City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Albuquerque,
NM Bernalillo Co. United States |
8th St. / Central Ave. (35.08526, -106.65660) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 27.3649 |
Other (At-Grade) Single-Lane |
2007 | Transition between downtown Functional Class: Minor Arterial ICD estimated from Google Maps linework. |
Albuquerque,
NM Bernalillo Co. United States |
Yale Blvd. NE / Camino de Salud (35.08985, -106.62158) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2021 | Roundabout constructed 2008. Concentric striped circulatory roadway. Roundabout removed 2020-2021 with construction of hospital building. |
Albuquerque,
NM Bernalillo Co. United States |
Indian School Rd. NW / Menaul Blvd. NW Extension (35.11061, -106.66163) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2012 | |
Albuquerque,
NM Bernalillo Co. United States |
Las Estancias Dr. / Las Estancias Way (35.01852, -106.71345) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.2778 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Albuquerque,
NM Bernalillo Co. United States |
Nunzio Ave. NW / Vista Fuente Rd. NW (35.18391, -106.67731) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.2362 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2007-2008). ICD estimated from Google Maps linework. |
Albuquerque,
NM Bernalillo Co. United States |
Monolith Dr. NW / Boulder Trl. Pl. NW (35.19212, -106.70888) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.3050 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). ICD estimated from Google Maps linework. |
Albuquerque,
NM Bernalillo Co. United States |
Ventana Ridge Rd. NW / Ventana W Pkwy. NW (35.19845, -106.74948) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.0864 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2004-2005). ICD estimated from Google Maps linework. |
Albuquerque,
NM Bernalillo Co. United States |
Las Estancias Dr. / (unknown) (35.01799, -106.71186) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.0811 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Two legs stubbed. ICD estimated from Google Maps linework. |
Albuquerque,
NM Bernalillo Co. United States |
4th St. NW / Roy Ave. (35.21026, -106.60148) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.7666 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | ICD estimated from Google Maps linework. |
Albuquerque,
NM Bernalillo Co. United States |
Rio Puerco / Central Ave. NW / I-40 WB Onramp (35.03300, -106.94539) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.9412 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Williamstown,
MA Berkshire Co. United States |
Main St (Rte 2) / North St (US 7) / Cold Spring Rd (US7 / Rte 2) / South St (42.71367, -73.21032) |
Other Existing |
All-Way Yield None |
5 Approaches 3 Driveways 21.9384 |
Other (At-Grade) Single-Lane |
Historic elliptical town common ICD estimated from Google Maps linework. | |
Adams,
MA Berkshire Co. United States |
Columbia St. (Rte 8) / Renfrew St. / Friend St. (42.63704, -73.11300) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.7517 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Morningside,
MA Berkshire Co. United States |
Tyler St. / Woodlawn Ave. / Dalton Ave. (42.45643, -73.23392) |
Roundabout Existing |
Unknown Unknown |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2021 | Year Completed estimated (2018-2022). |
Great Barrington,
MA Berkshire Co. United States |
US 7 (Main St.) / Rte 23-Rte 41 (Maple Ave.) (42.18916, -73.36466) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.townofgb.org/home/news/state-dot-begins-gb-roundabout-work-brown-bridge-repair-completion-set-june |
Blandon,
PA Berks Co. United States |
US 222 (Allentown Pike) / Tamarack Blvd. / Genesis Dr. (40.45234, -75.89067) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2022 | Year Completed estimated (2020-2022). |
Bern,
PA Berks Co. United States |
SR 183 (Bernville Rd.) / Wellness Way (40.37421, -75.97048) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2020 | New intersection installed as part of development. |
Blandon,
PA Berks Co. United States |
US 222 (Allentown Pike) / Schaeffer Rd. (40.45584, -75.88412) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2021 | https://berksweekly.com/traffic-transit/video-new-roundabout-opens-on-route-222-in-maidencreek-township/ |
Reading,
PA Berks Co. United States |
Deerfield Dr. / Ravine Dr. / Chaser Ct. (40.30062, -75.93044) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Richmond Township,
PA Berks Co. United States |
Kutztown Rd. (US 222) / Moselem Springs Rd. (PA 662) (40.48551, -75.83896) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 55.4106 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Oley Township,
PA Berks Co. United States |
SR 73 / SR 662 / Oley Rd. (40.39944, -75.80946) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.2909 |
Other (At-Grade) Single-Lane |
2019 | ICD estimated from Google Maps linework. |
Oley Township,
PA Berks Co. United States |
W Philadelphia Ave. (SR 73) / Memorial Hwy. (SR 662) / Lynx Dr. (40.38294, -75.78388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.9391 |
Other (At-Grade) Single-Lane |
2019 | https://www.pottsmerc.com/news/new-roundabout-opens-at-intersection-of-routes-and-in-oley/article_00e9f716-c345-11e9-9e3c-9b57da8ea891.html ICD estimated from Google Maps linework. |
Daniel Island,
SC Berkeley Co. United States |
Seven Farms Dr. / Daniel Island Dr. (32.85829, -79.91263) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.1009 |
Other (At-Grade) Single-Lane |
2019 | ICD estimated from Google Maps linework. |
Goose Creek,
SC Berkeley Co. United States |
Parish Farms Dr. / 1st Ave. / Van Buren Dr. (33.05534, -80.10269) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0357 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2011). ICD estimated from Google Maps linework. |
Inwood,
WV Berkeley Co. United States |
Gerrardstown Rd. / Winchester Ave. (39.36098, -78.03754) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 49.8644 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Inwood,
WV Berkeley Co. United States |
Middleway Pike / WV-51 / Surveyor Dr. (39.35656, -78.03477) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.5563 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Inwood,
WV Berkeley Co. United States |
WV-51 / (unknown) (39.35929, -78.03503) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.5593 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Foxbank Plantation,
SC Berkeley Co. United States |
Foxbank Plantation Blvd. / Red LEaf Blvd. (33.10575, -80.03870) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
||
Spring Grove Plantation,
SC Berkeley Co. United States |
Colony Post Loop / Plantation Grove Blvd. (33.07839, -80.01052) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 42.6717 |
Other (At-Grade) Single-Lane |
2005 | |
Moncks Corner,
SC Berkeley Co. United States |
Colony Post Loop / Caretaker Trl. (33.07825, -80.00718) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2005 | |
Weatherstone,
SC Berkeley Co. United States |
Holiday Dr. / Delafield Dr. (33.04487, -80.16566) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Summerville,
SC Berkeley Co. United States |
Meadow Weed Rd. / (unknown) (33.09056, -80.20008) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2019 | |
Sangaree,
SC Berkeley Co. United States |
Royle Rd. / Sangaree Pkwy. / School House Ln. (33.03424, -80.10967) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://abcnews4.com/news/local/sangaree-roundabout-and-pedestrian-bridge-underway-after-2-year-delay |
Charleston,
SC Berkeley Co. United States |
Point Hope Pkwy. / Hopewell Dr. (32.92135, -79.86880) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | Year Completed estimated (2015-2016). |
Hanahan,
SC Berkeley Co. United States |
Foster Creek Rd. / Williams Ln. / Song Sparrow Way (32.94510, -80.01085) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2018 | |
(unincorporated),
SC Berkeley Co. United States |
Bennington Dr. / Circle Oaks Dr. (32.93513, -79.82194) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Hanahan,
SC Berkeley Co. United States |
Tanner Hall Blvd. / (parking) (32.93118, -79.99964) |
Other Existing |
Uncontrolled None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2004 | West leg stubbed. |
Hanahan,
SC Berkeley Co. United States |
Emelin Dr. (32.94955, -80.01212) |
Other Existing |
Unknown Unknown |
2 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Inwood,
WV Berkeley Co. United States |
SR 51 (Gerrardstown Rd.) / Pilgrim St. (39.36208, -78.04223) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | At-grade rail crossing approximately 200 ft east. Year Completed estimated (2021-2023). |
Inwood,
WV Berkeley Co. United States |
SR 51 (Gerrardstown Rd.) / I-81 SB Ramps / Arden-Nollville Rd. (39.36247, -78.04925) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | https://www.journal-news.net/news/local-news/official-phase-one-of-i-81-inwood-bypass-nearly-done/article_87d020ff-2d39-5835-8d9a-c25afa4402ea.html |
Inwood,
WV Berkeley Co. United States |
SR 51 (Gerrardstown Rd.) / I-81 NB Ramps (39.36263, -78.04701) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | https://www.journal-news.net/news/local-news/official-phase-one-of-i-81-inwood-bypass-nearly-done/article_87d020ff-2d39-5835-8d9a-c25afa4402ea.html |
(unincorporated),
SC Berkeley Co. United States |
US 176 (State Rd.) / Mudville Rd. (33.20839, -80.25724) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://info2.scdot.org/SCDOTPress/Lists/Posts/Post.aspx?ID=3627 |
Martinsburg,
WV Berkeley Co. United States |
Tavern Rd. / Rock Cliff Dr. (39.47342, -77.97015) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://panhandlenewsnetwork.com/2024/04/05/bcems-director-offers-detours-as-rock-cliff-drive-tavern-road-intersection-closed-all-weekend-to-prep-for-roundabout/ |
Goose Creek,
SC Berkeley Co. United States |
Alder Dr. / Clayburne Dr. (33.01052, -80.01501) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). |
Summerville,
SC Berkeley Co. United States |
Millhouse Dr. / Holiday Dr. (33.04703, -80.16190) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/TownofSummervilleSC/posts/there-have-been-inquiries-regarding-the-recent-change-in-traffic-flow-at-the-hol/784110397246615/ |
Falling Waters,
WV Berkeley Co. United States |
Worchester Dr. / Charterhouse St. / (parking) (39.57602, -77.87653) |
Unknown Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Falling Waters,
WV Berkeley Co. United States |
Charterhouse St. / Stager Ave. (39.57511, -77.87514) |
Unknown Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Summerville,
SC Berkeley Co. United States |
Cane Bay Blvd. / Nexton Pkwy. (33.11110, -80.12334) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2007 | Y-intersection. Two circulating lanes throughout even though only one double-left movement. Year Completed estimated (2006-2007). Initially constructed with northeast and south legs only. West leg added 2021. https://www.youtube.com/watch?v=lgJ15GyjQv0. |
Summerville,
SC Berkeley Co. United States |
Lindera Preserve Blvd. / Whispering Breeze Ln. / Beautyberry Rd. (33.12670, -80.11247) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2015 | |
Summerville,
SC Berkeley Co. United States |
Cane Bay Blvd. / Fair Winds Blvd. (33.14374, -80.10819) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2020 | Constructed as multilane rotary in 2017 with lane change required to exit from east to south. West leg added 2018. Converted to single-lane roundabout in 2019-2020 with some striping glitches remaining. |
Leonia,
NJ Bergen Co. United States |
Challenge Rd. / (unknown) (40.86473, -73.99583) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2012 | |
Teaneck,
NJ Bergen Co. United States |
Challenger Rd. / (parking) (40.86211, -74.00624) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2010 | Painted splitter islands. |
Hasbrouck Heights,
NJ Bergen Co. United States |
Passaic Ave. / Boulevard (40.85798, -74.08175) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.1986 |
Other (At-Grade) Single-Lane |
Very narrow splitter islands. ICD estimated from Google Maps linework. | |
Franklin Lakes,
NJ Bergen Co. United States |
Franklin Lake Rd. / High Mountain Rd. (40.99348, -74.21235) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.2409 |
Other (At-Grade) Single-Lane |
2014 | Upgraded from a neighborhood traffic circle in 2014 ICD estimated from Google Maps linework. |
Rutherford,
NJ Bergen Co. United States |
Park Ave. / Erie Ave. (40.82835, -74.10118) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.0152 |
Other (At-Grade) Single-Lane |
2004 | Reconstructed as roundabout in 2004? ICD estimated from Google Maps linework. |
Dumont / Cresskill,
NJ Bergen Co. United States |
Madison Ave. / Knickerbocker Rd. (Monument) (40.94127, -73.97681) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 74.8804 |
Other (At-Grade) Single-Lane |
Completed May 30, 1924. Nearest traffic count was conducted on Knickerbocker Road (County Route 505) about 0.5 km from the intersection. http://tcs.state.nj.us/tmsweb/Report/h2d5c913_99_hrvolume.pdf Functional Class: Local ICD estimated from Google Maps linework. | |
Bergen,
Vestland Bergen Norway |
E16 (Hardangervegen - Vaksdalsvegen) / Rv7 (Hardangervegen) / Trengereidsvingane (60.42430, 5.62604) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bergen,
Vestland Bergen Norway |
Fv582 (Lyderhornsveien) / Rv555 (Sotraveien) WB Ramps (60.38233, 5.27003) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Bergen,
Vestland Bergen Norway |
Fv582 (Lyderhornsveien) / Rv555 (Sotraveien) EB Ramps (60.37997, 5.26842) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Bergen,
Vestland Bergen Norway |
Fv580 (Flyplassvegen) / Lilandsvegen (60.29211, 5.23489) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Bergen,
Vestland Bergen Norway |
Fleslandsvegen / Lønningsvegen / Espehaugen (60.28023, 5.23791) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bergen,
Vestland Bergen Norway |
Fv580 (Flyplassvegen) / Sandslivegen (60.29072, 5.28591) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Bergen,
Vestland Bergen Norway |
Fv580 (Flyplassvegen) / Fv556 (Ytrebygdsvegen) (60.28889, 5.26403) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Bergen,
Vestland Bergen Norway |
Olsvikskjenet / Lyderhornsveien / Rv555 (Sotraveien) EB Ramps (60.36878, 5.22605) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Bergen,
Vestland Bergen Norway |
Olsvikskjenet / Godviksvingene / Rv555 (Sotraveien) WB Ramps (60.36985, 5.22546) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Bergen,
Vestland Bergen Norway |
Fv580 (Flyplassvegen - Fanavegen) / Fv546 (Fanavegen) (60.29397, 5.32381) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Bergen,
Vestland Bergen Norway |
Fv546 (Fanavegen) / Laguneveien (60.29272, 5.32489) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bergen,
Vestland Bergen Norway |
E16 (Arnavegen) / Fv276 (Ådnavegen) (60.42200, 5.46023) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bergen,
Vestland Bergen Norway |
Fv566 (Indre Arna vegen - Garnesvegen) Fv276 (Garnesvegen) (60.42692, 5.46946) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
Rail line through central island but appears uncontrolled. | |
Bergen,
Hordaland Bergen Norway |
E39 (Hardangervegen) / Fv582 (Troldhaugvegen) / E39-Fv580 (Fritz C. Riebers veg) Ramps (60.32502, 5.33752) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Bergen,
Hordaland Bergen Norway |
Hesthaugvegen / (parking) / (parking) (60.46353, 5.31759) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bergen,
Hordaland Bergen Norway |
Fv540 (Fyllingsdalsveien - Hjalmar Brantings Vei) / Krokatjønnveien / Sælenveien (60.34831, 5.28189) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Bergen,
Hordaland Bergen Norway |
Tertnesveien / Åsamyrane / E16-E39 (Åsaneveien) Ramps (60.45581, 5.31902) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Bergen,
Hordaland Bergen Norway |
Michael Krohns gate / Solheimsgaten (60.37619, 5.33719) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bergen,
Hordaland Bergen Norway |
Nygårdsgaten / Solheimsgaten / Møllendalsveien / E39 Ramps (60.37933, 5.33486) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Berettyóúfalu,
Hajdú-Bihar Berettyóújfalui járás Hungary |
E60 (Földesi utca - Honvéd utca) / SR 47 (Kossuth utca) / SR 42 (Király-hágó út) (47.23416, 21.53392) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bad Reichenhall,
Bavaria Berchtesgadener Land Germany |
B20 / B21 (Triftmeisterweg) NB Ramps / Reichenbachstraße (47.72278, 12.87145) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Perumahan Negara Lambak Kanan Kawasan 5,
Brunei-Muara District Berakas B Brunei |
Jalan 10 Utara / Jalan 64 / Jalan 77 (4.97805, 114.96377) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Rogers,
AR Benton Co. United States |
Monte NE Rd. / S Arkansas St. / W Oak St. / S 1st St. (36.32593, -94.11640) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signal/Beacon |
4 Approaches 0 Driveways 42.6717 |
Other (At-Grade) Single-Lane |
2018 | Right-turn bypass lanes on south and east legs. Grade-separated pedestrian tunnel under east leg. At-grade rail crossing 230 feet to west. |
Rogers,
AR Benton Co. United States |
Monte NE Rd. / Pleasant Ridge Rd. (36.32245, -94.10972) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2018 | Through bypass lane on north leg. |
Bentonville,
AR Benton Co. United States |
SW Bright Rd. / SW Gator Blvd. / SW Wentworth Ave. (36.32128, -94.23638) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Left-only and left-through-right lanes on all four legs. |
Bentonville,
AR Benton Co. United States |
NE John Deshields Blvd. / NE Moberly Ln. (36.37658, -94.18313) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.0015 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2006-2007). ICD estimated from Google Maps linework. |
Bentonville,
AR Benton Co. United States |
NE J St. / Museum Way / John Deshields Blvd. (36.37822, -94.19655) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2019 | https://www.dot.state.mn.us/d2/projects/2019/hwy71-bemidji/index.html |
Rogers,
AR Benton Co. United States |
Pauline Whitaker Pkwy. / Pinnacle Hills Pkwy. (36.29741, -94.18677) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 76.2000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Year Completed estimated (2006-2009). |
Richland,
WA Benton Co. United States |
Steptoe Dr. / SR 240 EB Ramps / Columbia Park Trl. (46.23893, -119.24546) |
Roundabout Existing |
All-Way Yield Metering Signal |
5 Approaches 0 Driveways 49.5635 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | 5th leg is on-ramp to SR 240. Opened November 2007. Lane configuration reduced in 2016. Modified in 2018 to add metering signal. According to local news (link below) they started metering the traffic on the westbound Columbia Park Trail approach in 2018. It only turns on when traffic coming off the freeway gets backed up. https://97rockonline.com/tri-cities-roundabout-gets-new-metered-traffic-light-wait-what/ 21442 |
Kennewick,
WA Benton Co. United States |
Columbia Park Drive #1 (46.22221, -119.15110) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.8367 |
Other (At-Grade) Single-Lane |
2001 | Completed February 2001. Functional Class: Local ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
Columbia Park Drive #2 (46.22223, -119.14630) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.5366 |
Other (At-Grade) Single-Lane |
2001 | Completed February 2001 Functional Class: Local ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
12th Ave. / Irving St. (46.19768, -119.19670) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.9874 |
Other (At-Grade) Single-Lane |
2001 | Functional Class: Collector ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
Creekstone Dr. / Irving St. (46.18894, -119.19640) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.0725 |
Other (At-Grade) Single-Lane |
2005 | New roadway (Creekstone) connecting into existing subdivision stub-street (Irving) on south side and new subdivision on north side Functional Class: Collector ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
19th Ave. / Union St. (46.19220, -119.18040) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.2832 |
Other (At-Grade) Single-Lane |
2003 | 1/3 mile from school, primary bus and traffic route for the school, on school walking route, has adult crossing guards. Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
4th Ave. / Union St. (46.20640, -119.18010) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.4496 |
Other (At-Grade) Single-Lane |
2003 | Completed October 2003. Functional Class: Collector ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
Kennewick Ave. / Union St. (46.20983, -119.18000) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.1420 |
Other (At-Grade) Single-Lane |
2003 | Completed October 2003. Functional Class: Collector ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
Young St. / Quinault Ave. (46.22004, -119.21950) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6646 |
Other (At-Grade) Single-Lane |
2003 | Completed November 2003. Functional Class: Collector ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
27th Ave. / Union St. / Southridge Blvd / W Creekstone Dr. (46.18497, -119.18040) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.5168 |
Other (At-Grade) Single-Lane |
2000 | Completed August 25, 2000. Right-turn bypass on WB approach. Was 3-leg intersection; fourth leg added to west as part of project. Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
4th Ave. / Kellogg St. (46.20635, -119.20120) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.2355 |
Other (At-Grade) Single-Lane |
2009 | April 2009. Previously controlled by two-way stop Functional Class: Collector ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
Grandridge Blvd. / Okanogan Pl. (46.22327, -119.21380) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.3148 |
Other (At-Grade) Single-Lane |
2003 | Completed November 2003. Functional Class: Collector ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
Grandridge Blvd. / Center Pkwy. (46.22032, -119.23220) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.5746 |
Other (At-Grade) Single-Lane |
2006 | Completed August 3, 2006. Functional Class: Collector ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
Gage Blvd. / Center Pkwy. (46.22710, -119.23120) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.6169 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Functional Class: Arterial ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
27th Ave. / Vancouver St. (46.18394, -119.14850) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.4604 |
Other (At-Grade) Single-Lane |
2004 | Completed November 15, 2004. Functional Class: Arterial ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
18th Ave. / Irving St. (46.19221, -119.19620) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.1649 |
Other (At-Grade) Single-Lane |
2006 | New roads/intersection in subdivision - completed February 2006. Functional Class: Local ICD estimated from Google Maps linework. |
West Richland,
WA Benton Co. United States |
Bombing Range Rd. / Keene Rd. (46.26271, -119.34237) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2005 | Free-flow bypass lane on east leg. Opened October 2005. Plans underway to replace with signalized intersection: https://www.tricitiesbusinessnews.com/2021/12/wr-traffic-circle/ |