29465 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways / ICD (m) Functional Class /
LaneType
Year Completed Comments
Ladera Ranch, CA
Orange Co.
United States
Andaza St. / Aprender St.
(33.53717, -117.59692)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7933
Other (At-Grade)
Single-Lane
2015 ICD estimated from Google Maps linework.
Ladera Ranch, CA
Orange Co.
United States
Andaza St. / Tierno St.
(33.53467, -117.59986)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.8214
Other (At-Grade)
Single-Lane
2015 ICD estimated from Google Maps linework.
Ladera Ranch, CA
Orange Co.
United States
Esencia Dr. / Andaza St.
(33.53385, -117.60108)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
44.7995
Other (At-Grade)
Multilane (2 Lane, unspecified)
2015 ICD estimated from Google Maps linework.
Ladera Ranch, CA
Orange Co.
United States
Esencia Dr. / Fauna Dr.
(33.53540, -117.60302)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
50.7718
Other (At-Grade)
Single-Lane
2015 ICD estimated from Google Maps linework.
Ladera Ranch, CA
Orange Co.
United States
Chiquita Canyon Dr. / Fauna Dr.
(33.53331, -117.60768)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
43.8042
Other (At-Grade)
Single-Lane
2015 Year Completed estimated (2015-2016). ICD estimated from Google Maps linework.
Ladera Ranch, CA
Orange Co.
United States
Chiquita Canyon Dr. / Airoso St.
(33.53838, -117.60846)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
51.7656
Other (At-Grade)
Single-Lane
2015 ICD estimated from Google Maps linework.
Ladera Ranch, CA
Orange Co.
United States
Ascenso Ave. / Sendero Way
(33.52666, -117.62398)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
37.8338
Other (At-Grade)
Single-Lane
2013 ICD estimated from Google Maps linework.
Ladera Ranch, CA
Orange Co.
United States
Ribera Rd. / Ascenso Ave.
(33.52440, -117.62232)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
43.8087
Other (At-Grade)
Single-Lane
2014 ICD estimated from Google Maps linework.
Ladera Ranch, CA
Orange Co.
United States
Reata Rd. / Ribera Rd.
(33.52282, -117.62696)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
47.7922
Other (At-Grade)
Single-Lane
2013 ICD estimated from Google Maps linework.
Ladera Ranch, CA
Orange Co.
United States
Reata Rd. / (unknown)
(33.52152, -117.62808)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
43.8102
Other (At-Grade)
Single-Lane
2013 ICD estimated from Google Maps linework.
Ferndale, WA
Whatcom Co.
United States
Portal Way / I-5 NB Ramps
(48.85836, -122.58613)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
24.3591
Freeway Ramps (Grade-Separated)
Single-lane w/ Traversable Central Island
2019 Year Completed estimated (2018-2019). https://myferndalenews.com/mayor-second-roundabout-portal-way-5-scheduled-summer_56179/ ICD estimated from Google Maps linework.
El Paso, TX
El Paso Co.
United States
TX 1966 SPUR / W Schuster Ave. / (parking garage access)
(31.76499, -106.50484)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
53.3400
Other (At-Grade)
Multilane (2 Lane, unspecified)
2015 https://en.wikipedia.org/wiki/Texas_State_Highway_Spur_1966. Pedestrian crossings are grade-separated and pass under central island.
St Louis, MO
St. Louis City Co.
United States
McKinley Dr. / Wells Dr.
(38.63354, -90.28072)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
49.4467
Other (At-Grade)
Single-Lane
2008 Converted from traffic circle in 2007-2008. Previous circle had on-street parking in circulatory roadway. ICD estimated from Google Maps linework.
Albuquerque, NM
Bernalillo Co.
United States
4th St. NW / Roy Ave.
(35.21026, -106.60148)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
49.7666
Other (At-Grade)
Multilane (2 Lane, unspecified)
2010 ICD estimated from Google Maps linework.
Albuquerque, NM
Bernalillo Co.
United States
Rio Puerco / Central Ave. NW / I-40 WB Onramp
(35.03300, -106.94539)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
46.9412
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
2013 ICD estimated from Google Maps linework.
Rio Rancho, NM
Sandoval Co.
United States
Iris Rd. NE / Idalia Rd. NE
(35.30200, -106.62532)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
31.1908
Other (At-Grade)
Single-Lane
2010 Under construction late 2009. ICD estimated from Google Maps linework.
(unincorporated), TX
Fort Bend Co.
United States
Katy Flewellen Rd. / Spring Green Blvd. / Cinco Trace Dr.
(29.74661, -95.83852)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
54.8637
Other (At-Grade)
Multilane (2 Lane, unspecified)
2017 https://www.chron.com/neighborhood/sugarland/news/article/Ribbon-cutting-held-for-completion-of-Spring-13235918.php.
Oyster Bay, NY
Nassau Co.
United States
Bethpage State Pkwy. / Plainview Rd.
(40.73804, -73.46891)
Other
Existing
Other
Unknown
3 Approaches
0 Driveways
52.4868
Other (At-Grade)
Single-Lane
Stop control on west leg. ICD estimated from Google Maps linework.
Lincoln, NE
Lancaster Co.
United States
S 70th St. / Yankee Hill Rd.
(40.72642, -96.62571)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
46.1602
Other (At-Grade)
Single-Lane
2017 ICD estimated from Google Maps linework.
Lincoln, NE
Lancaster Co.
United States
S 84th St. / Yankee Hill Rd.
(40.72641, -96.60599)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.2551
Other (At-Grade)
Single-Lane
2017 ICD estimated from Google Maps linework.
Lincoln, NE
Lancaster Co.
United States
Yankee Hill Rd. / Yankee Woods Dr. / Sutherland St.
(40.72690, -96.60142)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.2548
Other (At-Grade)
Single-Lane
2017 ICD estimated from Google Maps linework.
Lincoln, NE
Lancaster Co.
United States
Yankee Hill Rd. / S 81st St.
(40.72632, -96.61068)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
40.7297
Other (At-Grade)
Single-Lane
2017 ICD estimated from Google Maps linework.
Lincoln, NE
Lancaster Co.
United States
Yankee Hill Rd. / (unknown)
(40.72634, -96.61576)
Roundabout
Existing
All-Way Yield
None
3 Approaches
1 Driveways
40.7297
Other (At-Grade)
Single-Lane
2018 Year Completed estimated (2017-2018). ICD estimated from Google Maps linework.
Lincoln, NE
Lancaster Co.
United States
Yankee Hill Rd. / Yankee Woods Dr.
(40.72635, -96.62073)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.8245
Other (At-Grade)
Single-Lane
2017 Year Completed estimated (2017-2018). North leg stubbed. ICD estimated from Google Maps linework.
Fort Collins, CO
Larimer Co.
United States
W Vine Dr. / N Shields St.
(40.59630, -105.09579)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
37.1817
Other (At-Grade)
Single-Lane
2015 Streetview shows it under construction in Jul 2015. ICD estimated from Google Maps linework.
Fort Collins, CO
Larimer Co.
United States
W Vine Dr. / N Taft Hill Rd.
(40.59652, -105.11480)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
31.7403
Other (At-Grade)
Single-Lane
2007 Year Completed estimated (2006-2007). ICD estimated from Google Maps linework.
Osage Beach, MO
Camden Co.
United States
Nichols Rd. / (medical center parking)
(38.12308, -92.68148)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
32.8847
Other (At-Grade)
Single-Lane
2016 http://www.californiademocrat.com/news/news/story/2016/oct/06/nichols-road-closed-osage-beach-pky-us-54-while-roadwork-continues/643517/ ICD estimated from Google Maps linework.
Lakeland, MO
Miller Co.
United States
US 54 Business / N Shore Dr.
(38.21423, -92.62436)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
15.0142
Other (At-Grade)
Single-lane w/ Traversable Central Island
2014 date from streetview (Jan '14 - no roundabout; Sept '14 - roundabout) ICD estimated from Google Maps linework.
Sultan, WA
Snohomish Co.
United States
US 2 / Rice Rd.
(47.86794, -121.77764)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
38.4579
Other (At-Grade)
Single-Lane
2012 https://www.seattletimes.com/seattle-news/transportation/after-multimillion-dollar-plan-to-boost-highway-2-safety-has-the-effort-borne-fruit/ ICD estimated from Google Maps linework.
West St Paul, MN
Dakota Co.
United States
Wentworth Ave. / Oakdale Ave.
(44.89793, -93.07155)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4568
Other (At-Grade)
Single-Lane
2017 https://streets.mn/2019/06/11/meet-a-roundabout-wentworth-ave/ ICD estimated from Google Maps linework.
Edina, MN
Hennepin Co.
United States
Valley View Rd. / Tracy Ave. / Valley Ln.
(44.88459, -93.36872)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
31.3100
Other (At-Grade)
Single-Lane
2016 Under construction in summer 2016 (streetview) ICD estimated from Google Maps linework.
Edina, MN
Hennepin Co.
United States
Valley View Rd. / Braemar Blvd.
(44.87250, -93.39152)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2015 Year Completed estimated (2015-2016).
Gainesville, GA
Hall Co.
United States
Sardis Rd. / Ledan Rd.
(34.35603, -83.89291)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
36.4810
Other (At-Grade)
Single-Lane
2017 https://www.gainesvilletimes.com/news/sardis-ledan-intersection-now-roundabout/ ICD estimated from Google Maps linework.
Bardstown, KY
Nelson Co.
United States
US 31E / US 150 / S 3rd St.
(37.80915, -85.46683)
Other
Existing
Other
Unknown
4 Approaches
0 Driveways
61.3332
Other (At-Grade)
Multilane (2 Lane, unspecified)
Building in central island with pedestrian access across circulatory roadway. Circulating lanes yield to entering lanes on two legs. ICD estimated from Google Maps linework.
Jackson, MS
Hinds Co.
United States
E Capitol St. / West St.
(32.29975, -90.18412)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
18.1714
Other (At-Grade)
Single-lane w/ Traversable Central Island
2014 ICD estimated from Google Maps linework.
Jackson, MS
Hinds Co.
United States
E Capitol St. / Lamar St.
(32.30000, -90.18602)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
14.1333
Other (At-Grade)
Single-lane w/ Traversable Central Island
2014 ICD estimated from Google Maps linework.
Jackson, MS
Hinds Co.
United States
Capitol St. / Farish St.
(32.30034, -90.18851)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
17.1618
Other (At-Grade)
Single-lane w/ Traversable Central Island
2014 ICD estimated from Google Maps linework.
Sartell, MN
Stearns Co.
United States
Heritage Dr. / Great River Rd. / Riverside Ave. / River Oaks Ln. / Evergreen Dr
(45.59865, -94.19409)
Roundabout
Existing
All-Way Yield
Unknown
5 Approaches
0 Driveways
48.4676
Other (At-Grade)
Multilane (2 Lane, unspecified)
2017 Year Completed estimated (2016-2018). ICD estimated from Google Maps linework.
Bloomington, IN
Monroe Co.
United States
W Tapp Rd. / I-69 NB Ramps
(39.13683, -86.57233)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
32.4230
Freeway Ramps (Grade-Separated)
Single-Lane
2018 Year Completed estimated (2017-2018). ICD estimated from Google Maps linework.
Bloomington, IN
Monroe Co.
United States
W Tapp Rd. / I-69 SB Ramps
(39.13653, -86.57389)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
29.6440
Freeway Ramps (Grade-Separated)
Single-Lane
2018 Year Completed estimated (2017-2018). ICD estimated from Google Maps linework.
Bloomington, IN
Monroe Co.
United States
W Fullerton Pike / I-69 NB Ramps / (unknown)
(39.12220, -86.56929)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
34.2828
Freeway Ramps (Grade-Separated)
Unknown
2017 Year Completed estimated (2016-2018). ICD estimated from Google Maps linework.
Bloomington, IN
Monroe Co.
United States
W Fullerton Pike / I-69 SB Ramps / Monroe Medical Park Blvd.
(39.12226, -86.57335)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
35.2093
Freeway Ramps (Grade-Separated)
Unknown
2017 Year Completed estimated (2016-2018). ICD estimated from Google Maps linework.
Bemidji, MN
Beltrami Co.
United States
Division St. W - 5th St. NW / Jefferson Ave. SW /
(47.46861, -94.90696)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
38.7532
Other (At-Grade)
Single-Lane
2017 https://www.bemidjipioneer.com/news/4348067-round-and-round-bemidjis-first-road-roundabout-and-running ICD estimated from Google Maps linework.
Louisville, KY
Jefferson Co.
United States
Chamberlain Ln. / Norton Commons Blvd.
(38.32134, -85.57084)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
23.4251
Other (At-Grade)
Single-Lane
2007 Year Completed estimated (2006-2008). ICD estimated from Google Maps linework.
Frankfort, KY
Franklin Co.
United States
Capital Ave. / E State St.
(38.18832, -84.87520)
Other
Existing
Other
None
4 Approaches
0 Driveways
29.1004
Other (At-Grade)
Single-Lane
Mix of stop and yield control. ICD estimated from Google Maps linework.
Leitchfield, KY
Grayson Co.
United States
W Main St. / N Main St. / E Main St. / S Main St.
(37.48011, -86.29373)
Other
Existing
Other
Unknown
4 Approaches
0 Driveways
55.9188
Other (At-Grade)
Multilane (2 Lane, unspecified)
Yielding on circulatory roadway; pedestrian crossings to building in central island. ICD estimated from Google Maps linework.
Blomkest, MN
Kandiyohi Co.
United States
US 71 (1st St. S) / STH 7 (195th Ave. SE)
(44.93535, -95.04408)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
55.8010
Other (At-Grade)
Single-Lane
2017 https://www.kare11.com/article/traffic/major-road-projects-highlight-mndot-construction-season/488383654 ICD estimated from Google Maps linework.
Aitkin, MN
Aitkin Co.
United States
US 169 / Southgate Dr. / Red Oak Dr.
(46.51627, -93.70711)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
39.4500
Other (At-Grade)
Single-Lane
2017 https://www.kare11.com/article/traffic/major-road-projects-highlight-mndot-construction-season/488383654 ICD estimated from Google Maps linework.
New Albany, IN
Floyd Co.
United States
E Daisy Ln. / Schell Ln.
(38.31025, -85.82716)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
26.2402
Other (At-Grade)
Single-Lane
2011 https://www.newsandtribune.com/news/business/in-a-roundabout-way/article_4fafdad7-0ad1-56ca-9c53-1ef9e3335d8a.html ICD estimated from Google Maps linework.
Detroit Lakes, MN
Becker Co.
United States
US 59 / CR 22
(46.76216, -95.87928)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2017 https://www.kare11.com/article/traffic/major-road-projects-highlight-mndot-construction-season/488383654
Las Vegas, NV
Clark Co.
United States
E Sahara Ave. / S Hollywood Blvd.
(36.14450, -115.02914)
Roundabout
Removed
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2019 This was built as a temporary roundabout in 2016. Some of the scenes in this video are when it was obviously temporary, some look like it is now: https://www.youtube.com/watch?v=IaFwJy3mCXc Removed in 2019. https://www.fox5vegas.com/news/cone-zone-hollywood-boulevard-roundabout-removed/video_cac02d5b-4d52-51df-940b-3b1d929a0d7c.html
Denham Springs, LA
Livingston Par.
United States
Lockhart Rd. / Cockerham Rd. / Linder Rd.
(30.50846, -90.93534)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
31.8983
Other (At-Grade)
Multilane (2 Lane, unspecified)
2018 https://www.livingstonparishnews.com/new-roundabout/youtube_e2ce3f06-169f-11e8-bddf-bb3b21456b5b.html ICD estimated from Google Maps linework.
Brownsfield/Central, LA
East Baton Rouge Par.
United States
Sullivan Rd. / Gurney Rd. / (school access)
(30.56124, -91.04099)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
27.7673
Other (At-Grade)
Single-Lane
2012 ICD estimated from Google Maps linework.
Brownsfield/Central, LA
East Baton Rouge Par.
United States
Gurney Rd. / Joor Rd.
(30.56104, -91.04840)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
25.7105
Other (At-Grade)
Single-Lane
2015 ICD estimated from Google Maps linework.
Iowa, LA
Calcasieu Par.
United States
Corbina Blvd / E McNeese St
(30.17724, -93.15878)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
66.0779
Other (At-Grade)
Single-Lane
2012 ICD estimated from Google Maps linework.
Perrysburg, OH
Wood Co.
United States
McCutchenville Pike / Carronade Dr.
(41.53419, -83.61252)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
41.1480
Other (At-Grade)
Single-Lane
2017 Year Completed estimated (2016-2018).
Perrysburg, OH
Wood Co.
United States
Eckel Junction Rd. / Carronade Dr.
(41.53663, -83.61085)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
25.9258
Other (At-Grade)
Single-Lane
2017 Year Completed estimated (2016-2017). ICD estimated from Google Maps linework.
Ft Gordon, GA
Richmond Co.
United States
Avenue of the States Dr. / Lane Ave. / Rice Dr. / Brainard Ave.
(33.41594, -82.13793)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
47.8512
Other (At-Grade)
Multilane (2 Lane, unspecified)
2012 ICD estimated from Google Maps linework.
Boothbay, ME
Lincoln Co.
United States
Wiscasset Rd. (Rte 27) / Common Dr. / Corey Ln.
(43.87517, -69.63386)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
34.4373
Other (At-Grade)
Single-Lane
2018 https://lcnme.com/currentnews/damariscotta-contractor-wins-statewide-award-for-boothbay-roundabout/ replaced two T-intersections. ICD estimated from Google Maps linework.
Wilsonville, OR
Clackamas Co.
United States
SW Villebois Dr. / SW Costa Cir.
(45.31264, -122.79111)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
44.5145
Other (At-Grade)
Single-Lane
2014 Year Completed estimated (2014-2015). ICD estimated from Google Maps linework.
Arlington, TX
Tarrant Co.
United States
Eden Rd. / New York Ave.
(32.62701, -97.07211)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Single-Lane
2018 Right-turn bypass lanes on east and north legs. Fourth approach stubbed. https://www.arlingtontx.gov/news/my_arlington_t_x/news_stories/eden_road_new_york_avenue_now_complete.
East Hampton, NY
Suffolk Co.
United States
East Hampton Sag Harbor Tpke (Hwy 114) / Toilsome Ln.
(40.96028, -72.20192)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
19.8421
Other (At-Grade)
Single-Lane
2018 Aug 2018 Streetview shows construction almost complete. ICD estimated from Google Maps linework.
Bonita Springs, FL
Lee Co.
United States
Old US 41 Rd. / W Terry St.
(26.34561, -81.77910)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
32.1083
Other (At-Grade)
Multilane (2 Lane, unspecified)
2017 https://www.naplesnews.com/story/news/local/communities/the-banner/2017/06/13/roundabout-construction-begins-terry-street-old-41-road-bonita-springs/389911001/ ICD estimated from Google Maps linework.
Bonita Springs, FL
Lee Co.
United States
Old US 41 Rd. / Pennsylvania Ave. / Ragsdale St.
(26.33864, -81.77897)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
20.3365
Other (At-Grade)
Single-Lane
2016 ICD estimated from Google Maps linework.
Greenville, OH
Darke Co.
United States
Public Square (Main St. / Broadway St.)
(40.10246, -84.63338)
Other
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
45.6767
Other (At-Grade)
Single-Lane
Parking around circulatory roadway. ICD estimated from Google Maps linework.
Columbus, OH
Franklin Co.
United States
International Gateway / Stelzer Rd. / Red Lot parking access
(39.99937, -82.90639)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
36.5967
Other (At-Grade)
Single-Lane
2008 On site of John Glenn Columbus International Airport. Year Completed estimated (2007-2009). ICD estimated from Google Maps linework.
Noblesville, IN
Hamilton Co.
United States
Greenfield Ave. / Howe Rd.
(40.01656, -85.98066)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
34.7581
Other (At-Grade)
Single-Lane
2019 https://www.cityofnoblesville.org/egov/apps/document/center.egov?view=item;id=6683 https://www.cityofnoblesville.org/egov/apps/document/center.egov?view=item;id=8070 ICD estimated from Google Maps linework.
Frisco, TX
Collin Co.
United States
Warren Pkwy. / Ohio Dr.
(33.10907, -96.80122)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
51.8160
Other (At-Grade)
Multilane (2 Lane, unspecified)
2019 https://communityimpact.com/dallas-fort-worth/frisco/top-stories/2019/04/08/multilane-roundabout-opens-to-frisco-drivers-april-9/
Peoria, AZ
Maricopa Co.
United States
W Beardsley Rd. / N 81st St.
(33.66711, -112.23386)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
33.7962
Other (At-Grade)
Multilane (2 Lane, unspecified)
2010 Year Completed estimated (2010-2011). ICD estimated from Google Maps linework.
Machesney Park, IL
Winnebago Co.
United States
Swanson Rd. / Perryville Rd.
(42.39150, -88.99469)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
32.6369
Other (At-Grade)
Single-Lane
2008 Year Completed estimated (2007-2009). ICD estimated from Google Maps linework.
Bluffton, SC
Beaufort Co.
United States
Bluffton Pkwy. / SC-46 (Bluffton Rd.)
(32.24955, -80.85640)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
56.5646
Other (At-Grade)
Multilane (2 Lane, unspecified)
2011 Constructed as temporary (year estimated 2006-2008); made permanent in 2011. ICD estimated from Google Maps linework.
Montrose, CO
Montrose Co.
United States
Ogden Rd. / Woodgate Rd.
(38.45096, -107.86297)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
32.7365
Other (At-Grade)
Single-Lane
2011 Year Completed estimated (2011-2012). ICD estimated from Google Maps linework.
Fort Collins, CO
Larimer Co.
United States
Kechter Rd. / Ziegler Rd.
(40.50920, -105.01979)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
31.7818
Other (At-Grade)
Single-Lane
2006 ICD estimated from Google Maps linework.
Fort Collins, CO
Larimer Co.
United States
E Trilby Rd. / Zephyr Rd.
(40.50153, -105.02384)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.6832
Other (At-Grade)
Single-Lane
2015 Year Completed estimated (2014-2015). ICD estimated from Google Maps linework.
Fort Collins, CO
Larimer Co.
United States
E Horsetooth Rd. / Ziegler Rd.
(40.53777, -105.02020)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
34.4912
Other (At-Grade)
Multilane (2 Lane, unspecified)
2008 Year Completed estimated (2007-2009). ICD estimated from Google Maps linework.
Richfield, WI
Washington Co.
United States
Holy Hill Rd. / Appleton Ave.
(43.25080, -88.19111)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4466
Other (At-Grade)
Single-Lane
2016 Year Completed estimated (2015-2017). ICD estimated from Google Maps linework.
Riverdale, AR
Pulaski Co.
United States
Rebsamen Park Rd. / Riverfront Dr.
(34.77506, -92.31189)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
31.3926
Other (At-Grade)
Single-Lane
2012 At-grade railroad crossing across one leg controlled by crossbuck and warning lights (no gates). Fatal crash July 20, 2019. Info: https://katv.com/news/local/vehicle-catches-on-fire-after-hitting-boulder-in-little-rock-traffic-circle. ICD estimated from Google Maps linework.
Lacey, WA
Thurston Co.
United States
Hogum Bay Rd. NE / Willamette Dr. NE
(47.06943, -122.76485)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
39.8601
Other (At-Grade)
Multilane (2 Lane, unspecified)
2017 ICD estimated from Google Maps linework.
Olympia, WA
Thurston Co.
United States
Marvin Rd. NE / 41st Ave. NE
(47.09046, -122.78075)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
32.0040
Other (At-Grade)
Single-Lane
2014
Spokane, WA
Spokane Co.
United States
S Glenrose Rd. / S Carnahan Rd.
(47.63586, -117.33495)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2019 Spokane County project. Open July 2019. Replaced southbound Carnahan yield control.
Flower Mound, TX
Denton Co.
United States
Chinn Chapel Rd. / Dixon Ln.
(33.06646, -97.08794)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
35.0520
Other (At-Grade)
Single-Lane
2012 .
Clarksburg, MD
Montgomery Co.
United States
Little Seneca Pkwy. / Snowden Farm Pkwy.
(39.22989, -77.25280)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
28.6795
Other (At-Grade)
Multilane (2 Lane, unspecified)
2012 Year Completed estimated (2011-2013). ICD estimated from Google Maps linework.
Clarksburg, MD
Montgomery Co.
United States
Snowden Farm Pkwy. / Winding Woods Way
(39.22604, -77.24727)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.7086
Other (At-Grade)
Multilane (2 Lane, unspecified)
2012 Year Completed estimated (2011-2013). ICD estimated from Google Maps linework.
Clarksburg, MD
Montgomery Co.
United States
Little Seneca Pkwy. / Meadow Mist Rd.
(39.23154, -77.24309)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.5290
Other (At-Grade)
Single-Lane
2011 ICD estimated from Google Maps linework.
Murfreesboro, TN
Rutherford Co.
United States
MTSU Blvd. / Blue Raider Dr
(35.84867, -86.35948)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
44.5318
Other (At-Grade)
Multilane (2 Lane, unspecified)
2008 Middle Tennessee State University campus. ICD estimated from Google Maps linework.
Murfreesboro, TN
Rutherford Co.
United States
Blue Raider Dr. / Lightning Way
(35.85075, -86.35946)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
36.7862
Other (At-Grade)
Multilane (2 Lane, unspecified)
2012 Year Completed estimated (2011-2013). ICD estimated from Google Maps linework.
Murfreesboro, TN
Rutherford Co.
United States
Lightning Way / Champion Way
(35.85103, -86.36464)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.9777
Other (At-Grade)
Multilane (2 Lane, unspecified)
2014 ICD estimated from Google Maps linework.
Nocatee, FL
St. Johns Co.
United States
Crosswater Pkwy. / Snowden Pkwy. / Nocatee Landing Trl.
(30.07254, -81.40063)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
55.8124
Other (At-Grade)
Single-Lane
2017 ICD estimated from Google Maps linework.
Nocatee, FL
St. Johns Co.
United States
Crosswater Pkwy. / Crosswater Lake Dr.
(30.06597, -81.39842)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
47.5470
Other (At-Grade)
Single-Lane
2018 Year Completed estimated (2017-2018). ICD estimated from Google Maps linework.
College Park, MD
Prince George's Co.
United States
River Rd. / University Research Ct. / Haig Dr.
(38.96838, -76.92358)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.0005
Other (At-Grade)
Multilane (2 Lane, unspecified)
2013 Year Completed estimated (2012-2013). ICD estimated from Google Maps linework.
College Park, MD
Prince George's Co.
United States
Campus Dr. / Regents Dr.
(38.98762, -76.94019)
Other
Existing
Other
Unknown
4 Approaches
0 Driveways
58.4848
Other (At-Grade)
Multilane (2 Lane, unspecified)
Mix of Yield and Stop signs (3 Yields; 1 Stop) at approaches. ICD estimated from Google Maps linework.
Bound Brook, NJ
Somerset Co.
United States
Bolmer Blvd. / E Main St. / Lincoln Blvd.
(40.56146, -74.52779)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
25.9080
Other (At-Grade)
Single-Lane
2005 Year Completed estimated (2004-2006).
Twin Falls, ID
Twin Falls Co.
United States
Fillmore St. / Nielsen Point Pl.
(42.59707, -114.45643)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
43.0800
Other (At-Grade)
Single-Lane
2013 Year Completed estimated (2012-2013). ICD estimated from Google Maps linework.
Lewiston, ID
Nez Perce Co.
United States
Snake River Ave. / Southway Ave.
(46.40090, -117.03531)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
35.4156
Other (At-Grade)
Multilane (2 Lane, unspecified)
2013 https://www.facebook.com/LewistonPublicWorks/posts/street-work-for-the-roundabout-at-southway-avenue-and-snake-river-avenue-schedul/614436265234323/ ICD estimated from Google Maps linework.
Middletown, DE
New Castle Co.
United States
Churchtown Rd. / Choptank Rd.
(39.50377, -75.74957)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
27.6457
Other (At-Grade)
Single-Lane
2009 Year Completed estimated (2008-2009). ICD estimated from Google Maps linework.
Middletown, DE
New Castle Co.
United States
Jamison Corner Rd. / Lornwood Grove Rd.
(39.53013, -75.67821)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
40.5316
Other (At-Grade)
Single-Lane
2013 Year Completed estimated (2011-2015). ICD estimated from Google Maps linework.
Middletown, DE
New Castle Co.
United States
Jamison Corner Rd. / Hyatt's Corner Rd.
(39.52718, -75.67941)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
42.3758
Other (At-Grade)
Single-Lane
2013 Year Completed estimated (2011-2015). ICD estimated from Google Maps linework.
Middletown, DE
New Castle Co.
United States
Jamison Corner Rd. / US 301 SB Ramps
(39.52516, -75.67982)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
34.0859
Freeway Ramps (Grade-Separated)
Single-Lane
2018 https://www.youtube.com/watch?v=EAI_NlUZRbU ICD estimated from Google Maps linework.
Middletown, DE
New Castle Co.
United States
Jamison Corner Rd. / US 301 NB Ramps
(39.52313, -75.67956)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
40.5357
Freeway Ramps (Grade-Separated)
Single-Lane
2018 ICD estimated from Google Maps linework.
Middletown, DE
New Castle Co.
United States
Bethel Church Rd. / Choptank Rd.
(39.52188, -75.74826)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.4023
Other (At-Grade)
Single-Lane
2010 ICD estimated from Google Maps linework.