single-Lane |
2013 | One approach stubbed out. ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
St Mary Way / Marillac St. / Henry Chapple St. (45.75672, -108.62191) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.9980 |
Other (At-Grade) Single-Lane |
2013 | One approach stubbed out. ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
King Ave. / St. Vincent Way (45.75520, -108.62260) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.9990 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Previously controlled by two-way stop Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Grand Junction,
CO Mesa Co. United States |
G Rd. / 23rd Rd. (39.10632, -108.62669) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2011 | Specifically designed for over-length, WB-110 trucks. |
Grand Junction,
CO Mesa Co. United States |
Broadway / Redlands Pkwy. (39.07812, -108.63467) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.7214 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
King Ave. W / S 56th St. W (45.75516, -108.65895) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.yourbigsky.com/local-news-2/billings-king-ave-56th-st-w-reopened/ |
Billings,
MT Yellowstone Co. United States |
Central Ave. / 56th St. W (45.76970, -108.65917) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.mdt.mt.gov/pubinvolve/56thRoundabouts/ |
Billings,
MT Yellowstone Co. United States |
Ironwood Dr. / Woodcreek Dr. (45.81641, -108.67716) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2003 | |
Fruita,
CO Mesa Co. United States |
Aspen Ave. / Mesa St. (Park Square) (39.15884, -108.73360) |
Other Existing |
Unknown Unknown |
0 Approaches 0 Driveways 77.7908 |
Other (At-Grade) Unknown |
Completed 1940? ICD estimated from Google Maps linework. | |
Fruita,
CO Mesa Co. United States |
CO-340 / I-70 EB Ramps / I-70 Frontage Rd. (39.15470, -108.73769) |
Roundabout Existing |
All-Way Yield Active Pedestrian Warning (flashing yellow) |
4 Approaches 0 Driveways 40.7499 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Fruita,
CO Mesa Co. United States |
CO-340 / Raptor Rd. (39.15351, -108.73813) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2337 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Red Lodge,
MT Carbon Co. United States |
US 212 (Broadway Ave.) / 3rd St. (45.19487, -109.24681) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 40.3987 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Chinle,
AZ Apache Co. United States |
Navajo Rte 27 / Navajo Rte 7 (36.15072, -109.55430) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2021 | https://www.nhonews.com/news/2021/jan/19/11-miles-navajo-route-27-paved-between-chinle-and-/ |
Maeser,
UT Uintah Co. United States |
Main St. / Aggie Blvd. (40.45562, -109.56693) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Year Completed estimated (2009-2011). |
Burnside,
AZ Apache Co. United States |
US 191 / AZ 264 (35.75473, -109.62710) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2009 | Right-turn bypass lane. Elliptical shaped. ICE = 180 ft x 160 ft. |
Safford,
AZ Graham Co. United States |
N 8th Ave. / Safford Bryce Rd. / Airport Rd. (32.85769, -109.71607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://gilaherald.com/graham-county-roundabout-working-well/ |
Thatcher,
AZ Graham Co. United States |
W Church St. / N High School Ave. (32.84581, -109.75898) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://gilaherald.com/church-street-roundabout-open-for-business/ |
Thatcher,
AZ Graham Co. United States |
W Golf Course Rd. / Hoopes Ave. / S Robinson Ave. (32.80760, -109.76289) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 62.2373 |
Other (At-Grade) Single-Lane |
2017 | http://leagueaz.org/connection/2018/0218/thatcher.html ICD estimated from Google Maps linework. |
Bisbee,
AZ Cochise Co. United States |
Bisbee Rd. / SR 80 / SR 92 (31.42830, -109.89230) |
Rotary Existing |
All-Way Yield None |
4 Approaches 0 Driveways 104.9686 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Show Low,
AZ Navajo Co. United States |
S Summit Trl. / (parking) (34.23113, -110.06795) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2007 | No splitter islands on two legs, and diverging double yellow lines on two legs. |
Show Low,
AZ Navajo Co. United States |
S Summit Trl. / Falling Leaf Rd. (34.23781, -110.07255) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2007 | No splitter islands on two legs, and diverging double yellow lines on two legs. |
Show Low,
AZ Navajo Co. United States |
S Summit Trl. / W Sugar Pine Way / Spirea Ln. (34.24039, -110.07928) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.0896 |
Other (At-Grade) Single-Lane |
2007 | No splitter islands on two legs, and diverging double yellow lines on two legs. |
Show Low,
AZ Navajo Co. United States |
W Sugar Pine Way / S Torreon Loop (34.24261, -110.08372) |
Other Existing |
Unknown Unknown |
3 Approaches 1 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2007 | No splitter islands on two legs. One leg of the intersection is a private community access point. |
Oljato-Monument Valley,
UT San Juan Co. United States |
US 163 / Monument Valley Rd. (37.00424, -110.17341) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | https://www.nhonews.com/news/2018/jun/19/oljato-community-breaks-ground-roundabout-road-nav/ |
Sierra Vista,
AZ Cochise Co. United States |
E Golden Acres Dr. / Canyon de Flores (31.50212, -110.25097) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | ADOT truck turnaround. Year Completed estimated (2013-2015). |
Sierra Vista,
AZ Cochise Co. United States |
Jeffords St. / Cushing St. (31.55698, -110.33997) |
Other Existing |
All-Way Stop None |
4 Approaches 0 Driveways 37.7952 |
Other (At-Grade) Single-Lane |
2010 | Stop line at each entry. Pedestrian crossings within circulatory roadway. |
Sierra Vista,
AZ Cochise Co. United States |
Rucker St. / Cooney St. / Jeffords St. (31.55599, -110.34628) |
Other Existing |
All-Way Stop None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2010 | Stop line at each entry. Pedestrian crossings within circulatory roadway. |
Sierra Vista,
AZ Cochise Co. United States |
Derum St. / Rucker St. / Smith Ave. / Winrow Rd. (31.55118, -110.34837) |
Rotary Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2011 | On base of Fort Huachuca. No truck apron. |
Sierra Vista,
AZ Cochise Co. United States |
Smith Ave. / Winrow Ave. / Cushing St. (31.55504, -110.36013) |
Rotary Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
1992 | On base of Fort Huachuca. No truck apron. Very little speed control on east leg. Year Completed estimated (1985-1992). |
Bonnyville No 87,
AB Alberta Canada |
AB Hwy 55 / AB Hwy 892 (54.45699, -110.48469) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.0454 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Medicine Hat,
AB Division 1 Canada |
College Dr. SE / (parking) (50.01817, -110.68204) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.0000 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2005-2009). |
Medicine Hat,
AB Division 1 Canada |
2 Ave. SE / 8 St. SE (50.03145, -110.68217) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | https://medicinehatnews.com/news/local-news/2024/10/04/hurry-before-the-snow-city-road-construction-nears-finish-line-as-fall-weather-arrives/ |
Medicine Hat,
AB Division 1 Canada |
College Dr. / College Dr. (50.01654, -110.68389) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2005-2010). |