City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Oakton,
VA Fairfax Co. United States |
Saintsbury Dr. / (transit center parking lot) (38.87667, -77.26993) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2013 | Serves Metro station. Right-turn-only lanes on east and west legs. South leg stubbed. Year Completed estimated (2012-2014). |
Lacey,
WA Thurston Co. United States |
(unknown) / (unknown) (47.04571, -122.76216) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2007 | Serves Lacey Regional Athletic Center. July 2007. |
Martell,
CA Amador Co. United States |
Industry Dr. / (parking lot access) (38.36968, -120.80150) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.5824 |
Other (At-Grade) Single-Lane |
2006 | Serves industrial park. ICD estimated from Google Maps linework. |
Avon,
CO Eagle Co. United States |
William J Post Blvd. / Fawcett Rd. (39.62907, -106.50190) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.7944 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2003 | Serves Home Depot and Walmart retail center. Functional Class: Arterial ICD estimated from Google Maps linework. |
Pinebrook,
UT Summit Co. United States |
Kilby Rd. / (parking) (40.73918, -111.56018) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2018 | Serves Ecker Hill International Middle School. East leg added with roundaobut. |
Pinebrook,
UT Summit Co. United States |
Kilby Rd. / (parking) (40.74010, -111.56068) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2018 | Serves Ecker Hill International Middle School. |
Wilkes-Barre,
PA Luzerne Co. United States |
South Valley Pkwy. / (parking) (41.19624, -75.97224) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Serves distribution center with truck traffic. Year Completed estimated (2019-2022). |
Spokane,
WA Spokane Co. United States |
N Access Rd. / (parking) (47.76485, -117.38118) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2018 | Serves Costco. |
Superior,
CO Boulder Co. United States |
5th Ave. / Center Dr. (39.95764, -105.17190) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.1262 |
Other (At-Grade) Single-Lane |
1999 | Serves Costco and Target as part of 750,000 square foot shopping center. Functional Class: Local ICD estimated from Google Maps linework. |
Broomfield,
CO Adams Co. United States |
Zang St. / (parking lot #1) (39.92782, -105.13320) |
Roundabout Existing |
Unknown Unknown |
4 Approaches 0 Driveways 36.6350 |
Other (At-Grade) Single-Lane |
2001 | Serves commercial development. ICD estimated from Google Maps linework. |
Broomfield,
CO Adams Co. United States |
Zang St. / (parking lot #2) (39.92641, -105.13170) |
Roundabout Existing |
Unknown Unknown |
4 Approaches 0 Driveways 35.7199 |
Other (At-Grade) Single-Lane |
2001 | Serves commercial development. ICD estimated from Google Maps linework. |
Grand Junction,
CO Mesa Co. United States |
Independent Ave. / Sams Club entrance (39.08170, -108.58310) |
Roundabout Existing |
Unknown Unknown |
3 Approaches 0 Driveways 33.3754 |
Other (At-Grade) Single-Lane |
2003 | Serves commercial development parking lot. ICD estimated from Google Maps linework. |
Bradenton,
FL Manatee Co. United States |
Lighthouse Dr. / (parking) (27.49371, -82.46907) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2019 | Serves big box retail store. Edge line extension across exits. |
De Land,
FL Volusia Co. United States |
S Woodland Blvd (US 17-92) / Haven St. / (retail driveway) (29.01198, -81.30282) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 1 Driveways 49.0897 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | Serves as main entrance to Walmart neighborhood center. No pedestrian connections beyond roundabout into site. Driveway for mobile home park directly into roundabout. ICD estimated from Google Maps linework. |
Richmond,
VA Henrico Co. United States |
N. Lombardy St. / School Rd. / Admiral St. (37.55981, -77.45100) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.5627 |
Other (At-Grade) Single-Lane |
2005 | Serves as entrance to Virgina Union University. ICD estimated from Google Maps linework. |
Hollymead,
VA Albemarle Co. United States |
Rte. 649 / Rte. 606 / Airport Rd. (38.13692, -78.44793) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.3634 |
Other (At-Grade) Single-Lane |
2005 | Serves as entrance to airport. Previously controlled by all-way stop ICD estimated from Google Maps linework. |
Redding,
CA Shasta Co. United States |
S Bonnyview Rd. / Bechelli Ln. (40.53910, -122.35470) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Serves as a primary intersection for a Costco store. https://krcrtv.com/news/local/south-bonnyview-and-bechelli-lane-roadabout-update |
Jacksonville,
FL Jacksonville Co. United States |
Touchton Rd. / (parking) (30.26961, -81.56347) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2010 | Serves apartment complex. |
Grand Forks,
ND Grand Forks Co. United States |
Airport Dr. / Airport Dr. (47.94149, -97.17424) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4026 |
Other (At-Grade) Single-Lane |
2011 | Serves airport. ICD estimated from Google Maps linework. |
North Pole,
AK Fairbanks North Star United States |
Santa Claus Ln. / Park Way (64.75673, -147.35280) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.6162 |
Other (At-Grade) Single-Lane |
2007 | Series of three roundabouts. Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
North Pole,
AK Fairbanks North Star United States |
Badger Rd. / Richardson Hwy EB Ramps / Santa Claus Ln. (64.75820, -147.35170) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.5771 |
Freeway Ramps (Grade-Separated) Single-Lane |
2007 | Series of three roundabouts. Previously controlled by one-way stop ICD estimated from Google Maps linework. |
North Pole,
AK Fairbanks North Star United States |
Badger Rd. / Richardson Hwy WB Ramps (64.75903, -147.35120) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.5390 |
Freeway Ramps (Grade-Separated) Single-Lane |
2007 | Series of three roundabouts. Raindrop-shaped central island. ICD estimated from Google Maps linework. |
Prairie du Chien,
WI Crawford Co. United States |
S Marquette Rd. / E Blackhawk Ave. (43.05193, -91.14100) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 40.1459 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Series of three roundabouts. Nearby at-grade rail crossing. ICD estimated from Google Maps linework. |
Prairie du Chien,
WI Crawford Co. United States |
S Marquette Rd. / E Wisconsin St. (43.05037, -91.14098) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 33.1649 |
Other (At-Grade) Single-Lane |
2014 | Series of three roundabouts. Nearby at-grade rail crossing. ICD estimated from Google Maps linework. |
Prairie du Chien,
WI Crawford Co. United States |
S Marquette Rd. / E Iowa St. (43.04911, -91.14094) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 41.8934 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Series of three roundabouts. Nearby at-grade rail crossing. ICD estimated from Google Maps linework. |
Kansas City,
MO Clay Co. United States |
NW 108th St. / N Summit St. (39.28953, -94.58976) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.6717 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Series of three roundabouts. ICD estimated from Google Maps linework. |
Oxnard,
CA Ventura Co. United States |
Forest Park Blvd. / N Ventura Rd. (34.24629, -119.17948) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.3886 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of three roundabouts. ICD estimated from Google Maps linework. |
Oxnard,
CA Ventura Co. United States |
Forest Park Blvd. / N Oxnard Blvd. (34.24458, -119.17711) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.4023 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of three roundabouts. ICD estimated from Google Maps linework. |
Oxnard,
CA Ventura Co. United States |
Forest Park Blvd. / Moonlight Park Ave. (34.24280, -119.17467) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.4287 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of three roundabouts. ICD estimated from Google Maps linework. |
Oxford,
MS Lafayette Co. United States |
SR 30 / Park Dr. (34.38524, -89.49947) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Series of three roundabouts. |
Oxford,
MS Lafayette Co. United States |
SR 30 / Ferndale Blvd. (34.38595, -89.50223) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Series of three roundabouts. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Perimeter St. (43.01009, -89.72186) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.5667 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Brookwood Dr. (43.00978, -89.71380) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.8068 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Telmark Pkwy. (43.00933, -89.71098) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.6540 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Ridgeview Rd. / Lillehammer Ln. (43.00663, -89.70390) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.4418 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / STH 78 / STH 92 (43.01007, -89.73044) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.9333 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / Monad Rd. (45.76236, -108.61760) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.6596 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 8 roundabouts. Previously controlled by two-way stop Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / Zoo Dr. (45.73609, -108.61740) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.6799 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 8 roundabouts. Previously controlled by two-way stop Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / Hesper Rd. (45.74060, -108.61740) |
Roundabout Existing |
Unknown Unknown |
4 Approaches 0 Driveways 43.3436 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 8 roundabouts. Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / King Ave. (45.75507, -108.61760) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 58.3321 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 8 roundabouts. Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / Broadwater Ave. (45.77685, -108.61760) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.9815 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 8 roundabouts. Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / Central Ave. (45.76963, -108.61760) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3183 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 8 roundabouts. Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / (Local Access) (45.74776, -108.61750) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 37.5041 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 8 roundabouts. Main access to construction materials facility (600+ trucks per day). Previously controlled by two-way stop Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
Billings,
MT Yellowstone Co. United States |
Shiloh Rd. / Grand Ave. (45.78407, -108.61760) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.1455 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 8 roundabouts. Fatal crash 2012. 11861-05. Functional Class: Principal Arterial ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 NB Ramps (44.43074, -88.10989) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2011 | Series of 6 roundabouts. Yield-controlled right-turn bypass lane on south leg; merging right-turn bypass lane on east leg. Opened September 2011. Circular central island. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 SB Ramps (44.43050, -88.11402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.3880 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | Series of 6 roundabouts. Opened September 2011. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / PDQ Dr. / Mid Valley Dr. (44.43032, -88.11939) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.9379 |
Other (At-Grade) Single-Lane |
2010 | Series of 6 roundabouts. Opened November 22, 2010. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / Lawrence Dr. (44.43083, -88.10675) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.7605 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 6 roundabouts. Opened November 2, 2010. ICD estimated from Google Maps linework. |
Cottonwood,
AZ Yavapai Co. United States |
AZ 89A / Avenida Centerville (34.75854, -112.05880) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0983 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 5 roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Cottonwood,
AZ Yavapai Co. United States |
AZ 89A / Groseta Ranch Rd. (34.74706, -112.04510) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.1235 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 5 roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Cottonwood,
AZ Yavapai Co. United States |
AZ 89A / Lisa St. / Lincoln Dr. (34.75449, -112.05400) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0444 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 5 roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Clarkdale,
AZ Yavapai Co. United States |
AZ 89A / Cement Plant Rd. / Clarkdale Pkwy. (34.76220, -112.06416) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Series of 5 roundabouts. Yield-controlled right-turn bypass lane on east leg. Year Completed estimated (2007-2009). |
San Diego,
CA San Diego Co. United States |
La Jolla Blvd. / Forward St. (32.81379, -117.26950) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 22.0827 |
Other (At-Grade) Single-Lane |
2008 | Series of 5 roundabouts. ICD estimated from Google Maps linework. |
San Diego,
CA San Diego Co. United States |
La Jolla Blvd. / Bird Rock Ave. (32.81559, -117.27060) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 21.0785 |
Other (At-Grade) Single-Lane |
2008 | Series of 5 roundabouts. ICD estimated from Google Maps linework. |
San Diego,
CA San Diego Co. United States |
La Jolla Blvd. / Camino de la Costa (32.81756, -117.27190) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 23.0854 |
Other (At-Grade) Single-Lane |
2008 | Series of 5 roundabouts. ICD estimated from Google Maps linework. |
Lenexa,
KS Johnson Co. United States |
Clare Rd. / 86th Terr. (38.97160, -94.87243) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.0706 |
Other (At-Grade) Single-Lane |
2010 | Series of 5 roundabouts. ICD estimated from Google Maps linework. |
Lenexa,
KS Johnson Co. United States |
Clare Rd. / 89th Terr. (38.96470, -94.87216) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 26.0017 |
Other (At-Grade) Single-Lane |
2010 | Series of 5 roundabouts. ICD estimated from Google Maps linework. |
Lenexa,
KS Johnson Co. United States |
Clare Rd. / 92nd St. (38.96217, -94.87213) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.0739 |
Other (At-Grade) Single-Lane |
2010 | Series of 5 roundabouts. ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / Cabela Way (43.28377, -88.18944) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.9939 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. Functional Class: Arterial ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / US 45 SB Ramps (43.28387, -88.18716) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.5606 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / US 45 NB Ramps (43.28380, -88.18485) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4301 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / US 41 SB Ramps (43.28170, -88.19557) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.3868 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / US 41 NB Ramps (43.28247, -88.19345) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.7780 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Lenexa,
KS Johnson Co. United States |
Clare Rd. / 88th Terr. (38.96687, -94.87220) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2010 | Series of 5 roundabouts. |
Cottonwood,
AZ Yavapai Co. United States |
AZ 89A / Verde Heights Dr. (34.73999, -112.03740) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2009 | Series of 5 roundabouts. |
Scaggsville,
MD Howard Co. United States |
MD 216 / Maple Lawn Blvd. (39.14710, -76.90723) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.7543 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2005 | Series of 4 roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Scaggsville,
MD Howard Co. United States |
MD 216 / Westside Blvd. (39.14796, -76.90977) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.6801 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 4 roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Irondequoit,
NY Monroe Co. United States |
Rte 590 / Titus Ave. (43.21195, -77.54978) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.3001 |
Other (At-Grade) Single-Lane |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Irondequoit,
NY Monroe Co. United States |
Rte 590 / Seneca Rd. (43.21642, -77.54655) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.2973 |
Other (At-Grade) Single-Lane |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Irondequoit,
NY Monroe Co. United States |
Rte 590 / Point Pleasant Rd. (43.22389, -77.54493) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.2926 |
Other (At-Grade) Single-Lane |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Irondequoit,
NY Monroe Co. United States |
Rte 590 / Durand Blvd. (43.22728, -77.54431) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5500 |
Other (At-Grade) Single-Lane |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Scaggsville,
MD Howard Co. United States |
MD 216 / US 29 SB Ramps (39.14562, -76.90418) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.7228 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2001 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Scaggsville,
MD Howard Co. United States |
MD 216 / US 29 NB Ramps / Ice Crystal Dr. (39.14476, -76.89799) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.7234 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2001 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / Moon Rd. / Giebel Ct. (43.56057, -89.78316) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.8114 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / Timothy Ln. (43.55597, -89.77811) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 39.8145 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 EB Ramps (43.55774, -89.77940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.6788 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 WB Ramps (43.55867, -89.78077) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5437 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Westfield,
IN Hamilton Co. United States |
E 161st St. / Far Hills Dr. (40.02170, -86.13441) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2013 | Series of 3 roundabouts. Painted spirals next to central island. |
Green Bay,
WI Brown Co. United States |
Mason St. (STH 32-STH 54) / S. Taylor St. (44.52414, -88.07916) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4266 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 SB Ramps (44.52418, -88.08284) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.9811 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 NB Ramps (44.52415, -88.08103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.4266 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 EB Ramps (42.95128, -89.37859) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7217 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 WB Ramps (42.95272, -89.37769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9591 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / CTH M (42.94950, -89.37981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9613 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Cottage Grove,
WI Dane Co. United States |
CTH N / CTH TT (43.11198, -89.19907) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.2597 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Cottage Grove,
WI Dane Co. United States |
CTH N / I-94 WB Ramps (43.11037, -89.19930) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.6200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Cottage Grove,
WI Dane Co. United States |
CTH N / I-94 EB Ramps (43.10877, -89.19923) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.3649 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Minneapolis,
MN Hennepin Co. United States |
W 70th St. / (west parking entrance) (44.87635, -93.32676) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.2365 |
Other (At-Grade) Single-Lane |
2007 | Series of 3 roundabouts as part of road diet. ICD estimated from Google Maps linework. |
Minneapolis,
MN Hennepin Co. United States |
W 70th St. / (central parking entrance) (44.87637, -93.32523) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.7755 |
Other (At-Grade) Single-Lane |
2007 | Series of 3 roundabouts as part of road diet. ICD estimated from Google Maps linework. |
Minneapolis,
MN Hennepin Co. United States |
W 70th St. / (east parking entrance) (44.87636, -93.32317) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.2365 |
Other (At-Grade) Single-Lane |
2007 | Series of 3 roundabouts as part of road diet. ICD estimated from Google Maps linework. |
Bloomington,
IN Monroe Co. United States |
W Woodyard Rd. / N Curry Pike / W Hunter Valley Rd. (39.19027, -86.58242) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3877 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Series of 2 roundabouts. Striped out spiral in circulatory roadway. https://www.heraldtimesonline.com/story/news/traffic/2022/03/03/work-2-6-m-double-roundabout-bloomington-start-next-week/9332294002/ |
Edina,
MN Hennepin Co. United States |
Eden Ave. / Wilson Rd. / Dale Dr. (44.91042, -93.34835) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 25.9080 |
Other (At-Grade) Single-Lane |
2023 | Series of 2 roundabouts. Roundabout located 75 feet from roundabout to the west. |
Edina,
MN Hennepin Co. United States |
Eden Ave. / Grange Rd. (44.91059, -93.34897) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2023 | Series of 2 roundabouts. Roundabout located 75 feet from roundabout to the east. |
Bloomington,
IN Monroe Co. United States |
W Woodyard Rd. / N Smith Pike (39.19089, -86.58340) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2022 | Series of 2 roundabouts. |
Blaine,
WA Whatcom Co. United States |
SR 548 (Grandview Rd.) / Blaine Rd. / (parking) (48.89206, -122.72655) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2010 | September 2010. Merging right-turn bypass lane on south leg. Right-turn-oinly lane on north leg. |
Bremerton,
WA Kitsap Co. United States |
Cross SKIA Connector / Harry Earl Rd. (47.50340, -122.75060) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.2730 |
Other (At-Grade) Single-Lane |
2010 | September 2010. ICD estimated from Google Maps linework. |
Tumwater,
WA Thurston Co. United States |
Littlerock Rd. SW / Kingswood Dr. SW (46.99435, -122.92190) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2010 | September 2010. |
Deer Park,
WA Spokane Co. United States |
E Crawford Ave. / Weber Rd. (47.95444, -117.45384) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2009 | September 2009. |
Covington,
WA King Co. United States |
SE Wax Rd. / 180th Ave. SE / SE 267th Pl. (47.36216, -122.10200) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 53.3935 |
Other (At-Grade) Single-Lane |
2008 | September 2008. ICD estimated from Google Maps linework. |
Lacey,
WA Thurston Co. United States |
Rainier Rd. SE / SE Balustrade Blvd. (46.98697, -122.82220) |
Roundabout Existing |
All-Way Yield Active Pedestrian Warning (flashing yellow) |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2005 | September 2005. Horizon Pointe subdivision. Serves as primary access to Horizon Pointe Elementary School. |