Hemlock Ave. / Evergreen Way
- Type
- Roundabout
- Status
- Existing
- Functional Class
- Other (At-Grade)
- Lane Type
- Single-Lane
- Control Type
- All-Way Yield
- Previous Control Type
- Unknown
- Other Control Type
- None
- Approaches
- 3
- Driveways
- 0
- Diameter (ICD)
- 45.40 m
- City
- South Windsor
- County
- Hartford Co.
- State
- CT
- Country
- United States
- Latitude
- 41.81417
- Longitude
- -72.55495
- Year Completed
- 2004
- Notes