City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Carmel,
IN Hamilton Co. United States |
E 126th St. / Keystone Pkwy. SB Ramps (39.97122, -86.11327) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Right-turn-only lane on north leg. Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E Carmel Dr. / Keystone Pkwy. NB Ramps (39.96208, -86.11313) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2010 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E Carmel Dr. / Keystone Pkwy. SB Ramps (39.96198, -86.11397) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2010 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E 116th St. / Keystone Pkwy. NB Ramps (39.95663, -86.11353) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2009 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E 116th St. / Keystone Pkwy. SB Ramps (39.95665, -86.11430) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E 106th St. / Keystone Pkwy. NB Ramps (39.94169, -86.11259) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E 106th St. / Keystone Pkwy. SB Ramps (39.94140, -86.11354) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Right-turn-only lane on north leg. Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
Towne Rd. / W 141st St. (39.99182, -86.20277) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2008 | Painted spirals next to central island. |
Carmel,
IN Hamilton Co. United States |
Towne Rd. / W 136th St. / Milano Dr. (39.98461, -86.20267) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2009 | Painted spirals next to central island. |
Carmel,
IN Hamilton Co. United States |
Towne Rd. / W. Main St. (39.97734, -86.20269) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2009 | Painted spirals next to central island. |
Carmel,
IN Hamilton Co. United States |
Towne Rd. / W 126th St. (39.97018, -86.20264) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2007 | Painted spirals next to central island. |
Carmel,
IN Hamilton Co. United States |
E 106th St. / Pennsylvania St. (39.94167, -86.15559) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2008 | Yield-controlled right-turn bypass lane on west leg. Painted spirals next to central island. |
Carmel,
IN Hamilton Co. United States |
E 103rd St. / N Pennsylvania St. (39.93620, -86.15535) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2007 | Replaced four-legged intersection with stop control on north, west, and east legs. |
South Bend,
IN St. Joseph Co. United States |
US 20 / Lexington Ave. (41.69575, -86.31279) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2006 | Fatal crash June 29, 2011. 11861-05. |
Venice,
FL Sarasota Co. United States |
Jacaranda Blvd. / Venice Ave. (27.09950, -82.38444) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 79.2480 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | Modified 2017 to change lane configuration and address crash issues. 21442 |
Richfield,
MN Hennepin Co. United States |
66th St. / Portland Ave. (44.88355, -93.26782) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2009 | Opened to traffic late fall 2008, finished 2009. Changes to signing and striping made August 2011. 21442 |
Flemington,
NJ Hunterdon Co. United States |
Rte 12 / Main St. / Reaville Ave. (40.50183, -74.85851) |
Rotary Existing |
All-Way Yield None |
5 Approaches 6 Driveways 106.6800 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2010 | Oval shaped. ICD = 350 ft x 265 ft. Minor movements need to change lanes for some movements. Modified 2009-2010 to have yield on entry with original rotary geometry. 21442 |
Idaho Falls,
ID Bonneville Co. United States |
E Lincoln Rd. / E Hitt Rd. (N 25th) (43.51143, -111.98410) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2001 | Right-turn-only lane on west leg. Year Completed estimated (1992-2003). Converted from single-lane to multilane in 2018. 21442 |
Bourne,
MA Barnstable Co. United States |
Otis Rotary [MacArthur Blvd. (Rte 28) / Connery Ave. / Sandwich Rd. (Rte 28A)] (41.68534, -70.59144) |
Rotary Existing |
All-Way Yield None |
4 Approaches 0 Driveways 249.9360 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | New lane configuration/striping in 2017. ICD = 820 ft x 620 ft. 21442 |
Scottsdale,
AZ Maricopa Co. United States |
Princess Blvd. / Princess Dr. (33.64804, -111.91795) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways 64.0077 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
1986 | Painted spiral next to central island. Completed 1986. Reconfigured in 2007? 21442 |
Avon,
CO Eagle Co. United States |
Avon Rd. / Benchmark Rd. (39.63425, -106.52220) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1997 | Originally had raindrop shape with locked gate access across south leg for emergency vehicles only. Redesigned and reopened May 2007 with full access. 21442 |
Revere,
MA Suffolk Co. United States |
Copeland Circle [Rte 60 (Squire Rd.) / US 1 Ramps] (42.43008, -71.01710) |
Rotary Existing |
Unknown Unknown |
4 Approaches 0 Driveways 381.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
Retrofitted (November 2018) with multi-lane approaches/departures on the Route 1 ramps and roundabout style pavement markings and signs within the circulating roadway. ICD = 1250 ft x 880 ft. 21442 | |
Hilliard,
OH Franklin Co. United States |
Leap Rd. / Anson Dr. (40.04170, -83.13882) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2009 | Right-turn-only lane on south leg. |
Hilliard,
OH Franklin Co. United States |
Britton Pkwy. / Riggins Rd. (40.06493, -83.13857) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8637 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2006 | Converted from 2x2 roundabout to a 2x1 roundabout in 2020 by changing the EB and WB thru/right lanes to RT only lanes. |
Baraboo,
WI Sauk Co. United States |
Old US 12 / CTH BD (43.48896, -89.77718) |
Roundabout Removed |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2010 | Constructed in 2010. Removed in 2017(?) due to bypass expansion. |
South Hadley,
MA Hampshire Co. United States |
US 202 (Purple Heart Dr.) / N Main St. (42.22171, -72.60281) |
Rotary Existing |
All-Way Yield None |
5 Approaches 0 Driveways 292.6080 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
Oval shaped. ICD 960 ft x 640 ft. | |
(unincorporated),
MA Barnstable Co. United States |
Rte 6A / Rte 28 (gateway to Cape Cod) (41.74313, -70.58651) |
Rotary Existing |
All-Way Yield None |
0 Approaches 0 Driveways 118.8720 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Menasha,
WI Winnebago Co. United States |
CTH CB / Mutual Way (44.23560, -88.49555) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2018 | Yield-controlled right-turn bypass lane on west leg. |
Bunnell,
FL Flagler Co. United States |
US 1 / S Old Dixie Hwy. / CR 325 (29.40689, -81.19684) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Through bypass lane on northwest leg. Previous control: stop sign and yield signs. http://www.cflroads.com/project/441210-1/SR_5_US_1_at_Old_Dixie_Highway_Roundabout |
Lake Point,
UT Tooele Co. United States |
Saddleback Blvd. / Sunset Rd. (40.68168, -112.25544) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2019 | Year Completed estimated (2017-2020). |
Vail,
CO Eagle Co. United States |
Vail Rd. / I-70 EB Ramps / South Frontage Rd. (39.64355, -106.37810) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1995 | Completed October 1995. Circular central island. |
Wauwatosa,
WI Milwaukee Co. United States |
N Swan Blvd. / Discovery Pkwy. (43.05192, -88.03430) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | https://www.wauwatosa.net/Home/Components/News/News/1708/166 |
Rockford,
TN Blount Co. United States |
Pellissippi Pl. / (unknown) (35.79925, -83.93118) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2015 | Year Completed estimated (2014-2016). |
Lake Worth,
FL Palm Beach Co. United States |
SR 802 (Lucerne Ave. - Lake Ave.) / A St. (26.61670, -80.06500) |
Roundabout Existing |
All-Way Yield Pedestrian Signal (red-yellow-green to drivers) |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2002 | ICD = 190 ft x 140 ft. |
West Palm Beach,
FL Palm Beach Co. United States |
S. Quadrille Blvd. (El Campeon Blvd.) / Fern St. (26.71040, -80.05505) |
Roundabout Removed |
All-Way Yield Unknown |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
1997 | Replaced with TWSC 1995-1999; signalized in 2019. |
Jackson,
TN Madison Co. United States |
N Highland Ave. / Deaderick St. (35.61967, -88.81928) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2018 | Painted spirals next to central island. https://www.jacksonsun.com/story/news/local/2018/05/11/construction-continues-north-highland-roundabout/578801002/ |
Vail,
CO Eagle Co. United States |
Chamonix Rd. / I-70 WB Ramps / North Frontage Rd. (39.62828, -106.42120) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
1997 | |
Vail,
CO Eagle Co. United States |
Chamonix Rd. / I-70 EB Ramps / South Frontage Rd. (39.62753, -106.42020) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
1997 | |
Taneytown,
MD Carroll Co. United States |
MD 140 / MD 832 / Antrim Blvd. (39.64809, -77.15468) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
1996 | Completed August 1996. Curbs set for double lane, striped for single outer circulating lane. |
Eau Claire,
WI Eau Claire Co. United States |
State St. / E Lexington Blvd. (44.79197, -91.49592) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 39.6240 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Merging right-turn bypass lane on east leg. W Lexington Blvd meets State St just south of the roundabout and is controlled by a stop sign. https://www.eauclairewi.gov/our-city/construction-projects/future-projects/state-street |
Avon,
CO Eagle Co. United States |
Avon Rd. / I-70 WB Ramps (39.63782, -106.52080) |
Roundabout Existing |
All-Way Yield Active Pedestrian Warning (flashing yellow) |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
1997 | Highway ref. pt. 70-166.62. Raindrop shaped. |
Avon,
CO Eagle Co. United States |
Avon Rd. / I-70 EB Ramps (39.63683, -106.52170) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
1997 | Highway ref. pt. 70-166.62. Raindrop shaped. |
Avon,
CO Eagle Co. United States |
Avon Rd. / Beaver Creek Blvd. (39.63528, -106.52220) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 68.5800 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1997 | Right-turn-only lane on north leg. Elliptical shaped. Skewed intersection. ICD = 225 ft x 160 ft. |
Avon,
CO Eagle Co. United States |
Avon Rd. / US 6 (39.63110, -106.52260) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1997 | Highway ref. pt. 6-170.04. Right-turn-only lane on east leg. |
Winston-Salem,
NC Forsyth Co. United States |
Salem Rd. / Old Salem Rd. / S. Main St. (36.08215, -80.24125) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 64.0080 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2005 | TIP Project U-2926. Right-turn-only lanes on east and west legs. |
Annapolis,
MD Anne Arundel Co. United States |
Gateway Circle [MD 450 (West St.) / Taylor Ave. / Spa Rd.] (38.97630, -76.50486) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
1999 | Elliptical shaped. ICD = 180 ft x 160 ft. Opened December 1999. |
Cottonwood,
AZ Yavapai Co. United States |
AZ 89A / Verde Heights Dr. (34.73999, -112.03740) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2009 | Series of 5 roundabouts. |
Carmel,
IN Hamilton Co. United States |
Hazel Dell Pkwy. / E 131st St. (39.97845, -86.07054) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1998 | Built in late 1990s.Converted to multilane 2010-2012. Right-turn-only lane on west leg; left-turn-only lane on east leg. |
Carmel,
IN Hamilton Co. United States |
E Main St. / Keystone Pkwy. SB Ramps (39.97844, -86.11319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Raindrop shaped. Year Completed estimated (2008-2010). |
Carmel,
IN Hamilton Co. United States |
E Main St. / Keystone Pkwy. NB Ramps (39.97843, -86.11238) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Raindrop shaped. Year Completed estimated (2008-2010). |
Carmel,
IN Hamilton Co. United States |
W 111th St. / Illinois St. (39.94891, -86.16105) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2013 | Painted spiral next to central island. |
Carmel,
IN Hamilton Co. United States |
Towne Rd. / W 96th St. (39.92673, -86.20283) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2013 | |
Carmel,
IN Hamilton Co. United States |
W Main St. / US 31 NB Ramps (39.97797, -86.15668) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2015 | Raindrop shaped. |
Carmel,
IN Hamilton Co. United States |
W Main St. / US 31 SB Ramps (39.97787, -86.15802) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2015 | Raindrop shaped. |
Carmel,
IN Hamilton Co. United States |
W Main St. / Grand Blvd. (39.97798, -86.15168) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2015 | |
Carmel,
IN Hamilton Co. United States |
Old Merdian St. / W. 136th St. / Eglin Dr. / Rohrer Rd. (39.98577, -86.14240) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2014 | Replaced three-way stop-controlled intersection with one uncontrolled leg. |
Carmel,
IN Hamilton Co. United States |
Range Line Rd. / Carmel Dr. (39.96149, -86.12697) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2016 | |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 NB Ramps (44.43074, -88.10989) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2011 | Series of 6 roundabouts. Yield-controlled right-turn bypass lane on south leg; merging right-turn bypass lane on east leg. Opened September 2011. Circular central island. |
Oshkosh,
WI Winnebago Co. United States |
CTH E (Witzel Ave.) / Koeller St. (44.01805, -88.58098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened September 24, 2010. |
Carlsbad,
CA San Diego Co. United States |
Legoland Dr. / Armada Dr. (33.13229, -117.31660) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1999 | Unstriped circulatory roadway. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 SB Ramps (44.43050, -88.11402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.3880 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | Series of 6 roundabouts. Opened September 2011. |
Ellicott City,
MD Howard Co. United States |
MD 104 (Waterloo Rd.) / MD 100 WB Ramps (39.22470, -76.80600) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
1999 | |
Mount Rainier,
MD Prince Georges Co. United States |
US 1 / 34th St. / Perry St. (38.93647, -76.96074) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2001 | Oval shaped. ICD = 135 ft x 115 ft. |
Brattleboro,
VT Windham Co. United States |
Rte 9 / Rte 5 (42.88500, -72.55670) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1999 | Adjacent to I-89. Heavy truck volume (>7%). |
Durango,
CO La Plata Co. United States |
Wilson Gulch Dr. / Three Springs Blvd. (37.23339, -107.82310) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | |
Malta,
NY Saratoga Co. United States |
Rte 67 (Dunning St.) / I-87 NB Ramps (42.97052, -73.80057) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Painted spiral next to central island. Part of a series of 5 roundabouts. |
Malta,
NY Saratoga Co. United States |
Rte 67 (Dunning St.) / I-87 SB Ramps (42.97024, -73.80309) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Painted spiral next to central island. Part of a series of 5 roundabouts. |
Malta,
NY Saratoga Co. United States |
Rte 67 (Dunning St.) / US 9 (42.97116, -73.79296) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Part of a series of 5 roundabouts. |
Malta,
NY Saratoga Co. United States |
Rte 67 (Dunning St.) / Kelch Dr. / Blacksmith Dr. (Malta Commons) (42.97068, -73.79804) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Part of a series of 5 roundabouts. |
Anchorage,
AK Anchorage United States |
C St. / O'Malley EB Ramps (61.12273, -149.88630) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2006 | |
Anchorage,
AK Anchorage United States |
C St. / O'Malley WB Ramps (61.12404, -149.88630) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2006 | |
Prescott,
AZ Yavapai Co. United States |
SR 89 / Willow Lake Rd. (34.59233, -112.42580) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 64.0080 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2006 | |
Oshkosh,
WI Winnebago Co. United States |
Jackson St. / Murdock Ave. (44.03947, -88.54265) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | |
Oshkosh,
WI Winnebago Co. United States |
CTH E (Witzel Ave.) / Washburn St. (44.01808, -88.58321) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened September 24, 2010. |
Oshkosh,
WI Winnebago Co. United States |
US 45 / Fernau Ave. / Lake Butte des Morts Dr. (44.05513, -88.57150) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened August 24, 2010. |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / S Washburn St. (44.01085, -88.58483) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / US 41 SB Ramps (44.01089, -88.58318) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / US 41 NB Ramps (44.01078, -88.58145) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / S Koeller St. (44.01079, -88.57978) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
US 45 / US 41 SB Ramps (44.06074, -88.57443) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / N Koeller St. / Oshkosh Ave. (44.03258, -88.57882) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2012 | Roundabout relocated to west of previous intersection. Series of 4 roundabouts. Opened June 18, 2012. |
South Bend,
IN St. Joseph Co. United States |
US 20 / Mayflower Rd. (41.69477, -86.32246) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2006 | |
South Bend,
IN St. Joseph Co. United States |
Douglas Rd. / Twyckenham Dr. (41.70880, -86.22773) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | |
Fishers,
IN Hamilton Co. United States |
E 106th St. / Lantern Rd. (39.94202, -86.01386) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
Westfield,
IN Hamilton Co. United States |
E 161st St. / US 31 NB Ramps (40.02195, -86.13092) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2013 | Raindrop shaped. Series of 3 roundabouts. |
Westfield,
IN Hamilton Co. United States |
E 161st St. / US 31 SB Ramps (40.02183, -86.13259) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2013 | Raindrop shaped. Series of 3 roundabouts. |
Westfield,
IN Hamilton Co. United States |
E 161st St. / Far Hills Dr. (40.02170, -86.13441) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2013 | Series of 3 roundabouts. Painted spirals next to central island. |
Conway,
AR Faulkner Co. United States |
Tyler St. / Salem Rd. (35.10218, -92.47104) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.thecabin.net/news/citys-latest-roundabout-nears-completion/article_700674de-e112-508f-b408-f67025d0eced.html |
Overland Park,
KS Johnson Co. United States |
Lowell Ave. / 162nd St. (38.83538, -94.68283) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). East leg added 2018-2020. |
Overland Park,
KS Johnson Co. United States |
Lowell Ave. / 165th St. (38.83088, -94.68238) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2013). |
Overland Park,
KS Johnson Co. United States |
Lowell Ave. / (unknown) (38.82932, -94.68023) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2013). |
Topeka,
KS Shawnee Co. United States |
SW Huntoon St. / SW Urish Rd. (39.04338, -95.78022) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2017 | Right-turn-only lane on south leg. |
Leawood,
KS Johnson Co. United States |
Fairway St. / Norwood St. / Meadow Ln. / W 148th St. (38.86092, -94.61576) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). |
Dallas,
TX Dallas Co. United States |
Keller Springs Rd. / TX 289 NB Ramps (32.97228, -96.80342) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2016 | |
Berryton,
KS Shawnee Co. United States |
SE 45th St. / SE Berryton Rd. / SE West Edge Rd. (38.98614, -95.63295) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | https://news.yahoo.com/e-45th-street-just-south-181226532.html |
Topeka,
KS Shawnee Co. United States |
SE 45th St. / SE California Ave. (38.98616, -95.65162) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 64.0077 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2014 | Painted spirals next to central island. Year Completed estimated (2014-2015). |
Topeka,
KS Shawnee Co. United States |
SE 37th St. / SE California Ave. (39.00069, -95.65168) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2017 | |
Topeka,
KS Shawnee Co. United States |
SE 28th Terrace / SE Beach Dr. (39.01604, -95.61985) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2005 | Year Completed estimated (2005-2006). |
Cypress,
TX Harris Co. United States |
E Elizabeth Shore Loop / S Elizabeth Shore Loop (29.95707, -95.72752) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Auchengate,
Scotland South Ayrshire United Kingdom |
A759 (Woodend Rd.) / A78 SB On-Ramp (55.56906, -4.63727) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |