City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Eau Claire,
WI Eau Claire Co. United States |
Golf Rd. / Rudolph Rd. (44.77115, -91.47843) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.4590 |
Other (At-Grade) Single-Lane |
2007 | Opened September 2007. ICD estimated from Google Maps linework. |
Harrison,
WI Calumet Co. United States |
US 10 / STH 55 (44.21376, -88.28327) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.0893 |
Other (At-Grade) Single-Lane |
2009 | Opened September 2009. High speed approach roadways. ICD estimated from Google Maps linework. |
Oconto,
WI Oconto Co. United States |
STH 22 (Charles St.) / US 41 NB Ramps (44.89208, -87.89580) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.9203 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 7, 2009. ICD estimated from Google Maps linework. |
Oconto,
WI Oconto Co. United States |
STH 22 (Charles St.) / US 41 SB Ramps (44.89205, -87.90080) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.9203 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 7, 2009. ICD estimated from Google Maps linework. |
(unincorporated),
WI Manitowoc Co. United States |
STH 310 / CTH B (44.15364, -87.66055) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.4174 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. High-speed approach roadways. ICD estimated from Google Maps linework. |
(unincorporated),
WI Manitowoc Co. United States |
STH 310 / CTH Q (44.15357, -87.67864) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7037 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. High-speed approach roadways. ICD estimated from Google Maps linework. |
Kiel,
WI Manitowoc Co. United States |
STH 67 / CTH AA (E Park Ave.-Rockville Rd.) (43.92072, -88.02247) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.4329 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
(unincorporated),
WI Manitowoc Co. United States |
STH 310 / CTH R (44.15350, -87.70831) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7037 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. High-speed approach roadways. ICD estimated from Google Maps linework. |
Lannon,
WI Waukesha Co. United States |
CTH V (Town Line Rd.) / W Good Hope Rd. (43.14820, -88.18388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.0124 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Deforest,
WI Dane Co. United States |
Savannah Dr. / Williamsburg Way (43.19280, -89.31834) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0536 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Hudson,
WI Saint Croix Co. United States |
Hanley Rd. / STH 35 NB Ramps (44.94889, -92.69390) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.5014 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2005 | Right-turn bypass lane. Opened October 21, 2005. ICD estimated from Google Maps linework. |
Hudson,
WI Saint Croix Co. United States |
Hanley Rd. / STH 35 SB Ramps (44.94890, -92.69675) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0372 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2005 | Right-turn bypass lane. Opened October 21, 2005. ICD estimated from Google Maps linework. |
Harrison,
WI Calumet Co. United States |
STH 55 (Crooks Ave.-Friendship Dr.) / CTH KK (Calumet St.) (44.24297, -88.27441) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.3469 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Whitewater,
WI Walworth Co. United States |
BUS 12-STH 59 (E Milwaukee St.-Elkhorn Rd.) / Bluff Rd. / Clay St. (42.83102, -88.71045) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.2833 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Opened October 2007. ICD estimated from Google Maps linework. |
Milton,
WI Rock Co. United States |
STH 59 / CTH M (42.76886, -88.91364) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.5632 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
CTH EE / CTH OK (43.70249, -87.74506) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9907 |
Other (At-Grade) Single-Lane |
2011 | Opened July 28, 2011. ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / CTH Y (43.80647, -87.78098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9247 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / CTH JJ (43.81919, -87.79837) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.3314 |
Other (At-Grade) Single-Lane |
2009 | High-speed approach roadways. Opened October 2009. ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
CTH CE (College Ave.) / CTH KK (Walter Ave.-E John St.) (44.25859, -88.38350) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.2026 |
Other (At-Grade) Single-Lane |
2008 | Opened November 2008. ICD estimated from Google Maps linework. |
Eau Claire,
WI Eau Claire Co. United States |
STH 53 / Old Town Hall Rd. / Scully Rd. (44.76384, -91.41872) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.4875 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Opened October 2008. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / CTH X / Gateway Blvd. (42.53840, -88.94769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.7205 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / I-43 NB Ramps (42.53960, -88.94841) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.6798 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / I-43 SB Ramps (42.54142, -88.94933) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.0787 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / Moon Rd. / Giebel Ct. (43.56057, -89.78316) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.8114 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / Timothy Ln. (43.55597, -89.77811) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 39.8145 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 EB Ramps (43.55774, -89.77940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.6788 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 WB Ramps (43.55867, -89.78077) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5437 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
Moon Rd. / Timothy Ln. (43.56132, -89.77681) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.0800 |
Other (At-Grade) Single-Lane |
2010 | Fatal crash July 10, 2010. ICD estimated from Google Maps linework. |
Merrill,
WI Lincoln Co. United States |
STH 64 (1st St. E) / N Center Ave. (45.18173, -89.68332) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.5152 |
Other (At-Grade) Single-Lane |
2010 | Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Marinette,
WI Marinette Co. United States |
STH 64 (Hall Ave.) / STH 180 / CTH T (45.09968, -87.66032) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.8788 |
Other (At-Grade) Single-Lane |
2010 | Opened November 17, 2010. ICD estimated from Google Maps linework. |
(unincorporated),
WI Outagamie Co. United States |
STH 76 / CTH O (44.35172, -88.53697) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.1389 |
Other (At-Grade) Single-Lane |
2010 | Opened September 24, 2010. High-speed approach roadways. ICD estimated from Google Maps linework. |
Platteville,
WI Grant Co. United States |
Chestnut St. / Markee Ave. (42.72607, -90.48517) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.6039 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
CTH M (Pleasant View Rd.) / CTH S (Mineral Point Rd.) (43.06030, -89.53722) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.2298 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened June 27, 2011. ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
CTH M (Pleasant View Rd.) / Valley View Rd. / Junction Rd. (43.04614, -89.53278) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.1149 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened July 17, 2011. ICD estimated from Google Maps linework. |
Pleasant Prairie,
WI Kenosha Co. United States |
STH 165 (104th St.) / CTH EZ (39th Ave.) (42.52248, -87.85383) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.5327 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened August 8, 2011. ICD estimated from Google Maps linework. |
Pleasant Prairie,
WI Kenosha Co. United States |
STH 165 (104th St.) / CTH ML (Springbrook Rd.) (42.52253, -87.86031) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.8919 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 7, 2011. Yield-controlled right-turn bypass lanes. ICD estimated from Google Maps linework. |
Mukwonago,
WI Waukesha Co. United States |
STH 83 / CTH I (River Rd.) (42.92252, -88.34597) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.3560 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 23, 2011. ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH LP (Lake Park Rd.) / CTH AP (Plank Rd.) (44.23572, -88.36309) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9297 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH AP (Plank Rd.) / Midway Rd. (44.23008, -88.37485) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.2316 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Sherwood,
WI Calumet Co. United States |
STH 114 / CTH N (44.20024, -88.32381) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.0987 |
Other (At-Grade) Single-Lane |
2011 | High-sped approach roadways. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 WB Ramps (42.91764, -89.36607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2309 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 EB Ramps (42.91774, -89.36817) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1083 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 EB Ramps (42.95128, -89.37859) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7217 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 WB Ramps (42.95272, -89.37769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9591 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / CTH M (42.94950, -89.37981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9613 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Crooks Ave.) / CTE CE (E College Ave.) (44.25803, -88.27377) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9138 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Greenville,
WI Outagamie Co. United States |
STH 15 / CTH CB (Greenville Dr.) (44.28721, -88.50600) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.1525 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Opened August 2013. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / Brooks Ln. / N Washburn St. (44.03244, -88.58758) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.9435 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened June 8, 2012. Three-lane roundabout. Series of 4 roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 SB Ramps (44.03272, -88.58319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1058 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 NB Ramps (44.03271, -88.58178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 140.8193 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 EB Ramps (44.95862, -92.55999) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.1723 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 WB Ramps (44.96036, -92.55952) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.7061 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / CTH TT (Graham St.-80th Ave.) (44.97808, -92.55799) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.5353 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 130th St. (44.99273, -92.53744) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.8527 |
Other (At-Grade) Single-Lane |
2012 | Opened July 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 120th St. (44.99254, -92.55791) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.0760 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
New Richmond,
WI Saint Croix Co. United States |
STH 65 / CTH G (45.07907, -92.53756) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9508 |
Other (At-Grade) Single-Lane |
2012 | Opened September 2012. ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / Klondike Dr. (44.59813, -90.18018) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.6235 |
Other (At-Grade) Single-Lane |
2012 | Opened November 2012. Free-flow right-turn bypass lane with acceleration lane. ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / Heritage Dr. (44.62685, -90.18053) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.6000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / CTH BB (44.62490, -90.18009) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.3017 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. Free-flow right-turn bypass lane into added lane. ICD estimated from Google Maps linework. |
Sherwood,
WI Calumet Co. United States |
STH 114-STH 55 / Stommel Rd. (44.19113, -88.28387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.5360 |
Other (At-Grade) Single-Lane |
2012 | Opened September 24, 2012. ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) (43.38493, -87.92303) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) / Northwood Rd. (43.38498, -87.92057) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Port Washington,
WI Ozaukee Co. United States |
STH 33 (W Grand Ave.) / CTH LL (43.38688, -87.90026) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.6619 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 NB Ramps (43.32441, -88.18568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 19.1147 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 SB Ramps (43.32437, -88.18747) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.5901 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Polk,
WI Washington Co. United States |
STH 60 / CTH C (Hillsdale Rd.) (43.32433, -88.24101) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4426 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / Tillie Rd. / Cedar Pkwy (43.32438, -88.19016) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.1475 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Jupiter,
FL Palm Beach Co. United States |
N Jog Rd. / Donald Ross Rd. (26.88178, -80.14438) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 36.2192 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Coral Springs,
FL Broward Co. United States |
Blue Sage Way / Bay Leaf Ct. / Eden Manor (26.33207, -80.25658) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 58.8722 |
Other (At-Grade) Single-Lane |
2005 | Functional Class: Local ICD estimated from Google Maps linework. |
Coconut Creek,
FL Broward Co. United States |
Centura Parc / NW 36th Ave. / NW 23rd Pl. / NW 23rd St. / NW 22nd Dr. (26.25800, -80.17292) |
Other Existing |
Unknown Unknown |
6 Approaches 0 Driveways 57.8387 |
Other (At-Grade) Single-Lane |
Functional Class: Local ICD estimated from Google Maps linework. | |
Sunrise,
FL Broward Co. United States |
E Aragon Blvd. / NW 24th Pl. (26.15855, -80.24427) |
Other Existing |
All-Way Stop None |
4 Approaches 0 Driveways 23.5841 |
Other (At-Grade) Single-Lane |
Stop control on entries, no splitter islands. Functional Class: Local ICD estimated from Google Maps linework. | |
Ladysmith,
VA Caroline Co. United States |
Edmund Pendleton Dr. / (unknown) (38.00584, -77.51439) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.8177 |
Other (At-Grade) Single-Lane |
2006 | Functional Class: Local ICD estimated from Google Maps linework. |
Ladysmith,
VA Caroline Co. United States |
Library Blvd. / Azalea Dr. (38.02824, -77.52386) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.6312 |
Other (At-Grade) Single-Lane |
2007 | Functional Class: Local ICD estimated from Google Maps linework. |
Conway,
SC Horry Co. United States |
Wild Wing Blvd. / (unknown) (33.79378, -78.98237) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 97.2690 |
Other (At-Grade) Single-Lane |
2008 | Functional Class: Local ICD estimated from Google Maps linework. |
Conway,
SC Horry Co. United States |
University Blvd. / Technology Blvd. (33.79577, -79.00601) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7157 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Previously controlled by one-way stop ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Marina Pkwy / 62nd Ave. N (33.74878, -78.84309) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.7155 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Marina Pkwy / US 17 Connector (33.75152, -78.83283) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.7142 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Marina Pkwy / 79th Ave. N (33.75726, -78.82594) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6974 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Marina Pkwy / (unknown) (33.76145, -78.81818) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.7237 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Marina Pkwy / Amalfi Pl. (33.76431, -78.81388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.7082 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Sardis Dr. / Uniola Dr. / Swanson Dr. / Seabert Dr. (33.75730, -78.92888) |
Other Existing |
All-Way Stop None |
4 Approaches 0 Driveways 33.7608 |
Other (At-Grade) Single-Lane |
Stop control on entry. ICD estimated from Google Maps linework. | |
Myrtle Beach,
SC Horry Co. United States |
Tuscany Grande Blvd. / Viareggio Rd. (33.73640, -78.95387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.6535 |
Other (At-Grade) Single-Lane |
2007 | No splitter islands. Functional Class: Local ICD estimated from Google Maps linework. |
Myrtle Beach,
SC Horry Co. United States |
Tuscany Grande Blvd. / Livorn Loop (33.73368, -78.95984) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.6821 |
Other (At-Grade) Single-Lane |
2007 | No splitter islands. Functional Class: Local ICD estimated from Google Maps linework. |
Santa Cruz,
CA Santa Cruz Co. United States |
Pacific Ave. / Center St. / W. Cliff Dr. (36.96490, -122.02620) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4453 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Cupertino,
CA Santa Clara Co. United States |
Cristo Rey Dr. / Hammond Way / Canyon Oak Way (37.33058, -122.08070) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 36.0875 |
Other (At-Grade) Single-Lane |
2000 | Functional Class: Local ICD estimated from Google Maps linework. |
Dublin,
OH Franklin Co. United States |
Avery-Muirfield Dr. / Post Rd. (40.10686, -83.16028) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.9333 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | ICD estimated from Google Maps linework. |
Dublin,
OH Franklin Co. United States |
Avery Rd. / Tuswell Dr. / Innovation Dr. (40.09153, -83.15848) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.6841 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | ICD estimated from Google Maps linework. |
Kihei,
HI Maui Co. United States |
Piikea Ave. / Liloa Dr. (20.75081, -156.44990) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5056 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Kihei,
HI Maui Co. United States |
Waiapo St. / Oluea St. (20.76022, -156.45500) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 113.9119 |
Other (At-Grade) Single-Lane |
2007 | Painted splitter islands. Functional Class: Local ICD estimated from Google Maps linework. |
Cottage Grove,
MN Washington Co. United States |
Jamaica Ave. / US 10-US 61 EB Ramps / W Point Douglas Rd. (44.81452, -92.93504) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 57.6128 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Cottage Grove,
MN Washington Co. United States |
Jamaica Ave. / US 10-US 61 WB Ramps (44.81586, -92.93379) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.2780 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Prescott,
AZ Yavapai Co. United States |
Grande Dame Pkwy. / SR 89A EB Ramps (34.63499, -112.39830) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 52.0821 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Prescott,
AZ Yavapai Co. United States |
Grande Dame Pkwy. / SR 89A WB Ramps (34.63643, -112.39710) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.0985 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Chino Valley,
AZ Yavapai Co. United States |
SR 89 / Road 4S (34.71659, -112.45340) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.9577 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Functional Class: Arterial ICD estimated from Google Maps linework. |
Mesa,
AZ Maricopa Co. United States |
E McKellips Rd. / Loop 202 SB Ramps (33.45145, -111.67100) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.8421 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Mesa,
AZ Maricopa Co. United States |
E McKellips Rd. / Loop 202 NB Ramps (33.45142, -111.66850) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.8492 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Verrado,
AZ Maricopa Co. United States |
W Sunrise Ln. / W Highlands Dr. (33.49936, -112.52120) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.8011 |
Other (At-Grade) Single-Lane |
2008 | ICD estimated from Google Maps linework. |
Malta,
NY Saratoga Co. United States |
Rte 108 (Dunning St.) / Fox Wander Rd. / Partridge Drum (42.97179, -73.78532) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.2073 |
Other (At-Grade) Single-Lane |
2008 | ICD estimated from Google Maps linework. |
Malta,
NY Saratoga Co. United States |
Rte 108 (Dunning St.) / Plains Rd. (42.97257, -73.77570) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7115 |
Other (At-Grade) Single-Lane |
2008 | ICD estimated from Google Maps linework. |
Malta,
NY Saratoga Co. United States |
Rte 9 / Stonebreak Rd. (42.96317, -73.79144) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.4560 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |