City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Howard,
WI Brown Co. United States |
Lineville Rd. / E Deerfield Ave. (44.59137, -88.04580) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.9744 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. / US 141 NB Ramps (44.59141, -88.04751) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.8249 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Yield-controlled right-turn bypass lanes on south and east legs. Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. / US 141 SB Ramps (44.59134, -88.04995) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.8250 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Two-lane yield-controlled right-turn bypass lane on north leg; free-flow right-turn bypass lane on west leg. Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Linefield Rd. / W Deerfield Ave. (44.59129, -88.05171) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.1239 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Apple River,
WI Polk Co. United States |
US 8 / STH 46 / 131st Ave. (45.39584, -92.35625) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.6105 |
Other (At-Grade) Single-Lane |
2013 | Yield-controlled right-turn bypass lane on west leg. Free-flow right-turn bypass lane on south leg. Year Completed estimated (2012-2015). ICD estimated from Google Maps linework. |
Grand Chute,
WI Outagamie Co. United States |
Olde Casaloma Dr. / W Converters Dr. / N Victory Dr. (44.28936, -88.47671) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 34.1971 |
Other (At-Grade) Unknown |
2018 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Velp Ave. / Memorial Dr. (44.55604, -88.05792) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.4028 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Velp Ave. / I-41 NB Ramps (44.55664, -88.05906) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.5086 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2016 | Yield-controlled right-turn bypass lane on off-ramp. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Velp Ave. / I-41 SB Ramps (44.55731, -88.06068) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.0611 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2016 | Yield-controlled right-turn bypass lane on off-ramp. Add-lane bypass lane on west leg. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Cardinal Ln. / Howard Commons / (church parking) (44.55810, -88.08480) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 50.2094 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | ICD estimated from Google Maps linework. |
Hales Corners,
WI Milwaukee Co. United States |
STH 24 (W Forest Home Ave.-Janesville Rd.) / W Forest Home Ave. (42.93732, -88.04641) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.0902 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Yorkville,
WI Racine Co. United States |
Washington Ave. / Spring St. (42.72909, -87.96664) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 47.3752 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Bellevue,
WI Brown Co. United States |
Monroe Rd. / Landmark Blvd. (44.45864, -87.98951) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 48.5902 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Monroe Rd. / Ledgeview Rd. / Oak Ridge Cir. (44.42652, -88.02331) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.2642 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Ledgeview,
WI Brown Co. United States |
Heritage Rd. / Monroe Rd. (44.41810, -88.02942) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.3300 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Heritage Rd. / S Broadway St. (44.42806, -88.05654) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.0285 |
Other (At-Grade) Single-Lane |
2013 | Right-turn-only lane on east leg. Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Greenleaf Rd. / Heritage Rd. (44.42854, -88.06892) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2333 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2017). ICD estimated from Google Maps linework. |
Stevens Point,
WI Portage Co. United States |
Division St. / Northpoint Dr. (44.54109, -89.57577) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.9678 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Eau Claire,
WI Eau Claire Co. United States |
CR Q (North Crossing-Olson Dr.) / Black Ave. / Princeton Crossing (44.83396, -91.44714) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.2768 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Lafayette,
WI Chippewa Co. United States |
CTH X / CR J (44.92409, -91.32223) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.8254 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2014). ICD estimated from Google Maps linework. |
Manitowoc,
WI Manitowoc Co. United States |
STH 42 / Maritime Dr. / Waldo Blvd. (44.10825, -87.64308) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.4448 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | Completed November 8, 2019. https://projects.511wi.gov/waldo/full-project-overview/ ICD estimated from Google Maps linework. |
Waunakee,
WI Dane Co. United States |
W Main St. / Century Ave. (43.19206, -89.46181) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.2174 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2014-2018). ICD estimated from Google Maps linework. |
Greenville,
WI Outagamie Co. United States |
CR CB / Greenville Dr. / Wally Way (44.28549, -88.50618) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4894 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Year Completed estimated (2011-2012). ICD estimated from Google Maps linework. |
Troy,
WI St. Croix Co. United States |
Radio Rd. / STH 35 NB Ramps (44.89914, -92.64804) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.2222 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Two-lane yield-controlled right-turn bypass lane on off-ramp. Merging right-turn bypass lane on north leg onto on-ramp. Year Completed estimated (2012-2016). ICD estimated from Google Maps linework. |
River Falls,
WI St. Croix Co. United States |
Radio Rd. / STH 35 SB Ramps (44.89762, -92.64890) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.6854 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Two-lane yield-controlled right-turn bypass lane on off-ramp. Merging right-turn bypass lane oon south leg. Year Completed estimated (2012-2016). ICD estimated from Google Maps linework. |
River Falls,
WI St. Croix Co. United States |
Radio Rd. / Paulson Rd. (44.89510, -92.64967) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.4559 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Fourth (west) leg stubbed. Year Completed estimated (2012-2016). ICD estimated from Google Maps linework. |
Portage,
WI Columbia Co. United States |
W Wisconsin St. (STH 16) / Columbia Dr. (STH 127) / I-39 SB Ramps (43.56023, -89.49496) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.9282 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2018 | https://www.wiscnews.com/portagedailyregister/news/local/dot-nearly-ready-to-open-portage-s-first-roundabout-to/article_bdd0df9d-4e73-52b4-99de-252ab92cf7c8.html#4 ICD estimated from Google Maps linework. |
DeForest,
WI Dane Co. United States |
CR V / US 51 NB Ramps (43.25270, -89.32322) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.0214 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | date: https://www.oesllc.com/portfolio-items/ush-51-expansion-and-interchange-madison-deforest-dane-county-wi/ ICD estimated from Google Maps linework. |
Windsor,
WI Dane Co. United States |
CR V / US 51 SB Ramps (43.25275, -89.32500) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.9732 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | date: https://www.oesllc.com/portfolio-items/ush-51-expansion-and-interchange-madison-deforest-dane-county-wi/ ICD estimated from Google Maps linework. |
DeForest,
WI Dane Co. United States |
CR V (E North St.) / North Towne Rd. / Ball Ct. (43.25277, -89.32677) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.8431 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | date: https://www.oesllc.com/portfolio-items/ush-51-expansion-and-interchange-madison-deforest-dane-county-wi/ ICD estimated from Google Maps linework. |
Windsor,
WI Dane Co. United States |
Windsor Rd. / US 51 NB Ramps (43.21629, -89.32191) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.3902 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2013-2014). Under construction in 2013 per Streetview. ICD estimated from Google Maps linework. |
Windsor,
WI Dane Co. United States |
Windsor Rd. / US 51 SB Ramps (43.21641, -89.32400) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.2973 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2013-2014). ICD estimated from Google Maps linework. |
Windsor,
WI Dane Co. United States |
Windsor Rd. / N Towne Rd. (43.21636, -89.32789) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.9085 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2013-2014). ICD estimated from Google Maps linework. |
Dale,
WI Outagamie Co. United States |
US 45 / STH 96 (Wisconsin Rd.) (44.27234, -88.73946) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 35.0622 |
Other (At-Grade) Single-Lane |
2018 | date: https://www.whby.com/2018/04/15/roundabout-project-to-start-at-hwys-45-96/# ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
Holy Hill Rd. / Appleton Ave. (43.25080, -88.19111) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4466 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2017). ICD estimated from Google Maps linework. |
Turtle Lake,
WI Barron Co. United States |
US 8 / US 63 / Maple St. (45.39994, -92.14205) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.6073 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=45.3742088814016%2C-92.07809042445086&z=12 ICD estimated from Google Maps linework. |
Turtle Lake,
WI Barron Co. United States |
US 8 / Norway St. / Martin Ave. (45.39574, -92.15154) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.4172 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Cylon,
WI St. Croix Co. United States |
US 63 / STH 46 / STH 64 (45.13661, -92.38388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 64.0301 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
St Joseph,
WI St. Croix Co. United States |
CTH E / STH 64 NB Ramps (45.06005, -92.77939) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.3998 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
St Joseph,
WI St. Croix Co. United States |
STH 35 / CR E / STH 64 SB Ramps (45.05953, -92.78237) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.4002 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
St Joseph,
WI St. Croix Co. United States |
STH 35 / Main St. (45.05597, -92.79070) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.4031 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Baldwin,
WI St. Croix Co. United States |
CTH T / I-94 WB Ramps (44.94316, -92.43558) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.7317 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Central island designed for OSOW bypass of freeway. ICD estimated from Google Maps linework. |
Hammond,
WI St. Croix Co. United States |
CTH T / I-94 EB Ramps (44.94155, -92.43564) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.7328 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Central island designed for OSOW bypass of freeway. ICD estimated from Google Maps linework. |
Cady,
WI St. Croix Co. United States |
STH 128 / I-94 WB Ramps (44.93429, -92.19686) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.3472 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Cady,
WI St. Croix Co. United States |
STH 128 / I-94 EB Ramps (44.93265, -92.19704) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.5030 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Keshena,
WI Menominee Co. United States |
STH 47-STH 55 / Standing Pines Dr. (44.85970, -88.62769) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 26.2441 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.859088195652475%2C-88.62733226609475&z=17 ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
CTH C (Shawano Ave.) / CTH FF (Sherwood St.) (44.56660, -88.12972) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.7370 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
CTH FF (Sherwood St.) / STH 29 WB Ramps (44.56134, -88.13042) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.7403 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
CTH FF (Hillcrest Rd.) / STH 29 EB Ramps (44.55969, -88.13035) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.4432 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
CTH FF(Hillcrest Rd.) / Centennial Centre Blvd. / Navajo Trl. (44.55505, -88.13014) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5952 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2012-2015). ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
Centennial Centre Blvd. / Centerline Dr. / Adriana Ct. (44.56730, -88.15748) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.6753 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
N Overland Rd. / Centennial Centre Blvd. (44.56766, -88.16971) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.3942 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2011-2015). Fourth leg added 2018. ICD estimated from Google Maps linework. |
Wrightstown,
WI Brown Co. United States |
STH 96 (High St.) / Turner St. (44.32438, -88.16021) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.5944 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Wrightstown,
WI Brown Co. United States |
Broadway St. / Main St. (44.32745, -88.16800) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 51.2624 |
Other (At-Grade) Single-Lane |
2015 | At-grade rail crossing on north leg. ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / Hyland Ave. (44.29221, -88.26390) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.6150 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / Gertrude St. / Maloney Rd. (44.29752, -88.27006) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0145 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / I-41 NB Ramps (44.29871, -88.27147) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.1587 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / I-41 SB Ramps (44.30008, -88.27294) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.4315 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Fond du Lac,
WI Fond Du Lac Co. United States |
US 45 / US 151 SB Ramps (43.74567, -88.41839) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.0029 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Fond du Lac,
WI Fond Du Lac Co. United States |
US 45 / CTH V / Park Ave. (43.74417, -88.42120) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.6501 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Fond du Lac,
WI Fond Du Lac Co. United States |
US 45-CTH V / US 151 NB Ramps (43.74052, -88.41995) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.6120 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Wilson,
WI Sheboygan Co. United States |
CTH EE (Weeden Creek Rd.) / CTH A (43.70317, -87.76892) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2015 | |
Jackson,
WI Washington Co. United States |
STH 60 / CTH G (Division Rd.) (43.32329, -88.12235) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.0990 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Germantown,
WI Washington Co. United States |
STH 175 (Appleton Ave.) / CTH Y (Lannon Rd.) (43.20619, -88.15727) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.8216 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Germantown,
WI Washington Co. United States |
STH 145 (Fond du Lac Ave.) / Donges Bay Rd. (43.20656, -88.08297) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5624 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Merton,
WI Waukesha Co. United States |
CTH E / CTH VV (43.15625, -88.35119) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.8501 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Oak Creek/Cudahy,
WI Milwaukee Co. United States |
E College Ave. / S Ace Industrial Dr. (42.92994, -87.88328) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.2257 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Yorkville,
WI Racine Co. United States |
US 45 (S Colony Ave.) / Spring St. (42.70407, -88.05189) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.6176 |
Other (At-Grade) Single-Lane |
2017 | Elliptical shape. ICD estimated from Google Maps linework. |
Lake Geneva,
WI Walworth Co. United States |
STH 50 / US 12 WB Ramps (42.59455, -88.40682) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.6181 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Lake Geneva,
WI Walworth Co. United States |
STH 50 / US 12 EB Ramps (42.59368, -88.41081) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.9954 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Fulton,
WI Rock Co. United States |
STH 59 / E Richardson Springs Rd. / N Goede Rd. (42.83490, -89.02549) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.3008 |
Other (At-Grade) Single-Lane |
2016 | Previously had I-39 NB Ramps attached; these have been relocated to new roundabout to the west of this roundabout. ICD estimated from Google Maps linework. |
Fulton,
WI Rock Co. United States |
STH 59 / I-39 NB Ramps (42.83577, -89.02705) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.5420 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Fulton,
WI Rock Co. United States |
STH 59 / I-39 SB Ramps (42.83635, -89.02979) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.4238 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Rutland,
WI Dane Co. United States |
STH 138 / Kettle Park Way (42.91821, -89.25204) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.4812 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | ICD estimated from Google Maps linework. |
Fitchburg,
WI Dane Co. United States |
Williamsburg Way / Anton Dr. (43.02444, -89.47065) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 30.5595 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Dunn's Marsh,
WI Dane Co. United States |
Verona Rd. / W Beltline Frontage Rd. (43.03322, -89.45763) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2852 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Built under a freeway, but no ramps directly to or from that freeway. ICD estimated from Google Maps linework. |
Portland,
WI Monroe Co. United States |
STH 27 / STH 33 (43.74201, -90.79387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2016 | |
Sparta,
WI Monroe Co. United States |
S Black River St. (STH 27) / River Rd. (43.93267, -90.82053) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.4248 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Altoona,
WI Eau Claire Co. United States |
Blue Stem Blvd. / Front Porch Pl. (44.82143, -91.45639) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.8858 |
Other (At-Grade) Single-Lane |
2016 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.820497288186075%2C-91.45543828018646&z=16. ICD estimated from Google Maps linework. |
Altoona,
WI Eau Claire Co. United States |
Meadowlark Ln. / Front Porch Pl. (44.82051, -91.46056) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1222 |
Other (At-Grade) Single-Lane |
2016 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.82028420322557%2C-91.46035208710174&z=16. ICD estimated from Google Maps linework. |
Prescott,
WI Pierce Co. United States |
Dexter St. / Orrin Rd. / (school access) (44.76041, -92.78138) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.4658 |
Other (At-Grade) Single-Lane |
2012 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.7645749168422%2C-92.78835567417138&z=13. ICD estimated from Google Maps linework. |
Hudson,
WI St. Croix Co. United States |
Stageline Rd. / (hospital access) (44.96308, -92.71749) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.8025 |
Other (At-Grade) Single-Lane |
2013 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.963156877300584%2C-92.71910371961587&z=17. ICD estimated from Google Maps linework. |
Weston,
WI Marathon Co. United States |
Ross Ave. / Sandy Ln. (44.91973, -89.55186) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.2108 |
Other (At-Grade) Single-Lane |
2006 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.91908498514172%2C-89.55208415863603&z=15. ICD estimated from Google Maps linework. |
Allouez,
WI Brown Co. United States |
Hoffman Rd. (CTH XX) / Libal St. (44.46042, -88.02819) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2014 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.46040658672803%2C-88.03253203284055&z=15. |
Lawrence,
WI Brown Co. United States |
Lost Dauphin Rd. (CTH D) / Hickory Rd. (44.37573, -88.13582) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2017 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.37572660404294%2C-88.13766541271974&z=17. |
Wrightstown,
WI Brown Co. United States |
County Line Rd. / Golf Course Rd. / Broadway St. / Lock Rd. (44.32815, -88.19128) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.4268 |
Other (At-Grade) Single-Lane |
2015 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.327271862015316%2C-88.1974894025879&z=14 ICD estimated from Google Maps linework. |
Grand Chute,
WI Outagamie Co. United States |
E Edgewood Dr. / N Lightning Dr. (44.31650, -88.36852) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2017 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.31723974656583%2C-88.38383077985048&z=14. |
Neenah,
WI Winnebago Co. United States |
Castle Oak Dr. / Marathon Ave. (44.14932, -88.47024) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.1380 |
Other (At-Grade) Single-Lane |
2016 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.14891305159338%2C-88.47012163076346&z=16. ICD estimated from Google Maps linework. |
Fond du Lac,
WI Fond Du Lac Co. United States |
W Pioneer Rd. / S Military Rd. (43.76131, -88.47064) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.9914 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=43.760977353650404%2C-88.47475648794119&z=15. ICD estimated from Google Maps linework. |
Sturgeon Bay,
WI Door Co. United States |
STH 42 / Michigan St. (44.83499, -87.34712) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.8168 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.829603204967256%2C-87.35688177363386&z=12 ICD estimated from Google Maps linework. |
Menasha,
WI Winnebago Co. United States |
CTH CB / Mutual Way (44.23560, -88.49555) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2018 | Yield-controlled right-turn bypass lane on west leg. |
Greenville,
WI Outagamie Co. United States |
CTH CB / W Atlantis Dr. (44.26708, -88.50676) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | Access to airport. |
Franklin,
WI Milwaukee Co. United States |
S 51st St. / W Drexel Ave. (42.90151, -87.98018) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2019 | |
Pittsfield,
WI Brown Co. United States |
Crest Dr. / Pelican Dr. (44.65696, -88.23054) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2019 | |
Village of Belleview,
WI Brown Co. United States |
STH 29 (Kewaunee Rd.) / S Huron Rd. / Cottage Rd. (44.44412, -87.91760) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.3168 |
Other (At-Grade) Single-Lane |
2019 | ICD estimated from Google Maps linework. |
Sevastopol,
WI Door Co. United States |
STH 4 / STH 57 / Egg Harbor Rd. (44.85354, -87.34650) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1138 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | https://www.greenbaypressgazette.com/story/news/local/door-co/news/2016/06/24/door-countys-first-roundabout-opens/86338626/ ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Oakridge Rd. / CR CB (44.18512, -88.50515) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.2479 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | https://fox11online.com/news/local/new-roundabout-legacy-of-victim-killed-in-town-of-neenah-crash ICD estimated from Google Maps linework. |
Eau Claire,
WI Eau Claire Co. United States |
State St. / Hamiton Ave. (44.78565, -91.49619) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | Opened October 25, 2019. https://www.eauclairewi.gov/our-city/construction-projects/future-projects/state-street |
Eau Claire,
WI Eau Claire Co. United States |
State St. / MacArthur Ave. (44.78927, -91.49616) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | https://www.eauclairewi.gov/our-city/construction-projects/future-projects/state-street |
Eau Claire,
WI Eau Claire Co. United States |
State St. / E Lexington Blvd. (44.79197, -91.49592) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 39.6240 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Merging right-turn bypass lane on east leg. W Lexington Blvd meets State St just south of the roundabout and is controlled by a stop sign. https://www.eauclairewi.gov/our-city/construction-projects/future-projects/state-street |