City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
La Crosse,
WI La Crosse Co. United States |
STH 35 / Sunnyside Rd. (43.74798, -91.20032) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2022 | https://www.wizmnews.com/2022/04/06/100-people-show-to-meeting-on-wisconsin-dots-hwy-35-roundabout-plan-in-la-crosse/ |
Green,
OH Summit Co. United States |
Arlington Rd. / Greensburg Rd. (40.94937, -81.49420) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2022 | Yield-controlled right-turn bypass lane on north leg. https://www.youtube.com/watch?v=n5GeAwyMV7k |
Harrisburg,
PA Dauphin Co. United States |
N 2nd St. / Verbeke St. (40.26853, -76.89149) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.9456 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Year Completed estimated (2021-2022). |
Harrisburg,
PA Dauphin Co. United States |
N 2nd St. / Reily St. (40.27050, -76.89293) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.9456 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Year Completed estimated (2021-2022). |
Harrisburg,
PA Dauphin Co. United States |
N 2nd St. / Kelker St. (40.27418, -76.89553) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | |
(unincorporated),
NC Cumberland Co. United States |
Blacks Bridge Rd. / Old Plank Rd. (34.94696, -78.98484) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lane on west leg. |
Traverse City,
MI Grand Traverse Co. United States |
Keystone Rd. N / Cass Rd. (44.69811, -85.61832) |
Roundabout Existing |
All-Way Yield Other |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2022 | Railroad crossing on east leg 65 ft from circulatory roadway; controlled by yield sign. https://www.traverseticker.com/news/keystone-road-reopens-saturday-to-two-way-traffic/ |
St Peter,
MN Nicollet Co. United States |
W Broadway Ave. / Sunrise Dr. (44.33175, -93.96950) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2022 | Elliptical shaped. ICD = 140 ft x 130 ft. https://www.keyc.com/2022/08/15/roundabout-construction-begins-st-peter/ |
Mankato,
MN Blue Earth Co. United States |
CR 12 / Adams St. (44.16990, -93.92685) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2021-2023). |
Greeley,
CO Weld Co. United States |
N 35th Ave. / W O St. / CR 64 (40.45520, -104.73479) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Other (At-Grade) Single-Lane |
2022 | Merging right-turn bypass lanes on all legs. Designed with striped out outer portion of circulatory roadway for future expansion to outside. Year Completed estimated (2021-2023). |
Saukville,
WI Ozaukee Co. United States |
STH 33 / CTH I (43.39585, -87.97946) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6717 |
Other (At-Grade) Single-Lane |
2022 | |
St Albert,
AB Division 11 Canada |
Villeneuve Rd. / Dennison Dr. / Jensen Gate (53.65788, -113.65248) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2022 | https://stalbert.ca/dev/construction/transportation/villeneuve/ |
Greenwood,
IN Johnson Co. United States |
S Honey Creek Rd. / Stones Crossing Rd. (39.57825, -86.13973) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Replaced offset T-intersections. https://dailyjournal.net/2022/08/21/stones-crossing-honey-creek-roads-to-close-for-roundabout-construction-2/ |
Burnsville,
MN Dakota Co. United States |
Cliff Rd. W / I-35W SB Ramps (44.78229, -93.29009) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://patch.com/minnesota/burnsville/construction-begins-i-35w-southbound-ramp-improvement-project |
Columbia,
MD Howard Co. United States |
Tamar Dr. / Old Montgomery Rd. (39.20533, -76.82822) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2022 | https://www.howardcountymd.gov/News090122c |
(unincorporated),
NC Robeson Co. United States |
Leeper Rd. / I-295 SB Ramps (34.92075, -78.97889) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://abc11.com/nc-fayetteville-outer-loop-i295-new-sections-open/12478490/ |
(unincorporated),
NC Robeson Co. United States |
Leeper Rd. / I-295 NB Ramps (34.92281, -78.97772) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://abc11.com/nc-fayetteville-outer-loop-i295-new-sections-open/12478490/ |
(unincorporated),
NC Cumberland Co. United States |
Old Plank Rd. / I-295 SB Ramps (34.94793, -78.99697) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Yield-controlled right-turn bypass lanes on north and west legs. https://abc11.com/nc-fayetteville-outer-loop-i295-new-sections-open/12478490/ |
(unincorporated),
NC Cumberland Co. United States |
Old Plank Rd. / I-295 NB Ramps (34.94791, -78.99430) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Yield-controlled right-turn bypass lanes on south and east legs. https://abc11.com/nc-fayetteville-outer-loop-i295-new-sections-open/12478490/ |
(unincorporated),
NC Robeson Co. United States |
SR 71 / Leeper Rd. (SR 1717) (34.90711, -78.99060) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | https://www.aaroads.com/guides/nc-071/ |
Waukee,
IA Dallas Co. United States |
NW 2nd St. / NW Sunrise Dr. (41.62191, -93.88215) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | East leg stubbed. Yield-controlled right-turn bypass lane on west leg. Year Completed estimated (2021-2022). https://www.waukee.org/194/Capital-Improvement-Projects |
Waukee,
IA Dallas Co. United States |
NW 2nd St. / (parking) (41.62461, -93.88202) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | East leg stubbed. Access to school and park. Year Completed estimated (2021-2022). https://www.waukee.org/194/Capital-Improvement-Projects |
Nampa,
ID Canyon Co. United States |
E Victory Rd. / N Kings Rd. (43.57584, -116.53288) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2022 | https://twitter.com/NampaPIO/status/1606348916282101760 |
Hobart,
WI Brown Co. United States |
CR VV (Marley St.) / STH 29 EB Ramps (44.57594, -88.17273) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://wisconsindot.gov/Pages/projects/by-region/ne/wis29study/schedule.aspx |
Hobart,
WI Brown Co. United States |
Marley St. / Triangle Dr. / Oneida Way (44.57460, -88.17586) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | North leg stubbed. https://wisconsindot.gov/Pages/projects/by-region/ne/wis29study/schedule.aspx |
Howard,
WI Brown Co. United States |
CR VV (Marley St.) / STH 29 WB Ramps (44.57753, -88.17131) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://wisconsindot.gov/Pages/projects/by-region/ne/wis29study/schedule.aspx |
Hobart,
WI Brown Co. United States |
N Overland Rd. / Oneida Way / Centerline Dr. (44.57140, -88.16988) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2022 | |
Brown Deer,
WI Milwaukee Co. United States |
STH 57 / Teutonia Ave. (43.17202, -87.96338) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2022 | |
Oconomowoc,
WI Waukesha Co. United States |
Pabst Rd. / Olympia Fields Dr. (43.08687, -88.47287) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Macomb,
MI Macomb Co. United States |
25 Mile Rd. / Romeo Plank Rd. / Garfield Rd. (42.70077, -82.95901) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | Year Completed estimated (2021-2022). |
Anoka,
MN Anoka Co. United States |
Green Haven Rd. / Jacob Ln. / US 10-US 169 WB Ramps (45.20655, -93.40067) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Anoka,
MN Anoka Co. United States |
W Main St. / US 10-US 169 EB Ramps / Church St. (45.20504, -93.40072) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2022-2023). |
Tumwater,
WA Thurston Co. United States |
93rd Ave. SW / Lathrop Industrial Dr. (46.95285, -122.94231) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Add-lane right-turn bypass lane on south leg. Year Completed estimated (2021-2022). |
Surrey,
BC Greater Vancouver Canada |
25 Ave. / 166 St. (49.04745, -122.76265) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2022 | |
Brighton,
CO Adams Co. United States |
Longs Peak St. / Silo Ct. (39.99463, -104.75777) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). |
Brighton,
CO Adams Co. United States |
Longs Peak St. / Baler Ct. (39.99464, -104.75476) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). |
Henderson,
CO Adams Co. United States |
Henderson Rd. / E 124th Ave. / Park Blvd. (39.92505, -104.87550) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | Merging right-turn bypass lanes on north and east legs. https://adcogov.org/henderson-rd-park-blvd-roundabout-project |
Merced,
CA Merced Co. United States |
E Yosemite Ave. / Campus Pkwy. (37.33240, -120.42433) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | Year Completed estimated (2021-2022). |
Stockton,
CA San Joaquin Co. United States |
Montauban Ave. / Hammertown Dr. (38.01652, -121.28893) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2022 | |
Post Falls,
ID Kootenai Co. United States |
E Poleline Ave. / N Cecil Rd. (47.73044, -116.90517) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.postfalls.gov/poleline-cecil-project/ |
Cumming,
GA Cherokee Co. United States |
Holbrook Campground Rd. / Birmingham Hwy. / County Line Rd. (34.21315, -84.27118) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Bloomingdale,
GA Chatham Co. United States |
Bloomingdale Rd. / Little Neck Rd. / I-16 EB Ramps (32.09873, -81.32315) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Yield-controlled right-turn bypass lane on west leg (freeway exit ramp) that is aimed at circulatory roadway. Yield-controlled right-turn bypass lane on south leg onto freeway entrance ramp. |
Lakewood,
WA Pierce Co. United States |
Gravelly Lake Dr. SW / Washington Blvd. SW (47.14920, -122.53942) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://cityoflakewood.us/weekly-bulletin-220408/ |
Lakewood,
WA Pierce Co. United States |
Washington Blvd. SW / Interlaaken Dr. SW (47.14862, -122.54186) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). |
Lathrop,
MO Clinton Co. United States |
US 69 / MO-116 (39.55283, -94.23581) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.modot.org/clinton-county-us-route-69-and-route-116-intersection-improvement-project |
Lima,
OH Allen Co. United States |
SR 309 / S Thayer Rd. (40.73112, -84.01320) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2022 | https://www.hometownstations.com/news/saving-lives-is-the-goal-of-allen-countys-two-new-roundabouts-on-state-route-309/article_f37f2a24-1d8c-11ed-abd6-fbf254cf9124.html |
Harrod,
OH Allen Co. United States |
SR 309 / S Napoleon Rd. (40.73202, -83.93435) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.hometownstations.com/news/saving-lives-is-the-goal-of-allen-countys-two-new-roundabouts-on-state-route-309/article_f37f2a24-1d8c-11ed-abd6-fbf254cf9124.html |
Lincoln,
NE Lancaster Co. United States |
S Folsom St. / W Palm Canyon St. (40.75232, -96.73030) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2022 | Striped out shoulder on right side of north and south entries. https://www.lincoln.ne.gov/City/Departments/LTU/LTU-Projects/LOTM/Projects/Growth/Folsom-at-Old-Cheney |
Middlesboro,
KY Bell Co. United States |
SR 2079 (Winchester Ave.) / SR 2401 (S Petersborough Ave.) (36.60367, -83.72960) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | |
Parma,
MI Jackson Co. United States |
W Michigan Ave. / I-94 EB Ramps (42.26564, -84.61940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://jtv.tv/i-94-michigan-avenue-parma-interchange-to-reopen-tuesday/ |
Parma,
MI Jackson Co. United States |
W Michigan Ave. / Norton Rd. / I-94 WB Ramps (42.26653, -84.62125) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Combined two intersections. https://jtv.tv/i-94-michigan-avenue-parma-interchange-to-reopen-tuesday/ |
Bismarck,
ND Burleigh Co. United States |
43rd Ave. NE / N 19th St. (46.85254, -100.76214) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2022 | |
Bismarck,
ND Burleigh Co. United States |
43rd Ave. N / N 26th St. (46.85246, -100.75128) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2022 | |
Freedom,
PA Beaver Co. United States |
SR 989 (Dunlap Hill Rd.) / Freedom Crider Rd. (40.67684, -80.19046) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2022 | Year Completed estimated (2022-2023). |
Royalton,
IL Franklin Co. United States |
SR 149 (N Main St.) / SR 184 (37.89199, -89.11396) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Replaced triangular intersection. https://www.facebook.com/photo/?fbid=782341056078810&set=a.659310081715242 |
Mauston,
WI Juneau Co. United States |
STH 82 (Gateway Ave.) / I-90-I-94 EB Ramps (43.79649, -90.05800) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. https://www.mauston.com/vertical/Sites/%7BF7711255-419A-434B-BDA9-D1E7B277079F%7D/uploads/221216_I-90-94_and_WIS_82_Winter_Shutdown.pdf |
Mauston,
WI Juneau Co. United States |
STH 82 (Gateway Ave.) / I-90-I-94 WB Ramps (43.79635, -90.05521) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. https://www.mauston.com/vertical/Sites/%7BF7711255-419A-434B-BDA9-D1E7B277079F%7D/uploads/221216_I-90-94_and_WIS_82_Winter_Shutdown.pdf |
Cedar Falls,
IA Black Hawk Co. United States |
Greenhill Rd. / S Main St. (42.49855, -92.44586) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.cedarfalls.com/1572/South-MainGreenhill-Intersection-Improve |
Celebration,
FL Osceola Co. United States |
Celebration Blvd. / Future Way (28.30090, -81.56698) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Austin,
TX Travis Co. United States |
Ausblick Ave. / Peafowl St. (30.14491, -97.71121) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Austin,
TX Travis Co. United States |
Ausblick Ave. / Turaco Trl. (30.14320, -97.70775) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Urbana,
IA Benton Co. United States |
SR 150 (31st Ave. - Sunset St.) / Sunset St. (55th St.) (42.22578, -91.89114) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://vintontoday.com/articles/news/article1033582.html |
Ashland,
MA Middlesex Co. United States |
Pond St. / Spyglass Hill Dr. / (parking) (42.24026, -71.43205) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | Utility pole within central island on inner edge of truck apron. |
Otsego,
MN Wright Co. United States |
CR 37 (65th St. NE) / CR 18 (45.24509, -93.70494) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | |
Frisco,
TX Denton Co. United States |
Shaddock Creek Ln. / Thomasville Ln. (33.16741, -96.86206) |
Traffic Calming Circle Existing |
All-Way Yield None |
3 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Painted splitter islands. Aerial images from 2021 show testing the potential installation using cones and temporary striping. |
Frisco,
TX Denton Co. United States |
Shaddock Creek Ln. / Southbury Ln. (33.16718, -96.85847) |
Traffic Calming Circle Existing |
All-Way Yield None |
3 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Painted splitter islands. Aerial images in 2021 show testing the potential installation using cones and temporary striping. |
Frisco,
TX Collin Co. United States |
Mockingbird Ln. / (parking) (33.18527, -96.80470) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2022 | On campus of University of North Texas. |
Dinuba,
CA Tulare Co. United States |
Nebraska Ave. (Avenue 424) / N Alta Ave. (Road 80) (36.56040, -119.39519) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2022 | https://www.facebook.com/cityofdinuba/videos/the-alta-nebraska-roundabout-project-is-completed-and-the-roadway-is-now-openthi/779884746555640/ |
Kent,
WA King Co. United States |
SE 272nd St. / 106th Ave. SE (47.35794, -122.19865) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Built by developer. |
Hiawatha,
IA Linn Co. United States |
Tower Terrace Rd. / N Center Point Rd. (42.05872, -91.69228) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.facebook.com/hedcoiowa/videos/new-roundabout-at-tower-terrace-and-n-center-point-rd/550647193126949/ |
Carlisle,
PA Cumberland Co. United States |
B St. / Fairground Ave. (40.20914, -77.18946) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.facebook.com/carlislepa/videos/b-street-and-fairground-avenue-roundabout/587170292764586/ |
Chisago City,
MN Chisago Co. United States |
Lofton Ave. / Chisago Blvd. (45.34679, -92.87900) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.chisagocountymn.gov/DocumentCenter/View/17057/Postcard-Notification-CSAH-2324-Round-A-Bout?bidId= |
Stratford,
PE Queens Canada |
Trans Canada Hwy 1 / Lottie Way (46.22429, -63.09089) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.princeedwardisland.ca/en/news/new-roundabout-in-stratford-planned-for-2022-construction-season |
West Frankfort,
IL Franklin Co. United States |
SR 149 / Ken Gray Blvd. / West Frankfort Plaza (37.89743, -88.95243) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2023). |
(unincorporated),
GA Banks Co. United States |
GA 59 / GA 63 (34.29408, -83.40714) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Replaced triangular intersection. Year Completed estimated (2021-2022). |
Tamarac,
FL Broward Co. United States |
W McNab Rd. / Hiatus Rd. (26.20828, -80.29103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | |
Bentley,
AB Division 8 Canada |
Hwy 12 / Hwy 20 (52.46439, -114.07495) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Single-Lane |
2022 | https://centralalbertaonline.com/articles/roundabout-construction-begins-on-highway-12-and-highway-20 |
Montreal,
QC Montreal Canada |
Avenue Pierre-de Coubertin / Rue Leclaire (45.56049, -73.54725) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 25.0000 |
Other (At-Grade) Single-Lane |
2022 | https://journalmetro.com/local/2986842/un-carrefour-giratoire-trop-dangereux-pour-les-cyclistes-et-les-pietons/ |
Lincoln,
NE Lancaster Co. United States |
W Holdrege St. / W Chitwood Ln. (40.82831, -96.78397) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2022 | Elliptical shaped. ICD = 105 ft x 90 ft. South leg stubbed. Year Completed estimated (2021-2023). |
Arlington,
TX Tarrant Co. United States |
Emerald Grove Dr. / Prairie Crest Ln. (32.81193, -97.06947) |
Traffic Calming Circle Existing |
All-Way Stop None |
4 Approaches 0 Driveways 4.5720 |
Other (At-Grade) Single-Lane |
2022 | |
O'Fallon,
MO St. Charles Co. United States |
Hwy DD / Dalriada Blvd. (38.74631, -90.75882) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2022 | Right-turn-only lanes on southwest and northeast legs. Appears to be convertible to 2x1. https://www.sccmo.org/DocumentCenter/View/18378/OF_HIGHWAY-DD |
New Iberia,
LA Iberia Par. United States |
LA 3212 (Northwest Bypass) / Grand Prairie Rd. (30.01150, -91.88149) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Single-Lane |
2022 | North leg stubbed. Year Completed estimated (2021-2022). |
Springfield,
MO Greene Co. United States |
S Grant Ave / W Chrisman St. / (parking) (37.18891, -93.29950) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 1 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2022 | https://sgfneighborhoodnews.com/construction-wraps-up-on-first-section-of-grant-avenue-parkway/ |
Cedar Rapids,
IA Linn Co. United States |
1st Ave. NW / Wiley Blvd. (41.96746, -91.72573) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | |
Village of Harrison,
WI Calumet Co. United States |
CR N / Schmitt Rd. / Midway Rd. (44.22865, -88.32319) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2022 | https://www.postcrescent.com/story/news/local/2022/05/26/appleton-area-road-construction-projects-set-summer/9589455002/ |
Lakewood Ranch,
FL Manatee Co. United States |
Star Farms Loop / Lighterwood Trl. (27.46937, -82.35948) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2022 | |
Port St Lucie,
FL St. Lucie Co. United States |
NW Gilson Rd. / SE Becker Rd. (27.20929, -80.29377) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2022 | |
North Port,
FL Sarasota Co. United States |
Brookgreen St. / S West Villages Pkwy. / Topiary Park Pl. (27.01914, -82.32953) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2022 | Striped out inner entering, circulating, and exiting lanes on northeast and southwest legs. |
San Diego,
CA San Diego Co. United States |
Florida Dr. / Morley Field Dr. (32.73983, -117.14367) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Modular (quick build) construction. https://www.californiaconstructionnews.com/2022/10/01/construction-starts-on-modular-roundabout-quick-build/ |
Saint Lucie West,
FL St. Lucie Co. United States |
Tradition Pkwy. / (unknown) (27.27040, -80.45863) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Wesley Chapel,
FL Pasco Co. United States |
Curley Rd. / Snowberry Way (28.27006, -82.28450) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Wesley Chapel,
FL Pasco Co. United States |
Curley Rd. / Infinite Dr. (28.26532, -82.28842) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Wesley Chapel,
FL Pasco Co. United States |
Momentum Blvd. / (unknown) (28.26769, -82.28214) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2022 | Painted splitter islands on west and south legs. Circulating edge line extensions across exits. |
Williston,
ND Williams Co. United States |
26th St. W / 9th Ave. W (48.16873, -103.63658) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2022 | Right-turn-only leg on west leg. |
Fairfax,
VA City of Fairfax United States |
University Dr. / (parking) (38.86028, -77.30428) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 3 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2022 | https://www.youtube.com/watch?v=UwmJSdActdk |
Inwood,
WV Berkeley Co. United States |
SR 51 (Gerrardstown Rd.) / Pilgrim St. (39.36208, -78.04223) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | At-grade rail crossing approximately 200 ft east. Year Completed estimated (2021-2023). |
Blaine,
GA Pickens Co. United States |
GA 136 / GA 136 Connector (34.51086, -84.55772) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Replaced triangular set of intersections. |
Double Oak,
TX Denton Co. United States |
Waketon Rd. / Chinn Chapel Rd. (33.06268, -97.08807) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2022 | On border between Flower Mound and Double Oak https://www.doubleoak.texas.gov/public-works/news/waketon-road-detour-09302022 |
Bloomington,
IN Monroe Co. United States |
W Woodyard Rd. / N Curry Pike / W Hunter Valley Rd. (39.19027, -86.58242) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3877 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Series of 2 roundabouts. Striped out spiral in circulatory roadway. https://www.heraldtimesonline.com/story/news/traffic/2022/03/03/work-2-6-m-double-roundabout-bloomington-start-next-week/9332294002/ |
Bloomington,
IN Monroe Co. United States |
W Woodyard Rd. / N Smith Pike (39.19089, -86.58340) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2022 | Series of 2 roundabouts. |