City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Virginia Beach,
VA Virginia Beach City United States |
Ashville Park Blvd. / (parking) (36.73509, -76.00756) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2007 | North leg added 2015-2016. |
Oxford,
OH Butler Co. United States |
US 127 / SR 73 (39.51120, -84.60918) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | ODOT maintains |
Patchogue,
NY Suffolk Co. United States |
Holbrook Rd. / Lake St. (40.76695, -73.01946) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2020 | Replaces triangle-shaped intersection with stop and yield control. https://www.suffolkcountynews.net/stories/lake-street-west-avenue-traffic-circle-to-open,86421 |
Paloma,
FL Palm Beach Co. United States |
Aviles Cir. / Pacifico Ct. (26.85738, -80.10605) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2008 | Minimal splitter islands. One-stage pedestrian crossings. Year Completed estimated (2007-2008). |
Westlake,
FL Palm Beach Co. United States |
Town Center Pkwy. / Town Center Pkwy. (26.75856, -80.29949) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 64.0080 |
Other (At-Grade) Single-Lane |
2018 | Elliptical shaped. ICD = 210 ft x 190 ft. |
Boynton Beach,
FL Palm Beach Co. United States |
Equus Cir. / Stone Pier Dr. (26.54341, -80.19471) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2006 | |
Boynton Beach,
FL Palm Beach Co. United States |
Equus Cir. / Stone Pier Dr. (26.53987, -80.19491) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 2 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2006 | |
Boynton Beach,
FL Palm Beach Co. United States |
Equus Cir. / Three Rail Dr. (26.54322, -80.19888) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2006-2007). |
Boynton Beach,
FL Palm Beach Co. United States |
Equus Cir. / Three Rail Dr. (south) (26.53981, -80.19912) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 2 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2005 | |
Mission Bay,
FL Palm Beach Co. United States |
Regional Park Dr. / 115th Ave. S (26.37614, -80.22849) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2018 | Striping across exits. |
Parkland,
FL Broward Co. United States |
Parkland Bay Trl. / Hillsboro Blvd. (26.33443, -80.28894) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2018 | |
Parkland,
FL Broward Co. United States |
Parkland Bay Dr. / S Baypoint Cir. (26.33521, -80.28954) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2018 | |
Sunset Lakes,
FL Broward Co. United States |
SW 40th St. / Bass Creek Rd. / SW 184th Ave. (25.97128, -80.39165) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2004). |
Richmond West,
FL Miami-Dade Co. United States |
SW 152nd Ave. / SW 175th St. / SW 176th St. (25.60434, -80.43800) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2014 | |
Richmond West,
FL Miami-Dade Co. United States |
SW 155th Ct. / SW 174th St. (25.60492, -80.44457) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2014 | |
Richmond West,
FL Miami-Dade Co. United States |
SW 155th Ct. / SW 175th St. (25.60420, -80.44403) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2014 | |
Frederick,
MD Frederick Co. United States |
S East St. / (future road) (39.40599, -77.40392) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2009 | Year Completed estimated (2009-2011). East leg is stubbed for future connection. |
Upper Clover Basin,
CO Boulder Co. United States |
Clover Basin Dr. / Eagan Way / Eagan Cir. (40.14043, -105.16769) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2014 | |
Castle Rock,
CO Douglas Co. United States |
Castle Oaks Dr. / Arabella Dr. (39.41863, -104.77860) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2006 | |
Castle Highlands,
CO Douglas Co. United States |
Wolfensberger Rd. / Plum Creek Pkwy. / Coachline Rd. (39.37564, -104.88568) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2018 | Year Completed estimated (2017-2019). |
Young American,
CO Douglas Co. United States |
E Plum Creek Pkwy. / Lake Gulch Rd. / S Gilbert St. (39.35773, -104.84209) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Year Completed estimated (2019-2021). |
Pueblo,
CO Pueblo Co. United States |
Palazzo Ln. / Village Green Pl. (38.31441, -104.57757) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2005 | |
Harrisburg,
PA Dauphin Co. United States |
N 7th St. / Reily St. (40.27393, -76.88481) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2022 | |
McDonough,
GA Henry Co. United States |
Mount Carmel Rd. / Mill Rd. (33.44787, -84.21413) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2021 | |
McDonough,
GA Henry Co. United States |
Mount Carmel Rd. / Chambers Rd. (33.44669, -84.23067) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2018). |
Locust Grove,
GA Henry Co. United States |
N Unity Grove Rd. / Colvin Dr. (33.36757, -84.08138) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2008 | Y-shaped roundabout with high-radius right-turn movements. Replaced triangular intersection with unknown control. Year Completed estimated (2008-2009). |
Richmond Hill,
GA Bryan Co. United States |
Belfast Keller Rd. / Belfast River Rd. (31.83099, -81.30293) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2020 | Right edge of each entry striped out. Year Completed estimated (2019-2020). |
Richmond Hill,
GA Bryan Co. United States |
GA 144 / Belfast River Rd. / Captain Matthew Freeman Dr. (31.88082, -81.26192) |
Roundabout Unknown |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Initial construction 2015 as temporary roundabout. Unknown status as of 2021. | |
Stone Mountain,
GA Gwinnett Co. United States |
Lilburn Stone Mountain Rd. / Old Tucker Rd. (33.84796, -84.14816) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | |
Garden City Beach,
SC Horry Co. United States |
Garden City Connector / Woodlake Dr. (33.59492, -79.01721) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.wmbfnews.com/2021/03/18/construction-underway-turn-indian-wells-golf-club-into-housing-development/ |
Water Ridge,
FL Polk Co. United States |
Adams Barn Rd. / Campion Blvd. / Spartina Way (28.09686, -81.75501) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2008 | |
Water Ridge,
FL Polk Co. United States |
Adams Barn Rd. / Water Ridge Blvd. / Mimosa Yellow Blvd. (28.10391, -81.75508) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2008 | |
(unincorporated),
SC Anderson Co. United States |
US 178 (Liberty Hwy.) / SC 88 (Old Greenville Hwy.) (34.70600, -82.67664) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | |
Cumming,
GA Forsyth Co. United States |
Clement Rd. / Ballantrae Cir. (34.12079, -84.17825) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2006 | Entrance to gated community. |
Florence,
SC Florence Co. United States |
(unknown) / (unknown) (34.27325, -79.70144) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2022 | |
Ogden,
NC New Hanover Co. United States |
Eventide Blvd. / Songbird Ct. (34.25685, -77.78302) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2007 | |
Germantown,
MD Montgomery Co. United States |
Observation Dr. / Goldenrod Ln. (39.18419, -77.24566) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2013 | Year Completed estimated (2012-2014). |
Germantown,
MD Montgomery Co. United States |
Crystal Rock Dr. / Century Blvd. (39.20326, -77.27356) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2015 | Striping added 2019-2021. Inconsistent lane use markings between entry and circulatory roadway. |
Clarksburg,
MD Montgomery Co. United States |
Little Seneca Pkwy. / Cabin Branch Ave. (39.21654, -77.28310) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2016 | Year Completed estimated (2016-2017). Striping added 2019-2021. |
Clarksburg,
MD Montgomery Co. United States |
Broadway Ave. / Little Seneca Pkwy. (39.21646, -77.28540) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2016 | Year Completed estimated (2015-2017). Striping added 2019-2021. |
Clarksburg,
MD Montgomery Co. United States |
Clarksburg Rd. / W Old Baltimore Rd. (39.21396, -77.29731) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2019-2020). |
Clarksburg,
MD Montgomery Co. United States |
Cabin Branch Ave. / Skimmer St. (39.22020, -77.28435) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2016 | Year Completed estimated (2015-2017). Striping added 2019-2021. |
Gambrills,
MD Anne Arundel Co. United States |
Grand Meadow Dr. / Ridings Way (39.00615, -76.66270) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.4632 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Willard,
MO Greene Co. United States |
US 160 / E Jackson St. (MO Hwy Z) (37.29842, -93.41908) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2020 | https://www.modot.org/node/21620 |
Willard,
MO Greene Co. United States |
US 160 / Farm Rd. 94 (37.27738, -93.39683) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | https://www.modot.org/node/21620 |
Kansas City,
MO Clay Co. United States |
Searcy Creek Pkwy. / NE Shoal Creek Pkwy. (39.22229, -94.50338) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 77.7240 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | |
Sebring,
FL Highlands Co. United States |
Sun N Lake Blvd. / Ponce de Leon Blvd. (27.53577, -81.51032) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
Painted splitter islands on north and south legs. | |
Sebring,
FL Highlands Co. United States |
Sun N Lake Blvd. / Columbus Blvd. (27.53353, -81.51780) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
Painted splitter islands on north and west legs. | |
Ridge,
CO Pueblo Co. United States |
Dillon Dr. / I-25 NB Off-Ramp (38.33728, -104.61885) |
Roundabout Existing |
All-Way Yield Unknown |
2 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | Year Completed estimated (2015-2018). |
Conway,
AR Faulkner Co. United States |
Tyler St. / Salem Rd. (35.10218, -92.47104) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.thecabin.net/news/citys-latest-roundabout-nears-completion/article_700674de-e112-508f-b408-f67025d0eced.html |
Overland Park,
KS Johnson Co. United States |
Lowell Ave. / 162nd St. (38.83538, -94.68283) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). East leg added 2018-2020. |
Overland Park,
KS Johnson Co. United States |
Lowell Ave. / 165th St. (38.83088, -94.68238) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2013). |
Overland Park,
KS Johnson Co. United States |
Lowell Ave. / (unknown) (38.82932, -94.68023) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2013). |
Leawood,
KS Johnson Co. United States |
Fairway St. / Norwood St. / Meadow Ln. / W 148th St. (38.86092, -94.61576) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). |
Berryton,
KS Shawnee Co. United States |
SE 45th St. / SE Berryton Rd. / SE West Edge Rd. (38.98614, -95.63295) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | https://news.yahoo.com/e-45th-street-just-south-181226532.html |
Topeka,
KS Shawnee Co. United States |
SE 45th St. / SE California Ave. (38.98616, -95.65162) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 64.0077 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2014 | Painted spirals next to central island. Year Completed estimated (2014-2015). |
Topeka,
KS Shawnee Co. United States |
SE 37th St. / SE California Ave. (39.00069, -95.65168) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2017 | |
Topeka,
KS Shawnee Co. United States |
SE 28th Terrace / SE Beach Dr. (39.01604, -95.61985) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2005 | Year Completed estimated (2005-2006). |
Topeka,
KS Shawnee Co. United States |
SW Huntoon St. / SW Urish Rd. (39.04338, -95.78022) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2017 | Right-turn-only lane on south leg. |
Ellicott City,
MD Howard Co. United States |
Lancelot Cross / Butterfruit Way / Argent Path / Stardust Ln. (39.28522, -76.90384) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Single-Lane |
1998 | Year Completed estimated (1993-2002). |
Dallas,
TX Dallas Co. United States |
Keller Springs Rd. / TX 289 NB Ramps (32.97228, -96.80342) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2016 | |
Jonesboro,
AR Craighead Co. United States |
SR 163 (Harrisburg Rd.) / SR 158 (E Lawson Rd.) (35.74871, -90.66603) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3880 |
Other (At-Grade) Single-Lane |
2021 | https://www.kait8.com/2021/06/22/new-roundabout-use-south-jonesboro/ |
Truro,
England Cornwall United Kingdom |
A39/A390 (Morlaix Ave.) / A39 (Arch Hill) / Falmouth Rd. (50.25479, -5.05632) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2+ lanes) w/ Traversable Central Island |
Double mini-roundabout. | |
Bury,
England Greater Manchester United Kingdom |
Sunny Bank Rd. / Randale Dr. (53.56124, -2.28470) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
||
Youngsville,
LA Lafayette Par. United States |
Chemin Metairie Rd. / Detente Rd. (30.09046, -92.00503) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Youngsville,
LA Lafayette Par. United States |
Chemin Metairie Rd. / Savoy Rd. (30.09469, -92.01512) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://1079ishot.com/progress-road-construction-roundabout-youngsville-chemin-metairie-savoy/ |
Broussard,
LA Lafayette Par. United States |
W Fairfield Dr. / S Bernard Rd. (30.11737, -91.97755) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2017 | Merging right-turn bypass lane on north leg. Add-lane right-turn bypass lane on east leg. Year Completed estimated (2017-2018). |
Assen,
Drenthe Assen Netherlands |
Nobellaan / Maria in Campislaan / Thorbeckelaan (52.99944, 6.55055) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Vries,
Drenthe Tynaarlo Netherlands |
Asserstraat / Eikenlaan (53.07360, 6.57817) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Vries,
Drenthe Tynaarlo Netherlands |
N386 / Groningerstraat (53.08085, 6.58086) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Tynaarlo,
Drenthe Tynaarlo Netherlands |
N386 (Vriezerweg) / Meerweg / Onlandweg (53.08017, 6.59827) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Tynaarlo,
Drenthe Tynaarlo Netherlands |
N386 / A28-E232 SB Ramps / (parking) (53.08031, 6.60176) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Tynaarlo,
Drenthe Tynaarlo Netherlands |
N386 / A28-E232 SB Ramps / Dorpsstraat (53.08035, 6.60571) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Tynaarlo,
Drenthe Tynaarlo Netherlands |
N386 (Zuidlaarderweg) / (unknown) (53.07903, 6.61948) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Zuidlaren,
Drenthe Tynaarlo Netherlands |
N386 / N34 SB Ramps (53.08533, 6.65335) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Zuidlaren,
Drenthe Tynaarlo Netherlands |
N386 / N34 NB Ramps (53.08579, 6.65493) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Zuidlaren,
Drenthe Tynaarlo Netherlands |
N386 / Tienelsweg / Schipborgerweg (53.08890, 6.66526) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Zuidlaren,
Drenthe Tynaarlo Netherlands |
N386 (Stationsweg) / Julianalaan / Voorkampen (53.09135, 6.67756) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Kropswolde,
Groningen Midden-Groningen Netherlands |
N386 (Woldweg) / Meerweg (53.14196, 6.72374) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Kropswolde,
Groningen Midden-Groningen Netherlands |
N386 / Waesingeweg / Abraham Kuypersingel (53.15199, 6.72331) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Foxhol,
Groningen Midden-Groningen Netherlands |
N386 / Industrieweg / Korte Groningerweg (53.16800, 6.72707) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Wangaratta,
VIC Wangaratta Australia |
Ovens St. / Docker St. / Ford St. (-36.35507, 146.32299) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Wangaratta,
VIC Wangaratta Australia |
C314 (Ryley St. - Murphy St.) / Ford St. (-36.35666, 146.32455) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Farragut,
TN Knox Co. United States |
Union Rd. / Ivey Farms Rd. / Way Station Trl. (35.87083, -84.20959) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2020 | |
Farragut,
TN Knox Co. United States |
Way Station Trl. / Baltica Ln. (35.87272, -84.21185) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2020 | |
Hays,
KS Ellis Co. United States |
Vine St. (US 183) / W 37th St. / E 37th St. (38.89633, -99.31777) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2021 | https://hayspost.com/posts/8b04e698-656a-41e7-86e6-e165ff1e4e68 |
Hays,
KS Ellis Co. United States |
Vine St. (US 183) / I-70 EB Ramps (38.89756, -99.31782) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2021 | https://hayspost.com/posts/8b04e698-656a-41e7-86e6-e165ff1e4e68 |
Hays,
KS Ellis Co. United States |
Vine St. (US 183) / E 41st St. / W Mopar Dr. (38.90005, -99.31783) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2021 | https://hayspost.com/posts/8b04e698-656a-41e7-86e6-e165ff1e4e68 |
Grand Junction,
CO Mesa Co. United States |
Grand Ave. / N 1st St. / SR 340 (Broadway) / I-70 Business Loop (39.07031, -108.57097) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2022 | https://www.codot.gov/news/2021/august-2021/1st-street-roundabout-project-enters-new-phase |
Dahlonega,
GA Lumpkin Co. United States |
US 19 Business / Oak Grove Rd. (34.55042, -83.99573) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2021 | https://www.thedahloneganugget.com/local-newsletter/new-road-project-roundabout-way-real-progress |
Bloomingdale,
GA Chatham Co. United States |
GA 17 (Bloomingdale Rd.) / I-16 WB Ramps (32.10083, -81.32357) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Guyton,
GA Effingham Co. United States |
GA 17 / Blue Jay Rd. (32.21768, -81.36852) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | Painted splitter islands. Year Completed estimated (2017-2018). |
Lawrenceville,
GA Gwinnett Co. United States |
Nash St. / Constitution Blvd. (33.94902, -83.99395) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2020 | |
Flowery Branch,
GA Hall Co. United States |
Hog Mountain Rd. / Cash Rd. / (unknown) (34.18190, -83.90296) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | |
Richmond Hill,
GA Bryan Co. United States |
GA 144 (Ford Ave.) / I-95 NB Ramps (31.95979, -81.32843) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2021-2022). |
Richmond Hill,
GA Bryan Co. United States |
GA 144 (Ford Ave.) / I-95 SB Ramps (31.96054, -81.32963) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2021-2022). |
San Anselmo,
CA Marin Co. United States |
San Francisco Blvd. / Santa Cruz Ave. (37.98566, -122.56572) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 12.1920 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | Painted splitter islands. Year Completed estimated (2018-2019). |
Collegedale,
TN Hamilton Co. United States |
University Dr. / Taylor Cir. (35.04776, -85.04983) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2010 | On campus of Southern Adventist University. Fountain in central island. Year Completed estimated (2008-2010). |
Rossville,
GA Catoosa Co. United States |
Mack Smith Rd. / Steele Rd. (34.97325, -85.21493) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2019 | Elliptical shaped. ICD = 125 ft x 115 ft. |
Waconia,
MN Carver Co. United States |
Waconia Pkwy. / Pond Ln. / Wildflower Way (44.84055, -93.81376) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 |