Roundabout Details

Baux Mountain Rd. / Winston-Salem Northern Beltway (NC 74) EB Ramps

Type
Roundabout
Status
Existing
Functional Class
Freeway Ramps (Grade-Separated)
Lane Type
Single-Lane
Control Type
All-Way Yield
Previous Control Type
None (new)
Other Control Type
None
Approaches
3
Driveways
0
Diameter (ICD)
39.62 m
City
Winston-Salem
County
Forsyth Co.
State
NC
Country
United States
Latitude
36.18202
Longitude
-80.22303
Year Completed
2022
Notes
Signed as NC 74 in 2023; will change to to I-74 when beltway completed in 2026. https://malmeroads.net/i7374nc/i74seg4.html
Back to List