|
City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
|---|---|---|---|---|---|---|---|
|
Jackson,
GA Butts Co. United States |
US 23-GA 16 (W 3rd St.) / US 23 (Brookwood Ave.) / GA 16 (W 3rd St.) (33.29422, -83.97431) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2025 | https://www.dot.ga.gov/applications/geopi/Pages/Dashboard.aspx?ProjectID=0015425. |
|
Houston,
TX Harris Co. United States |
Navigation Blvd. / Jensen Dr. / Runnels St. (29.75927, -95.34579) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Double-left-turn movement on southeast leg. |
|
Hill City,
MN Aitkin Co. United States |
US 169 / STH 200 (46.98658, -93.60475) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.dot.state.mn.us/news/2025/05/27-d1-hwy200.html |
|
Gonzales,
LA Ascension Par. United States |
Church Point Rd. / Roddy Rd. (30.24006, -90.90380) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | |
|
Gardnerville,
NV Douglas Co. United States |
Toler Ln. / Muller Pkwy. / Decker Rd. (38.93953, -119.72862) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2025 | https://www.douglascountynv.gov/news/what_s_new/toler_lane_roundabout_construction. |
|
Gardnerville,
NV Douglas Co. United States |
Buckeye Rd. / Muller Pkwy. (38.96130, -119.73837) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://www.recordcourier.com/news/2025/jul/09/muller-lane-parkway-work-will-close-buckeye-road-next-week/. |
|
Covington,
GA Newton Co. United States |
Brown Bridge Rd. / Magnet Rd. (33.55415, -84.00785) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2024 | Elliptical shaped. ICD = 155 ft x 145 ft. https://www.facebook.com/GDOTEast/videos/crews-are-preparing-to-detour-magnet-road-at-brown-bridge-road-in-newton-countya/1573496266567977/ |
|
Braselton,
GA Jackson Co. United States |
GA 53 / New Cut Rd. / Ednaville Rd. (34.13223, -83.76743) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2024 | Elliptical shaped. ICD = 165 ft x 135 ft. https://www.facebook.com/Braselton411/posts/the-roundabout-at-hwy-53-new-cut-roadednaville-road-has-been-operational-for-jus/853349783584952/. |
|
Henderson,
NV Clark Co. United States |
E Paradise Hills Dr. / Greenway Rd. (35.99086, -114.97674) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
|
Henderson,
NV Clark Co. United States |
Greenway Rd. / Heather Dr. (36.00537, -114.97668) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2021 | Yield-controlled right-turn bypass lane on south leg. Year Completed estimated (2021-2022). |
|
Henderson,
NV Clark Co. United States |
Greenway Rd. / E Middleton Dr. / Onyx Mountain Dr. (36.01882, -114.97610) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2021-2022). |
|
Henderson,
NV Clark Co. United States |
Paradise Hills Dr. / Nevada State Dr. (35.98365, -114.93505) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2021 | Year Completed estimated (2021-2022). |
|
(unincorporated),
NC Rowan Co. United States |
Old Salisbury-Concord Rd. / Irish Potato Rd. (35.50306, -80.54390) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | On border between Cabarrus County and Rowan County. https://www.kannapolisnc.gov/news/ID/30/Cabarrus-County-Roundabout-Construction-Starts-Next-Week. |
|
Toms River,
NJ Ocean Co. United States |
W College Dr. / N College Dr. (40.00760, -74.17067) |
Rotary Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 88.3920 |
Other (At-Grade) Single-Lane |
Elliptical shaped. ICD = 290 ft x 250 ft. | |
|
Brick,
NJ Ocean Co. United States |
Acapulco Dr. / W Briarcliff Dr. / E Briarcliff Dr. (40.04476, -74.09687) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
Trenton,
NJ Mercer Co. United States |
Newtown Blvd. / Lake Dr. (40.22339, -74.62862) |
Other Existing |
One-Way/Two-Way Stop Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
|
Westampton,
NJ Burlington Co. United States |
Irick Rd. / (unknown) (40.03028, -74.82283) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2025 | |
|
Cinnaminson,
NJ Burlington Co. United States |
Harbor Blvd. / Camelot Ct. (40.01780, -75.00059) |
Unknown Existing |
Unknown Unknown |
3 Approaches 0 Driveways 39.9998 |
Other (At-Grade) Single-Lane |
||
|
Cinnaminson,
NJ Burlington Co. United States |
Harbor Blvd. / Nathan Dr. (40.01933, -75.00208) |
Unknown Existing |
Unknown Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
||
|
Palmyra,
NJ Burlington Co. United States |
Harbour Dr. / Riverfront Dr. / Lakeside Dr. (40.00910, -75.03418) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Single-Lane |
||
|
Moorestown,
NJ Burlington Co. United States |
Laurel Creek Blvd. / Oakmont Dr. (39.99317, -74.90294) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
Moorestown,
NJ Burlington Co. United States |
Hazeltime Circle: Sarazen Dr. / Tournament Dr. (39.98666, -74.89670) |
Other Existing |
Unknown Unknown |
3 Approaches 10 Driveways 70.1040 |
Other (At-Grade) Single-Lane |
Pedestrian access to central island. No splitter islands. | |
|
Moorestown,
NJ Burlington Co. United States |
Laurel Creek Blvd. / Troon Ct. (39.99753, -74.89022) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
Delanco,
NJ Burlington Co. United States |
Newtons Landing Blvd. / Russ Farm Way / Pennington Ct. (40.04379, -74.94370) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands on two legs. | |
|
Bridgeboro,
NJ Burlington Co. United States |
Russ Farm Way / Shipps Way (40.04530, -74.94627) |
Other Existing |
Unknown Unknown |
2 Approaches 0 Driveways 47.9999 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
Sicklerville,
NJ Camden Co. United States |
Jefferson Dr. / Wilson Dr. (39.78690, -75.04044) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2011). |
|
Rochester,
MN Olmsted Co. United States |
1st Ave. SE / 6th St. SE (44.01687, -92.46105) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 1 Driveways 32.0037 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2025 | Compact roundabout serves as the turnaround for the bus rapid transit route, with one-way eastbound and westbound grade separated cycle tracks on the north and south legs. |
|
Charleston,
SC Berkeley Co. United States |
Island Park Dr. / Fairbanks Dr. (32.86747, -79.90146) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
|
Charleston,
SC Berkeley Co. United States |
Island Park Dr. / Robert Daniel Dr. (32.86967, -79.90304) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
1999 | Yield signs placed in central island; no signs on right side of entry. Elliptical shaped. ICD = 200 ft x 165 ft. Year Completed estimated (1996-2002). |
|
Charleston,
SC Berkeley Co. United States |
Island Park Dr. / Ithecaw Creek St. (32.88205, -79.89531) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5277 |
Other (At-Grade) Single-Lane |
2007 | No splitter islands on 2 legs. |
|
Auburn,
CA Placer Co. United States |
SR 49 (Grass Valley Hwy.) / Florence Ln. / Lorenson Rd. (38.97820, -121.10831) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://www.facebook.com/CaltransDistrict3/videos/state-route-49-has-a-new-roundabout-at-florence-lnlorenson-rd-be-mindful-of-the-/1272931464323547/ |
|
Auburn,
CA Placer Co. United States |
SR 49 (Grass Valley Hwy.) / Lone Star Rd. (38.99650, -121.10907) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | |
|
Mendota,
CA Fresno Co. United States |
SR 33 (Derrick St.) / SR 180 (Oller St.) (36.76037, -120.38644) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2025 | Northeast leg stubbed. |
|
Mobile,
AL Mobile Co. United States |
McGregor Ave. S / Dauphin St. / Wimbledon Dr. (30.68570, -88.14859) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2025 | Elliptical shaped. ICD = 180 ft x 140 ft. https://www.youtube.com/watch?v=3vxsxPC0wOM |
|
West Hartford,
CT Capitol United States |
King Philip Dr. / Old Meadow Rd. (41.79822, -72.74586) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2025 | |
|
Pomona,
CA Los Angeles Co. United States |
E Franklin Ave. / San Antonio Ave. (34.04086, -117.73643) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2025 | https://la.streetsblog.org/2025/11/04/pomona-is-becoming-bike-friendly. |
|
Pomona,
CA Los Angeles Co. United States |
S Park Ave. / W 9th St. (34.05137, -117.75427) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2025 | https://la.streetsblog.org/2025/11/04/pomona-is-becoming-bike-friendly. |
|
Pomona,
CA Los Angeles Co. United States |
W 9th St. / S Hamilton Blvd. (34.05116, -117.76303) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2025 | https://la.streetsblog.org/2025/11/04/pomona-is-becoming-bike-friendly. |
|
Mount Pleasant Township,
PA Westmoreland Co. United States |
SR 981 / SR 2021 (Mt. Pleasant Rd.) / Hecla Rd. (40.20248, -79.49697) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2024 | |
|
(uninc),
SC Lexington Co. United States |
US 21-US 176 / Old Wire Rd. (33.88656, -81.05126) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2026 | Open to traffic in October 2025; completion in 2026. https://www.wltx.com/article/traffic/scdot-roundabout-transition-old-wire-road-us21-oct13/101-d3255f3c-6773-4829-bf6a-f096a104b2c2. |
|
Huntsville,
UT Weber Co. United States |
E 100 S / S 7800 E (41.26231, -111.76145) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2025 | https://udotinput.utah.gov/huntsvilleroundabout |
|
Cedar City,
UT Iron Co. United States |
University Blvd. (W Center St.) / N 1150 W (37.67703, -113.07770) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | At Southern Utah University campus. https://www.stgeorgeutah.com/news/officials-suu-students-celebrate-new-roundabout-on-corner-of-campus-in-cedar-city/article_7041f280-27e1-4057-8a16-dfd2de8fc846.html |
|
Chillicothe,
OH Ross Co. United States |
Stewart Rd. / River Trace / (parking) (39.34567, -82.97469) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.sciotopost.com/new-roundabout-opens-off-north-bridge-street-shopping-plaza-easing-access-to-ross-county-drivers/. |
|
Coshocton,
OH Coshocton Co. United States |
CR 1A / CR 496 / Bridge St. (40.27969, -81.87129) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2025 | |
|
New Lenox,
IL Will Co. United States |
W Haven Ave. / S Cedar Rd. / E Haven Ave. / N Cedar Rd. (41.51225, -87.96606) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2025 | Elliptical shaped. ICD = 170 ft x 130 ft. Replaced two T-intersections. One had two stop signs, the other a stop and a yield. |
|
Des Moines,
IA Polk Co. United States |
E Army Post Rd. / SE 36th St. (41.52582, -93.54389) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2025 | |
|
Corinth,
TX Denton Co. United States |
Lake Sharon Dr. / Parkridge Dr. (33.14342, -97.06615) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2023 | |
|
Leawood,
KS Johnson Co. United States |
Tomahawk Creek Pkwy. / Town Center Dr. (38.91644, -94.63404) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://www.leawood.org/522/Tomahawk-Creek-Parkway-Project. |
|
Prince Rupert,
BC Skeena-Queen Charlotte Canada |
Hwy 16 / McBride St. / 2nd Ave. (54.31566, -130.32203) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 52.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | Double left turn on southeast leg. Right-turn-only lane on southwest leg. https://www.cfnrfm.ca/2025/10/31/new-roundabout-opens-at-prince-ruperts-downtown-gateway/. |
|
Prince Albert,
SK Division 15 Canada |
7th Ave. E / (unknown) (53.17601, -105.73273) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2024 | |
|
District of Saanich,
BC Capital Canada |
Cadboro Bay Rd. / Sinclair Rd. (48.46101, -123.29760) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2025 | https://www.facebook.com/Saanich.BC/posts/the-mini-roundabout-at-cadboro-bay-road-and-sinclair-road-is-now-open-and-while-/1172058321616318/ |
|
Salamanca,
NY Cattaraugus Co. United States |
SR 417 (Broad St.) / Iroquois Dr. / Messenger St. (42.15851, -78.73651) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2025 | https://www.oleantimesherald.com/2025/08/21/salamanca-roundabout-project-nearing-completion/. |
|
Kushiro City,
Hokkaido Japan |
National Rte. 391 / Pref Rte. 25 / Pref Rte. 113 / lrifunerinko dori Ave. (42.98003, 144.38584) |
Other Existing |
One-Way/Two-Way Stop None |
5 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
Circulating traffic yields to entering traffic. | |
|
Damariscotta,
ME Lincoln Co. United States |
US 1 / Belvedere Rd. (44.04806, -69.50647) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2025 | https://www.facebook.com/photo/?fbid=1241515414678643&set=a.221832433313618 |
|
Saratoga Springs,
NY Saratoga Co. United States |
SR 29 (Washington St.) / Rowland St. / Petrified Sea Gardens Rd. (43.07550, -73.84783) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.linkedin.com/posts/nysdot_meet-nysdots-newest-roundabout-a-project-activity-7404535842704293888-26Zh |
|
Stamford,
CT Fairfield United States |
Greenwich Ave. / Davenport St. / Waterside Pl. / Pulaski St. (41.04409, -73.54613) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
Greenwich Ave. is two-way on north leg and one-way exit on west leg. Davenport St. is one-way entrance with left-turn-only lane on west leg. https://www.youtube.com/watch?v=Rw85VG_Bpq0. | |
|
Thunder Bay,
ON Thunder Bay Canada |
Cumberland St. N / Water St. / Marina Park Overpass / McVicar St. (48.43930, -89.21442) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | Elliptical shaped. ICD = 53 m x 45 m. Rumble strips between lanes. https://www.youtube.com/watch?v=rMjcSZWhUXU |
|
Cambridge,
ON Waterloo Canada |
Hwy 24 (Hespeler Rd.) / Hwy 38 (Maple Grove Rd.) / Fisher Mills Rd (43.43494, -80.32763) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2025 | https://www.facebook.com/RegionWaterloo/videos/rowconstruction-phase-1-of-our-maple-grove-road-improvements-is-now-complete-thi/718693177527986/ |
|
Alma,
QC Lac-Saint-Jean-Est Regional County Municipality Canada |
Boulevard Auger E / Rte du Lac E (48.51522, -71.61470) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.youtube.com/watch?v=rit-LdDmOI0 |
|
Columbia,
TN Maury Co. United States |
S Main St. / W 8th St. / E 8th St. (35.61349, -87.03407) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-Lane |
2025 | A statue of Thurgood Marshall has been erected in the central island. https://www.facebook.com/CityofColumbiaTN/videos/see-you-around-the-roundaboutthe-city-of-columbia-has-completed-construction-of-/2967828143398999/. https://www.facebook.com/margaret.ziegler/videos/a-new-statue-honoring-thurgood-marshall-now-stands-proudly-in-columbia-tn-unveil/1191676799450304/. |
|
Pocatello,
ID Bannock Co. United States |
E Briscoe Rd. / Park Lawn Dr. / Industry Way (42.93238, -112.46389) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2025 | Year Completed estimated (2024-2025). |
|
Charlestown,
IN Clark Co. United States |
CR 403 / Stacy Rd. (38.42635, -85.71956) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2025 | |
|
Moseley,
VA Chesterfield Co. United States |
Otterdale Rd. / Westerleigh Pkwy. (37.43012, -77.71944) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2025 | https://www.chesterfield.gov/CivicAlerts.aspx?AID=4409. |
|
Sorrento,
LA St. James Par. United States |
LA 70 / LA 3125 (30.10762, -90.87373) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | |
|
Saint John,
NB Saint John Canada |
Sandy Point Rd. / Foster Thurston Rd. / (unknown) (45.32177, -66.06879) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways |
Other (At-Grade) Unknown |
2025 | https://saintjohn.ca/en/news-and-notices/new-roundabout-now-open-sandy-point-road-and-foster-thurston-drive. |
|
(unincorporated),
AZ Greenlee Co. United States |
US 191 / SR 75 / SR 78 (32.94839, -109.22998) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2025 | Merging right-turn bypass lane on north leg. https://www.facebook.com/gilaherald/posts/the-arizona-department-of-transportation-has-completed-a-modern-roundabout-that-/1390191276441232/. |
|
Albuquerque,
NM Bernalillo Co. United States |
Mountain Rd. NW / 19th St. NW (35.09814, -106.66717) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.instagram.com/p/DPfMs6dETmU/ |
|
Vail,
CO Eagle Co. United States |
Chamonix Rd. / I-70 WB Ramps / North Frontage Rd. (39.62828, -106.42120) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
1997 | |
|
Vail,
CO Eagle Co. United States |
Chamonix Rd. / I-70 EB Ramps / South Frontage Rd. (39.62753, -106.42020) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
1997 | |
|
Avon,
CO Eagle Co. United States |
Avon Rd. / I-70 WB Ramps (39.63782, -106.52080) |
Roundabout Existing |
All-Way Yield Active Pedestrian Warning (flashing yellow) |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
1997 | Highway ref. pt. 70-166.62. Raindrop shaped. |
|
Avon,
CO Eagle Co. United States |
Avon Rd. / I-70 EB Ramps (39.63683, -106.52170) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
1997 | Highway ref. pt. 70-166.62. Raindrop shaped. |
|
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 NB Ramps (44.43074, -88.10989) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2011 | Series of 6 roundabouts. Yield-controlled right-turn bypass lane on south leg; merging right-turn bypass lane on east leg. Opened September 2011. Circular central island. |
|
Ritchie,
MD Prince Georges Co. United States |
Ritchie-Marlboro Rd. / I-95 SB Ramps (38.86894, -76.84738) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 770.9968 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2001 | Opening initially with two lanes. Expanded from two lanes to three lanes in 2010. 21442 |
|
Ritchie,
MD Prince Georges Co. United States |
Ritchie-Marlboro Rd. / I-95 NB Ramps (38.86824, -76.84158) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 67.0560 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2001 | Opened initially with two lanes. Expanded from two lanes to three lanes in 2010. 21442 |
|
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 SB Ramps (44.43050, -88.11402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.3880 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | Series of 6 roundabouts. Opened September 2011. |
|
Ellicott City,
MD Howard Co. United States |
MD 103 / MD 100 WB Ramps (39.20846, -76.78294) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.3154 |
Freeway Ramps (Grade-Separated) Single-Lane |
1998 | Opened November 1998. ICD estimated from Google Maps linework. |
|
Ellicott City,
MD Howard Co. United States |
MD 103 / MD 100 EB Ramps (39.20733, -76.78243) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.5396 |
Freeway Ramps (Grade-Separated) Single-Lane |
1998 | Opened November 1998. ICD estimated from Google Maps linework. |
|
Ellicott City,
MD Howard Co. United States |
Snowden River Pkwy. / MD 100 WB Ramps (39.21233, -76.79544) |
Roundabout Existing |
All-Way Yield Metering Signal |
3 Approaches 0 Driveways 25.9105 |
Freeway Ramps (Grade-Separated) Single-Lane |
1998 | Opened November 1998. Metering signal on Snowden River Pkwy approach. ICD estimated from Google Maps linework. |
|
Ellicott City,
MD Howard Co. United States |
MD 104 (Waterloo Rd.) / MD 100 WB Ramps (39.22470, -76.80600) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
1999 | |
|
Topeka,
KS Shawnee Co. United States |
Rice Rd. / I-70 WB Ramps / Sycamore Dr. (39.03610, -95.62310) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.5293 |
Freeway Ramps (Grade-Separated) Single-Lane |
2000 | Part of a major realignment of I-70 and K-4. Sycamore Drive is one way with two westbound lanes (into the roundabout). Partial cloverleaf AB interchange type. Completed October 2000. ICD estimated from Google Maps linework. |
|
Topeka,
KS Shawnee Co. United States |
Rice Rd. / I-70 EB Ramps / Cyprus Drive (39.03190, -95.62320) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.8817 |
Freeway Ramps (Grade-Separated) Single-Lane |
2000 | Part of a major realignment of I-70 and K-4. Cyprus Drive is One Way Eastbound (away from the roundabout). Partial cloverleaf AB interchange type. Completed October 2000. ICD estimated from Google Maps linework. |
|
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 SB Ramps (44.52418, -88.08284) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.9811 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
|
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 NB Ramps (44.52415, -88.08103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.4266 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
|
Arcata,
CA Humboldt Co. United States |
Guintoli Ln. / US 101 SB Ramps (40.90400, -124.08920) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.7180 |
Freeway Ramps (Grade-Separated) Single-Lane |
2005 | ICD estimated from Google Maps linework. |
|
Arcata,
CA Humboldt Co. United States |
Guintoli Ln. / US 101 NB Ramps (40.90492, -124.08510) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.3015 |
Freeway Ramps (Grade-Separated) Single-Lane |
2005 | ICD estimated from Google Maps linework. |
|
Kingston,
NY Ulster Co. United States |
I-587 / Rte 28 / I-87 Ramps / Washington Ave. (41.94362, -74.02840) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2000 | A 600 ft diameter traffic circle was replaced by 200 ft diameter roundabout. At Exit 19 from I-87. I-587 terminates in roundabout. |
|
Anchorage,
AK Anchorage United States |
C St. / O'Malley EB Ramps (61.12273, -149.88630) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2006 | |
|
Newton,
KS Harvey Co. United States |
Broadway St. / I-135 Ramps (38.05000, -97.32250) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.1441 |
Freeway Ramps (Grade-Separated) Single-Lane |
2003 | Single-point interchange. Near roundabout interchange at I-135/1st Street. Roundabout completed January 2002, ramps from I-135 to the roundabout reopened March 2002. Eliptical structure incorporating both NB and SB ramps. Previously controlled by one-way stop ICD estimated from Google Maps linework. |
|
Topeka,
KS Shawnee Co. United States |
46th St. / US 75 Ramps (39.12934, -95.71959) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 124.9680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2002 | Roundabout under structure as part of single-point interchange. Elliptical shaped. ICD = 410 ft x 270 ft. Original intersection was at grade. Completed November 2002. |
|
Anchorage,
AK Anchorage United States |
Dowling Rd. / New Seward Hwy SB Ramps (61.16636, -149.85780) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 65.5320 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2004 | Roundabout revised in 2022-2023. |
|
Anchorage,
AK Anchorage United States |
Dowling Rd. / New Seward Hwy NB Ramps (61.16637, -149.85520) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2004 | Spiral striping. Roundabout revised 2022-2023. |
|
Lewisville,
NC Forsyth Co. United States |
Concord Church Rd. / US 421 SB Ramp / Williams Rd. (36.08978, -80.43072) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.9191 |
Freeway Ramps (Grade-Separated) Single-Lane |
2000 | Solved capacity problem. Previously controlled by one-way stop ICD estimated from Google Maps linework. |
|
St. George,
UT Washington Co. United States |
E. Brigham Rd. / I-15 NB Ramps (37.05939, -113.58350) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.8889 |
Freeway Ramps (Grade-Separated) Single-Lane |
2006 | Raindrop-shaped interchange terminal. ICD estimated from Google Maps linework. |
|
Scaggsville,
MD Howard Co. United States |
MD 216 / US 29 SB Ramps (39.14562, -76.90418) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.7228 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2001 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
|
Scaggsville,
MD Howard Co. United States |
MD 216 / US 29 NB Ramps / Ice Crystal Dr. (39.14476, -76.89799) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 70.1040 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2001 | Series of 4 roundabouts. |
|
Millington,
MD Kent Co. United States |
MD 291 / US 301 SB Ramps (39.26463, -75.86641) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.4393 |
Freeway Ramps (Grade-Separated) Single-Lane |
1999 | Opened August 1999. ICD estimated from Google Maps linework. |
|
Millington,
MD Kent Co. United States |
MD 291 / US 301 NB Ramps (39.26386, -75.86260) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.6656 |
Freeway Ramps (Grade-Separated) Single-Lane |
1999 | Opened August 1999. ICD estimated from Google Maps linework. |
|
Gig Harbor,
WA Pierce Co. United States |
Borgen Blvd. / SR 16 NB Ramps / Burnham Dr. (47.35843, -122.61260) |
Roundabout Existing |
All-Way Yield None |
6 Approaches 0 Driveways 47.7339 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2001 | Oval shaped central island. 6 legged configuration includes a on-ramp (outbound)leg. Central island is used as a roadway storm detention pond. Completed Summer/Fall 2001. Previously controlled by one-way stop ICD estimated from Google Maps linework. |
|
Richland,
WA Benton Co. United States |
Steptoe Dr. / SR 240 EB Ramps / Columbia Park Trl. (46.23893, -119.24546) |
Roundabout Existing |
All-Way Yield Metering Signal |
5 Approaches 0 Driveways 49.5635 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | 5th leg is on-ramp to SR 240. Opened November 2007. Lane configuration reduced in 2016. Modified in 2018 to add metering signal. According to local news (link below) they started metering the traffic on the westbound Columbia Park Trail approach in 2018. It only turns on when traffic coming off the freeway gets backed up. https://97rockonline.com/tri-cities-roundabout-gets-new-metered-traffic-light-wait-what/ 21442 |
|
St. George,
UT Washington Co. United States |
E. Brigham Rd. / I-15 SB Ramps / Pioneer Rd. (37.05999, -113.58560) |
Roundabout Existing |
All-Way Yield None |
6 Approaches 0 Driveways 78.1526 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2006 | Combines interchange ramps and frontage road. ICD estimated from Google Maps linework. |