City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Neenah,
WI Winnebago Co. United States |
Winneconne Ave. / S Lake St. / Fox Point Plaza (44.17743, -88.48352) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9712 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Opened November 2010. Functional Class: Arterial ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
S Green Bay Rd. / Fox Point Plaza (44.17558, -88.48499) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.6896 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Functional Class: Arterial ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
N Ashland Ave. / Glory Rd. / N 8th St. (44.45685, -88.07702) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0668 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Opened August 6, 2010. Functional Class: Arterial ICD estimated from Google Maps linework. |
Barksdale,
WI Bayfield Co. United States |
STH 13 / US 2 WB Ramps (46.58774, -90.95454) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.9645 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Rice Lake,
WI Barron Co. United States |
CTH MM (Orchard Beach Ln.) / Kern Ave. (45.48642, -91.72517) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.9569 |
Other (At-Grade) Single-Lane |
2005 | Opened June 15, 2005. ICD estimated from Google Maps linework. |
Rice Lake,
WI Barron Co. United States |
College Dr. / Technology Dr. (45.47778, -91.74466) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.8230 |
Other (At-Grade) Single-Lane |
2005 | Functional Class: Local ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Cardinal Ln. (CTH EB) / Woodale Ave. (44.57285, -88.08469) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.6285 |
Other (At-Grade) Single-Lane |
2005 | ICD estimated from Google Maps linework. |
Ledgeview,
WI Brown Co. United States |
Dickinson Rd. (CTH G) / Monroe Rd. (CTH GV) (44.43271, -88.01631) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.0532 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 15, 2009. ICD estimated from Google Maps linework. |
Suamico,
WI Brown Co. United States |
School Ln. (CTH B) / Velp Ave. (CTH HS) (44.63452, -88.05177) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.7946 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
US 141 / Military Rd. (44.54792, -88.04733) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.8554 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 18, 2011. ICD estimated from Google Maps linework. |
Bellevue,
WI Brown Co. United States |
US 141 (Main St.) / CTH JJ (Verlin Rd.) (44.47005, -87.96315) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4669 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Opened September 3, 2010. ICD estimated from Google Maps linework. |
Pulaski,
WI Brown Co. United States |
STH 32 (S Wisconsin St.) / CTH B (Crest Dr.) (44.65709, -88.22159) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.4779 |
Other (At-Grade) Single-Lane |
2011 | Opened September 6, 2011. ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
STH 54 (W Mason St.) / CTH J (Seminary Rd.) (44.50105, -88.19372) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.7030 |
Other (At-Grade) Single-Lane |
2011 | Opened November 2011. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
CTH G (Main Ave.) / US 41 NB Ramps (44.45238, -88.08887) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | |
De Pere,
WI Brown Co. United States |
CTH G (Main St.) / US 41 SB Ramps (44.45374, -88.09212) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.5943 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | ICD estimated from Google Maps linework. |
Hales Corners,
WI Milwaukee Co. United States |
Grange Ave. / 116th St. (42.94460, -88.05808) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.2220 |
Other (At-Grade) Single-Lane |
2003 | Opened October 15, 2003. ICD estimated from Google Maps linework. |
Franklin,
WI Milwaukee Co. United States |
Drexel Ave. / Shoppes of Wyndham driveway (42.90494, -88.03474) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 25.3700 |
Other (At-Grade) Single-Lane |
2008 | Opened July 2008. ICD estimated from Google Maps linework. |
Milwaukee,
WI Milwaukee Co. United States |
W Winnebago St. / 7th St. / Juneau Ave. (43.04590, -87.92050) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.3694 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Opened November 10, 2010. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
Stonewall Dr. / Living Word Ln. / Eagle Dr. (43.32521, -88.14996) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 21.7210 |
Other (At-Grade) Single-Lane |
2008 | Functional Class: Local ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 EB Ramps (43.55774, -89.77940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.6788 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 WB Ramps (43.55867, -89.78077) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5437 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
Moon Rd. / Timothy Ln. (43.56132, -89.77681) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.0800 |
Other (At-Grade) Single-Lane |
2010 | Fatal crash July 10, 2010. ICD estimated from Google Maps linework. |
Baraboo,
WI Sauk Co. United States |
Old US 12 / CTH BD (43.48896, -89.77718) |
Roundabout Removed |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2010 | Constructed in 2010. Removed in 2017(?) due to bypass expansion. |
Merrill,
WI Lincoln Co. United States |
STH 64 (1st St. E) / N Center Ave. (45.18173, -89.68332) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.5152 |
Other (At-Grade) Single-Lane |
2010 | Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Marinette,
WI Marinette Co. United States |
STH 64 (Hall Ave.) / STH 180 / CTH T (45.09968, -87.66032) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.8788 |
Other (At-Grade) Single-Lane |
2010 | Opened November 17, 2010. ICD estimated from Google Maps linework. |
(unincorporated),
WI Outagamie Co. United States |
STH 76 / CTH O (44.35172, -88.53697) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.1389 |
Other (At-Grade) Single-Lane |
2010 | Opened September 24, 2010. High-speed approach roadways. ICD estimated from Google Maps linework. |
Platteville,
WI Grant Co. United States |
Chestnut St. / Markee Ave. (42.72607, -90.48517) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.6039 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
CTH M (Pleasant View Rd.) / CTH S (Mineral Point Rd.) (43.06030, -89.53722) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.2298 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened June 27, 2011. ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
CTH M (Pleasant View Rd.) / Valley View Rd. / Junction Rd. (43.04614, -89.53278) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.1149 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened July 17, 2011. ICD estimated from Google Maps linework. |
Pleasant Prairie,
WI Kenosha Co. United States |
STH 165 (104th St.) / CTH EZ (39th Ave.) (42.52248, -87.85383) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.5327 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened August 8, 2011. ICD estimated from Google Maps linework. |
Pleasant Prairie,
WI Kenosha Co. United States |
STH 165 (104th St.) / CTH ML (Springbrook Rd.) (42.52253, -87.86031) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.8919 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 7, 2011. Yield-controlled right-turn bypass lanes. ICD estimated from Google Maps linework. |
Mukwonago,
WI Waukesha Co. United States |
STH 83 / CTH I (River Rd.) (42.92252, -88.34597) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.3560 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 23, 2011. ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH LP (Lake Park Rd.) / CTH AP (Plank Rd.) (44.23572, -88.36309) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9297 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH AP (Plank Rd.) / Midway Rd. (44.23008, -88.37485) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.2316 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Sherwood,
WI Calumet Co. United States |
STH 114 / CTH N (44.20024, -88.32381) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.0987 |
Other (At-Grade) Single-Lane |
2011 | High-sped approach roadways. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 WB Ramps (42.91764, -89.36607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2309 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 EB Ramps (42.91774, -89.36817) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1083 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 EB Ramps (42.95128, -89.37859) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7217 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 WB Ramps (42.95272, -89.37769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9591 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / CTH M (42.94950, -89.37981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9613 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Crooks Ave.) / CTE CE (E College Ave.) (44.25803, -88.27377) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9138 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Greenville,
WI Outagamie Co. United States |
STH 15 / CTH CB (Greenville Dr.) (44.28721, -88.50600) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.1525 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Opened August 2013. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / N Koeller St. / Oshkosh Ave. (44.03258, -88.57882) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2012 | Roundabout relocated to west of previous intersection. Series of 4 roundabouts. Opened June 18, 2012. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / Brooks Ln. / N Washburn St. (44.03244, -88.58758) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.9435 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened June 8, 2012. Three-lane roundabout. Series of 4 roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 SB Ramps (44.03272, -88.58319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1058 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 NB Ramps (44.03271, -88.58178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 140.8193 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 EB Ramps (44.95862, -92.55999) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.1723 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 WB Ramps (44.96036, -92.55952) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.7061 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / CTH TT (Graham St.-80th Ave.) (44.97808, -92.55799) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.5353 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 130th St. (44.99273, -92.53744) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.8527 |
Other (At-Grade) Single-Lane |
2012 | Opened July 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 120th St. (44.99254, -92.55791) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.0760 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
New Richmond,
WI Saint Croix Co. United States |
STH 65 / CTH G (45.07907, -92.53756) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9508 |
Other (At-Grade) Single-Lane |
2012 | Opened September 2012. ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / Klondike Dr. (44.59813, -90.18018) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.6235 |
Other (At-Grade) Single-Lane |
2012 | Opened November 2012. Free-flow right-turn bypass lane with acceleration lane. ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / Heritage Dr. (44.62685, -90.18053) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.6000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / CTH BB (44.62490, -90.18009) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.3017 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. Free-flow right-turn bypass lane into added lane. ICD estimated from Google Maps linework. |
Sherwood,
WI Calumet Co. United States |
STH 114-STH 55 / Stommel Rd. (44.19113, -88.28387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.5360 |
Other (At-Grade) Single-Lane |
2012 | Opened September 24, 2012. ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) (43.38493, -87.92303) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) / Northwood Rd. (43.38498, -87.92057) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Port Washington,
WI Ozaukee Co. United States |
STH 33 (W Grand Ave.) / CTH LL (43.38688, -87.90026) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.6619 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 NB Ramps (43.32441, -88.18568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 19.1147 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 SB Ramps (43.32437, -88.18747) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.5901 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Polk,
WI Washington Co. United States |
STH 60 / CTH C (Hillsdale Rd.) (43.32433, -88.24101) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4426 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / Tillie Rd. / Cedar Pkwy (43.32438, -88.19016) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.1475 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 NB Ramps (42.75114, -88.95416) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 SB Ramps (42.75331, -88.95426) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
Jupiter,
FL Palm Beach Co. United States |
N Jog Rd. / Donald Ross Rd. (26.88178, -80.14438) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 36.2192 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Coral Springs,
FL Broward Co. United States |
Blue Sage Way / Bay Leaf Ct. / Eden Manor (26.33207, -80.25658) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 58.8722 |
Other (At-Grade) Single-Lane |
2005 | Functional Class: Local ICD estimated from Google Maps linework. |
Coconut Creek,
FL Broward Co. United States |
Centura Parc / NW 36th Ave. / NW 23rd Pl. / NW 23rd St. / NW 22nd Dr. (26.25800, -80.17292) |
Other Existing |
Unknown Unknown |
6 Approaches 0 Driveways 57.8387 |
Other (At-Grade) Single-Lane |
Functional Class: Local ICD estimated from Google Maps linework. | |
Sunrise,
FL Broward Co. United States |
E Aragon Blvd. / NW 24th Pl. (26.15855, -80.24427) |
Other Existing |
All-Way Stop None |
4 Approaches 0 Driveways 23.5841 |
Other (At-Grade) Single-Lane |
Stop control on entries, no splitter islands. Functional Class: Local ICD estimated from Google Maps linework. | |
Ladysmith,
VA Caroline Co. United States |
Edmund Pendleton Dr. / (unknown) (38.00584, -77.51439) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.8177 |
Other (At-Grade) Single-Lane |
2006 | Functional Class: Local ICD estimated from Google Maps linework. |
Ladysmith,
VA Caroline Co. United States |
Library Blvd. / Azalea Dr. (38.02824, -77.52386) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.6312 |
Other (At-Grade) Single-Lane |
2007 | Functional Class: Local ICD estimated from Google Maps linework. |
Conway,
SC Horry Co. United States |
Wild Wing Blvd. / (unknown) (33.79378, -78.98237) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 97.2690 |
Other (At-Grade) Single-Lane |
2008 | Functional Class: Local ICD estimated from Google Maps linework. |
Conway,
SC Horry Co. United States |
University Blvd. / Technology Blvd. (33.79577, -79.00601) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7157 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Previously controlled by one-way stop ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Marina Pkwy / 62nd Ave. N (33.74878, -78.84309) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.7155 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Marina Pkwy / US 17 Connector (33.75152, -78.83283) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.7142 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Marina Pkwy / 79th Ave. N (33.75726, -78.82594) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6974 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Marina Pkwy / (unknown) (33.76145, -78.81818) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.7237 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Marina Pkwy / Amalfi Pl. (33.76431, -78.81388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.7082 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Sardis Dr. / Uniola Dr. / Swanson Dr. / Seabert Dr. (33.75730, -78.92888) |
Other Existing |
All-Way Stop None |
4 Approaches 0 Driveways 33.7608 |
Other (At-Grade) Single-Lane |
Stop control on entry. ICD estimated from Google Maps linework. | |
Myrtle Beach,
SC Horry Co. United States |
Tuscany Grande Blvd. / Viareggio Rd. (33.73640, -78.95387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.6535 |
Other (At-Grade) Single-Lane |
2007 | No splitter islands. Functional Class: Local ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Tuscany Grande Blvd. / Livorn Loop (33.73368, -78.95984) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.6821 |
Other (At-Grade) Single-Lane |
2007 | No splitter islands. Functional Class: Local ICD estimated from Google Maps linework. |
Santa Cruz,
CA Santa Cruz Co. United States |
Pacific Ave. / Center St. / W. Cliff Dr. (36.96490, -122.02620) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4453 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Cupertino,
CA Santa Clara Co. United States |
Cristo Rey Dr. / Hammond Way / Canyon Oak Way (37.33058, -122.08070) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 36.0875 |
Other (At-Grade) Single-Lane |
2000 | Functional Class: Local ICD estimated from Google Maps linework. |
Dublin,
OH Franklin Co. United States |
Avery-Muirfield Dr. / Post Rd. (40.10686, -83.16028) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.9333 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | ICD estimated from Google Maps linework. |
Dublin,
OH Franklin Co. United States |
Avery Rd. / Tuswell Dr. / Innovation Dr. (40.09153, -83.15848) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.6841 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
W 121st St. / Shelbourne Rd. (39.96279, -86.22161) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2011 | |
Somers,
WI Kenosha Co. United States |
CTH G (Wood Rd.-30th Ave.) / Parkside Blvd. (42.64751, -87.84920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.0173 |
Other (At-Grade) Single-Lane |
2009 | Opened September 8, 2009. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
CTH P (Old US 45) / CTH PV (Pleasant Valley Rd.) (43.35352, -88.18166) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.0005 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Lisbon,
WI Waukesha Co. United States |
STH 164 / CTH Q (43.19316, -88.26125) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.7948 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Wales,
WI Waukesha Co. United States |
US 18 / Blackwood Dr. (43.01132, -88.38609) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.5660 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened August 2009. ICD estimated from Google Maps linework. |
Muskego,
WI Waukesha Co. United States |
CTH Y (Racine Ave.) / Kelsey Dr. (42.85757, -88.15911) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.6425 |
Other (At-Grade) Single-Lane |
2009 | Opened November 9, 2009. ICD estimated from Google Maps linework. |
Yorkville,
WI Racine Co. United States |
US 45 / STH 20 (Washington Ave.) / N Colony Ave. (42.74216, -88.05209) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.8396 |
Other (At-Grade) Single-Lane |
2010 | Opened November 2010. ICD estimated from Google Maps linework. |
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / I-94 EB Ramps (43.06063, -88.44229) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.9046 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / I-94 WB Ramps (43.06174, -88.44228) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.1203 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
Columbus,
GA Muscogee Co. United States |
Ashley Station Blvd. / Olive St. (32.48650, -84.97856) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.1785 |
Other (At-Grade) Single-Lane |
2007 | Completed February 2007. Previously controlled by two-way stop Functional Class: Local ICD estimated from Google Maps linework. |
Ripon,
CA San Joaquin Co. United States |
Fulton Ave. / Werner Dr. / Wilma Ave. (37.74446, -121.13550) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.7204 |
Other (At-Grade) Single-Lane |
2006 | One leg is skewed. ICD estimated from Google Maps linework. |
Voorheesville,
NY Albany Co. United States |
Rte 85A (Maple Rd.) / Rte 155 (42.64936, -73.92110) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2003 | Replaced a stop-controlled, channelized triangular intersection. Completed Fall 2003. First roundabout in Albany area. |
Colonie,
NY Albany Co. United States |
Albany Shaker Rd. / Maxwell Rd. (42.72396, -73.79143) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.7278 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Intersection is being relocated to east. Addition of a fourth leg is planned. Previously controlled by one-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Las Vegas (Summerlin),
NV Clark Co. United States |
Vista Run Dr. / Park Vista Dr. (36.17820, -115.34610) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.2741 |
Other (At-Grade) Single-Lane |
1995 | Year completed estimated (1990-1999) ICD estimated from Google Maps linework. |
Lincoln,
NE Lancaster Co. United States |
W Alvo Blvd. / Tallgrass Pkwy (40.88540, -96.73535) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 58.6909 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |