City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Williamsburg,
KY Whitley Co. United States |
US 25W / I-75 SB Ramps (36.79318, -84.17100) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Varberg,
Halland County Varberg Sweden |
Värnamovägen / E6-E20 NB Ramps (57.12949, 12.31446) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7190 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Built after 2009 and before July 2016 as shown by Google StreetView. Previous control Yield from ramp and no control on other two approaches. |
Varberg,
Halland County Varberg Sweden |
Värnamovägen / E6-E20 SB Ramps (57.12786, 12.31052) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7190 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Built after 2012 and before 2018 as shown by Google StreetView. Previous control Yield from ramp and no control on other two approaches |
Marengo,
IL McHenry Co. United States |
SR 23 / I-90 WB Ramps (42.17930, -88.61798) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Yield-controlled right turn bypass lane on east leg off freeway exit ramp. Merging right turn bypass lane on south leg onto freeway entrance ramp. |
Marengo,
IL McHenry Co. United States |
SR 23 / I-90 EB Ramps (42.17539, -88.61798) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Yield-controlled right turn bypass lane on east leg off freeway exit ramp. Merging right turn bypass lane on south leg onto freeway entrance ramp. |
Chernogorsk,
Khakassia Chernogorsk Russia |
prospekt Kosmonavtov / M54 (avtodoroga Yenisey) EB Ramps (53.84000, 91.34129) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Lincoln,
NE Lancaster Co. United States |
S 68th St. / NE 2 EB Ramps (40.68931, -96.62932) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.9976 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. |
Whittlesford,
England Cambridgeshire United Kingdom |
A505 / M11 Ramps (52.09854, 0.13804) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Carpinteria,
CA Santa Barbara Co. United States |
Ogan Rd. / Via Real / US 101 NB On-Ramp (34.40144, -119.51551) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | https://www.coastalview.com/news/roadways-open-with-improvements/article_979e3586-c6f1-11ea-bc84-b3d50932177b.html |
Portage la Prairie,
MB Division 9 Canada |
Hwy 1A / Trans Canada Hwy. WB Ramps (49.97435, -98.35997) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://portageonline.com/articles/see-aerial-view-of-west-end-roundabout-now-open https://www.portageonline.com/articles/final-plan-for-west-end-overpass-complete |
Portage la Prairie,
MB Division 9 Canada |
Hwy 1A / Trans Canada Hwy. EB Ramps (49.97330, -98.36839) |
Roundabout Unknown |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Unknown |
https://www.portageonline.com/articles/update-on-west-end-overpass-replacement-construction | |
Indianapolis,
IN Marion Co. United States |
W County Line Rd. / N Bluff Rd. / I-69 (SR 37) NB Ramps (39.63481, -86.20389) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2021-2022). |
Mount Orab,
OH Brown Co. United States |
N High St. / SR 32 EB Ramps (39.04104, -83.92064) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Raindrop shaped. |
Girard,
PA Erie Co. United States |
SR 18 (Meadville Rd.) / I-90 WB Ramps (41.96319, -80.34086) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. https://www.goerie.com/story/news/local/2022/07/15/bridge-and-roundabouts-open-i-90-route-18-girard-platea-interchange-erie-county-pa/65373375007/ |
Girard,
PA Erie Co. United States |
SR 18 (Meadville Rd.) / I-90 EB Ramps (41.96210, -80.34068) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. https://www.goerie.com/story/news/local/2022/07/15/bridge-and-roundabouts-open-i-90-route-18-girard-platea-interchange-erie-county-pa/65373375007/ |
Paeonian Springs,
VA Loudoun Co. United States |
Charles Town Pike / SR 7 WB Ramps (39.14190, -77.61205) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2015 | Year Completed estimated (2014-2016). |
Chaska,
MN Carver Co. United States |
Big Woods Blvd. / US 212 EB On-Ramp (44.79095, -93.63046) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2020 | Year Completed estimated (2019-2020). |
Calgary,
AB Division 6 Canada |
Sarcee Trl. SW / Na'a Dr. SW / Trans-Canada Hwy EB Ramps (51.07800, -114.18891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2017 | |
Waterford,
VA Loudoun Co. United States |
Charles Town Pike / E Colonial Hwy. / Dry Mill Pkwy. / SR 7 EB Ramps (39.14003, -77.61273) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2015 | Combines two stop-controlled intersections. Year Completed estimated (2014-2016). |
East Greenbush,
NY Rensselaer Co. United States |
US 4 (Troy Rd.) / I-90-Rte 9 WB Ramps (42.62923, -73.70059) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | |
Richmond,
VA Richmond City United States |
W Laburnum Ave. / I-195 SB Ramps (37.58383, -77.47494) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Freeway Ramps (Grade-Separated) Single-lane w/ Traversable Central Island |
2020 | Central island made of pre-cast concrete. https://precast.org/2021/08/first-of-its-kind/ |
Cranberry Township,
PA Butler Co. United States |
MSA Dr. / I-79 NB Off-Ramp (40.68440, -80.09193) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | |
Delta,
BC Greater Vancouver Canada |
Nordel Way / Highway 91 Connector EB Ramps / Frontage Rd. (49.14617, -122.94689) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Merging right-turn bypass lane on east leg; add-lane right-turn bypass lane on south leg. |
Beaver Falls,
PA Beaver Co. United States |
College Ave. / 31st St. / Moss Alley (40.77170, -80.32230) |
Other Existing |
All-Way Stop Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
Parking along circulatory roadway. | |
Calgary,
AB Division 6 Canada |
West Valley Rd. SW / 101 St. SW / 1 Ave. SW / Trans-Canada Hwy EB On-Ramp (51.08514, -114.23423) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Calgary,
AB Division 6 Canada |
Valley Ridge Blvd. NW / Trans Canada Hwy EB Ramps (51.08743, -114.24755) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 67.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2022 | |
Lake St Louis,
MO St. Charles Co. United States |
Lake Saint Louis Blvd. / Veteran's Memorial Pkwy. / I-70 EB Ramps (38.80322, -90.77073) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 67.0560 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | |
Bargersville,
IN Johnson Co. United States |
SR 144 / I-69 SB Ramps (39.56591, -86.24760) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2022 | Interchange replaced at-grade signalized intersection. |
Bargersville,
IN Johnson Co. United States |
SR 144 / CR 144 / I-69 NB Ramps (39.56557, -86.24616) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2022 | Interchange replaced at-grade signalized intersection. |
Lincoln,
NE Lancaster Co. United States |
S 68th St. / NE 2 WB Ramps (40.69162, -96.62914) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.9973 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. |
Wasioja Township,
MN Dodge Co. United States |
STH 56 / US 14 EB Ramps (44.03323, -92.91556) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. https://www.dot.state.mn.us/d6/projects/hwy14/index.html |
Wasioja Township,
MN Dodge Co. United States |
STH 56 / US 14 WB Ramps (44.03463, -92.91491) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. https://www.dot.state.mn.us/d6/projects/hwy14/index.html |
Greenwood,
IN Johnson Co. United States |
W Smith Valley Rd. / I-69 NB Ramps (39.60476, -86.21867) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2023 | https://uploads.knightlab.com/storymapjs/a054ad9d809a2e94199b7216d217fa6d/i-69-finish-line-construction-overview-johnson-county-v-0-4/index.html |
Greenwood,
IN Johnson Co. United States |
W Smith Valley Rd. / I-69 SB Ramps (39.60480, -86.22082) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2023 | https://uploads.knightlab.com/storymapjs/a054ad9d809a2e94199b7216d217fa6d/i-69-finish-line-construction-overview-johnson-county-v-0-4/index.html |
West Linn,
OR Clackamas Co. United States |
OR 43 (Willamette Dr.) / I-205 NB Ramps (45.36158, -122.60954) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | https://www.westlinntidings.com/news/new-i-205-roundabout-opens-at-highway-43-in-west-linn/article_27714680-46ce-11ee-a8d4-db795c337eb4.html (image at https://www.flickr.com/photos/oregondot/ ) |
Claremont,
MN Dodge Co. United States |
CR 3 (130th Ave.) / US 14 EB Ramps (44.03664, -92.98574) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. Year Completed estimated (2021-2023). https://www.dot.state.mn.us/d6/projects/hwy14/index.html. |
Claremont,
MN Dodge Co. United States |
CR 3 (130th Ave.) / US 14 WB Ramps (44.03834, -92.98577) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. Year Completed estimated (2021-2023). https://www.dot.state.mn.us/d6/projects/hwy14/index.html. |
Oxford,
MS Lafayette Co. United States |
SR 30 / SR 7 SB Ramps (34.38488, -89.49810) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Raindrop shaped. Series of three roundabouts. |
Athens,
OH Athens Co. United States |
E Stimson Ave. / US 33 Ramps / US 50 Ramps (39.32934, -82.08530) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | The roundabout collects and distributes traffic from multiple ramps in the US 33/US 50/Stimson Avenue interchange. https://www.transportation.ohio.gov/projects/projects/106553 |
Holts Summit,
MO Callaway Co. United States |
MO OO (E Simon Blvd.) / US 54 EB Ramps (38.65479, -92.11091) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. https://www.modot.org/node/29043 |
(unincorporated),
PA Westmoreland Co. United States |
Waltz Mill Rd. / I-70 EB Ramps (40.21090, -79.66617) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Year Completed estimated (2021-2023). |
Wenatchee,
WA Chelan Co. United States |
US 2-US 97 / US 2-US 97 Ramps / Easy St. (47.46942, -120.33556) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | https://www.yoursourceone.com/columbia_basin/us-2-97-and-easy-street-roundabout-in-wenatchee-to-open-this-weekend/article_0804b578-1764-11ee-82ea-bb1c1c03b812.html |
(unincorporated),
GA Columbia Co. United States |
US 221 (Appling Harlem Rd.) / I-20 EB Ramps (33.49596, -82.31523) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Yield-controlled right-turn bypass lanes on south leg. https://www.wfxg.com/story/48383413/applingharlem-road-exit-roundabouts-open-to-traffic. |
(unincorporated),
GA Columbia Co. United States |
US 221 (Appling Harlem Rd.) / I-20 WB Ramps (33.49769, -82.31505) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Yield-controlled right-turn bypass lane on east leg. https://www.wfxg.com/story/48383413/applingharlem-road-exit-roundabouts-open-to-traffic. |
Whiteville,
NC Columbus Co. United States |
US 701 (N J.K. Powell Blvd.) / US 74-US 76 EB Ramps (34.34889, -78.70960) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | |
Whiteville,
NC Columbus Co. United States |
US 701 (N J.K. Powell Blvd.) / US 74-US 76 WB Ramps (34.35100, -78.70967) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | |
Rotterdam,
NY Schenectady Co. United States |
Rte 146 (Carman Rd.) / I-890 SB Ramps (42.76055, -73.94206) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Merging right-turn bypass lane on south leg. https://www.news10.com/news/albany-county/road-work-begins-to-upgrade-route-146-intersections/ |
Gretna,
NE Sarpy Co. United States |
S 180th St. / Camelback Ave. (41.15770, -96.19688) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2022-2023). |
Arcadia,
IN Hamilton Co. United States |
E 236th St. / US 31 SB Ramps (40.13069, -86.12917) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.in.gov/indot/about-indot/central-office/welcome-to-the-greenfield-district/interchange-project-at-us-31-and-236th-street/ |
Cicero,
IN Hamilton Co. United States |
Northbound Ramps / E 236th St. / US 31 NB Ramps (40.13083, -86.12698) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.in.gov/indot/about-indot/central-office/welcome-to-the-greenfield-district/interchange-project-at-us-31-and-236th-street/ |
Ruffs Dale,
PA Westmoreland Co. United States |
SR 3014 (Hunker Rd.) / I-70 WB Ramps (40.21336, -79.66387) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Jackson,
MI Jackson Co. United States |
N Elm Ave. / I-94-US 127 EB Ramps (42.27461, -84.38325) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
Jackson,
MI Jackson Co. United States |
N Elm Ave. / I-94-US 127 WB Entrance Ramp (42.27627, -84.38357) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
(unincorporated),
NC Robeson Co. United States |
Leeper Rd. / I-295 SB Ramps (34.92075, -78.97889) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://abc11.com/nc-fayetteville-outer-loop-i295-new-sections-open/12478490/ |
(unincorporated),
NC Robeson Co. United States |
Leeper Rd. / I-295 NB Ramps (34.92281, -78.97772) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://abc11.com/nc-fayetteville-outer-loop-i295-new-sections-open/12478490/ |
(unincorporated),
NC Cumberland Co. United States |
Old Plank Rd. / I-295 SB Ramps (34.94793, -78.99697) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Yield-controlled right-turn bypass lanes on north and west legs. https://abc11.com/nc-fayetteville-outer-loop-i295-new-sections-open/12478490/ |
(unincorporated),
NC Cumberland Co. United States |
Old Plank Rd. / I-295 NB Ramps (34.94791, -78.99430) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Yield-controlled right-turn bypass lanes on south and east legs. https://abc11.com/nc-fayetteville-outer-loop-i295-new-sections-open/12478490/ |
Burnsville,
MN Dakota Co. United States |
Cliff Rd. W / I-35W SB Ramps (44.78229, -93.29009) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://patch.com/minnesota/burnsville/construction-begins-i-35w-southbound-ramp-improvement-project |
Howard,
WI Brown Co. United States |
CR VV (Marley St.) / STH 29 WB Ramps (44.57753, -88.17131) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://wisconsindot.gov/Pages/projects/by-region/ne/wis29study/schedule.aspx |
Kuching,
Sarawak Bahagian Kuching Malaysia |
Jalan Datuk Tawi Sli (1.52093, 110.33663) |
Rotary Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 200.0000 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
Oval shaped. ICD = 200 m x 160 m. | |
Kuching,
Sarawak Bahagian Kuching Malaysia |
Jalan Tun Razak / Jalan Wan Alwi / Jalan Ridgeway (1.53037, 110.35927) |
Rotary Existing |
All-Way Yield Unknown |
6 Approaches 0 Driveways 230.0000 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
||
Kuching,
Sarawak Bahagian Kuching Malaysia |
Jalan Lapangan Terbang (1.50399, 110.34811) |
Other Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
Vehicular access to central island. | |
Hobart,
WI Brown Co. United States |
CR VV (Marley St.) / STH 29 EB Ramps (44.57594, -88.17273) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://wisconsindot.gov/Pages/projects/by-region/ne/wis29study/schedule.aspx |
Anoka,
MN Anoka Co. United States |
Green Haven Rd. / Jacob Ln. / US 10-US 169 WB Ramps (45.20655, -93.40067) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Anoka,
MN Anoka Co. United States |
W Main St. / US 10-US 169 EB Ramps / Church St. (45.20504, -93.40072) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2022-2023). |
Basingstoke,
England Hants United Kingdom |
A339 / M3 Ramps (51.25793, -1.06507) |
Signalized Roundabout/Circle Existing |
Signal Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
||
Port Coquitlam,
BC Greater Vancouver Canada |
Fremont St. / Fremont Dr. / Hwy 7B (Loogheed Hwy.) Exit Ramp (49.24939, -122.73402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Raindrop shaped. Year Completed estimated (2008-2011). |
Berthoud,
CO Weld Co. United States |
CO 56 / I-25 SB Ramps (40.30636, -104.98169) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2021 | https://www.codot.gov/news/2021/november-2021/co56-i25-reopens-early |
Berthoud,
CO Weld Co. United States |
CO 56 / I-25 NB Ramps (40.30632, -104.97848) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2021 | https://www.codot.gov/news/2021/november-2021/co56-i25-reopens-early |
Platten,
Rhineland-Palatinate Bernkastel-Wittlich Germany |
K56 / B50-E42 Ramps (49.95063, 6.92518) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Wentzville,
MO St. Charles Co. United States |
Prospect Rd. / I-64 EB Exit Ramp (38.79596, -90.82043) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6717 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Interchange replaced single at-grade intersection. Year Completed estimated (2008-2009). |
Wentzville,
MO St. Charles Co. United States |
Prospect Rd. / Corporate Pkwy. / I-64 WB Exit Ramp (38.79597, -90.81810) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Interchange replaced single at-grade intersection. Year Completed estimated (2008-2009). |
O'Fallon,
MO St. Charles Co. United States |
Connecting Rd. / Alta Mira Ct. / MO 364 WB Ramps (38.76954, -90.74393) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | |
Sheffield Cross,
Co Laois Ireland |
N77 / M7 (Portlaoise Bypass) Ramps / L26965 (53.01330, -7.30334) |
Rotary Existing |
Unknown Unknown |
5 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Mauston,
WI Juneau Co. United States |
STH 82 (Gateway Ave.) / I-90-I-94 EB Ramps (43.79649, -90.05800) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. https://www.mauston.com/vertical/Sites/%7BF7711255-419A-434B-BDA9-D1E7B277079F%7D/uploads/221216_I-90-94_and_WIS_82_Winter_Shutdown.pdf |
Mauston,
WI Juneau Co. United States |
STH 82 (Gateway Ave.) / I-90-I-94 WB Ramps (43.79635, -90.05521) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. https://www.mauston.com/vertical/Sites/%7BF7711255-419A-434B-BDA9-D1E7B277079F%7D/uploads/221216_I-90-94_and_WIS_82_Winter_Shutdown.pdf |
Skarmyra,
Gävleborg County Hudiksvalls kommun Sweden |
Rte 84 / E4 SB Ramps (61.71420, 17.04736) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
Raindrop shaped. Completed in 2009 or earlier. | |
Skarmyra,
Gävleborg County Hudiksvalls kommun Sweden |
Rte 84 / E4 NB Ramps (61.71437, 17.05036) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
Raindrop shaped. Completed in 2009 or earlier. | |
Björkmo,
Gävleborg County Hudiksvalls kommun Sweden |
Forsavägen / E4 SB Ramps (61.65449, 17.01670) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Raindrop shaped. |
Björkmo,
Gävleborg County Hudiksvalls kommun Sweden |
Forsavägen / E4 NB Ramps (61.65422, 17.01869) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Raindrop shaped. |
Rossla,
Gävleborg County Hudiksvalls kommun Sweden |
(unknown) / E4 SB Ramps (61.60826, 17.00904) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | |
Rossla,
Gävleborg County Hudiksvalls kommun Sweden |
(unknown) / E4 NB Ramps (61.60874, 17.01314) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | |
Västbo,
Västernorrland County Sundsvall Municipality Sweden |
Cpl Nolby: Tunavägen / E4 SB Ramps (62.29391, 17.34802) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | |
Sundsvall,
Västernorrland County Sundsvall Municipality Sweden |
E14 / E4 Ramps (62.38152, 17.35326) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 91.4400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | |
Vaple,
Västernorrland County Sundsvall Municipality Sweden |
Kemivägen / E4 SB Ramps (62.33946, 17.35021) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Raindrop shaped. Year Completed estimated (2010-2017). |
Stockvik,
Västernorrland County Sundsvall Municipality Sweden |
Kemivägen / E4 NB Ramps (62.33902, 17.35173) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Raindrop shaped. Year Completed estimated (2010-2017). |
Sundsvall,
Västernorrland County Sundsvall Municipality Sweden |
Ortviksvägen / E4 Ramps / Arbetarsvängen (62.39681, 17.33741) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 91.4400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2015 | |
Sundsvall,
Västernorrland County Sundsvall Municipality Sweden |
Cpl Birsta N: Timmervägen / E4 SB Ramps (62.44850, 17.33855) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2017 | Year Completed estimated (2012-2017). |
Sonnarp,
Skåne County Örkelljunga kommun Sweden |
/Rte 24 / E4 Ramps (56.28422, 13.34145) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 106.6800 |
Freeway Ramps (Grade-Separated) Single-Lane |
Elliptical shaped. Completed on or before 2009. | |
Blackeberg,
Halland County Falkenbergs kommun Sweden |
Rte 154 / E6-E20 SB Ramps (56.93033, 12.51433) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 150.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | Yielding right-turn bypass lane on northeast leg. |
Vinbergs kyrkby,
Halland County Falkenbergs kommun Sweden |
Rte 154 / E6-E20 NB Ramps (56.93274, 12.51676) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | Year Completed estimated (2014-2015). |
Allen,
TX Collin Co. United States |
Allen Dr. / US 75-TX 36 (North Central Expressway) SB Frontage Rd. (33.11254, -96.67377) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Right-turn-only lane on west leg. |
Allen,
TX Collin Co. United States |
Allen Dr. / US 75-TX 36 (North Central Expressway) NB Frontage Rd. (33.11162, -96.67259) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2023 | Right-turn-only lane on east leg. No left turn arrows marked on entry. |
Halmstad,
Halland County Halmstads kommun Sweden |
Växjövägen / E6 SB Ramps (56.67370, 12.89606) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2015 | Concentric striped circulatory roadway. |
Halmstad,
Halland County Halmstads kommun Sweden |
Växjövägen / E6 NB Ramps (56.67432, 12.90147) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2009 | Merging right-turn bypass lane on west leg. Concentric striped circulatory roadway. |
Halmstad,
Halland County Halmstads kommun Sweden |
Laholmsvägen / E6 SB Ramps / Gjutaregatan (56.65500, 12.90306) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2020 | Previously a T intersection. Changed to 4 leg roundabout in 2020. Concentric striped circulatory roadway. |
Arlington,
FL Duval Co. United States |
SR 109 (University Blvd. N) / Colcord Ave. / Alt US 90-SR 115 EB Exit Ramp (30.32669, -81.60476) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2014 | Replaced loop ramp in one quadrant of full cloverleaf interchange. |
Halmstad,
Halland County Halmstads kommun Sweden |
Rte 26 (Nissastigen) / E6-E20 NB Ramps (56.71150, 12.89011) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Year Completed estimated (2009-2012). Add-lane right-turn bypass lane on south leg; yielding right-turn bypass lane on west leg. |
Kennewick,
WA Benton Co. United States |
Ridgeline Dr. / US 395 NB Ramps / S Zintel Way (46.17192, -119.19115) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.nbcrightnow.com/news/us-395-and-ridgeline-drive-interchange-near-southridge-now-open/article_f08f07aa-e2e2-11ed-a02e-ab286dbac1ad.html |
Ulvaryd,
Kronoberg County Markaryds kommun Sweden |
Rte 117 / Handelsvägen / E4 NB Ramps (56.44572, 13.60102) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
Completed on or before 2009. |