|
City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
|---|---|---|---|---|---|---|---|
|
Moon Township,
PA Allegheny Co. United States |
SR 3070 / Resurrection Rd. / I-376 SB Ramps (40.48070, -80.20240) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.4290 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Previously controlled by two-way stop ICD estimated from Google Maps linework. |
|
Ferguson Township,
PA Centre Co. United States |
Old Gatesburg Rd. / Pine Hall Rd. (40.78030, -77.89010) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.4617 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
|
Meridian,
ID Ada Co. United States |
Kleiner Memorial Pkwy. / Kleiner Park Loop (43.62315, -116.34710) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.5827 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
|
Osage Beach,
MO Camden Co. United States |
Burton Duenke Ln. / KK Dr. (38.11672, -92.69313) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.6461 |
Other (At-Grade) Single-Lane |
2011 | Right turn bypass lane. ICD estimated from Google Maps linework. |
|
North Little Rock,
AR Pulaski Co. United States |
Riverfront Dr. / Broadway St. / Rockwater Blvd. (34.75854, -92.28074) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0983 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
|
Malta,
NY Saratoga Co. United States |
Luther Forest Blvd. / Rte 67 (42.94714, -73.78510) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.9691 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
|
Carmel,
IN Hamilton Co. United States |
W 121st St. / Shelbourne Rd. (39.96279, -86.22161) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2011 | |
|
Carmel,
IN Hamilton Co. United States |
W 126th St. / Shelbourne Rd. (39.96992, -86.22144) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2011 | |
|
Fishers,
IN Hamilton Co. United States |
E 106th St. / Lantern Rd. (39.94202, -86.01386) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
|
Santa Cruz,
CA Santa Cruz Co. United States |
Pacific Ave. / Center St. / W. Cliff Dr. (36.96490, -122.02620) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4453 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
|
Malta,
NY Saratoga Co. United States |
Rte 9 / Stonebreak Rd. (42.96317, -73.79144) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.4560 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
|
Prescott,
AZ Yavapai Co. United States |
Grande Dame Pkwy. / SR 89A EB Ramps (34.63499, -112.39830) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 52.0821 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
|
Prescott,
AZ Yavapai Co. United States |
Grande Dame Pkwy. / SR 89A WB Ramps (34.63643, -112.39710) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.0985 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
|
Fayetteville,
GA Fayette Co. United States |
Grady Ave. / Beauregard Blvd. / Redwine Rd. (33.44083, -84.45750) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.8984 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
|
Howard,
WI Brown Co. United States |
US 141 / Military Rd. (44.54792, -88.04733) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.8554 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 18, 2011. ICD estimated from Google Maps linework. |
|
Madison,
WI Dane Co. United States |
CTH M (Pleasant View Rd.) / CTH S (Mineral Point Rd.) (43.06030, -89.53722) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.2298 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened June 27, 2011. ICD estimated from Google Maps linework. |
|
Madison,
WI Dane Co. United States |
CTH M (Pleasant View Rd.) / Valley View Rd. / Junction Rd. (43.04614, -89.53278) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.1149 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened July 17, 2011. ICD estimated from Google Maps linework. |
|
Pleasant Prairie,
WI Kenosha Co. United States |
STH 165 (104th St.) / CTH EZ (39th Ave.) (42.52248, -87.85383) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.5327 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened August 8, 2011. ICD estimated from Google Maps linework. |
|
Pleasant Prairie,
WI Kenosha Co. United States |
STH 165 (104th St.) / CTH ML (Springbrook Rd.) (42.52253, -87.86031) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.8919 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 7, 2011. Yield-controlled right-turn bypass lanes. ICD estimated from Google Maps linework. |
|
Mukwonago,
WI Waukesha Co. United States |
STH 83 / CTH I (River Rd.) (42.92252, -88.34597) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.3560 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 23, 2011. ICD estimated from Google Maps linework. |
|
Sheboygan,
WI Sheboygan Co. United States |
CTH EE / CTH OK (43.70249, -87.74506) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9907 |
Other (At-Grade) Single-Lane |
2011 | Opened July 28, 2011. ICD estimated from Google Maps linework. |
|
Appleton,
WI Calumet Co. United States |
CTH AP (Plank Rd.) / Midway Rd. (44.23008, -88.37485) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.2316 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
|
Sherwood,
WI Calumet Co. United States |
STH 114 / CTH N (44.20024, -88.32381) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.0987 |
Other (At-Grade) Single-Lane |
2011 | High-sped approach roadways. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
|
Oregon,
WI Dane Co. United States |
STH 138 / US 14 WB Ramps (42.91764, -89.36607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2309 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
|
Oregon,
WI Dane Co. United States |
STH 138 / US 14 EB Ramps (42.91774, -89.36817) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1083 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
|
Amelia Island,
FL Nassau Co. United States |
SR A1A / David Gregory Dr. (30.56414, -81.45299) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.7665 |
Other (At-Grade) Single-Lane |
2011 | Functional Class: Arterial ICD estimated from Google Maps linework. |
|
Sarasota,
FL Sarasota Co. United States |
Main St. / Central Ave. / S Pineapple Ave. (27.33642, -82.54263) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.3410 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
|
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / S Washburn St. (44.01085, -88.58483) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
|
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / US 41 SB Ramps (44.01089, -88.58318) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
|
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / US 41 NB Ramps (44.01078, -88.58145) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
|
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / S Koeller St. (44.01079, -88.57978) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
|
Oshkosh,
WI Winnebago Co. United States |
US 45 / US 41 SB Ramps (44.06074, -88.57443) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
|
Tallahassee,
FL Leon Co. United States |
Weems Rd. / Easterwood Dr. (30.45154, -84.22405) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.8283 |
Other (At-Grade) Single-Lane |
2011 | Previously controlled by one-way stop ICD estimated from Google Maps linework. |
|
Cottage Grove,
WI Dane Co. United States |
CTH N / CTH TT (43.11198, -89.19907) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.2597 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
|
Cottage Grove,
WI Dane Co. United States |
CTH N / I-94 WB Ramps (43.11037, -89.19930) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.6200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
|
Cottage Grove,
WI Dane Co. United States |
CTH N / I-94 EB Ramps (43.10877, -89.19923) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.3649 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
|
Lannon,
WI Waukesha Co. United States |
CTH V (Town Line Rd.) / W Good Hope Rd. (43.14820, -88.18388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.0124 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
|
Deforest,
WI Dane Co. United States |
Savannah Dr. / Williamsburg Way (43.19280, -89.31834) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0536 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
|
St. Croix Falls,
WI Polk Co. United States |
US 8 / 208th St. (45.39731, -92.58540) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.2548 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened March 8, 2011. ICD estimated from Google Maps linework. |
|
Pulaski,
WI Brown Co. United States |
STH 32 (S Wisconsin St.) / CTH B (Crest Dr.) (44.65709, -88.22159) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.4779 |
Other (At-Grade) Single-Lane |
2011 | Opened September 6, 2011. ICD estimated from Google Maps linework. |
|
Hobart,
WI Brown Co. United States |
STH 54 (W Mason St.) / CTH J (Seminary Rd.) (44.50105, -88.19372) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.7030 |
Other (At-Grade) Single-Lane |
2011 | Opened November 2011. ICD estimated from Google Maps linework. |
|
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / I-94 EB Ramps (43.06063, -88.44229) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.9046 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
|
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / I-94 WB Ramps (43.06174, -88.44228) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.1203 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
|
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / CTH DR (Delafield Rd.) (43.05922, -88.44241) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 36.6506 |
Other (At-Grade) Single-Lane |
2011 | Opened August 11, 2011. ICD estimated from Google Maps linework. |
|
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / Pabst Farms Blvd. / CTH DR (43.06441, -88.44336) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.3731 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
|
Genesee,
WI Waukesha Co. United States |
STH 83 / STH 59 (Genesee Rd.) (42.95798, -88.36010) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.4592 |
Other (At-Grade) Single-Lane |
2011 | Opened October 7, 2011. ICD estimated from Google Maps linework. |
|
Genesee,
WI Waukesha Co. United States |
STH 83 / CTH X (Saylesville Rd.) / Fields Crossing Dr. (42.93302, -88.34619) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.1073 |
Other (At-Grade) Single-Lane |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
|
Akron,
OH Summit Co. United States |
SR 241 (Seiberling St. - Innovation Way) / Seiberling St. / Eagle St. / Eagle Way (41.05604, -81.47194) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2011 | |
|
Matthews,
NC Mecklenburg Co. United States |
(internal shopping center intersection) (35.13310, -80.71056) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 19.8120 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). |
|
Kimball,
NY Westchester Co. United States |
Xavier Dr. / Paula Ave. (40.92692, -73.85267) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 15.2400 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2011 | Year Completed estimated (2010-2011). |
|
Ottawa,
ON Ottawa Canada |
(unknown) (45.28965, -75.90432) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2011 | Within shopping centre. Year Completed estimated (2009-2012). |
|
Ottawa,
ON Ottawa Canada |
(unknown) (45.28800, -75.90712) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2011 | Within shopping centre. Year Completed estimated (2009-2012). |
|
Jekyll Island,
GA Glynn Co. United States |
GA 520 (Ben Fortson Pkwy.) / N Beachview Dr. (31.04758, -81.41269) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2011 | Elliptical shaped. ICD = 135 ft x 125 ft. |
|
New Haven,
CT New Haven Co. United States |
Quinnipiac Ave. / Ferry St. (41.30011, -72.89024) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 21.3357 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2011 | |
|
Leander,
TX Williamson Co. United States |
Calla Lily Blvd. / Water Hyacinth Loop / Water Hyssop Loop (30.56533, -97.83054) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2011 | |
|
El Paso,
TX El Paso Co. United States |
Constitution Ave. / Gulf Victory Way (31.84900, -106.35481) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 94.4880 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Located on Fort Bliss. |
|
El Paso,
TX El Paso Co. United States |
Constitution Ave. / (unknown) (31.85059, -106.35745) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 76.2000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Located on Fort Bliss. |
|
El Paso,
TX El Paso Co. United States |
Gulf Victory Way / Constitution Ave. (31.84527, -106.35999) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 75.8952 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Located on Fort Bliss. Concentric circulatory roadway striping. |
|
Bryan,
TX Brazos Co. United States |
Eastchester Dr. / Gramercy Park Dr. (30.65461, -96.29199) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2011 | |
|
Fort Worth,
TX Tarrant Co. United States |
Elizabeth Blvd. / 5th Ave. (32.71659, -97.33907) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.3357 |
Other (At-Grade) Single-Lane |
2011 | Painted splitter islands. |
|
Fort Worth,
TX Tarrant Co. United States |
Elizabeth Blvd. / S Adams St. (32.71659, -97.33668) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.3357 |
Other (At-Grade) Single-Lane |
2011 | Painted splitter islands. |
|
Fort Worth,
TX Tarrant Co. United States |
Elizabeth Blvd. / Willing Ave. (32.71660, -97.34144) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.8600 |
Other (At-Grade) Single-Lane |
2011 | Painted splitter islands. |
|
Cedar Park,
TX Williamson Co. United States |
Alamo Plaza Dr. / Enchanted Rock Dr. (30.53461, -97.82527) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Single-Lane |
2011 | Diamond shaped. Pedestrian access to central island; no splitter islands. |
|
Alexandria,
LA Rapides Par. United States |
England Dr. / Vandenburg Dr. (31.32622, -92.52851) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2011 | |
|
McAllen,
TX Hidalgo Co. United States |
Lark Blvd. (26.26139, -98.23389) |
Other Existing |
All-Way Yield None |
2 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2011 | Pedestrian access through central island. Painted splitter islands. |
|
Lubbock,
TX Lubbock Co. United States |
Topeka Ave. / 121st St. (33.48496, -101.90862) |
Other Existing |
Uncontrolled None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2011 | No splitter islands. |
|
McAllen,
TX Hidalgo Co. United States |
Valencia Market Pl. / Warbler Ave. (26.27065, -98.22098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2011 | |
|
Miami,
FL Miami-Dade Co. United States |
SW 6th St. / SW 62nd Ave. (25.76516, -80.29595) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2011 | |
|
Barrie,
ON Simcoe Canada |
Governors Dr. / Ring Rd. (44.41354, -79.66887) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | East and west legs have painted splitter islands. Concentric striped circulatory roadway. Year Completed estimated (2009-2013). |
|
Hamilton,
ON Hamilton Canada |
Whittington Dr. / Raymond Rd. (43.21417, -79.93589) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2009-2012). Splitter islands added 2015. |
|
Hamilton,
ON Hamilton Canada |
Robertson Rd. / Raymond Rd. (43.21206, -79.93525) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2011 | No splitter islands. Year Completed estimated (2009-2012). |
|
Hamilton,
ON Hamilton Canada |
Raymond Rd. / Irwin Ave. (43.21613, -79.93984) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2009-2012). Splitter islands added 2016-2017. |
|
Fredericton,
NB York Canada |
Brookside Dr. / Reynolds St. / White Hills Crossing (45.99357, -66.64898) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2011). |
|
Reno,
NV Washoe Co. United States |
Raggio Pkwy. / (unknown) (39.57033, -119.79414) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 73.1520 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Converted from older rotary in 2010-2011 with striping to remove concentric circulatory roadway striping. |
|
Box Elder,
SD Pennington Co. United States |
Davis Dr. / Schnever St. (44.13351, -103.07564) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2011 | At Ellsworth Air Force Base just past entrance gate. |
|
Summerfield,
MD Prince George's Co. United States |
Ruby Lockhart Blvd. / Taj Ln. (38.92163, -76.84438) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | |
|
Glenarden,
MD Prince George's Co. United States |
Ruby Lockhart Blvd. / Campus Way (38.92345, -76.84696) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | |
|
Glenarden,
MD Prince George's Co. United States |
Ruby Lockhart Blvd. / Evarts St. / Sir Michael Pl. (38.92506, -76.84953) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Double left-turn and double right-turn movements. |
|
Summerfield,
MD Prince George's Co. United States |
Campus Way / Geaton Park Pl. (38.92577, -76.84451) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | |
|
Sacramento,
CA Sacramento Co. United States |
Airport Blvd. / Lindbergh Dr. / Aviation Dr. (38.69345, -121.59025) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2011 | South leg is exit only. |
|
Post Falls,
ID Kootenai Co. United States |
W Prairie Ave. / N McGuire Rd. (47.74518, -116.98054) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2011 | |
|
Redmond,
WA King Co. United States |
Redmond Ridge Dr. NE / NE Cedar Park Crest (47.68578, -122.03278) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2011-2012). |
|
Visalia,
CA Tulare Co. United States |
Shannon Pkwy. / Mooney Blvd. (36.36166, -119.31435) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Two lane entry on north leg into single-lane circulatory roadway. Striped out inner lane of circulatory roadway. Year Completed estimated (2010-2011). |
|
San Ramon,
CA Contra Costa Co. United States |
Stoneleaf Rd. / W Branch Rd. (37.76337, -121.91875) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2011 | |
|
Barrie,
ON Simcoe Canada |
Live Eight Way / Park Place Blvd. / (parking) (44.33760, -79.68131) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Year Completed estimated (2011-2013). |
|
Tuscaoosa,
AL Tuscaloosa Co. United States |
Ruby Tyler Pkwy. / N River Dr. (33.20882, -87.51579) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). |
|
North Salt Lake,
UT Davis Co. United States |
Orchard Dr. / E Eaglegate Dr. (40.83459, -111.91224) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2011 | Crosswalks next to circulatory roadway. Year Completed estimated (2010-2011). |
|
Caledon,
ON Peel Canada |
Kennedy Rd. / Newhouse Blvd. / Bonnieglen Farm Blvd. (43.75910, -79.83540) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2009-2013). |
|
London,
ON Middlesex Canada |
Morgan Ave. / Morgan Crescent / Singleton Ave. (42.93441, -81.27261) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2009-2011). Splitter islands added 2015. |
|
Jefferson City,
MO Cole Co. United States |
Ellis Blvd. / Tanner Bridge Rd. (38.55085, -92.18866) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2011 | Elliptical shape. ICD = 135 ft x 125 ft. Skewed intersection. Right-turn bypass lane due to skew on west leg. Year Completed estimated (2010-2011). |
|
Youngsville,
LA Lafayette Par. United States |
Fortune Rd. / Bonin Rd. (30.12382, -92.00743) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.5852 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). ICD estimated from Google Maps linework. |
|
Las Cruces,
NM Dona Ana Co. United States |
N Main St. / N Water St. / N Church St. (32.31404, -106.77979) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.3465 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
|
Laurinburg,
NC Scotland Co. United States |
US 501 Business (Johns Rd.) / Lauchwood Dr. (34.75125, -79.46361) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2009-2011). ICD estimated from Google Maps linework. |
|
Windsor,
ON Essex Canada |
Mill St. / Felix Ave. / Ryan St. (42.30012, -83.07024) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.2675 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). ICD estimated from Google Maps linework. |
|
Morrisville,
NC Wake Co. United States |
Market Center Dr. / Village Market Pl. (35.80699, -78.81617) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.8065 |
Other (At-Grade) Single-Lane |
2011 | ICD = 140 ft. Year Completed estimated (2010-2013). ICD estimated from Google Maps linework. |
|
Durham,
NC Durham Co. United States |
Nova Glen Dr. / DPS Middle School Entrance (36.10940, -78.89156) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2011 | Painted splitter islands. Year Completed estimated (2010-2013). |
|
Durham,
NC Durham Co. United States |
Windrush Ln. / Callandale Ln. (35.95677, -78.83138) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.2023 |
Other (At-Grade) Single-Lane |
2011 | Splitter islands added in 2015. ICD = 100 ft. ICD estimated from Google Maps linework. |
|
Saratoga Springs,
UT Utah Co. United States |
W Aspen Hills Blvd. / N 400 W (40.39159, -111.92595) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2011). |
|
Phoenix,
AZ Maricopa Co. United States |
E Madison St. / (parking) (33.44625, -111.98911) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2011 | Accommodates WB-67 truck deliveries to the Phoenix Sky Train terminal. Part of Phoenix Sky Harbor off-site parking facility. Year Completed estimated (2011-2012). |
|
Cumming,
GA Forsyth Co. United States |
Aquatic Cir. / (parking) (34.22443, -84.10920) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2011 |