City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Greenville,
WI Outagamie Co. United States |
STH 76 (Municipal Dr.) / School Rd. (44.28745, -88.53703) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://projects.511wi.gov/76schoolrab/full-project-overview/ |
Ironton,
OH Lawrence Co. United States |
SR 93 (Park Ave.) / US 52 EB Ramps (38.53856, -82.67758) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.facebook.com/photo.php?fbid=611157614528583&id=100069030495739&set=a.176172631360419 |
Ironton,
OH Lawrence Co. United States |
SR 93 (Park Dr.) / US 52 WB Ramps (38.53950, -82.67593) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.facebook.com/photo.php?fbid=611157614528583&id=100069030495739&set=a.176172631360419 |
Sisters,
OR Deschutes Co. United States |
US 20 / Locust St. / Camp Polk Rd. (44.29043, -121.54369) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | https://ktvz.com/news/sisters/2024/07/26/new-sisters-roundabout-opens-to-all-traffic-monday-evening-but-theres-still-some-work-to-do/ |
(unincorporated),
UT Kane Co. United States |
SR 9 (Zion Park Scenic Byway) / North Fork Rd. (37.23921, -112.83215) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://kmyu.tv/news/local/udot-construction-projects-this-spring-summer-fall-autumn-2024-mountain-view-corridor-completion-date-i-15-travel-conditions-why-arent-potholes-being-filled-repaired-new-roads-traffic-forecast |
Findlay,
OH Hancock Co. United States |
US 68 / SR 15 EB Ramps / CR 80 (40.98862, -83.65067) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | New exit ramp from SR 15 coming in from the east. Former exit ramp from SR 15 (from the west) is now connected to County Road 80. https://wfin.com/local-news/opening-of-new-findlay-roundabout-pushed-back-a-few-days/ . |
Houston,
TX Harris Co. United States |
Irvington Blvd. / Patton St. / (parking) (29.79828, -95.36102) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | Painted splitter island on west leg. https://abc13.com/post/northside-roundabout-irvington-patton-stirs-controversy-after-houston-mayor-john-whitmire-decides-future/15488879/ |
Santa Fe,
NM Santa Fe Co. United States |
Oshara Blvd. / Falcon Way (35.61812, -105.98968) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.santafecountynm.gov/news/detail/county-celebrates-early-completion-of-landmark-ne-se-connector-roads-project |
Santa Fe,
NM Santa Fe Co. United States |
Rabbit Rd. / Falcon Way (35.62208, -105.99127) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). https://www.santafecountynm.gov/news/detail/county-celebrates-early-completion-of-landmark-ne-se-connector-roads-project. |
Statesboro,
GA Bulloch Co. United States |
Langston Chapel Rd. / Harville Rd. / Bethel Church Rd. (32.39523, -81.75920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.statesboroherald.com/local/a-friday-surprise-harville-roadlangston-chapel-road-roundabout-opens/ |
Battle Ground,
WA Clark Co. United States |
SR 503 (NE Lewisville Hwy.) / NE Rock Creek Rd. (45.85681, -122.52193) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | https://www.tiktok.com/@washingtonstatedot/video/7427125569801817374 |
Carmel,
IN Hamilton Co. United States |
3rd Ave. SW / Walnut St. (39.97281, -86.13123) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Scheduled to open by end of 2024. https://content.govdelivery.com/accounts/INCARMEL/bulletins/3c0a439. https://content.govdelivery.com/attachments/fancy_images/INCARMEL/2024/11/10465307/5813388/dji-0523_crop.jpg. |
Carmel,
IN Hamilton Co. United States |
Walnut St. / Veterans Way (39.97284, -86.12840) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Scheduled to open November 2024. https://content.govdelivery.com/accounts/INCARMEL/bulletins/3c0a439. |
Carmel,
IN Hamilton Co. United States |
Pennsylvania St. / Liberty Fund Dr. (39.95080, -86.15550) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Scheduled to open by November 2024. https://content.govdelivery.com/accounts/INCARMEL/bulletins/3c0a439 |
Montrose,
CO Montrose Co. United States |
Niagara Rd. / Hillcrest Dr. (38.46724, -107.85663) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.montrosepress.com/hillcrest-and-niagara-roundabout-opens/image_bc92464a-3aea-11ef-be15-b79f08cef2a5.html |
Montrose,
CO Montrose Co. United States |
Grand Ave. / N 9th St. (38.48349, -107.88856) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Hanover,
ON Grey Canada |
Grey Road 4 / Grey Road 3 (44.15682, -80.95434) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/CountyOfGrey/videos/grey-road-3-4-roundabout/1307920140569289/?_rdr |
Tecumseh,
ON Essex Canada |
County Road 42 / County Road 43 (Concession Road 11) / Banwell Rd. (42.27605, -82.89638) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2024 | Combined two T-intersections by realigning CR 43 and Banwell Rd to the west. Previously, one was signalized and the other controlled by stop sign. https://www.countyofessex.ca/en/resident-services/county-road-42-reconstruction.aspx. |
San Juan,
San Juan Oriente Barrio Puerto Rico |
Calle A (Marginal Rd.) / Hwy 17 EB Entrance Ramp (18.40897, -66.02947) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 44.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2014 | Concentric striped circulatory roadway. |
St Thomas,
ON Elgin Canada |
Hwy 3 (St. Thomas Expressway / Heritage Hwy.) / Centennial Ave. (42.78906, -81.14742) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://www.youtube.com/watch?v=sH0wZd962xw |
St Thomas,
ON Elgin Canada |
S Edgeware Rd. / Centennial Ave. / Highbury Ave. (42.79264, -81.15053) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Unknown |
2024 | https://www.youtube.com/watch?v=sH0wZd962xw. |
St Thomas,
ON Elgin Canada |
Peach Tree Blvd. / Blairmont Terrace / Empire Pkwy. (42.75560, -81.15701) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.0000 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2015-2016). |
St Thomas,
ON Elgin Canada |
Wellington St. / Highview Dr. (42.77443, -81.15316) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
St Thomas,
ON Elgin Canada |
Caso Crossing / (unknown) (42.77726, -81.18001) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
Limoges,
ON Prescott and Russell Canada |
Limoges Rd. / Rte. 300 (45.30533, -75.23732) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2024 | https://www.instagram.com/munrusselltwp/p/DCFWFM2J22v/ |
Canton,
OH Stark Co. United States |
Champions Gateway / George Halas Dr. (40.82371, -81.39960) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2022-2024). |
Fishers,
IN Hamilton United States |
E 141st St. / Prairie Lakes Blvd. S / Old Oak Dr. (39.99352, -86.00093) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Open November 27, 2024. E 141st Street is the boundary between Fishers and Noblesville. |
Oxley Park,
NSW Penrith Australia |
Brisbane St. / Sydney St. (-33.76751, 150.78856) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 20.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
||
York,
SC York Co. United States |
Campbell Rd. / S Paraham Rd. (35.03157, -81.13440) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2024 | https://scdot-environmental-project-site-scdot.hub.arcgis.com/pages/s-54-s-paraham-road-at-s-80-campbell-road-in-york-county |
Elliott,
SC Lee Co. United States |
US 401 (Darlington Hwy.) / SC 341 (Lynchburg Hwy.) (34.11931, -80.14440) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Completed Nov. 2024 https://www.wistv.com/2024/02/13/scdot-install-all-way-stop-sc-341-us-401-lee-county-intersection/ |
Greater Sudbury,
ON Greater Sudbury Canada |
Lasalle Blvd. / Frood Rd. (46.51506, -81.00561) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | https://www.greatersudbury.ca/live/transportation-parking-and-roads/construction/completed-projects/2023/lasalle-boulevard-at-frood-road-sudbury3/ |
Alexandria,
VA Alexandria City United States |
Hickory St. / Kennedy St. (38.83080, -77.06213) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | Central island is painted only and ringed with mountable dividers. https://www.alexandriava.gov/transportation-planning/project/hickory-street-and-kennedy-street-neighborhood-mini-roundabout |
South Haven,
MI Allegan Co. United States |
Blue Star Hwy. / N Shore Dr. (42.42646, -86.25553) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2006-2011). |
(unincorporated),
TX Fort Bend Co. United States |
Brandt Rd. / James Long Pkwy. (29.64406, -95.75007) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2024 | |
Mahomet,
IL Champaign Co. United States |
Churchill Rd. / E South Mahomet Rd. (40.17978, -88.37471) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.wandtv.com/community/ribbon-cutting-being-held-for-new-mahomet-roundabout/article_bafa4206-5314-11ee-a61e-03aed1b80bd1.html |
Martinsburg,
WV Berkeley Co. United States |
Tavern Rd. / Rock Cliff Dr. (39.47342, -77.97015) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://panhandlenewsnetwork.com/2024/04/05/bcems-director-offers-detours-as-rock-cliff-drive-tavern-road-intersection-closed-all-weekend-to-prep-for-roundabout/ |
Eau Claire,
WI Eau Claire Co. United States |
Menomonie St. / Water St. / (parking) / (parking) (44.80108, -91.52105) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.eauclairewi.gov/our-city/construction-projects/2024-project-information/menomonie-street-rab. |
Fort Wayne,
IN Allen Co. United States |
Flaugh Rd. / (parking) (41.12811, -85.22634) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2023 | |
Vincennes,
IN Knox Co. United States |
Kimmell Rd. / (parking) (38.65818, -87.50978) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2017 | Southeast leg stubbed. |
Elkhart,
IN Elkhart Co. United States |
CR 18 / CR 13 / CR 115 (41.65947, -85.91544) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Peanut shaped. Replaced two offset T-intersections. https://wsbt.com/news/local/new-roundabout-now-open-elkhart-county-traffic-peanut-roundabout-intersection-county-road-18-13-115 |
(unincorporated),
WA Clark Co. United States |
NE 99th St. / 107th Ave. (45.69338, -122.56319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Previous control was Yield for northbound traffic, Stop for eastbound traffic, none for westbound traffic. https://www.clarkcountytoday.com/news/intersection-of-ne-99th-street-and-ne-107th-avenue-closed-beginning-aug-14/ |
Hockinson,
WA Clark Co. United States |
NE 152nd Ave. / NE 119th St. (45.70833, -122.51640) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://clark.wa.gov/public-works/ne-119th-st-and-ne-152nd-ave |
Lacey,
WA Thurston Co. United States |
Britton Pkwy. NE / Carpenter Rd. NE / Britton Ln. NE (47.06434, -122.79957) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | No splitter island on north leg. https://cityoflacey.org/projects/carpenter-road-britton-parkway-roundabout/ |
Lebanon,
IN Boone Co. United States |
W 300 N / Witt Rd. (40.08342, -86.49589) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Gateway to Lilly Medicine Foundry campus. |
Québec,
QC Capitale-Nationale Canada |
Avenue Wilfrid-Pelletier / Rue de Tripoli (46.77159, -71.30965) |
Other Existing |
All-Way Yield None |
4 Approaches 5 Driveways 72.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. Pedestrian access to central island. | |
St-Georges,
QC Beauce-Sartigan Regional County Municipality Canada |
42e Avenue / 126e Rue (46.13684, -70.64171) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 2 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2009-2015). |
Beatrice,
NE Gage Co. United States |
N 33rd St. / Lincoln St. (40.27145, -96.70903) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2019-2024). |
Lincoln,
NE Lancaster Co. United States |
Wilderness Hills Blvd. / Hohensee Dr. (40.72236, -96.66957) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2021-2023). |
Lincoln,
NE Lancaster Co. United States |
Wilderness Hills Blvd. / Tree Line Dr. (40.71977, -96.66724) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2023). |
Lincoln,
NE Lancaster Co. United States |
S 40th St. / Prairie Wind Rd. (40.71608, -96.66347) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | |
Lincoln,
NE Lancaster Co. United States |
S 40th St. / Rokeby Rd. (40.71187, -96.66347) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | |
Lincoln,
NE Lancaster Co. United States |
S 40th St. / Tiger Lily Rd. (40.70815, -96.66347) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2023). |
Lincoln,
NE Lancaster Co. United States |
Saltillo Rd. / S 77th St. (40.69733, -96.61606) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Lincoln,
NE Lancaster Co. United States |
Rokeby Rd. / (future road) (40.71180, -96.60998) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 1 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2021 | |
Ashland,
NE Saunders Co. United States |
US 6 / SR 66 (41.03366, -96.36444) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Beech Grove,
IN Marion Co. United States |
Churchman Ave. / Perkins Ave. (39.73015, -86.11137) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Exclamation point shaped - circular roundabout with a peanut-shaped extension. https://www.wthr.com/article/news/local/peanut-roundabout-intersection-beech-grove-churchman-perkins-southern-avenue-triangle-dangerous-construction-new-opening-indiana-indianapolis/531-994b2626-c882-400f-a6db-bf5988e8d1c6?ref=exit-recirc Circular roundabout with a Peanut shaped extension on the southeast - not sure if you want to put this in the database as one roundabout or two. Replaced 3 former intersections with one extended roundabout. Diagram of new roundabout here: https://www.indystar.com/gcdn/authoring/authoring-images/2024/05/16/PIND/73712294007-beech-grove-roundabout-churchman-avenue.JPG?width=660&height=586&fit=crop&format=pjpg&auto=webp |
Indianapolis,
IN Marion Co. United States |
S Post Rd. / E Raymond St. (39.74019, -86.00861) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/indydpw/posts/the-post-road-and-raymond-street-roundabout-project-has-begun-this-25-million-in/925521166281352/ |
Bloomingdale,
IL DuPage Co. United States |
Bloomfield Pkwy. / Bloomfield Cir. (41.95403, -88.10742) |
Other Existing |
Uncontrolled None |
3 Approaches 5 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Pedestrian access to central island. | |
La Porte,
IN La Porte Co. United States |
Truesdell Ave. / Clear Lake Blvd. / Chalmers St. (41.61909, -86.72983) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | |
Enumclaw,
WA King Co. United States |
Suntop Blvd. / Bondgard Ave. E / (parking) (47.19554, -121.97087) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Ishpeming,
MI Marquette Co. United States |
US 41-M-28 / Lakeshore Dr. (46.49855, -87.68279) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.michigan.gov/mdot/news-outreach/pressreleases/2024/10/22/major-work-on-us-41-m-28-roundabout-project-in-ishpeming |
Cedar Rapids,
IA Linn Co. United States |
6th St. SW / Innovation Dr. / St Martin Blvd. SW (41.89632, -91.67617) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Single-Lane |
2023 | Add-lane right-turn bypass lane on west leg. |
Gretna,
NE Sarpy Co. United States |
S 192nd St. / Giles Rd. (41.17596, -96.21575) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2023 | https://www.sarpy.gov/CivicAlerts.aspx?AID=274 |
Wayne,
OH Wood Co. United States |
SR 199 (McCutcheonville Rd.) / SR 281 (Defiance Pike) (41.28254, -83.50863) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/story.php/?story_fbid=952157470289266&id=100064850644016&_rdr |
Tompkins Township,
MI Jackson Co. United States |
Springport Rd. / Minard Rd. (42.33710, -84.54673) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.mlive.com/news/jackson/2024/09/new-roundabout-opens-in-northern-jackson-county.html |
Bainbridge Island,
WA Kitsap Co. United States |
SR 305 / NE Seabold Rd. / NE Port Madison Rd. (47.70104, -122.55759) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://wsdot.wa.gov/about/news/2023/safety-improvement-project-sr-305-bainbridge-island-begins-oct-23 |
Bainbridge Island,
WA Kitsap Co. United States |
SR 395 / NE Adas Will Ln. (47.70562, -122.56059) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://wsdot.wa.gov/about/news/2023/safety-improvement-project-sr-305-bainbridge-island-begins-oct-23 |
Franklin,
IN Johnson Co. United States |
N Graham Rd. / Earlywood Dr. (39.52081, -86.05894) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://dailyjournal.net/wp-content/uploads/2024/10/133863878_web1_20241012dj-earlywood-graham-brief-1.jpg |
Wentzville,
MO St. Charles Co. United States |
Veterans Memorial Pkwy. / I-70 EB Ramps / Ruggeri Rd. (38.80935, -90.87713) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Prince George,
BC Fraser-Fort George Canada |
Foothills Blvd. / 18 Ave. (53.90734, -122.81107) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways |
Other (At-Grade) Single-Lane |
2023 | https://www.princegeorge.ca/city-hall/news-notices/roundabout-construction-complete |
Prince George,
BC Fraser-Fort George Canada |
Boundary Rd. / Boeing Rd. / Gunn Rd. (53.90194, -122.67834) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2017). |
Quesnel,
BC Cariboo Canada |
Johnston Ave. / Ranch Rd. (52.97197, -122.48810) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.0000 |
Other (At-Grade) Single-Lane |
2005 | Year Completed 2005 or earlier. |
Surrey,
BC Greater Vancouver Canada |
140 St. / 32 Ave. (49.06026, -122.83447) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.northdeltareporter.com/news/surrey-council-to-consider-contract-for-intersection-work-in-newton-south-surrey-2749829 |
Red Deer County,
AB Division 8 Canada |
40 Ave. (Range Road 273) / McKenzie Rd. (Township Road 374) (52.20118, -113.79011) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2021). |
Rocky Mount,
NC Nash Co. United States |
SR 48 (Goldrock Rd.) / Roundtree Dr. / Waterloo Dr. (35.99310, -77.80791) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | https://www.facebook.com/photo.php?fbid=955156466066790&id=100047173362729&set=a.584158543166586 |
Pontiac,
IL Livingston Co. United States |
Belmont Rd. / (parking) (40.87097, -88.66806) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2019-2022). |
Palm Desert,
CA Riverside Co. United States |
San Pablo Ave. / (unknown) (33.73244, -116.38242) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.9184 |
Other (At-Grade) Single-Lane |
2022 | Class 2 bicycle lanes striped through roundabout without raised curbs. |
Palm Desert,
CA Riverside Co. United States |
Magnesia Falls Dr. / San Pablo Ave. (33.73603, -116.38246) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2022 | Class 1 bicycle path crossing on west leg and Class 2 features all legs. |
(unincorporated),
SC Berkeley Co. United States |
US 176 (State Rd.) / Mudville Rd. (33.20839, -80.25724) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://info2.scdot.org/SCDOTPress/Lists/Posts/Post.aspx?ID=3627 |
Springfield,
KY Washington Co. United States |
US 150 (KY 55 / KY 555) / US 150 Business (Bardstown Rd.) (37.69068, -85.23244) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2024 | |
Elizabethtown,
KY Hardin Co. United States |
KY 434 (Battle Training Rd.) / KY 251 (Shepherdsville Rd.) (37.78142, -85.85653) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2024 | Newspaper Articles: *June 2024 (Work Begins): https://www.thenewsenterprise.com/news/local/work-about-to-begin-on-another-roundabout/article_9ab1ff3c-0660-5285-9e4a-f38be708a425.html *Nov. 2024 (Work Finishing Up): https://www.thenewsenterprise.com/news/local/crews-put-finishing-touches-on-roundabout/article_0de37f1d-6f6c-5628-8ace-b004be52caee.html |
Atlanta,
GA Fulton Co. United States |
Marietta Rd. NW / Laurel Ave. NW / Annie St. NW / (unknown) (33.80150, -84.44302) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Elliptical shaped. ICD = 80 ft x 70 ft. Painted splitter island on east leg. Year Completed estimated (2022-2023). |
Olathe,
KS Johnson Co. United States |
S Ridgeview Rd. / E Frontier Ln. (38.86395, -94.79728) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Olathe,
KS Johnson Co. United States |
S Ridgeview Rd. / Sheridan Bridge Ln. (38.85959, -94.79741) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2021-2022). |
Warrington,
England United Kingdom |
A5280 (Lingley Green Ave.) / Park Rd. (53.39701, -2.66806) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Warrington,
England United Kingdom |
Longshaw St. / Harrison Square (53.40960, -2.60579) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways |
Other (At-Grade) Single-Lane |
||
Warrington,
England United Kingdom |
A574 (Cromwell Ave.) / Callands Rd. / Europa Blvd. (53.41510, -2.61499) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Warrington,
England United Kingdom |
A574 (Cronwell Ave.) / Westbrook Crescent / Ladywood Rd. (53.40739, -2.62844) |
Roundabout Removed |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Year Removed estimated (2012-2013). |
Warrington,
England United Kingdom |
A574 (Cromwell Ave.) / Westbrook Way (53.40949, -2.62855) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
Grade separated pedestrian crossing from all four quadrants intersecting over central island. | |
Warrington,
England United Kingdom |
Whittle Avenue Roundabout: A5281 (Whittle Ave. / Burtonwood Rd.) / Whittle Ave. / Westbrook Way / Fortress Blvd. (53.40726, -2.64444) |
Rotary Existing |
All-Way Yield None |
5 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Warrington,
England United Kingdom |
A5281 (Whittle Ave.) / Lingley Green Ave. / Stanhoe Dr. / Malvern Close (53.40289, -2.64858) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Warrington,
England United Kingdom |
Westbrook Way / Westbrook Crescent (53.40909, -2.63703) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
Pedestrian overcrossing through central island. | |
Wigan,
England United Kingdom |
A49 (Warrington Rd.) / B5238 (Poolstock Ln.) (53.52299, -2.65304) |
Roundabout Removed |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2016 | Year Removed estimated (2015-2016). Replaced with signalized intersection. |
Birchwood,
England Warrington United Kingdom |
Oakwood Gate Roundabout: Oakwood Gate / Ordnance Ave. / Dewhurst Rd. / (parking) (53.41873, -2.52827) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 1 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Reedsburg,
WI Sauk Co. United States |
STH 23-STH 33 / STH 136 / Golf View Ct. (43.53251, -89.95461) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://wisdot.maps.arcgis.com/apps/webappviewer/index.html?id=106c80b1ec5f42a5a8808e6acad23067 |
Paoli,
WI Dane Co. United States |
STH 69 / CR PB (42.92780, -89.52744) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2022 | https://wisdot.maps.arcgis.com/apps/webappviewer/index.html?id=106c80b1ec5f42a5a8808e6acad23067 |
Whiteland,
IN Johnson Co. United States |
Paul Hand Blvd. (CR 400 N) / Graham Rd. (CR 225 E) (39.53561, -86.05912) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://dailyjournal.net/2024/11/14/roundabout-open-at-paul-hand-boulevard-and-graham-road-in-franklin/ |
Noblesville,
IN Hamilton Co. United States |
E 141st St. / Breakthrough Dr. (39.99472, -85.91414) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | Located in Noblesville Event Center. https://nobport.cityofnoblesville.org/maps/PublicViewer.html. |
(unincorporated),
LA Calcasieu Par. United States |
SR 14 (Gerstner Memorial Blvd.) / Ward Line Rd. (30.15787, -93.12882) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.kplctv.com/video/2023/06/29/gerstner-memorial-blvd-ward-line-rd-runabout-project-moves-new-construction-phase/ |
Broussard,
LA Lafayette Par. United States |
Birchview Dr. / Old Cypress Dr. (30.11338, -91.97132) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2014). |