City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Winfield,
IN Lake Co. United States |
E 109th Ave. / Green Pl. (41.42020, -87.26608) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.instagram.com/mattscottmedia/reel/DDNztI8hQq3/ |
Mankato,
MN Blue Earth Co. United States |
STH 22 / Augusta Dr. (44.18859, -93.94948) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.keyc.com/video/2024/10/04/roundabout-highway-22-augusta-drive-mankato-opens-october-5/ |
Olathe,
KS Johnson Co. United States |
S Ridgeview Rd. / Sheridan Bridge Ln. (38.85959, -94.79741) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2021-2022). |
Canton,
OH Stark Co. United States |
Champions Gateway / George Halas Dr. (40.82371, -81.39960) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2022-2024). |
Halifax,
NS Halifax Canada |
Barrington St. / Upper Water St. / Valour Way / Nora Bernard St. (44.65429, -63.58093) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.reddit.com/r/halifax/comments/1gcimzq/the_barringtonnora_bernard_roundabout/ |
Carmel,
IN Hamilton Co. United States |
Pennsylvania St. / Liberty Fund Dr. (39.95080, -86.15550) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Scheduled to open by November 2024. https://content.govdelivery.com/accounts/INCARMEL/bulletins/3c0a439 |
Greater Sudbury,
ON Greater Sudbury Canada |
Lasalle Blvd. / Frood Rd. (46.51506, -81.00561) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | https://www.greatersudbury.ca/live/transportation-parking-and-roads/construction/completed-projects/2023/lasalle-boulevard-at-frood-road-sudbury3/ |
Oak Level Township,
NC Nash Co. United States |
N Old Carriage Rd. / US 64 EB Ramps (35.98033, -77.89689) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html |
Oak Level Township,
NC Nash Co. United States |
N Old Carriage Rd. / US 64 WB Ramps (35.98205, -77.89806) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html |
Oak Level Township,
NC Nash Co. United States |
N Old Carriage Rd. / (school entrance) (35.97561, -77.89630) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html |
Oak Level Township,
NC Nash Co. United States |
Sunset Ave. / Arrow Rd. (35.97106, -77.89111) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2023-2024). https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html. |
Oak Level Township,
NC Nash Co. United States |
Sunset Ave. / I-95 SB Ramps / Freight Rd. (35.96924, -77.88406) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html. |
Oak Level Township,
NC Nash Co. United States |
Sunset Ave. / I-95 NB Ramps (35.96838, -77.88020) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html. |
Hortonville,
WI Outagamie Co. United States |
STH 15 (Greenville Dr.) / CR JJ (W Broadway Dr.) (44.32965, -88.60005) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Yield-controlled right-turn bypass lane on southwest leg. Intersection was moved about 400 feet to the southeast. Year Completed estimated (2023-2024). |
Hortonville,
WI Outagamie Co. United States |
STH 15 / CR T (44.34801, -88.67547) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2023-2024). https://projects.511wi.gov/wis15expand/full-project-overview/ |
Nampa,
ID Canyon Co. United States |
S Midland Blvd. / Iowa Ave. (43.55439, -116.59279) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.facebook.com/cityofnampa.us/posts/-exciting-safety-news-for-our-community-were-happy-to-announce-the-installation-/900763452095945/ |
Rogers,
AR Benton Co. United States |
S 52nd St. / W Oak St. / W Metro Park Crossing (36.32797, -94.18675) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.5newsonline.com/article/news/local/oak-street-overpass-rogers-open-two-years-construction/527-0586afae-17c6-4a62-a3cc-bbda5e891e86 (advance the video to 1:30 to see a nice aerial picture of the roundabout) |
Bend,
OR Deschutes Co. United States |
US 20 / Old Bend Redmond Hwy. (44.11907, -121.31678) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 65.5320 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | https://www.centraloregondaily.com/archives/central-oregon-daily/highway-20-roundabout-at-old-bend-redmond-hwy-set-to-open-o-b-riley-reopening/article_e239715a-4a6e-5d19-8c96-993910415551.html?=/&subcategory=61%7CLegal |
Noblesville,
IN Hamilton Co. United States |
Pleasant St. / 10th St. (40.03912, -86.01218) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Fully open late October 2024. https://www.ibj.com/articles/44-years-in-the-making. https://www.reimaginepleasantst.com/navigating-noblesville?lightbox=dataItem-m3eoau451 |
Saint-Augustin-de-Desmaures,
QC Capitale-Nationale Canada |
Chemin de la Butte / Chemin du Lac (46.74119, -71.40780) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2013 | Left-turn-only lane on west leg. Right-turn-only lanes on east and north legs. |
Red Deer County,
AB Division 8 Canada |
Hwy 20 / Memorial Trl. / Township Road 384 (52.29009, -114.07341) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 39.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Completed in October 2024. RRFB is located on the north leg only. Currently, Memorial Trail is only one lane in each direction, but can be upgraded to two lanes in the future. |
Kannapolis,
NC Cabarrus Co. United States |
SR 3 (Mooresville Rd.) / Miller St. / Franklin Ave. (35.49574, -80.63904) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2023-2024). |
Kannapolis,
NC Cabarrus Co. United States |
Lane St. / Turkey Rd. / Royse St. (35.49738, -80.55891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Year Completed estimated (2019-2021). |
Noblesville,
IN Hamilton Co. United States |
Allisonville Rd. / E 146th St. Ramps (40.00038, -86.01932) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2025 | Grade separated interchange with roundabout on the lower level. 146th Street through traffic passes overhead. Roundabout opened to traffic June 9, 2025 while final construction continued in the area. https://hamiltoncounty.in.gov/DocumentCenter/View/17636/146th--Allisonville---Looking-Northwest https://hamiltoncounty.in.gov/DocumentCenter/View/17637/146th--Allisonville---Looking-Southwest https://hamiltoncounty.in.gov/1238/146th-St-Allisonville-Rd-Interchange |
Johnstown,
OH Licking Co. United States |
Green Chapel Rd. / (unknown) (40.12333, -82.70509) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | |
New Albany,
OH Licking Co. United States |
Green Chapel Rd. / (unknown) (40.12385, -82.71205) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | |
Johnstown,
OH Licking Co. United States |
Mink St. / (unknown) (40.10488, -82.70700) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | |
Clarkston,
WA Asotin Co. United States |
US 12 (Bridge St.) / Diagonal St. / 2nd St. (46.41994, -117.04045) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | Replaced five-legged signalized intersection. https://www.lmtribune.com/local-news/welcome-to-clarkston-19216825 |
Brant,
ON Brant Canada |
Rest Acres Rd. / Cobblestone Dr. / Daugaard Ave. (43.18023, -80.38441) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2020-2023). |
Brant,
ON Brant Canada |
Rest Acres Rd. / Arlington Pkwy. / Court Dr. (43.17712, -80.38332) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2020-2023). |
Brant,
ON Brant Canada |
Rest Acres Rd. / Scenic Ridge Gate / Lydia Ln. (43.17224, -80.38134) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2020-2023). |
Ridgefield,
WA Clark Co. United States |
N 56th Pl. / N Pioneer Canyon Dr. (45.81812, -122.69068) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
Left-turn-only lane on south leg marked as through lane. | |
Ridgefield,
WA Clark Co. United States |
Pioneer St. / S 68th Ct. (45.81598, -122.67714) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Double left turn on south leg. Year Completed estimated (2023-2024). |
Albany,
GA Dougherty Co. United States |
N Westover Blvd. / Capstone Connector (31.62104, -84.21878) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://www.facebook.com/GDOTSW/videos/here-you-go-albanydougherty-colee-co-the-westover-blvd-roundabout-in-action-were/971035348343443/ |
MIdland,
TX Midland Co. United States |
N Garfield St. / W Cuthbert Ave. (32.00234, -102.10148) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | Elliptical shaped. ICD = 190 ft x 150 ft. https://www.instagram.com/reel/DKK8XzFS0uo/ |
Fort Collins,
CO Larimer Co. United States |
E Mulberry Street Frontage Rd. / Greenfield Dr. (40.58247, -105.01497) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | |
Timnath,
CO Larimer Co. United States |
Buss Grove Rd. (CR 40) / Timnath Pkwy. (40.53741, -104.97702) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | |
Timnath,
CO Larimer Co. United States |
Weitzel St. / Swetsville Zoo Rd. (40.51930, -104.98815) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2021-2023). |
Estes Park,
CO Larimer Co. United States |
US 36 (N Saint Vrain Ave.) / Community Dr. (40.37449, -105.49980) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2019-2024). |
Estes Park,
CO Larimer Co. United States |
US 36 / US 34 Business / Crags Dr. (40.37248, -105.52360) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Elliptical shaped. Replaced two two-way stop-controlled intersections. ICD = 120 ft x 95 ft. Year Completed estimated (2019-2024). |
Rogers,
AR Benton Co. United States |
S Promenade Blvd. / W Oak St. (36.32767, -94.17844) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.youtube.com/watch?v=GlgAq7Dsqgo |
Springdale,
AR Washington Co. United States |
S 64th St. / Apple Rd. (36.16841, -94.20162) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 64.0080 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | RRFB on all three legs. |
Bentonville,
AR Benton Co. United States |
Watertower Rd. / SE 8th St. (36.36477, -94.17059) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2022-2023). |
Rogers,
AR Benton Co. United States |
S Bellview Rd. / S JB Hunt Dr. / S 28th Pl. (36.29465, -94.17170) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rogersar.gov/CivicSend/ViewMessage/message/209522 |
Rogers,
AR Benton Co. United States |
W Pleasant Grove Rd. / S Rainbow Rd. / Southgate Estates Cir. (36.29174, -94.20767) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.facebook.com/CraftonTullPage/videos/pleasant-grove-road-roundabout/1459630811196234/ |
Rogers,
AR Benton Co. United States |
W Pleasant Grove Rd. / S Rainbow Rd. (36.29171, -94.21214) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lane on north leg. |
Brodheadsville,
PA Monroe Co. United States |
US 209 / Pleasant Valley Ln. (40.92167, -75.40245) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | RRFB on all legs. |
Fayetteville,
GA Fayette Co. United States |
GA 92 / Seay Rd. / Harp Rd. (33.40417, -84.44370) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 65.5317 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lane on southwest leg. Irregular oval shaped. ICD = 215 ft x 165 ft. Combined two T-intersections. Year Completed estimated (2021-2022). |
Fayetteville,
GA Fayette Co. United States |
GA 92 / Antioch Rd. / Lockwood Rd. (33.40156, -84.44190) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Combined two offset T-intersections. Year Completed estimated (2021-2022). |
Flagstaff,
AZ Coconino Co. United States |
S Beulah Blvd. / W University Ave. / W University Dr. (35.18368, -111.66341) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://www.beulahuniversityproject.com/ |
Falun,
Dalarna County Falu kommun Sweden |
Gruvgatan / Myntgatan (60.60446, 15.62970) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2009 | Year Completed estimated (2006-2009). |
Falun,
Dalarna County Falu kommun Sweden |
Gruvgatan / Korsnäsväagen / Holmtorget (60.60497, 15.63215) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2010 | Completed before 2010. |
Falun,
Dalarna County Falu kommun Sweden |
Korsnäsvägen (60.60407, 15.63553) |
Roundabout Existing |
Other None |
2 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Raindrop shaped. This is a roundabout used for U-turns only, so yield on one entry only (the approach with two lanes of through traffic have to yield to U-turning traffic). |
Falun,
Dalarna County Falu kommun Sweden |
Rödbrorondellen: Korsnäsvägen / Åsgatan (60.60433, 15.63895) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | |
Falun,
Dalarna County Falu kommun Sweden |
Stationsrondellen: Korsnäsvägen / Södra Stationsgatan (60.60472, 15.64298) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2014 | Year Completed estimated (2013-2015). |
Frankfort,
IN Clinton Co. United States |
SR 28 / Banderas Dr. / CR 800 W (40.26283, -86.64985) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Intersection shifted approximately 250 ft east. https://www.facebook.com/FrankfortPoliceDepartment/videos/its-national-roundabout-week-here-is-a-video-of-frankforts-own-roundabout-taken-/1952011948594793/ |
Brandenton,
FL Manatee Co. United States |
SR 64 / Lorraine Rd. / 145th St. E (27.47548, -82.39557) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://www.mysuncoast.com/2025/04/02/state-road-64-lorraine-road-roundabout-opens-early/ |
Cape Breton,
NS Cape Breton Canada |
Rte 4 (Kings Rd.) / Kenwood Dr. / Rose St. (46.11226, -60.21703) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://www.saltwire.com/cape-breton/in-photo-new-cape-breton-roundabout-in-sydney-river-fully-open-to-motorists |
Truro,
NS Colchester Canada |
Rte 2 (Willow St.) / McClures Mill Rd. (45.35399, -63.29396) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.saltwire.com/nova-scotia/truro/truro-drivers-still-working-on-roundabout-learning-curve |
Shelby,
NC Cleveland Co. United States |
NC-150 (Cherryville Rd.) / NC-180 (N Post Rd.) (35.31228, -81.49215) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Left-turn-only lane on northeast leg. Year Completed estimated (2022-2024). |
Shelby,
NC Cleveland Co. United States |
NC-150 (Cherryville Rd.) / Shelby Bypass EB Ramps (35.31324, -81.49081) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2022-2024). |
Shelby,
NC Cleveland Co. United States |
NC-150 (Cherryville Rd.) / Shelby Bypass WB Ramps (35.31432, -81.48908) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2022-2024). |
Evendale,
OH Hamilton Co. United States |
Aviation Way / (parking) (39.25152, -84.44081) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2018 | |
Evendale,
OH Hamilton Co. United States |
Aviation Way / Evendale Dr. (39.24957, -84.44120) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Double left turn on west leg. |
Union,
OH Montgomery Co. United States |
Dog Leg Rd. / Union Airpark Blvd. / Martindale Rd. (39.89519, -84.25501) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Merging right-turn bypass lane on south leg. Yield-controlled right-turn bypass lane on west leg. Designed for future double-left-turn on east leg. https://www.daytondailynews.com/local/new-roundabout-at-union-airpark-blvd-and-dog-leg-road/44be0409-4bf4-4c75-abdd-b5d18f213524/ |
Lakeland,
FL Polk Co. United States |
Polytechnic Circle / Polytechnic Circle (28.14440, -81.84474) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
Left-turn movements designated as through movements. | |
Fort Worth,
TX Tarrant Co. United States |
N Riverside Dr. / Thompson Rd. (32.89078, -97.30703) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Fort Worth,
TX Tarrant Co. United States |
N Riverside Dr. / Summerfields Blvd. (32.88568, -97.30702) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Cockrel Hill,
TX Dallas Co. United States |
W Jefferson Blvd. / S Cockrell Hill Rd. (32.73730, -96.89138) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Replaced split-phased traffic signal. August 2022 - undergoing additional study by Dallas County due to saturated peak hour conditions on NB and SB approaches. Traffic has nearly reached projected 2035 volumes in year 2022, based on study from 2014. |
Chaska,
MN Carver Co. United States |
Big Woods Blvd. / US 212 EB On-Ramp (44.79095, -93.63046) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2020 | Year Completed estimated (2019-2020). |
Odenton,
MD Anne Arundel Co. United States |
Town Center Blvd. / Odenton Landing Way / Odenton Ave. (39.09810, -76.70709) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2018 | Year Completed estimated (2017-2018). |
Otsego,
MN Wright Co. United States |
95th St. NE (CR 39) / Odean Ave. NE (45.28502, -93.59096) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Davidsonville Historic District,
MD Prince George's Co. United States |
Oak Grove Rd. / (parking) (38.87858, -76.77717) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
West End,
MT Yellowstone Co. United States |
Central Ave. / S 38th St. W (45.76969, -108.61240) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | |
West End,
MT Yellowstone Co. United States |
Central Ave. / S 36th St. W (45.76949, -108.60726) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | |
Binghamton,
NY Broome Co. United States |
Upper Front St. / Old Front St. / I-81 SB Ramps (42.12650, -75.90703) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | https://www.wbng.com/2022/08/04/second-roundabout-now-open-rt-11-town-dickinson/ |
Ottawa,
ON Ottawa Canada |
Campeau Dr. / Winterset Rd. (45.30466, -75.92836) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 56.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Southeast leg stubbed. Completed September 2021. |
Southfield,
MI Oakland Co. United States |
Franklin Rd. / W Eleven Mile Rd. (42.48636, -83.29104) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2018). |
Fulshear,
TX Fort Bend Co. United States |
Texas Heritage Pkwy. / (unknown) (29.69670, -95.87960) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Athol,
ID Kootenai Co. United States |
SR 54 / N Good Hope Rd. / N Perimeter Rd. (47.94732, -116.61237) |
Rotary Existing |
Other None |
4 Approaches 0 Driveways 126.4920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
Yield signs on circulatory roadway. Elliptical shaped. ICD = 415 ft x 370 ft. | |
Tulsa,
OK Tulsa Co. United States |
Sage Blvd. / (hospital entrance) / (parking) (36.03334, -95.85593) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2010 | Oval shaped. ICD = 155 ft x 135 ft. |
Magnolia,
TX Montgomery Co. United States |
Magnolia Ridge Blvd. / Jewett Meadow Dr. / Rogerdale River Dr. (30.21121, -95.73470) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Calgary,
AB Division 6 Canada |
Sarcee Trl. SW / Na'a Dr. SW / Trans-Canada Hwy EB Ramps (51.07800, -114.18891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2017 | |
Calgary,
AB Division 6 Canada |
Na'a Dr. SW / Na'a Plaza SW (51.07872, -114.19234) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 58.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | |
Paeonian Springs,
VA Loudoun Co. United States |
Charles Town Pike / SR 7 WB Ramps (39.14190, -77.61205) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2015 | Year Completed estimated (2014-2016). |
Gaithersburg,
MD Montgomery Co. United States |
Perry Pkwy. / (parking) (39.14899, -77.21048) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2004 | Year Completed estimated (2002-2005). |
Red Deer County,
AB Division 8 Canada |
AB Hwy 2A / Airport Dr. / Township Road 372 (52.17205, -113.86197) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | https://www.reddeeradvocate.com/news/red-deer-county-roundabouts-completed/ |
Castle Rock,
CO Douglas Co. United States |
Plum Creek Pkwy. / S Eaton Cir. / Eaton St. (39.36073, -104.83311) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Elliptical shaped. ICD = 145 ft x 115 ft. Year Completed estimated (2020-2021). |
Frederick,
MD Frederick Co. United States |
Jefferson Station Blvd. / Jefferson Commons Way (39.39479, -77.44916) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2015 | Year Completed estimated (2013-2015). |
Elmsford,
NY Westchester Co. United States |
Old Saw Mill River Rd. / Grasslands Rd. (41.07631, -73.81875) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Sioux Falls,
SD Minnehaha Co. United States |
N Granite Ln. / N Granite Ct. (43.60869, -96.76803) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2015 | |
Noblesville,
IN Hamilton Co. United States |
SR 32 (Westfield Rd.) / River Rd. (40.04704, -86.02793) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
https://www.cityofnoblesville.org/topic/subtopic.php?topicid=540&structureid=1 | |
Meridian,
ID Ada Co. United States |
E Lake Hazel Rd. / S Locust Grove Rd. (43.54644, -116.37449) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2021-2022). |
Orange Township,
OH Delaware Co. United States |
E Powell Rd. / Lyra Dr. / Mesloh Dr. (40.15631, -82.97132) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.delgazette.com/news/98988/roundabout-completed-in-orange |
Noblesville,
IN Hamilton Co. United States |
SR 32 (Westfield Rd.) / SR 38 (Sheridan Rd.) / (Riverview Health Center entrance) (40.04704, -86.02480) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.cityofnoblesville.org/topic/subtopic.php?topicid=540&structureid=1 |
Salem,
NH Rockingham Co. United States |
Tuscan Blvd. / S Village Dr. (42.76904, -71.22519) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | In a mixed-use development called Tuscan Village. |
Salem,
NH Rockingham Co. United States |
Tuscan Blvd. / (unknown) (42.77007, -71.22693) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | In a mixed-use development called Tuscan Village. |
Windsor,
CO Larimer Co. United States |
CR 5 / Westgate Dr. / E CR 32 E (40.48667, -104.98201) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2020-2021). |
Windsor,
CO Larimer Co. United States |
CR 5 / Oakmont St. / Oakmont Ln. (40.48214, -104.98213) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2020-2021). |
Rolla,
MO Phelps Co. United States |
US 63 (N Bishop Ave.) / University Dr. (37.95373, -91.77712) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Entrance to Missouri S&T campus. http://moverollatdd.com/university-drive-realignment/ |