City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Iowa City,
IA Johnson Co. United States |
Herbert Hoover Hwy. NE / I-80 WB Ramps (41.67198, -91.44380) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Previous intersection was entrance ramp only. https://www.news.iowadot.gov/newsandinfo/2022/06/eastbound-i-80-ramps-at-herbert-hoover-highwayjohnson-county-road-f-44-exit-249-in-johnson-county-to.html |
Iowa City,
IA Johnson Co. United States |
Herbert Hoover Hwy. SE / I-80 EB Ramps (41.67099, -91.44629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Previous intersection was exit ramp only. https://www.news.iowadot.gov/newsandinfo/2022/06/eastbound-i-80-ramps-at-herbert-hoover-highwayjohnson-county-road-f-44-exit-249-in-johnson-county-to.html |
Rocklin,
CA Placer Co. United States |
Rocklin Rd. / Pacific St. (38.79073, -121.23610) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | Yield-controlled right-turn bypass lanes on west and south legs; add-lane right-turn bypass lane on east leg. https://www.rocklin.ca.us/roundabout |
(unincorporated),
NE Sarpy Co. United States |
S 180th St. / Cornhusker Rd. (41.16150, -96.19661) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Lakewood,
WA Pierce Co. United States |
North Gate Rd. SW / Edgewood Ave. SW / Winona St. SW (47.14678, -122.56385) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.kiro7.com/news/south-sound-news/stolen-car-stopped-by-wet-cement-lakewood/GDU77T3M6NC2RKBPTKKY5N53SA/ |
Kalispell,
MT Flathead Co. United States |
US 2 / Springcreek Rd. / Dern Rd. (48.19696, -114.37378) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2021 | https://www.mdt.mt.gov/pubinvolve/dernspring/ |
Waynesville,
MO Pulaski Co. United States |
Historic Route 66 / Hwy T (37.81205, -92.23491) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2018). |
Bonne Terre,
MO St. Francois Co. United States |
Old Orchard Rd. / Raider Rd. / US 67 SB Ramps (37.91037, -90.53216) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Elliptical shaped. ICD = 155 ft x 145 ft. Year Completed estimated (2007-2009). |
Bonne Terre,
MO St. Francois Co. United States |
Old Orchard Rd. / US 67 NB Ramps (37.91294, -90.53029) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Year Completed estimated (2007-2009). |
Lino Lakes,
MN Anoka Co. United States |
Birch St. / Tomahawk Trl. (45.14236, -93.11531) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2021 | Completed October 2021. |
Lino Lakes,
MN Anoka Co. United States |
Birch St. / Shadow Lake Dr. (45.14228, -93.10960) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2021 | Completed October 2021. |
Afton,
VA Albemarle Co. United States |
US 250 (Rockfish Gap Turnpike) / SR 151 (Critzers Shop Rd.) (38.02982, -78.80684) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.blueridgelife.com/2022/11/17/250-151-roundabout-is-active-so-far-so-good-but-its-early/ |
Kansas City,
MO Clay Co. United States |
N Shoal Creek Pkwy. / Maplewoods Pkwy. (39.28995, -94.55702) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2021 | Merging right-turn bypass lane lane on west leg. https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Clay Co. United States |
N Maplewoods Pkwy. / NE 106th St. / NE Staley Ferris Dr. (39.28508, -94.55712) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2021 | Peanut shaped. Replaced two offset T-intersections. https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Clay Co. United States |
N Maplewoods Pkwy. / New Mark Dr. / NE 100th St. (39.27475, -94.55715) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Clay Co. United States |
N Maplewoods Pkwy. / NE 96th St. (39.26747, -94.55716) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | East leg stubbed. https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Platte Co. United States |
Line Creek Pkwy. / Tiffany Springs Rd. (39.25957, -94.61010) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Kansas City,
MO Clay Co. United States |
N Booth Ave. / NE Shoal Creek Valley Dr. / Commercial Dr. (39.24626, -94.47674) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Yield-controlled right-turn bypass lane on west leg. Year Completed estimated (2020-20210. |
Kansas City,
MO Clay Co. United States |
NE Shoal Creek Valley Dr. / (unknown) (39.24673, -94.47459) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2020 | |
Sedalia,
MO Pettis Co. United States |
Rte Y (W 16th St.) / Winchester Dr. (38.69957, -93.27763) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). |
Folsom,
CA Sacramento Co. United States |
Grand Prairie Rd. / Rustic Ridge Dr. (38.63617, -121.09165) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
Folsom,
CA Sacramento Co. United States |
Grand Prairie Rd. / Rustic Ridge Dr. / Alder Creek Pkwy (38.64059, -121.09212) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
(unincorporated),
OH Delaware Co. United States |
Eagles Landing Dr. / Liberty Grand Blvd. (40.20685, -83.10250) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2021). |
New Haven,
CT New Haven Co. United States |
Chapel St. / Yale Ave. (41.31448, -72.95891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Peanut shaped. Replaces skewed intersection. https://www.fox61.com/video/news/local/new-haven-county/new-haven/first-of-its-kind-peanut-shaped-roundabout-opens-in-new-haven/520-3db77500-495f-4ae7-a441-ed85863cd327 |
Raymore,
MO Cass Co. United States |
MO 58 / Ward Rd. (38.80255, -94.40147) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.raymore.com/Home/Components/News/News/2466/ |
Raymore,
MO Cass Co. United States |
S Madison St. / (park access) (38.78857, -94.45769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2009-2010). |
Lafayette,
LA Lafayette Par. United States |
Dulles Dr. / N Domingue Ave. (30.21055, -92.08378) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Ottawa,
ON Ottawa Canada |
Greenbank Rd. / Half Moon Bay Rd. (45.25555, -75.73742) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Year Completed estimated (2021-2023). |
Novi,
MI Oakland Co. United States |
W 9 Mile Rd. / Taft Rd. (42.45158, -83.49410) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.candgnews.com/news/novi-council-approves-lighting-for-new-roundabout-635 |
Le Claire,
IA Scott Co. United States |
Wisconsin St. / 35th St. SW / (parking) (41.59770, -90.39139) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | Replaced offset T intersections. https://www.leclaireiowa.gov/340/Wisconsin-Street-and-35th-Street-Reconst |
Truckee,
CA Nevada Co. United States |
Donner Pass Rd. / Cold Stream Rd. / I-80 EB Ramps (39.32359, -120.22747) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Panama City Beach,
FL Bay Co. United States |
Front Beach Rd. / S Arnold Rd. (30.22327, -85.89081) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Triangular section of roads converted to roundabout with two of the former triangle sides to be converted to large-radius right-turn bypass lanes. https://www.pcbfl.gov/Home/Components/News/News/4818/ https://www.newsherald.com/story/news/local/2023/01/20/panama-city-beach-opens-a-new-lane-on-front-beach-road-roundabout/69820095007/ |
Stockton,
CA San Joaquin Co. United States |
E Miner Ave. / N San Joaquin St. (37.95611, -121.28804) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2021 | Bicycle lanes leading into roundabout with bicycle sharrows on outer edge of circulatory roadway beyond each entry. https://twitter.com/stocktonupdates/status/1407046118156947458 |
Santa Clara,
CA Santa Clara Co. United States |
(shopping center entrance) / (parking) (37.35667, -121.93755) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://www.svvoice.com/coleman-costco-installing-roundabout/ |
Ramara,
ON Simcoe Canada |
Hwy 12 / CR 169 / Concession Road 6 (44.57153, -79.18908) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Moses Lake,
WA Grant Co. United States |
SR 17 / Grape Dr. (47.14957, -119.29411) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://wsdot.wa.gov/construction-planning/search-projects/sr-17-grape-drive-intersection-improvements https://columbiabasinherald.com/news/2022/sep/06/grape-dr-roundabout-nears-completion/ |
Steamboat Springs,
CO Routt Co. United States |
Mount Werner Dr. / Steamboat Blvd. / Bangtail Way (40.45897, -106.81287) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.engagesteamboat.net/roundabout |
Steamboat Springs,
CO Routt Co. United States |
Central Park Dr. / Alpine Plaza / (parking) (40.46194, -106.82118) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2017 | Entrance to Central Park Plaza shopping center. Year Completed estimated (2015-2018). |
Woodland,
CA Yolo Co. United States |
Road 25A / Parkland Ave. (38.64099, -121.74450) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2020 | |
Woodland,
CA Yolo Co. United States |
Road 25A / Miekle Ave. (38.64078, -121.73624) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Woodland,
CA Yolo Co. United States |
Hunt St. / Heritage Pkwy. (38.64945, -121.74580) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Knoxville,
TN Knox Co. United States |
Moss Grove Blvd. / Amberleigh Bluff Way (35.90592, -84.09103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). |
Knoxville,
TN Knox Co. United States |
Montlake Dr. / Lakemoor View Rd. / US 129 SB Exit Ramp (35.92067, -83.95729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Meridian,
ID Ada Co. United States |
S Vanguard Way / S Wayfinder Ave. / (parking) (43.59800, -116.43116) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Right-turn-only lane on northeast leg. |
Meridian,
ID Ada Co. United States |
S Wayfinder Ave. / W Cobalt Dr. (43.60115, -116.42905) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Missoula,
MT Missoula Co. United States |
Mullan Rd. / Mary Jane Blvd. (46.88725, -114.05372) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2022-2023). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. / Grove Dr. (53.55573, -113.86097) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | |
Spruce Grove,
AB Division 11 Canada |
Grove Dr. W / Copperhaven Dr. / Harvest Ridge Dr. (53.55575, -113.95196) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2016-2020). |
Spruce Grove,
AB Division 11 Canada |
Grove Dr. W / (unknown) (53.55467, -113.95664) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2016-2020). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. (Range Road 271) / Fenwyck Blvd. (53.55121, -113.86090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd (Range Road 271) / (unknown) (53.54856, -113.86090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / 218th St. NW (53.52741, -113.69339) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / Secord Blvd. NW (53.52657, -113.70582) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / (unknown) (53.52650, -113.70143) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2019). |
Edmonton,
AB Division 11 Canada |
Glastonbury Blvd. NW / Granville Dr. NW (53.50464, -113.68570) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
Terwillegar Blvd. NW / Towne Centre Blvd. (53.44467, -113.57784) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2000-2004). |
Langford,
BC Capital Canada |
Millstream Rd. / Bear Mountain Pkwy. (48.47140, -123.50526) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Everett,
WA Snohomish Co. United States |
Riverfront Blvd. / 29th Ave. SE / 44th St. SE (47.95950, -122.19112) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2020 | |
Arlington,
WA Snohomish Co. United States |
236th St. NE / 19th Ave. NE (48.20959, -122.20491) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2021 | https://www.236safetyimprovements.org/project-updates |
Weddington,
NC Union Co. United States |
Weddington-Matthews Rd. (SR 1344) / Tilley Morris Rd. (SR 1345) / (school access) (35.05645, -80.73426) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.constructionjournal.com/projects/details/9adae8f3933146738feedddda9e51146.html |
Bowling Green,
MO Pike Co. United States |
US 61 Business / MO 161 / Court St (39.33344, -91.19504) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.modot.org/roundabout-bowling-green |
Billings,
MT Yellowstone Co. United States |
Five Mile Rd. / Mary St. / (Billings Bypass) (45.84863, -108.42492) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2021 | https://www.yourbigsky.com/local-news-2/billings-bypass-project-roundabout-opening-on-november-24/ |
Cleves,
OH Hamilton Co. United States |
Cooper Ave. / (high school parking) (39.16904, -84.75329) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2016 | Painted splitter island on south leg. |
Westfield,
IN Hamilton Co. United States |
W 171st St. / Eagletown Rd. (40.03649, -86.19331) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Opened March 2023. |
Cambridge,
ON Waterloo Canada |
Blenheim Rd. / Bismark Dr. (43.36041, -80.34133) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.cambridgetoday.ca/local-news/citys-newest-roundabout-unique-to-cambridge-west-development-5511610 |
Deptford,
NJ Gloucester Co. United States |
Salina Rd. / S College Dr. (39.77645, -75.12438) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://42freeway.com/roads/salina-road-roundabout-at-rowan-college-completed-traffic-signal-at-delsea-is-coming/ |
Roebling,
NJ Burlington Co. United States |
Cedar Ln. / Railroad Ave. (40.10521, -74.79512) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2017 | Previous control: Triangular intersection with yield signs. https://www.burlingtoncountytimes.com/story/news/2017/08/27/no-more-waiting-road-improvements/17642282007/ |
Cinnaminson,
NJ Burlington Co. United States |
Cinnaminson Ave. / Calhoun St. (39.98910, -75.01095) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2008 | Year Completed estimated (2007-2008). |
Cinnaminson,
NJ Burlington Co. United States |
Branch Pike / Burlington Pike (39.99064, -75.00752) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2008 | Inside shopping center. Year Completed estimated (2007-2008). |
Cinnaminson,
NJ Burlington Co. United States |
Riverton Rd. / Branch Pike / Parry Rd. (39.98818, -74.98070) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
Harrisburg,
PA Dauphin Co. United States |
Derry St. / Mulberry St. (40.26312, -76.86948) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://theburgnews.com/news/project-to-make-harrisburgs-mulder-square-safer-greener-nears-completion |
Oakton,
VA Fairfax Co. United States |
Nutley St. SW / I-66 WB Exit Ramp (38.87982, -77.26743) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Replaces full cloverleaf interchange. https://outside.transform66.org/about_the_project/project_sections/nutley.asp |
Oakton,
VA Fairfax Co. United States |
Nutley St. SW / I-66 EB Exit Ramp (38.87714, -77.26629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Replaced full cloverleaf interchange. https://outside.transform66.org/about_the_project/project_sections/nutley.asp |
Oakton,
VA Fairfax Co. United States |
Saintsbury Dr. / (transit center parking lot) (38.87667, -77.26993) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2013 | Serves Metro station. Right-turn-only lanes on east and west legs. South leg stubbed. Year Completed estimated (2012-2014). |
Oakton,
VA Fairfax Co. United States |
Saintsbury Dr. / (transit center parking garage) (38.87600, -77.27317) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2013 | Serves Metro station. Right-turn-only lanes on northeast and southwest legs. Southeast leg stubbed. Year Completed estimated (2012-2014). |
Fairfax,
VA Fairfax Co. United States |
Patriot Cir. / Mason Pond Dr. (38.82981, -77.31152) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2008 | |
Cedar Rapids,
IA Linn Co. United States |
16th Ave. SE / 5th St. SE (41.97092, -91.65498) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2019). |
Middletown,
DE New Castle Co. United States |
Brick Mill Rd. / Dove Run Centre Dr. (39.45413, -75.68672) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | |
Baton Rouge,
LA East Baton Rouge Par. United States |
The Grove Blvd. / (parking) (30.38708, -91.07573) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2018 | |
Denham Springs,
LA Livingston Par. United States |
Lockhart Rd. / Dunn Rd. (30.50500, -90.92494) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2021). |
Covington,
LA St. Tammany Par. United States |
Ochsner Blvd. / S Ochsner Blvd. (30.45565, -90.15060) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). South leg added 2019-2022. |
Covington,
LA St. Tammany Par. United States |
River Chase Dr. / Continental Dr. (30.43874, -90.12867) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2014). Southwest leg stubbed. |
Snellville,
GA Gwinnett Co. United States |
Wisteria Dr. / Clower St. (33.85952, -84.01452) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | |
West Dundee,
IL Kane Co. United States |
Millbrook Dr. / (unknown) / (parking) (42.14551, -88.34157) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2013-2015). |
Malta,
NY Saratoga Co. United States |
Stonebreak Rd. / Luther Forest Blvd. (42.96551, -73.75795) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2012 | Add-lane right-turn bypass lane on southeast leg. Year Completed estimated (2011-2013). Southeast leg added 2015-2018. |
Troy,
NY Rensselaer Co. United States |
US 4 (N Greenbush Rd.) / Williams Rd. (Rte 136) / Glenmore Rd. (42.69219, -73.68692) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lanes on north and east legs. Year Completed estimated (2021-2022). |
Cohoes,
NY Albany Co. United States |
Preston Dr. / Stacey Ct. (42.77582, -73.74557) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2015). |
Whitestown,
IN Boone Co. United States |
S Main St. / Albert S White Dr. / E 400 S (39.98263, -86.34596) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2022 | https://www.youtube.com/watch?v=34EKqFKijoI |
Winston-Salem,
NC Forsyth Co. United States |
Germanton Rd. (NC 8) / Old Hollow Rd. (NC 66) (36.19481, -80.25493) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Winston-Salem,
NC Forsyth Co. United States |
Germanton Rd. (NC 8) / Winston-Salem Northern Beltway (NC 74) EB Ramps (36.19637, -80.25492) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2021 | Opened in 2021 temporarily as single lane. Converted to 2x1 in 2022. https://malmeroads.net/i7374nc/i74seg4.html |
Winston-Salem,
NC Forsyth Co. United States |
Germanton Rd. (NC 8) / Winston-Salem Northern Beltway (NC 74) WB Ramps (36.19956, -80.25396) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | https://malmeroads.net/i7374nc/i74seg4.html |
Winston-Salem,
NC Forsyth Co. United States |
Baux Mountain Rd. / Winston-Salem Northern Beltway (NC 74) WB Ramps (36.18421, -80.22286) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://malmeroads.net/i7374nc/i74seg4.html |
Winston-Salem,
NC Forsyth Co. United States |
Baux Mountain Rd. / Winston-Salem Northern Beltway (NC 74) EB Ramps (36.18202, -80.22303) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Signed as NC 74 in 2023; will change to to I-74 when beltway completed in 2026. https://malmeroads.net/i7374nc/i74seg4.html |
Brownsburg,
IN Hendricks Co. United States |
S Green St. / Airport Rd. (39.82142, -86.40107) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://twitter.com/BrownsburgIN/status/1552378297249677312 |
Avon,
IN Hendricks Co. United States |
E CR 100 S / (unknown) (39.74854, -86.36651) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Only two legs finished as of June 2022, but it looks like north and south legs will be added. |
Avon,
IN Hendricks Co. United States |
E CR 100 S / CR 900 E (39.74857, -86.36160) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2022 | |
Avon,
IN Hendricks Co. United States |
E CR 100 S / Allpoints Ct. (39.74893, -86.34938) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Laddonia,
MO Audrain Co. United States |
US 54 / MO 19 / CR J (39.28073, -91.64373) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2022 | https://www.modot.org/node/27038 |
Fort Worth,
TX Tarrant Co. United States |
Ventana Pkwy. / Jerry Dunn Pkwy. (32.66820, -97.50849) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Arlington,
TX Tarrant Co. United States |
Calender Rd. / Kuykendall Dr. (32.63263, -97.15398) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2022 | 2020-2022 (SV) |