City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Elkhorn,
NE Douglas Co. United States |
George Miler Pkwy. / (unknown) (41.29519, -96.19483) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
(unincorporated),
NE Sarpy Co. United States |
S 180th St. / Cornhusker Rd. (41.16150, -96.19661) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Gretna,
NE Sarpy Co. United States |
S 180th St. / Lincoln Rd. (41.15455, -96.19669) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2021-2023). |
Gretna,
NE Sarpy Co. United States |
S 180th St. / Camelback Ave. (41.15770, -96.19688) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2022-2023). |
Thief River Falls,
MN Pennington Co. United States |
STH 32 / CSAH 16 (Mark Blvd. - 125th Ave. NE) (48.09335, -96.19746) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2020 | |
Thief River Falls,
MN Pennington Co. United States |
US 59 (3rd St. W) / Barzen Ave. (48.11988, -96.19783) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.dot.state.mn.us/d2/newsrels/20/11/6-thiefriverfalls.html https://www.dot.state.mn.us/d2/newsrels/20/11/3rd%20and%20Barzen%20roundabout.JPG |
(unincorporated),
NE Douglas Co. United States |
Northern Hills Dr. / N 182nd St. / N 182nd Creek (41.37520, -96.19863) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2008 | Traversable splitter islands. |
Elkhorn,
NE Douglas Co. United States |
Capitol Ave. / Burke St. / Chicago St. (41.25969, -96.19899) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.4818 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2006-2007). ICD estimated from Google Maps linework. |
Elkhorn,
NE Douglas Co. United States |
S 182nd St. / Harney St. (41.25644, -96.19941) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 21.5485 |
Other (At-Grade) Single-Lane |
2004 | ICD estimated from Google Maps linework. |
Elkhorn,
NE Douglas Co. United States |
Jones St. / S 182nd St. (41.25259, -96.20069) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2001 | Year Completed estimated (1999-2003). |
Elkhorn,
NE Douglas Co. United States |
Big Elk Pkwy. / N 182nd Ave. / Emmet St. (41.28828, -96.20098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2020 | |
Elkhorn,
NE Douglas Co. United States |
S 183rd St. / Mason St. (41.24925, -96.20166) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.3468 |
Other (At-Grade) Single-Lane |
2002 | Year Completed estimated (1999-2002). ICD estimated from Google Maps linework. |
Elkhorn,
NE Douglas Co. United States |
N 183rd St. / George Miller Pkwy. (41.29895, -96.20290) |
Unknown Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Elkhorn,
NE Douglas Co. United States |
N HWS Cleveland Blvd. / N 184th St. / Cuming St. (41.26800, -96.20306) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.4986 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). ICD estimated from Google Maps linework. |
Elkhorn,
NE Douglas Co. United States |
Capitol Ave. / S 186th Plaza (41.26027, -96.20354) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2769 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2006-2007). ICD estimated from Google Maps linework. |
Elkhorn,
NE Douglas Co. United States |
S 184th St. / Jackson St. (41.25366, -96.20389) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2004 | |
Elkhorn,
NE Douglas Co. United States |
Big Elk Pkwy. / N 185th St. / Bedford Ave. (41.28766, -96.20485) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2019 | |
Elkhorn,
NE Douglas Co. United States |
Indiana St. / N 184th St. / N 185th St. (41.27003, -96.20517) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.2370 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). ICD estimated from Google Maps linework. |
Elkhorn,
NE Douglas Co. United States |
S 185th St. / Farnam St. (41.25708, -96.20552) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 2 Driveways 23.3440 |
Other (At-Grade) Single-Lane |
2004 | Fourth leg stubbed. ICD estimated from Google Maps linework. |
Omaha,
NE Sarpy Co. United States |
S 186th St. / Chandler St. (41.18404, -96.20711) |
Other Existing |
Unknown Unknown |
3 Approaches 8 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Elkhorn,
NE Douglas Co. United States |
S 188th St. / Marcy St. (41.25070, -96.20884) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Thief River Falls,
MN Pennington Co. United States |
US 59 / STH 1 / 3rd St. W (US 59-STH 1) / 125th Ave. NE (48.12232, -96.20884) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2022). |
Elkhorn,
NE Douglas Co. United States |
Honeysuckle Dr. / N 188th St. (41.27365, -96.21011) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 25.1333 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). ICD estimated from Google Maps linework. |
Elkhorn,
NE Douglas Co. United States |
N 189th St. / Sahler St. (41.29569, -96.21044) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2014). |
Omaha,
NE Douglas Co. United States |
S 189th St. / Adams St. / Drexel St. (41.19322, -96.21053) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). |
Elkhorn,
NE Douglas Co. United States |
N 189th St. / Bedford Ave. (41.28897, -96.21167) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2017 | |
Elkhorn,
NE Douglas Co. United States |
N HWS Cleveland Blvd. / N 190th St. (41.26726, -96.21272) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 21.5450 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2006-2007). ICD estimated from Google Maps linework. |
Elkhorn,
NE Douglas Co. United States |
S 193rd St. / S 194th St. / C St. (41.22337, -96.21732) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (1999-2003). |
Omaha,
NE Douglas Co. United States |
S 194th Ave. / I St. (41.21624, -96.21918) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2004-2005). |
Omaha,
NE Douglas Co. United States |
Orchard Ave. / Holmes St. / S 194th Ave. (41.20854, -96.21950) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2001 | Year Completed estimated (1999-2003). |
Omaha,
NE Douglas Co. United States |
S HWS Cleveland Blvd. / Gold St. (41.23532, -96.21996) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.1295 |
Other (At-Grade) Single-Lane |
2006 | Two legs stubbed. Year Completed estimated (2005-2006). ICD estimated from Google Maps linework. |
Omaha,
NE Douglas Co. United States |
Adams St. / S 195th St. (41.19364, -96.21996) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2006 | Opened with northwest and northeast legs 2005-2006. Southwest leg added 2015-2016. |
Omaha,
NE Douglas Co. United States |
S 195th St. / Y St. / Z St. (41.19722, -96.22094) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). |
Omaha,
NE Douglas Co. United States |
S HWS Cleveland Blvd. / Marinda St. (41.23787, -96.22116) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.9433 |
Other (At-Grade) Single-Lane |
2002 | Fourth leg stubbed. Year Completed estimated (1999-2003). ICD estimated from Google Maps linework. |
Omaha,
NE Douglas Co. United States |
S HWS Cleaveland Blvd. / Shadow Ridge Dr. (41.24046, -96.22126) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.8403 |
Other (At-Grade) Single-Lane |
2002 | Year Completed estimated (1999-2003). ICD estimated from Google Maps linework. |
Elkhorn,
NE Douglas Co. United States |
Elk Ridge Dr. / Seward St. (41.27415, -96.22243) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.6519 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2006-2007). ICD estimated from Google Maps linework. |
Elkhorn,
NE Douglas Co. United States |
S HWS Cleveland Blvd. / Emile St. (41.25294, -96.22244) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2002 | Year Completed estimated (1999-2003). |
Omaha,
NE Douglas Co. United States |
William St. / S 196th St. (41.24540, -96.22248) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.2462 |
Other (At-Grade) Single-Lane |
2002 | Year Completed estimated (1999-2003). ICD estimated from Google Maps linework. |
Omaha,
NE Douglas Co. United States |
S HWS Cleveland Blvd. / L St. (41.21218, -96.22254) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2004-2005). |
Elkhorn,
NE Douglas Co. United States |
HWS Cleveland Blvd. / Harney St. (41.25526, -96.22319) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2002 | Year Completed estimated (1999-2003). |
Omaha,
NE Douglas Co. United States |
S HWS Cleveland Blvd. / 197th St. (41.25016, -96.22379) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2002 | Year Completed estimated (1999-2003). |
Omaha,
NE Douglas Co. United States |
S HWS Cleveland Blvd. / Orchard Ave. / N St. (41.20925, -96.22413) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2004-2005). |
Omaha,
NE Douglas Co. United States |
S 198th St. / J St. (41.21475, -96.22459) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2004-2005). |
Omaha,
NE Douglas Co. United States |
HWS Cleveland Blvd. / Blue Sage Pkwy. / William St. (41.24547, -96.22489) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.3482 |
Other (At-Grade) Single-Lane |
2002 | Year Completed estimated (1999-2003). Fourth leg added 2006-2009. ICD estimated from Google Maps linework. |
Emporia,
KS Lyon Co. United States |
W 18th Ave. / Graphic Arts Rd. (38.41962, -96.22618) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2005 | Opened July 2005. BTE jurisdiction. |
Omaha,
NE Douglas Co. United States |
S HWS Cleveland Blvd. / George B Lake Pkwy. (41.22537, -96.22721) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2005 | Year Completed estimated (2004-2005). |
Omaha,
NE Douglas Co. United States |
S 201st Ave. / C St. (41.22340, -96.22902) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2005 | Year Completed estimated (2004-2006). |
Emporia,
KS Lyon Co. United States |
(connector to US 50) / I-35 Ramps (38.41494, -96.22918) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 97.5360 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | New interchange configuration. Elliptical shaped. ICD = 320 ft x 270 ft. Constructed initially as half double-lane, half triple-lane. Opened November 2008. |
Emporia,
KS Lyon Co. United States |
US 50 / (connector to I-35) (38.41225, -96.22947) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 79.2480 |
Other (At-Grade) Single-Lane |
2008 | New interchange configuration. Half double-lane, half triple-lane. Opened November 2008. Modified 2011-2013 to reduce lanes. NCHRP Synthesis 488. 21442 |
Omaha,
NE Douglas Co. United States |
S 202nd St. / G St. (41.21786, -96.22948) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). |
Elkhorn,
NE Douglas Co. United States |
Brookstone Meadows Plaza (41.25322, -96.23221) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Elkhorn,
NE Douglas Co. United States |
N 204th St. (SR 31) / Pawnee Rd. (SR 36) (41.37871, -96.23428) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://dcpostgazette.com/2020/05/28/construction-of-roundabout-completed/ |
Elkhorn,
NE Douglas Co. United States |
Vinton St. / S 205th St. (41.22866, -96.23605) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Elkhorn,
NE Douglas Co. United States |
George B Lake Pkwy. / Nina St. (41.22276, -96.23790) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Elkhorn,
NE Douglas Co. United States |
Blue Sage Dr. / Vinton St. (41.23012, -96.24218) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2020 | |
Elkhorn,
NE Douglas Co. United States |
Blue Sage Dr. / Grover St. (41.22729, -96.24664) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Elkhorn,
NE Douglas Co. United States |
S 213th St. / I St. (41.21572, -96.24816) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2020). |
College Station,
TX Brazos Co. United States |
Arrington Rd. / Private Dr. A / Private Dr. C (30.55915, -96.26419) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2011 | Original approaches on Arrington Rd were completed in 2009. The other two legs providing access to the retail developments were added by 2011. |
College Station,
TX Brazos Co. United States |
Wellness Ln. / Stonebrook Dr. (30.58436, -96.27781) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2013 | On the grounds of the Scott and White Hospital complex, serves a secondary entrance to the hospital. |
College Station,
TX Brazos Co. United States |
Scott and White Dr. / Old Rock Prairie Rd. (30.58426, -96.28080) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 64.0070 |
Other (At-Grade) Single-Lane |
2013 | On the grounds of the Scott and White Hospital complex, serves the main entrance to the hospital. |
Bryan,
TX Brazos Co. United States |
Oakmont Blvd. / Pendleton Dr. (30.66573, -96.29169) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2018 | Northwest leg stubbed for future. |
Bryan,
TX Brazos Co. United States |
Eastchester Dr. / Gramercy Park Dr. (30.65461, -96.29199) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2011 | |
College Station,
TX Brazos Co. United States |
(unknown) (30.64501, -96.29351) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
College Station,
TX Brazos Co. United States |
Veterans Pkwy. / (parking) (30.64114, -96.29447) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
College Station,
TX Brazos Co. United States |
Veterans Pkwy. / (parking) (30.64202, -96.29761) |
Other Existing |
Other None |
3 Approaches 0 Driveways 33.5270 |
Other (At-Grade) Single-Lane |
2008 | City athletic complex. Uncontrolled on major street; yield control on minor. Series of three. |
College Station,
TX Brazos Co. United States |
Veterans Pkwy. / (parking) (30.64496, -96.30071) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Bryan,
TX Brazos Co. United States |
Miramont Blvd. / Miramont Cir. (30.67306, -96.30883) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2004 | Gateway intersection of Miramont subdivision/country club development. At the main entry to the clubhouse facilities. |
Bryan,
TX Brazos Co. United States |
Miraloma Dr. (30.67444, -96.31147) |
Other Existing |
Uncontrolled None |
2 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2008 | No splitter islands or control. |
Bryan,
TX Brazos Co. United States |
Wildflower Dr. / Towne Centre Way (30.66316, -96.32273) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6717 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Intersection of two low-volume collector roadways in a shopping center development. Circular roadway is two lanes wide (with no lane markings) plus a 13' truck apron. |
Bryan,
TX Brazos Co. United States |
Highpoint Dr. / Hillpoint Dr. (30.66730, -96.32802) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4308 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2014 | |
College Station,
TX Brazos Co. United States |
Old Main Dr. / Lamar St. / Jones St. (30.61311, -96.34466) |
Other Existing |
Other None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
1970 | Some yield control, some stop control. |
Bryan,
TX Brazos Co. United States |
Nash St. / Broadmoor Dr. (30.66954, -96.34609) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-Lane |
2016 | Previously a three-leg intersection with a one-way stop. Small-radius roundabout installed when apartment complex was built and driveway became the fourth leg of the intersection. All splitter islands are mountable to allow shortcut left turns by ladder trucks and WB-67 vehicles. |
Bryan,
TX Brazos Co. United States |
Esther Blvd. / Bennett St. (30.65622, -96.35323) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 15.2400 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | Oval shaped. Year Completed estimated (2017-2019). ICD = 50 ft x 38 ft. |
Bryan,
TX Brazos Co. United States |
Old College Rd. / College Main St. (30.62699, -96.35515) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2014 | . |
Bryan,
TX Brazos Co. United States |
N Main St. / 23rd St. (30.67649, -96.37298) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2018 | Crosswalks at yield line. |
Bryan,
TX Brazos Co. United States |
Palasota Dr. / Beck St. (30.66236, -96.38459) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.kbtx.com/2022/02/18/new-roundabout-nearing-completion-bryan/ |
Bryan,
TX Brazos Co. United States |
Woodville Rd. / Woody Ln. / Woodville Overpass / (parking) (30.71699, -96.38545) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.kbtx.com/video/2020/10/12/new-roundabout-opens-bryan/ https://www.bryantx.gov/wp-content/uploads/2020/01/01.07.2020-Woodville-Projects.jpg |
Bryan,
TX Brazos Co. United States |
Woodville Rd. / Old Hearne Rd. (30.71372, -96.38899) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.kbtx.com/2020/10/12/new-roundabout-opens-in-bryan/ |
Forney,
TX Kaufman Co. United States |
Gateway Blvd. / Reeder Rd. (32.74783, -96.42763) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 67.0560 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Fremont,
NE Dodge Co. United States |
US 77 / US 275 NB Ramps / Old Highway 8 (41.40473, -96.44391) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Year Completed estimated (2021-2024). |
Fremont,
NE Dodge Co. United States |
US 77 / US 275 SB Ramps (41.40474, -96.44633) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Yield-controlled right-turn-only lane on west leg. Year Completed estimated (2021-2024). |
Fremont,
NE Dodge Co. United States |
Diers Pkwy. / Johnson Rd. / E 16th St. / (parking) (41.44422, -96.45389) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2001 | Year Completed estimated (1999-2003). |
Bryan,
TX Brazos Co. United States |
5th St. / Rellis Pkwy. (30.64071, -96.46193) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Part of the gateway entrance to the Texas A&M University System RELLIS Campus (formerly Riverside Campus) from SH 47. The intersection was added when RELLIS Parkway (the leg to the northwest) was completed in 2018 (approximately). It was built as a bit of a hybrid, in terms of the number of lanes, in that the circulating roadway does not have two lanes all the way around, but it's built so that the second lane can be added for all movements as the need develops. |
Oakland,
NE Burt Co. United States |
US 77 / SR 32 (41.82428, -96.46580) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.9503 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Winnebago,
NE Thurston Co. United States |
US 75 / US 77 (42.23120, -96.47212) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.2574 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Fremont,
NE Dodge Co. United States |
US 77 (Fremont Southeast Beltway) / S Downing St. (41.40772, -96.47361) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Dakota Dunes,
SD Union Co. United States |
Dakota Dunes Blvd. / E Sawgrass Trl. (42.49039, -96.49223) |
Other Existing |
All-Way Stop None |
4 Approaches 0 Driveways 119.4816 |
Other (At-Grade) Single-Lane |
||
Inglewood,
NE Dodge Co. United States |
US 77 / S Broad St. / S Main St. (41.40986, -96.49868) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Left-through-right and right-turn-only lanes on northwest leg. Year Completed estimated (2023-2024). |
Wylie,
TX Collin Co. United States |
Inspiration Blvd. / Huffines Blvd. / Eminence Ln. (33.06009, -96.54798) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2017 | . |
Manhattan,
KS Riley Co. United States |
4th St. / Bluemont Ave. (39.18669, -96.56160) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.6571 |
Other (At-Grade) Single-Lane |
2010 | Previously controlled by two-way stop ICD estimated from Google Maps linework. |
Rowlett,
TX Dallas Co. United States |
Main St. / Coyle St. / Skyline Dr. (32.90316, -96.56289) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2006 | . |
Lincoln,
NE Lancaster Co. United States |
Holdrege St. / N 104th St. (40.82767, -96.57822) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.lincoln.ne.gov/City/Departments/LTU/LTU-Projects/LOTM/Projects/Growth/104th-and-Holdrege |
Fairview,
TX Collin Co. United States |
Elizabeth Way / Stone Hinge Dr. (33.12587, -96.57964) |
Other Existing |
One-Way/Two-Way Stop None |
3 Approaches 1 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2005 | No splitter islands. |
Fairview,
TX Collin Co. United States |
Weston Dr. / Ashcroft Dr. (33.12853, -96.58215) |
Other Existing |
One-Way/Two-Way Stop Unknown |
0 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2005 | No splitter islands. |
Fairview,
TX Collin Co. United States |
Stone Hinge Dr. / Ashcroft Dr. (33.12939, -96.58680) |
Other Existing |
One-Way/Two-Way Stop None |
3 Approaches 1 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2005 | No splitter islands. |
Fairview,
TX Collin Co. United States |
Stone Hinge Dr. / Newchester Dr. (33.12643, -96.58708) |
Other Existing |
One-Way/Two-Way Stop None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2005 | No splitter islands. |
Lincoln,
NE Lancaster Co. United States |
S 98th St. / Old Cheney Rd. (40.75518, -96.58708) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0450 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Lincoln,
NE Lancaster Co. United States |
S 98th St. / Pine Lake Rd. (40.74070, -96.58715) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.2454 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Denison,
TX Grayson Co. United States |
(unknown) / (parking) (33.71983, -96.59059) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2017 | Part of Texoma Health Foundation Park. |
Lincoln,
NE Lancaster Co. United States |
S 94th Bay / Andermatt Dr. / (40.73200, -96.59163) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.8212 |
Other (At-Grade) Single-Lane |
2008 | ICD estimated from Google Maps linework. |