City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Howard,
WI Brown Co. United States |
Lineville Rd. (CTH M) / Rockwell Ln. (44.59080, -88.08880) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.0674 |
Other (At-Grade) Single-Lane |
1999 | Roundabout is adjacent to Lineville Intermediate School, Middle School, and High School. School did not allow pedestrian crossings prior to roundabout due to unsafe conditions, now allows crossings using crossing guard. Completed October 1999. http://www.co.brown.wi.us/Planning/roundabouts.html Previously controlled by one-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Mason St. (STH 32-STH 54) / S. Taylor St. (44.52414, -88.07916) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4266 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Shawano Ave. (STH 29) / Taylor St. (44.53461, -88.07319) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.3783 |
Other (At-Grade) Multilane (3+ Lane) |
2011 | Opened September 2011. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 NB Ramps (44.52415, -88.08103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.4266 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 SB Ramps (44.52418, -88.08284) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.9811 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 SB Ramps (44.43050, -88.11402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.3880 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | Series of 6 roundabouts. Opened September 2011. |
De Pere,
WI Brown Co. United States |
Grant St. (CTH EE) / Lawrence Dr. (44.44511, -88.09367) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.8430 |
Other (At-Grade) Single-Lane |
2008 | Opened September 30, 2008. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 NB Ramps (44.43074, -88.10989) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2011 | Series of 6 roundabouts. Yield-controlled right-turn bypass lane on south leg; merging right-turn bypass lane on east leg. Opened September 2011. Circular central island. |
Oshkosh,
WI Winnebago Co. United States |
CTH E (Witzel Ave.) / Koeller St. (44.01805, -88.58098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened September 24, 2010. |
Wisconsin Rapids,
WI Wood Co. United States |
STH 54 (2nd Ave.) / Gaynor Ave. / 17th Ave. (44.38025, -89.84447) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.3874 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Opened September 2004. Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Milwaukee,
WI Milwaukee Co. United States |
S. 6th St. / W. Virginia St. / Florida St. (43.02698, -87.91770) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.7816 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2002 | Built as terminal of new bridge. Signal located downstream approximately 150-200 feet away (estimated) that queues back through roundabout during weekday p.m. peak. No lane designations on approach. Functional Class: Arterial ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Glendale Ave. / Hillcrest Heights (44.56551, -88.09801) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9305 |
Other (At-Grade) Single-Lane |
2008 | Opened August 1, 2008. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
CTH E (Witzel Ave.) / Washburn St. (44.01808, -88.58321) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened September 24, 2010. |
West Bend,
WI Washington Co. United States |
Paradise Dr. / CTH G (43.39770, -88.16100) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.5053 |
Other (At-Grade) Single-Lane |
2003 | Completed September 18, 2003 Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Oconomowoc,
WI Waukesha Co. United States |
Wisconsin Ave. / Lake Dr. (43.11224, -88.43968) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.1314 |
Other (At-Grade) Single-Lane |
2002 | Opened October 15, 2002. Previously controlled by one-way stop Functional Class: Local ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
CTH J / US 41 NB Ramps (44.30463, -88.24939) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.6070 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Opened October 11, 2010. ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
CTH J / US 41 SB Ramps (44.30645, -88.24948) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.8965 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Opened October 11, 2010. ICD estimated from Google Maps linework. |
Brookfield,
WI Waukesha Co. United States |
Barker Rd. (CTH Y) / North Ave. (CTH M) (43.06136, -88.16629) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.9042 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Functional Class: Arterial ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Main Ave. / Lawrence Dr. (44.45167, -88.08749) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 37.5127 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Kimberly,
WI Outagamie Co. United States |
S Railroad St. / W Kennedy Ave. (44.26087, -88.33906) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 17.1068 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2011). ICD estimated from Google Maps linework. |
Brown Deer,
WI Milwaukee Co. United States |
N Teutonia Ave. / W Bradley Rd. (43.16315, -87.96311) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 40.9442 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). ICD estimated from Google Maps linework. |
Fitchburg,
WI Dane Co. United States |
Lacy Rd. / Fahey Glen (43.00174, -89.41176) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.4443 |
Other (At-Grade) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Fitchburg,
WI Dane Co. United States |
Woods Hollow Rd / Gunflint Trail / Fontana Ct (43.00927, -89.42246) |
Other Existing |
Uncontrolled Unknown |
3 Approaches 0 Driveways 26.2003 |
Other (At-Grade) Single-Lane |
2002 | No control. Year Completed estimated (2000-2004). ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
CR T / CR Y (44.08259, -88.58346) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.1697 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. / E Deerfield Ave. (44.59137, -88.04580) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.9744 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. / US 141 NB Ramps (44.59141, -88.04751) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.8249 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Yield-controlled right-turn bypass lanes on south and east legs. Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. / US 141 SB Ramps (44.59134, -88.04995) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.8250 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Two-lane yield-controlled right-turn bypass lane on north leg; free-flow right-turn bypass lane on west leg. Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Linefield Rd. / W Deerfield Ave. (44.59129, -88.05171) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.1239 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2014-2015). ICD estimated from Google Maps linework. |
Apple River,
WI Polk Co. United States |
US 8 / STH 46 / 131st Ave. (45.39584, -92.35625) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.6105 |
Other (At-Grade) Single-Lane |
2013 | Yield-controlled right-turn bypass lane on west leg. Free-flow right-turn bypass lane on south leg. Year Completed estimated (2012-2015). ICD estimated from Google Maps linework. |
Grand Chute,
WI Outagamie Co. United States |
Olde Casaloma Dr. / W Converters Dr. / N Victory Dr. (44.28936, -88.47671) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 34.1971 |
Other (At-Grade) Unknown |
2018 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Velp Ave. / Memorial Dr. (44.55604, -88.05792) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.4028 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Velp Ave. / I-41 NB Ramps (44.55664, -88.05906) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.5086 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2016 | Yield-controlled right-turn bypass lane on off-ramp. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Velp Ave. / I-41 SB Ramps (44.55731, -88.06068) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.0611 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2016 | Yield-controlled right-turn bypass lane on off-ramp. Add-lane bypass lane on west leg. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Cardinal Ln. / Howard Commons / (church parking) (44.55810, -88.08480) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 50.2094 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | ICD estimated from Google Maps linework. |
Hales Corners,
WI Milwaukee Co. United States |
STH 24 (W Forest Home Ave.-Janesville Rd.) / W Forest Home Ave. (42.93732, -88.04641) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.0902 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Yorkville,
WI Racine Co. United States |
Washington Ave. / Spring St. (42.72909, -87.96664) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 47.3752 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Bellevue,
WI Brown Co. United States |
Monroe Rd. / Landmark Blvd. (44.45864, -87.98951) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 48.5902 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Monroe Rd. / Ledgeview Rd. / Oak Ridge Cir. (44.42652, -88.02331) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.2642 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Ledgeview,
WI Brown Co. United States |
Heritage Rd. / Monroe Rd. (44.41810, -88.02942) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.3300 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Heritage Rd. / S Broadway St. (44.42806, -88.05654) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.0285 |
Other (At-Grade) Single-Lane |
2013 | Right-turn-only lane on east leg. Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Greenleaf Rd. / Heritage Rd. (44.42854, -88.06892) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2333 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2017). ICD estimated from Google Maps linework. |
Stevens Point,
WI Portage Co. United States |
Division St. / Northpoint Dr. (44.54109, -89.57577) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.9678 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Eau Claire,
WI Eau Claire Co. United States |
CR Q (North Crossing-Olson Dr.) / Black Ave. / Princeton Crossing (44.83396, -91.44714) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.2768 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Lafayette,
WI Chippewa Co. United States |
CTH X / CR J (44.92409, -91.32223) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.8254 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2014). ICD estimated from Google Maps linework. |
Manitowoc,
WI Manitowoc Co. United States |
STH 42 / Maritime Dr. / Waldo Blvd. (44.10825, -87.64308) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.4448 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | Completed November 8, 2019. https://projects.511wi.gov/waldo/full-project-overview/ ICD estimated from Google Maps linework. |
Waunakee,
WI Dane Co. United States |
W Main St. / Century Ave. (43.19206, -89.46181) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.2174 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2014-2018). ICD estimated from Google Maps linework. |
Greenville,
WI Outagamie Co. United States |
CR CB / Greenville Dr. / Wally Way (44.28549, -88.50618) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4894 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Year Completed estimated (2011-2012). ICD estimated from Google Maps linework. |
Troy,
WI St. Croix Co. United States |
Radio Rd. / STH 35 NB Ramps (44.89914, -92.64804) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.2222 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Two-lane yield-controlled right-turn bypass lane on off-ramp. Merging right-turn bypass lane on north leg onto on-ramp. Year Completed estimated (2012-2016). ICD estimated from Google Maps linework. |
River Falls,
WI St. Croix Co. United States |
Radio Rd. / STH 35 SB Ramps (44.89762, -92.64890) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.6854 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Two-lane yield-controlled right-turn bypass lane on off-ramp. Merging right-turn bypass lane oon south leg. Year Completed estimated (2012-2016). ICD estimated from Google Maps linework. |
River Falls,
WI St. Croix Co. United States |
Radio Rd. / Paulson Rd. (44.89510, -92.64967) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.4559 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Fourth (west) leg stubbed. Year Completed estimated (2012-2016). ICD estimated from Google Maps linework. |
Portage,
WI Columbia Co. United States |
W Wisconsin St. (STH 16) / Columbia Dr. (STH 127) / I-39 SB Ramps (43.56023, -89.49496) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.9282 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2018 | https://www.wiscnews.com/portagedailyregister/news/local/dot-nearly-ready-to-open-portage-s-first-roundabout-to/article_bdd0df9d-4e73-52b4-99de-252ab92cf7c8.html#4 ICD estimated from Google Maps linework. |
DeForest,
WI Dane Co. United States |
CR V / US 51 NB Ramps (43.25270, -89.32322) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.0214 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | date: https://www.oesllc.com/portfolio-items/ush-51-expansion-and-interchange-madison-deforest-dane-county-wi/ ICD estimated from Google Maps linework. |
Windsor,
WI Dane Co. United States |
CR V / US 51 SB Ramps (43.25275, -89.32500) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.9732 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | date: https://www.oesllc.com/portfolio-items/ush-51-expansion-and-interchange-madison-deforest-dane-county-wi/ ICD estimated from Google Maps linework. |
DeForest,
WI Dane Co. United States |
CR V (E North St.) / North Towne Rd. / Ball Ct. (43.25277, -89.32677) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.8431 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | date: https://www.oesllc.com/portfolio-items/ush-51-expansion-and-interchange-madison-deforest-dane-county-wi/ ICD estimated from Google Maps linework. |
Windsor,
WI Dane Co. United States |
Windsor Rd. / US 51 NB Ramps (43.21629, -89.32191) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.3902 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2013-2014). Under construction in 2013 per Streetview. ICD estimated from Google Maps linework. |
Windsor,
WI Dane Co. United States |
Windsor Rd. / US 51 SB Ramps (43.21641, -89.32400) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.2973 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2013-2014). ICD estimated from Google Maps linework. |
Windsor,
WI Dane Co. United States |
Windsor Rd. / N Towne Rd. (43.21636, -89.32789) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.9085 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Year Completed estimated (2013-2014). ICD estimated from Google Maps linework. |
Dale,
WI Outagamie Co. United States |
US 45 / STH 96 (Wisconsin Rd.) (44.27234, -88.73946) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 35.0622 |
Other (At-Grade) Single-Lane |
2018 | date: https://www.whby.com/2018/04/15/roundabout-project-to-start-at-hwys-45-96/# ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
Holy Hill Rd. / Appleton Ave. (43.25080, -88.19111) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4466 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2017). ICD estimated from Google Maps linework. |
Turtle Lake,
WI Barron Co. United States |
US 8 / US 63 / Maple St. (45.39994, -92.14205) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.6073 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=45.3742088814016%2C-92.07809042445086&z=12 ICD estimated from Google Maps linework. |
Turtle Lake,
WI Barron Co. United States |
US 8 / Norway St. / Martin Ave. (45.39574, -92.15154) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.4172 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Cylon,
WI St. Croix Co. United States |
US 63 / STH 46 / STH 64 (45.13661, -92.38388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 64.0301 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
St Joseph,
WI St. Croix Co. United States |
CTH E / STH 64 NB Ramps (45.06005, -92.77939) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.3998 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
St Joseph,
WI St. Croix Co. United States |
STH 35 / CR E / STH 64 SB Ramps (45.05953, -92.78237) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.4002 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
St Joseph,
WI St. Croix Co. United States |
STH 35 / Main St. (45.05597, -92.79070) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.4031 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Baldwin,
WI St. Croix Co. United States |
CTH T / I-94 WB Ramps (44.94316, -92.43558) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.7317 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Central island designed for OSOW bypass of freeway. ICD estimated from Google Maps linework. |
Hammond,
WI St. Croix Co. United States |
CTH T / I-94 EB Ramps (44.94155, -92.43564) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.7328 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Central island designed for OSOW bypass of freeway. ICD estimated from Google Maps linework. |
Cady,
WI St. Croix Co. United States |
STH 128 / I-94 WB Ramps (44.93429, -92.19686) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.3472 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Cady,
WI St. Croix Co. United States |
STH 128 / I-94 EB Ramps (44.93265, -92.19704) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.5030 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Keshena,
WI Menominee Co. United States |
STH 47-STH 55 / Standing Pines Dr. (44.85970, -88.62769) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 26.2441 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.859088195652475%2C-88.62733226609475&z=17 ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
CTH C (Shawano Ave.) / CTH FF (Sherwood St.) (44.56660, -88.12972) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.7370 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
CTH FF (Sherwood St.) / STH 29 WB Ramps (44.56134, -88.13042) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.7403 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
CTH FF (Hillcrest Rd.) / STH 29 EB Ramps (44.55969, -88.13035) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.4432 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
CTH FF(Hillcrest Rd.) / Centennial Centre Blvd. / Navajo Trl. (44.55505, -88.13014) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5952 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2012-2015). ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
Centennial Centre Blvd. / Centerline Dr. / Adriana Ct. (44.56730, -88.15748) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.6753 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
N Overland Rd. / Centennial Centre Blvd. (44.56766, -88.16971) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.3942 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2011-2015). Fourth leg added 2018. ICD estimated from Google Maps linework. |
Wrightstown,
WI Brown Co. United States |
STH 96 (High St.) / Turner St. (44.32438, -88.16021) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.5944 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Wrightstown,
WI Brown Co. United States |
Broadway St. / Main St. (44.32745, -88.16800) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 51.2624 |
Other (At-Grade) Single-Lane |
2015 | At-grade rail crossing on north leg. ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / Hyland Ave. (44.29221, -88.26390) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.6150 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / Gertrude St. / Maloney Rd. (44.29752, -88.27006) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0145 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / I-41 NB Ramps (44.29871, -88.27147) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.1587 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / I-41 SB Ramps (44.30008, -88.27294) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.4315 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Fond du Lac,
WI Fond Du Lac Co. United States |
US 45 / US 151 SB Ramps (43.74567, -88.41839) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.0029 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Fond du Lac,
WI Fond Du Lac Co. United States |
US 45 / CTH V / Park Ave. (43.74417, -88.42120) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.6501 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Fond du Lac,
WI Fond Du Lac Co. United States |
US 45-CTH V / US 151 NB Ramps (43.74052, -88.41995) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.6120 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Wilson,
WI Sheboygan Co. United States |
CTH EE (Weeden Creek Rd.) / CTH A (43.70317, -87.76892) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2015 | |
Jackson,
WI Washington Co. United States |
STH 60 / CTH G (Division Rd.) (43.32329, -88.12235) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.0990 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Germantown,
WI Washington Co. United States |
STH 175 (Appleton Ave.) / CTH Y (Lannon Rd.) (43.20619, -88.15727) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.8216 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Germantown,
WI Washington Co. United States |
STH 145 (Fond du Lac Ave.) / Donges Bay Rd. (43.20656, -88.08297) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5624 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Merton,
WI Waukesha Co. United States |
CTH E / CTH VV (43.15625, -88.35119) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.8501 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Oak Creek/Cudahy,
WI Milwaukee Co. United States |
E College Ave. / S Ace Industrial Dr. (42.92994, -87.88328) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.2257 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Yorkville,
WI Racine Co. United States |
US 45 (S Colony Ave.) / Spring St. (42.70407, -88.05189) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.6176 |
Other (At-Grade) Single-Lane |
2017 | Elliptical shape. ICD estimated from Google Maps linework. |
Lake Geneva,
WI Walworth Co. United States |
STH 50 / US 12 WB Ramps (42.59455, -88.40682) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.6181 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Lake Geneva,
WI Walworth Co. United States |
STH 50 / US 12 EB Ramps (42.59368, -88.41081) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.9954 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Fulton,
WI Rock Co. United States |
STH 59 / E Richardson Springs Rd. / N Goede Rd. (42.83490, -89.02549) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.3008 |
Other (At-Grade) Single-Lane |
2016 | Previously had I-39 NB Ramps attached; these have been relocated to new roundabout to the west of this roundabout. ICD estimated from Google Maps linework. |
Fulton,
WI Rock Co. United States |
STH 59 / I-39 NB Ramps (42.83577, -89.02705) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.5420 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Fulton,
WI Rock Co. United States |
STH 59 / I-39 SB Ramps (42.83635, -89.02979) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.4238 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Rutland,
WI Dane Co. United States |
STH 138 / Kettle Park Way (42.91821, -89.25204) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.4812 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | ICD estimated from Google Maps linework. |
Fitchburg,
WI Dane Co. United States |
Williamsburg Way / Anton Dr. (43.02444, -89.47065) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 30.5595 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Dunn's Marsh,
WI Dane Co. United States |
Verona Rd. / W Beltline Frontage Rd. (43.03322, -89.45763) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2852 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Built under a freeway, but no ramps directly to or from that freeway. ICD estimated from Google Maps linework. |