City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Kennewick,
WA Benton Co. United States |
W Metaline Ave. / N Nevada St. / W Montana St. (46.22031, -119.23826) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 14.0478 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2013 | Open September 2013. ICD estimated from Google Maps linework. |
Liberty Lake,
WA Spokane Co. United States |
Liberty Lake Rd. / Harvard Rd. / E Mission Ave. / I-90 WB Off-Ramp (47.67454, -117.11097) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.0137 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | Open October 2013. ICD estimated from Google Maps linework. |
Redmond,
WA King Co. United States |
NE 76th St. / 164th Ave. NE (47.67214, -122.12180) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 99.7242 |
Other (At-Grade) Single-Lane |
2012 | Oblong shape. Connected two T-intersections on either side of median to allow crossing and left-turn movements. Open December 2012. ICD estimated from Google Maps linework. |
Snoqualmie,
WA King Co. United States |
SR 202 / Tokul Rd. / Mill Pond Rd. (47.54073, -121.83292) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 37.8938 |
Other (At-Grade) Single-Lane |
2016 | Open August 2016. ICD estimated from Google Maps linework. |
Redmond,
WA King Co. United States |
NE 116th St. / 172nd Ave. NE (47.70403, -122.11106) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.5420 |
Other (At-Grade) Single-Lane |
2015 | Open April 2015. ICD estimated from Google Maps linework. |
Redmond,
WA King Co. United States |
NE 116th St. / 162nd Ave. NE (47.70420, -122.12313) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 116.5413 |
Other (At-Grade) Single-Lane |
2014 | Open May 2014. ICD estimated from Google Maps linework. |
Lake Stevens,
WA Snohomish Co. United States |
SR 92 / 99th Ave NE (48.02885, -122.09804) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.5396 |
Other (At-Grade) Single-Lane |
2013 | Reverse curves on east and west approaches. Open November 2013. ICD estimated from Google Maps linework. |
Lake Stevens,
WA Snohomish Co. United States |
SR 92 / 113th Ave. SE (48.03019, -122.07884) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.9412 |
Other (At-Grade) Single-Lane |
2013 | Reverse curves on east and west approaches. Open November 2013. ICD estimated from Google Maps linework. |
Bellevue,
WA King Co. United States |
W Lake Sammamish Pkwy SE / I-90 WB Ramps (47.56690, -122.09947) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 139.9998 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Open November 2013. Raindrop shape. |
Everett,
WA Snohomish Co. United States |
41st St. / Lowell Riverfront Trl. Ext. (47.96284, -122.19307) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.9842 |
Other (At-Grade) Single-Lane |
2013 | Right-turn bypass lane on north leg. Open January 2013. ICD estimated from Google Maps linework. |
Lacey,
WA Thurston Co. United States |
Boulevard Rd. SE / 22nd Ave. (47.02903, -122.86477) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 97.6905 |
Other (At-Grade) Single-Lane |
2014 | Right-turn-only lane on west leg. Elliptical shape. Open October 2014. ICD estimated from Google Maps linework. |
Edgewood,
WA Pierce Co. United States |
Jovita Blvd. E / Emerald St. (47.25272, -122.29104) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.6695 |
Other (At-Grade) Single-Lane |
2013 | Open July 2013. ICD estimated from Google Maps linework. |
Nisqually,
WA Thurston Co. United States |
SR 510 / Reservation Rd. SE (47.01164, -122.69148) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2013 | Reverse curves on west and east legs. Open November 2013. |
Nisqually,
WA Thurston Co. United States |
SR 510 / Yelm Hwy SE (47.00928, -122.68839) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 62.7079 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Right-turn bypass lane on southwest leg. Open December 2013. ICD estimated from Google Maps linework. |
Mattawa,
WA Grant Co. United States |
SR 243 / Road 24 SW (46.73775, -119.91718) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2889 |
Other (At-Grade) Single-Lane |
2014 | Reverse curves on north and south legs. Open May 2014. ICD estimated from Google Maps linework. |
Hunts Point,
WA King Co. United States |
84th Ave. NE / NE 30th St. (47.63651, -122.22817) |
Traffic Calming Circle Existing |
All-Way Yield None |
3 Approaches 0 Driveways 159.3457 |
Other (At-Grade) Single-Lane |
2014 | Originally built between 1990 and 2002. Modified June 2014 to realign south leg. No splitter islands. ICD estimated from Google Maps linework. |
Hunts Point,
WA King Co. United States |
Hunts Point Rd. / NE 28th St. / 84th Ave. NE / SR 520 ramps (47.63600, -122.22744) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6536 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Open June 2014. ICD estimated from Google Maps linework. |
Joint Base Lewis-McChord,
WA Pierce Co. United States |
D St. / South Dr. / Integrity Gate (47.11600, -122.61932) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.3273 |
Other (At-Grade) Single-Lane |
2014 | Open July 2014. ICD estimated from Google Maps linework. |
Snohomish,
WA Snohomish Co. United States |
Ave. D / Bickford Ave. / 15th St. (47.93037, -122.10101) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 79.2238 |
Other (At-Grade) Single-Lane |
2014 | Open July 2014. ICD estimated from Google Maps linework. |
Yarrow Point,
WA King Co. United States |
92nd Ave. NE / NE Points Dr. / NE 33rd St. / SR 520 WB Off-Ramp (47.64153, -122.21728) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 86.9075 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | Open August 2014. ICD estimated from Google Maps linework. |
Ruston,
WA Pierce Co. United States |
Main St. / Bay View Corridor (47.29744, -122.50297) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.1095 |
Other (At-Grade) Single-Lane |
2014 | Open September 2014. ICD estimated from Google Maps linework. |
Ruston,
WA Pierce Co. United States |
N Ruston Way / Grand Ave. (47.29725, -122.50488) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 79.3788 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Ruston,
WA Pierce Co. United States |
N Ruston Way / Baltimore St. / N 51st St. / Yacht Club Rd. (47.29908, -122.50894) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 101.2449 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Marysville,
WA Snohomish Co. United States |
SR 531 (172nd St. NE) / 23rd Ave. NE (48.15210, -122.19919) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2016 | Open January 2016. |
Cashmere,
WA Chelan Co. United States |
N Division St. / Cottage Ave. (47.52214, -120.46999) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2015 | Open October 2015. |
Lacey,
WA Thurston Co. United States |
Willamette Dr. NE / 31st Ave. NE (47.07789, -122.75228) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.9205 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | Open October 2015. ICD estimated from Google Maps linework. |
Seabeck,
WA Kitsap Co. United States |
Seabeck Hwy NW / NW Holly Rd. (47.60901, -122.75692) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2015 | Open October 2015. |
Woodland,
WA Cowlitz Co. United States |
SR 503 (Lewis River Rd.) / Scott Ave. (45.91699, -122.74009) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.7138 |
Other (At-Grade) Single-Lane |
2015 | Open September 2015. ICD estimated from Google Maps linework. |
Lynnwood,
WA Snohomish Co. United States |
68th Ave. W / 204th St. SW (47.81409, -122.32484) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 20.0509 |
Other (At-Grade) Single-Lane |
2015 | Edmonds Community College. Open August 2015. ICD estimated from Google Maps linework. |
Kelso,
WA Cowlitz Co. United States |
SR 432 / Old Hwy 99 / I-5 NB Ramps / Kelso Dr. (46.10491, -122.87586) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | Open August 2015. Elliptical shape. ICD = approximately 110 ft x 100 ft. |
Joint Base Lewis-McChord,
WA Pierce Co. United States |
Colorado Ave. / Garcia Blvd. (47.09688, -122.58387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.4657 |
Other (At-Grade) Single-Lane |
2015 | Open January 2015. ICD estimated from Google Maps linework. |
Monroe,
WA Snohomish Co. United States |
W Main St. / SR 522 SB Ramps (47.84883, -122.00879) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Right-turn bypass lane on west leg. Open December 2014. |
Bonney Lake,
WA Pierce Co. United States |
198th Ave. E / Cascadia Blvd. E (47.12299, -122.16688) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.6959 |
Other (At-Grade) Single-Lane |
2008 | Fourth (southeast) leg added 2018. ICD estimated from Google Maps linework. |
Bonney Lake,
WA Pierce Co. United States |
Cascadia Blvd E / Canyon View Blvd. E (47.12810, -122.17464) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.6916 |
Other (At-Grade) Single-Lane |
2008 | ICD estimated from Google Maps linework. |
Bonney Lake,
WA Pierce Co. United States |
Cascadia Blvd E. / Forest Park Blvd. E (47.12820, -122.18033) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.0035 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Open December 2014. ICD estimated from Google Maps linework. |
Edmonds,
WA Snohomish Co. United States |
212th St. SW / 84th Ave. W / SW Bowdoin Way (47.80701, -122.34716) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 113.9049 |
Other (At-Grade) Single-Lane |
2014 | Open November 2014. ICD estimated from Google Maps linework. |
Marysville,
WA Snohomish Co. United States |
SR 9 / 84th St. NE / Getchell Rd. (48.07196, -122.11135) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2014 | Right-turn-only lanes on all four legs. Open October 2014. |
Wenatchee,
WA Chelan Co. United States |
US 97 Alt / Ohme Garden Rd. / Warehouse Way (47.48082, -120.32091) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.0940 |
Other (At-Grade) Single-Lane |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Spokane,
WA Spokane Co. United States |
N Waikiki Rd. / N Mill Rd. (47.76113, -117.42815) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.5085 |
Other (At-Grade) Single-Lane |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Redmond,
WA King Co. United States |
NE Novelty Hill Rd. / 195th Ave. NE (47.68845, -122.07993) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.5909 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Redmond,
WA King Co. United States |
NE Union Hill Rd. / 196th Ave. NE (47.67501, -122.07901) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open September 2012. |
Arlington,
WA Snohomish Co. United States |
SR 531 (172nd St NE) / SR 9 (48.15166, -122.11325) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.6373 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Joint Base Lewis-McChord,
WA Pierce Co. United States |
Portland Ave. SW / Boundary St. SW / Camp Murray Gate (47.12106, -122.56300) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.6312 |
Other (At-Grade) Single-Lane |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Silverdale,
WA Kitsap Co. United States |
Silverdale Way NW / Chico Way NW / NW Newberry Hill Rd. (47.63704, -122.70135) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 15.2906 |
Other (At-Grade) Single-Lane |
2012 | Open September 2012. ICD estimated from Google Maps linework. |
Poulsbo,
WA Kitsap Co. United States |
NE Lincoln Rd / Noll Rd. NE / Gala Way NE (47.75092, -122.61274) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2012 | Open September 2012. Replaced two offset T-intersections. |
Sammamish,
WA King Co. United States |
NE 8th St. / 233rd Ave NE (47.61687, -122.02903) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 63.6012 |
Other (At-Grade) Single-Lane |
2012 | Open September 2012. ICD estimated from Google Maps linework. |
Joint Base Lewis-McChord,
WA Pierce Co. United States |
Murray Rd. SW / 150th St. SW (47.12084, -122.54259) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open September 2012. |
Mill Creek,
WA Snohomish Co. United States |
SE 116th St. / 56th Ave SE (47.89201, -122.15856) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 80.8842 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2012 | Open August 2012. ICD estimated from Google Maps linework. |
Pasco,
WA Franklin Co. United States |
N 4th Ave. / N 3rd Ave. / W Marie St. (46.23961, -119.09537) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 61.1277 |
Other (At-Grade) Single-Lane |
2012 | Open August 2012. ICD estimated from Google Maps linework. |
Airway Heights,
WA Spokane Co. United States |
Sprague Ave. / Quest Dr. (47.65441, -117.56614) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.4880 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open July 2012. Concentric circulatory roadway striping. ICD estimated from Google Maps linework. |
Lake Stevens,
WA Snohomish Co. United States |
N Davies Rd. / Frontier Village Access Rd. (48.00472, -122.10462) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2012 | Painted splitter islands. Open July 2012. |
Pasco,
WA Franklin Co. United States |
Saraceno Way / (Columbia Basin College entrance) (46.25374, -119.12143) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.5560 |
Other (At-Grade) Single-Lane |
2000 | Year Completed estimated (1996-2003). ICD estimated from Google Maps linework. |
Spokane,
WA Spokane Co. United States |
US 2 / (development entrance) (47.76691, -117.38533) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.7715 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Open July 19, 2018. This intersection was originally accepted in 2012 as stop control (evolving to a signal with growth) for the first phase of a development. Because there was a long lapse prior to construction, it became subject to the WSDOT Intersection Control Evaluation process adopted July 2013. Subsequently, this is the first roundabout in WSDOT Eastern Region recommended by a consultant employing that process. ICD estimated from Google Maps linework. |
Deer Park,
WA Spokane Co. United States |
US 395 / N Short Rd. / N Main St. (47.94267, -117.47734) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.2022 |
Other (At-Grade) Single-Lane |
2018 | Opened 7/18/2018. ICD estimated from Google Maps linework. |
Grandview,
WA Yakima Co. United States |
Velma Ave. / King St. (46.24849, -119.91950) |
Other Existing |
All-Way Stop Unknown |
4 Approaches 5 Driveways 69.3770 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Chelan,
WA Chelan Co. United States |
SR 150 / No-See-Um Rd. (47.84969, -120.03549) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.6550 |
Other (At-Grade) Single-Lane |
2017 | https://www.wsdot.wa.gov/Projects/SR150/NoSeeUmRdIntersectionImprovements/default.htm ICD estimated from Google Maps linework. |
Ridgefield,
WA Clark Co. United States |
35th Avenue / Pioneer Street (WA SR-501) (45.81557, -122.71310) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.4585 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Perth Airport,
WA Australia |
Airport Dr. / Paltridge Rd. (-31.95545, 115.96920) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 57.7604 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Perth Airport,
WA Australia |
Horrie Miller Dr. / Paltridge Rd. (-31.95593, 115.97135) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 47.6267 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Perth Airport,
WA Australia |
Horrie Miller Dr. / Grogan Rd. / Sugarbird Lady Rd. (-31.94970, 115.97319) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 68.9114 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Perth Airport,
WA Australia |
Airport Dr. / Sugarbird Lady Rd. (-31.94834, 115.97257) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.6441 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Perth Airport,
WA Australia |
Sugarbird Lady Rd. / (carpark) (-31.94567, 115.97235) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 26.3496 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Perth Airport,
WA Australia |
Horrie Miller Dr. / Dunreath Dr. (-31.96286, 115.96906) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 37.4906 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Perth Airport,
WA Australia |
Horrie Miller Dr. / Reid Rd. (-31.96972, 115.96787) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.5141 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Redcliffe,
WA Australia |
Dunreath Dr. / Tonkin Hwy NB Ramps (-31.94527, 115.95042) |
Roundabout Existing |
All-Way Yield Unknown |
2 Approaches 0 Driveways 46.6188 |
Freeway Ramps (Grade-Separated) Single-Lane |
ICD estimated from Google Maps linework. | |
Perth Airport,
WA Australia |
Dunreath Dr. / Tonkin Hwy SB Ramps (-31.94391, 115.95158) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.6195 |
Freeway Ramps (Grade-Separated) Single-Lane |
ICD estimated from Google Maps linework. | |
Spokane,
WA Spokane Co. United States |
Freya St. / US 395 NB Ramps (47.72033, -117.35784) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 35.3533 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Completed July 2009. ICD estimated from Google Maps linework. |
(unincorporated),
WA Spokane Co. United States |
SR 902 (W Medical Lake Rd.) / Craig Rd. (47.59464, -117.60751) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.7735 |
Other (At-Grade) Single-Lane |
2018 | Compact roundabout (95' ICD). Open to traffic July 23, 2018. ICD estimated from Google Maps linework. |
Spokane,
WA Spokane Co. United States |
SR 290 (Trent Ave) / Martin Luther King Jr Way / Perry St. (47.66163, -117.39014) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 19.3053 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | New intersection of MLK Jr. Way and SR 290. Open to traffic August 5, 2018. Two circulating lanes for SR 290 WB entry leg ICD estimated from Google Maps linework. |
Airway Heights,
WA Spokane Co. United States |
US 2 / Spokane Tribe Casino Entrance (47.64293, -117.61009) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.0853 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | Open 11/13/2017. Casino open on January 8, 2018. First multilane on a WSDOT facility in Eastern Region. ICD estimated from Google Maps linework. |
Spokane,
WA Spokane Co. United States |
Freya St. / US 395 SB Ramps (47.72328, -117.35776) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.1548 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Open August 2012. ICD estimated from Google Maps linework. |
Monroe,
WA Snohomish Co. United States |
Chain Lake Rd. / N Kelsey St. (47.86475, -121.96958) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 29.6464 |
Other (At-Grade) Single-Lane |
2014 | Bing "On the Street" view shows it under construction ICD estimated from Google Maps linework. |
Marysville,
WA Snohomish Co. United States |
25th Ave. NE / 174th St. NE (48.15374, -122.19930) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.7001 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2017 | May be large enough to qualify as a compact roundabout but has a fully traversable central island. ICD estimated from Google Maps linework. |
Spokane Valley,
WA Spokane Co. United States |
E Broadway Ave. / N Flora Rd. (47.66424, -117.17510) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.1305 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (2009-2011). ICD estimated from Google Maps linework. |
Liberty Lake,
WA Spokane Co. United States |
E Mission Ave. / N Molter Rd. (47.67131, -117.08964) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 31.3654 |
Other (At-Grade) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Seattle,
WA King Co. United States |
Boylston Ave. / E. Howell St. (47.61765, -122.32347) |
Traffic Calming Circle Existing |
Unknown None |
4 Approaches 0 Driveways 128.8107 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
La Center,
WA Clark Co. United States |
NW Pacific Hwy. / W 4th St. (45.86195, -122.67258) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.6053 |
Other (At-Grade) Single-Lane |
2018 | https://www.clarkcountytoday.com/local_news/the-4th-street-and-pacific-highway-roundabout-in-la-center-completed/ ICD estimated from Google Maps linework. |
Port Orchard,
WA Kitsap Co. United States |
SW Lake Flora Rd. / JM Dickenson Rd. SW (47.46497, -122.72410) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.9114 |
Other (At-Grade) Single-Lane |
2011 | https://pugetsoundblogs.com/roadwarrior/tag/lake-flora/ ICD estimated from Google Maps linework. |
Tacoma,
WA Pierce Co. United States |
(unknown) / (unknown) (47.30214, -122.51434) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 27.5370 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). ICD estimated from Google Maps linework. |
Tacoma,
WA Pierce Co. United States |
N Pearl St. / Five Mile Dr. / N Waterfront Dr. / Ferry Crossing Landing Rd / Park Ave. (47.30193, -122.51556) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 32.3966 |
Other (At-Grade) Single-Lane |
2018 | https://www.thenewstribune.com/news/local/article196233104.html ICD estimated from Google Maps linework. |
Yakima,
WA Yakima Co. United States |
N Fair Ave. / E Lincoln Ave. / N 10th St. / Bravo Company Blvd. (46.60868, -120.49385) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.0238 |
Other (At-Grade) Single-Lane |
2015 | https://www.yakimawa.gov/media/news/fair-avenue-roundabout-opening-to-traffic/ ICD estimated from Google Maps linework. |
Raymond,
WA Pacific Co. United States |
US 101 / Henkle St. (SR 6) (46.68234, -123.73051) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.0389 |
Other (At-Grade) Single-Lane |
2018 | http://www.wsdot.wa.gov/Projects/US101/SR6IntersectionAndDrainage/default.htm ICD estimated from Google Maps linework. |
Marysville,
WA Snohomish Co. United States |
Marine Dr. NE / 64th St. NE / 31st Ave. NE (48.05407, -122.18921) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.7229 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Date from Streetview ICD estimated from Google Maps linework. |
Sultan,
WA Snohomish Co. United States |
US 2 / Rice Rd. (47.86794, -121.77764) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.4579 |
Other (At-Grade) Single-Lane |
2012 | https://www.seattletimes.com/seattle-news/transportation/after-multimillion-dollar-plan-to-boost-highway-2-safety-has-the-effort-borne-fruit/ ICD estimated from Google Maps linework. |
Tacoma,
WA Pierce Co. United States |
E 29th St. / E 30th St. / E 28th St. (47.23811, -122.40505) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 27.5704 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Oak Harbor,
WA Island Co. United States |
Ault Field Rd. / Heller Rd. / Clover Valley Rd. (48.32575, -122.67444) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 29.3818 |
Other (At-Grade) Single-Lane |
2018 | Previous control type: One-way Yield. ICD estimated from Google Maps linework. |
Burbank,
WA Walla Walla Co. United States |
SR 124 (Ice Harbor Dr.) / US 12 WB Ramps (46.20937, -119.01215) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.5397 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Yield-controlled right-turn bypass lane on north leg. ICD estimated from Google Maps linework. |
Burbank,
WA Walla Walla Co. United States |
SR 124 (Ice Harbor Dr.) / US 12 EB Ramps / 5th St. / Gateway Rd. (46.20577, -119.01321) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.8889 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Bellingham,
WA Whatcom Co. United States |
SR 542 (Mt Baker Hwy.) / E Smith Rd. / Allison Rd. (48.83225, -122.30533) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 37.7369 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2014). ICD estimated from Google Maps linework. |
Issaquah,
WA King Co. United States |
Maple St. NW / (parking lots) (47.54340, -122.05121) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 20.9614 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2017 | ICD estimated from Google Maps linework. |
Clarkston,
WA Asotin Co. United States |
5th St. / Fleshman Way WB Ramps (46.39754, -117.04430) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 33.7705 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Clarkston,
WA Asotin Co. United States |
5th St. / Fleshman Way EB Ramps (46.39672, -117.04444) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 33.7710 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Black Diamond,
WA King Co. United States |
SE Auburn Black Diamond Rd. / Roberts Dr. / Lake Sawyer Rd. SE (47.31151, -122.02996) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.2005 |
Other (At-Grade) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Everson,
WA Whatcom Co. United States |
SR 542 (Mount Baker Hwy.) / Lawrence Rd. (48.84341, -122.28884) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 29.0824 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Deming,
WA Whatcom Co. United States |
SR 542 (Mount Baker Hwy) / Valley Hwy (48.81605, -122.20267) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 29.8847 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Anacortes,
WA Skagit Co. United States |
SR 20 / SR 20 Spur (48.46352, -122.58156) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 53.8530 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Deer Park,
WA Spokane Co. United States |
US 395 / W Monroe Rd. / W Crawford St. (47.95398, -117.48830) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.7936 |
Other (At-Grade) Single-Lane |
2018 | Opened August 21, 2018. ICD estimated from Google Maps linework. |
East Wenatchee,
WA Douglas Co. United States |
Sunset Hwy (SR 28) / 5th St. NE (47.41003, -120.29177) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.3716 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Ellensburg,
WA Kittitas Co. United States |
US 97 / W University Way / N Dolarway Rd. (47.00659, -120.58616) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 35.8349 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Ferndale,
WA Whatcom Co. United States |
SR 548 (Grandview Rd.) / Kickerville Rd. (48.89209, -122.70435) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2018 |