Leeper Rd. / I-295 SB Ramps
- Type
- Roundabout
- Status
- Existing
- Functional Class
- Freeway Ramps (Grade-Separated)
- Lane Type
- Single-Lane
- Control Type
- All-Way Yield
- Previous Control Type
- None (new)
- Other Control Type
- None
- Approaches
- 3
- Driveways
- 0
- Diameter (ICD)
- 39.62 m
- City
- (unincorporated)
- County
- Robeson Co.
- State
- NC
- Country
- United States
- Latitude
- 34.92075
- Longitude
- -78.97889
- Year Completed
- 2022
- Notes