City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Frederick,
MD Frederick Co. United States |
Jefferson Station Blvd. / Jefferson Commons Way (39.39479, -77.44916) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2015 | Year Completed estimated (2013-2015). |
Minnetonka,
MN Hennepin Co. United States |
Ridgedale Dr. / (parking) (44.96568, -93.44039) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Center City,
MN Chisago Co. United States |
US 8 (Lake Blvd.) / Pleasant Valley Rd. (45.38276, -92.79510) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2020). |
(unincorporated),
MN Scott Co. United States |
Lucerne Blvd. / Vernon Ave. / 217th St. E (44.63688, -93.34899) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2016). |
Howard,
WI Brown Co. United States |
Evergreen Rd. / Marley St. (44.58025, -88.17017) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | West leg stubbed. |
Cypress,
TX Harris Co. United States |
Hayden Lakes Dr. / Bentridge Manor Ln. / Violet Hollow Park (30.04299, -95.64377) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2014-2015). |
Fredericksburg,
VA Spotsylvania Co. United States |
Towne Centre Blvd. / Waverly Dr. (38.28802, -77.51152) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2009 | Year Completed estimated (2008-2009). |
Wesley Chapel,
FL Pasco Co. United States |
Lajuana Blvd. / Strickland Ave. / Champions Path Way (28.20164, -82.33995) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2017 | Right-turn-only lanes on west and south legs. |
Loxahatchee Groves,
FL Palm Beach Co. United States |
(shopping center entrance) / (parking) (26.68441, -80.29474) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2016 | Concentric striped circulatory roadway. Year Completed estimated (2016-2017). |
Winter Garden,
FL Orange Co. United States |
Atwater Bay Dr. / Waterway Passage Dr. (28.41270, -81.64107) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2017 | Pedestrian crossings close to circulatory roadway. |
St Augustine,
FL St. Johns Co. United States |
Field Dr. / Shearwater Pkwy. (30.02409, -81.56736) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Gilroy,
CA Santa Clara Co. United States |
SR 152 (Hecker Pass Rd.) / Plum St. (37.01188, -121.61789) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Frisco,
TX Denton Co. United States |
Fields Pkwy. / Verde Meadows Dr. (33.19984, -96.84935) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | |
Bradenton,
FL Manatee Co. United States |
Tobermory Way / Carnoustie Pl. (27.45549, -82.44208) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2013 | Painted splitter islands. No truck apron. |
Bradenton,
FL Manatee Co. United States |
Waterlefe Blvd. / Winding Stream Way / Fish Hook Cove (27.51351, -82.44042) |
Other Existing |
Unknown None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2000 | Completed between 1998-2002. Lane markings and crosswalk painted in 2022. Pedestrian crossing within circulatory roadway. |
Dawsonville,
GA Forsyth Co. United States |
Serenity Park Dr. / Placid Way / Serene Way / Peaceful Path (34.32854, -84.07263) |
Other Existing |
Uncontrolled None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2017 | |
Yorkville,
IL Kendall Co. United States |
Fox Rd. / Eldamain Rd. / (unknown) (41.62718, -88.49774) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | https://www.youtube.com/watch?v=69pkvRANbUs |
West Branch,
IA Cedar Co. United States |
W Main St / Herbert Hoover Hwy / Johnson Cedar Rd. NE (41.67115, -91.36629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | On boundary between Cedar County and Johnson County and on western city limit of West Branch, IA. South leg is gravel road. https://www.anderson-bogert.com/projects/herbert-hoover-highway-and-johnson-cedar-road-roundabout/ |
Grand Junction,
CO Mesa Co. United States |
24 Rd. / G Rd. (39.10637, -108.60819) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | https://www.westernslopenow.com/news/local-news/the-artist-for-the-24-rd-roundabout-is-picked/ |
Fort Riley,
KS Riley Co. United States |
Apennines Dr. / Estes Rd. (39.11312, -96.81949) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2014-2020). |
Fort Riley,
KS Geary Co. United States |
Henry Dr. / Marshall Rd. (39.04386, -96.77208) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Turbo roundabout. Merging right-turn bypass lane on south leg. Year Completed estimated (2020-2022) |
Fort Riley,
KS Geary Co. United States |
Huebner Rd. / (unknown) (39.08638, -96.76175) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). |
Mocksville,
NC Davie Co. United States |
Wilkesboro St. / Yadkinville Rd. / Mumford Dr. / Meroney St. (35.90201, -80.57252) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | https://mocksvillenc.org/2023/07/17/wilkesboro-street-roundabout-opening-delayed/ |
Lanesburgh Township,
MN Le Sueur Co. United States |
STH 13 / CR 28 (44.48613, -93.58544) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | https://www.keyc.com/2023/08/31/highway-13le-sueur-county-road-28-construction-updates/ |
Kuna,
ID Ada Co. United States |
Hickory Valley Rd. / Courage Ave. (43.49807, -116.32973) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | |
Elk River,
MN Sherburne Co. United States |
Twin Lakes Rd. NW / Tyler St. / Twin Lakes Pkwy. (45.31576, -93.54120) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2021-2023). |
Elk River,
MN Sherburne Co. United States |
Twin Lakes Rd. NW / Line Ave. / 185th Ave. NW (45.30775, -93.54880) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2021-2023). |
(unincorporated),
SC York Co. United States |
SR 324 (McFarland Rd.) / SR 347 (Gordon Rd.) / Cameron Rd. (34.91962, -81.16901) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2013 | Previously controlled by three-way stop with SC 324 free-flowing. Year Completed estimated (2011-2013). |
O'Fallon,
MO St. Charles Co. United States |
Connecting Rd. / Alta Mira Ct. / MO 364 WB Ramps (38.76954, -90.74393) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | |
Grove City,
OH Franklin Co. United States |
Norton Rd. / Kropp Rd. / Grove City Rd. (39.87469, -83.15744) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | |
Henderson,
NV Clark Co. United States |
E Galleria Dr. / Watson Ridge St. (36.07101, -114.98142) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | |
Parrish,
FL Manatee Co. United States |
Charlotte Dr. / Bella Lago Blvd. (27.60985, -82.42227) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2020 | Through arrow on each entry, exit, and circulatory roadway segment. |
Chisago City,
MN Chisago Co. United States |
Lofton Ave. / Chisago Blvd. (45.34679, -92.87900) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.chisagocountymn.gov/DocumentCenter/View/17057/Postcard-Notification-CSAH-2324-Round-A-Bout?bidId= |
Colorado Springs,
CO El Paso Co. United States |
N 30th St. / Gateway Rd. (38.87780, -104.87071) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | https://coloradosprings.gov/project/30th-street-corridor-project |
Lakewood Ranch,
FL Manatee Co. United States |
Players Dr. / Bellefield Way (27.40446, -82.37433) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2014 | |
Lakewood Ranch,
FL Manatee Co. United States |
Silver Sky Cir. / (unknown) (27.44892, -82.37706) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2020 | |
Lakewood Ranch,
FL Manatee Co. United States |
Bellefield Way / Hammock Creek Dr. (27.41012, -82.37028) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2014 | |
Lincoln,
NE Lancaster Co. United States |
Hohensee Dr. / State Hill Dr. / Greystone Rd. (40.72329, -96.66071) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Fort Worth,
TX Denton Co. United States |
Holland Hill Dr. / Greenfield Manor / Chaplin Dr. (33.03145, -97.33806) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2020). |
Varberg,
Halland County Varbergs kommun Sweden |
Västkustvägen / Hobbyvägen (57.08522, 12.27299) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2005 | Completed 2005 or earlier |
Varberg,
Halland County Varbergs kommun Sweden |
Almers väg / Katteattsvögen (57.09456, 12.25753) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2018 | |
Orange Beach,
AL Baldwin Co. United States |
Canal Rd. / (parking) (30.29209, -87.57667) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | https://www.youtube.com/watch?v=OxgEB2iOzH4 |
Blackeberg,
Halland County Falkenbergs kommun Sweden |
Rte 154 / Kilavägen (56.92321, 12.50801) |
Unknown Existing |
All-Way Yield Metering Signal |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2009 | Completed fall 2009 or spring 2010. |
Vinbergs kyrkby,
Halland County Falkenbergs kommun Sweden |
Rte 154 / E6-E20 NB Ramps (56.93274, 12.51676) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | Year Completed estimated (2014-2015). |
Slidell,
LA St. Tammany Par. United States |
Oak Harbor Blvd. / E Howze Beach Rd. (30.21894, -89.77929) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Add-lane right-turn bypass lane on southeast leg and northeast leg.. |
Halmstad,
Halland County Halmstads kommun Sweden |
Laholmsvägen / Andersbergsringen (56.65640, 12.89981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Raindrop shaped. Grade-separated separated bicycle and pedestrian path under northwest leg. Was previously signalized 4-leg intersection. |
Dalby,
Skåne County Lund Municipality Sweden |
Norrevångsvägen / Lundavägen (55.66672, 13.33263) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2005 | Year Completed estimated (2003-2007). |
Omma,
Skåne County Sjöbo kommun Sweden |
Rte 13 / Ommadalsvägen / Esplanaden (55.64274, 13.68669) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2015 | Completed between 2012 and 2015 |
Halmstad,
Halland County Halmstads kommun Sweden |
Växjövägen / Wrangelsgatan (56.67343, 12.88196) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
Completed before 2002. | |
Otsego,
MN Wright Co. United States |
CR 37 (65th St. NE) / CR 18 (45.24509, -93.70494) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | |
Söderhamn,
Gävleborg County Söderhamns kommun Sweden |
Brädgårdsgatan / Söderhamnsporten (61.30119, 17.03813) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
Completed by 2009. | |
Västbo,
Västernorrland County Sundsvall Municipality Sweden |
Cpl Nolby: Tunavägen / E4 SB Ramps (62.29391, 17.34802) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | |
Stockvik,
Västernorrland County Sundsvall Municipality Sweden |
Övre Kemirondellen (62.33837, 17.35368) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2010-2017). |
Sundsvall,
Västernorrland County Sundsvall Municipality Sweden |
Cpl Sundsvall (62.38214, 17.34947) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2016 | Yield-controlled right-turn bypass lane on north leg. |
Katy,
TX Harris Co. United States |
Elyson Falls Dr. / Elyson Blvd. (29.87108, -95.78296) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2016 | |
Simrishamn,
Skåne County Simrishamns kommun Sweden |
Ehrnbergsvägen / Bruksgatan (55.54992, 14.34920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
Built on or before 2010. | |
Dinuba,
CA Tulare Co. United States |
Rosemary Ave. / Viscaya Pkwy. (36.55671, -119.40398) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2006 | No truck apron. 2011 or earlier (SV) |
Sundsvall,
Västernorrland County Sundsvall Municipality Sweden |
Cpl Birsta N: Timmervägen / E4 SB Ramps (62.44850, 17.33855) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2017 | Year Completed estimated (2012-2017). |
Klippan,
Skåne County Klippans kommun Sweden |
Klostervägen / Ladugårdsvägen / Fabriksallén / Krikavägen (56.12896, 13.15291) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
Completed on or before 2009. | |
Forsmöllan,
Skåne County Klippans kommun Sweden |
Rte 13 / Rte 21 / Klostervägen (56.12167, 13.16920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
Completed on or before 2009. | |
(unincorporated),
NC Cumberland Co. United States |
Blacks Bridge Rd. / Old Plank Rd. (34.94696, -78.98484) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lane on west leg. |
Rochester,
MN Olmsted Co. United States |
48th St. SW / Commercial Dr. SW (43.95305, -92.47263) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | |
Hermantown,
MN St. Louis Co. United States |
STH 194 / Midway Rd. (46.84399, -92.28043) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.dot.state.mn.us/news/2022/09/29-d1-hwy194.html |
(unincorporated),
CA Kern Co. United States |
SR 223 (E Bear Mountain Blvd.) / SR 184 / N Wheeler Ridge Rd. (35.20859, -118.91460) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://bakersfieldnow.com/news/local/caltrans-to-begin-roundabout-construction-on-bear-mountain-blvd |
(unincorporated),
MN Scott Co. United States |
STH 13 (Langford Ave.) / CR 8 (E 220th St.) (44.63049, -93.50170) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.dot.state.mn.us/metro/projects/hwy13-spring-lake-cedar/index.html |
Athens,
OH Athens Co. United States |
E Stimson Ave. / US 33 Ramps / US 50 Ramps (39.32934, -82.08530) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | The roundabout collects and distributes traffic from multiple ramps in the US 33/US 50/Stimson Avenue interchange. https://www.transportation.ohio.gov/projects/projects/106553 |
Koloa,
HI Kauai Co. United States |
SR 530 (Koloa Rd.) / Ala Kalanikaumaka (21.90635, -159.47038) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | A fourth leg is planned at the north side of this roundabout, but that probably won't be until at least 2030. |
Lake Stevens,
WA Snohomish Co. United States |
SR 9 / Vernon Rd. (48.00461, -122.10670) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | https://www.youtube.com/watch?v=5RRqjCCJjRc |
Lake Stevens,
WA Snohomish Co. United States |
SR 9 / SR 204 (Snohomish Marysville Rd.) / 7th Pl. NE (48.00286, -122.10637) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | https://www.youtube.com/watch?v=5RRqjCCJjRc |
Holly Springs,
MS Marshall Co. United States |
SR 4 (Holly Springs Bypass - E Eddie Lee Smith Dr.) / SR 7 (34.79574, -89.44691) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | |
West Chester Township,
OH Butler Co. United States |
Tylersville Rd. / Beckett Rd. / (parking) (39.36211, -84.45517) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | This is the 40th roundabout in Butler County. The Butler County Engineer's Office has planned, designed, reviewed, or constructed 37 out of the 40. |
Thornton,
CO Adams Co. United States |
Lincoln St. / E 141st Pl. / (parking) (39.95280, -104.98624) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2013 | |
Henderson,
CO Adams Co. United States |
Henderson Rd. / E 124th Ave. / Park Blvd. (39.92505, -104.87550) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | Merging right-turn bypass lanes on north and east legs. https://adcogov.org/henderson-rd-park-blvd-roundabout-project |
Windsor,
CO Weld Co. United States |
CO 257 / Pointe Plaza Dr. (40.47823, -104.88905) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2019 | At-grade rail crossing located 370 feet to south. Year Completed estimated (2018-2019). |
Norman,
OK Cleveland Co. United States |
Corporate Centre Dr. (35.25673, -97.48459) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2014-2015). |
Lincoln,
NE Lancaster Co. United States |
S Coddington Ave. / W A St. (40.79914, -96.74940) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Yield-controlled right-turn bypass lanes on north and south legs. Add-lane right-turn bypass lane on east leg. Designed for future expansion to 2x2 configuration. Year Completed estimated (2022-2023). |
Waukee,
IA Dallas Co. United States |
NW 2nd St. / NW Sunrise Dr. (41.62191, -93.88215) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | East leg stubbed. Yield-controlled right-turn bypass lane on west leg. Year Completed estimated (2021-2022). https://www.waukee.org/194/Capital-Improvement-Projects |
Waukee,
IA Dallas Co. United States |
NW 2nd St. / (parking) (41.62461, -93.88202) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | East leg stubbed. Access to school and park. Year Completed estimated (2021-2022). https://www.waukee.org/194/Capital-Improvement-Projects |
Somers,
WI Kenosha Co. United States |
Brumback Blvd. / 35th St. (42.60655, -87.88130) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2009 | |
Madison,
WI Dane Co. United States |
Watts Rd. / Redan Dr. (43.05059, -89.54702) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | East leg stubbed. |
Mjölby,
Östergötland County Mjölby Sweden |
Kungsvägen / Rte 50 SB Ramps (58.33732, 15.10334) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Raindrop shaped. |
De Pere,
WI Brown Co. United States |
CR G (Dickinson Rd.) / Scray Hills Rd. / Bower Creek Rd. (44.42502, -87.99870) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | Elliptical shaped. ICD = 150 ft x 125 ft. |
Norje,
Blekinge County Sölvesborg Sweden |
Ysanevägen / Furumovägen / Norjevägen (56.11168, 14.67508) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2008 | Completed in or before 2008. |
Wisconsin Dells,
WI Sauk Co. United States |
US 12 (Wisconsin Fells Pkwy.) / Fitzgerald Rd. / CR A (43.63331, -89.79087) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2020 | |
Waunakee,
WI Dane Co. United States |
STH 113 / Arboretum Dr. / Bong Rd. (43.17746, -89.41174) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | |
Lancaster,
WI Grant Co. United States |
US 61-STH 35 / STH 81 (42.81577, -90.68369) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | |
Hazelwood,
MO St. Louis Co. United States |
Dunn Rd. / Sieloff Dr. / I-270 WB Entrance Ramp (38.77626, -90.33959) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Left-turn-only lane on east leg. Little deflection westbound. |
Wapato,
WA Yakima Co. United States |
US 97 / Jones Rd. (46.46253, -120.43516) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | At-grade rail crossing approximately 130 feet east of roundabout. https://www.applevalleynewsnow.com/news/wsdot-new-roundabout-planned-for-dangerous-intersection-on-us-97-near-wapato/article_fbf84076-1f7c-11ee-87aa-2f9e824fe38f.html |
Woodstock Township,
MI Lenawee Co. United States |
US 127 / US 223 (42.03792, -84.34974) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | Right-turn-only lane on northwest leg. https://www.michigan.gov/mdot/news-outreach/pressreleases/2023/04/06/roundabout-and-resurfacing-project-in-lenawee-county-begins-monday |
Oakland,
FL Orange Co. United States |
SR 438 / W Oakland Ave. / W Orange Trl. / JW Jones Rd. (28.54757, -81.65162) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | Roundabout shifted approximately 250 feet north of previous stop-controlled intersection. |
Northfield,
MN Rice Co. United States |
110th St. E / Highland Pkwy. / Farrel Ave. (44.42723, -93.17792) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2020). |
Alexandria,
MN Douglas Co. United States |
STH 27 / I-94 EB Ramps (45.86026, -95.43178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.dot.state.mn.us/d4/projects/i94interchange/index.html |
Bend,
OR Deschutes Co. United States |
Powell Butte Hwy. / NE Butler Market Rd. (44.09444, -121.20382) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | https://www.youtube.com/watch?v=q0T0f0Cp1z4 |
Bristol,
IN Elkhart Co. United States |
Walorski Pkwy. / (parking) (41.73614, -85.87479) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | North leg stubbed. Surface drainage to ditches. https://rv-pro.com/news/elkhart-road-to-be-named-after-late-congresswoman-walorski/ |
El Paso,
TX El Paso Co. United States |
Pebble Hills Blvd. / Mike Price Dr. (31.78375, -106.20822) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2016 | |
(unincorporated),
CA Plumas Co. United States |
SR 36 / CR A13 (40.30580, -121.14170) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | South leg disconnected from existing TWSC intersection and shifted about 250 feet east along SR 36 to make two T-intersections. Roundabout designed for OSOW vehicles along SR 36. https://www.facebook.com/story.php?story_fbid=122177854508225216&id=61556756493806&_rdr |
Seymour,
IN Jackson Co. United States |
SR 11 (Walnut St.) / Burkart Blvd. (38.93361, -85.88983) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | |
Hammond,
IN Lake Co. United States |
SR 312 (E Chicago St.) / S Hohman Ave. (41.62846, -87.51733) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | Yield-controlled right-turn bypass lane on east leg. |
Sisters,
OR Deschutes Co. United States |
US 20 / Locust St. / Camp Polk Rd. (44.29043, -121.54369) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | https://ktvz.com/news/sisters/2024/07/26/new-sisters-roundabout-opens-to-all-traffic-monday-evening-but-theres-still-some-work-to-do/ |
Fort Yates,
ND Sioux Co. United States |
SR 24 / BIA 31 (92nd St.) (46.08839, -100.67016) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 |