City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Bathgate,
Scotland West Lothian United Kingdom |
Heartlands Terrace / M8 WB Ramps / (parking) (55.86999, -3.70232) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Bathgate,
Scotland West Lothian United Kingdom |
Heartlands Terrace / M8 EB Ramps / (unknown) (55.87122, -3.70250) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Red Deer County,
AB Division 8 Canada |
MacKenzie Rd. / Lexa Ave, / Hwy 2 SB Ramps (52.20126, -113.81739) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2021 | https://rdnewsnow.com/2021/10/28/mckenzie-road-roundabouts-now-open/ |
Red Deer County,
AB Division 8 Canada |
McKenzie Rd. / Gasoline Alley E / Hwy 2 NB Off-Ramp (52.20130, -113.81247) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2021 | https://rdnewsnow.com/2021/10/28/mckenzie-road-roundabouts-now-open/ |
Loon op Zand,
North Brabant Gemeente Loon op Zand Netherlands |
Kasteelhoevenweg / N261 NB Ramps (51.62066, 5.06720) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Loon op Zand,
North Brabant Gemeente Loon op Zand Netherlands |
Kasteelhoevenweg / N261 SB Ramps / Heideweg (51.62153, 5.06291) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Markaryd,
Kronoberg County Markaryd Sweden |
Rte 15 / E4 NB Ramps (56.46801, 13.63521) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
Raindrop shaped. Built before 2009. | |
Markaryd,
Kronoberg County Markaryd Sweden |
Rte 15 / E4 SB Ramps (56.46888, 13.63301) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 35.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
Raindrop shaped. Completed before 2009. | |
Skånes-Fagerhult,
Skåne County Örkelljunga Sweden |
Skyttevägen / E4 NB Ramps (56.35960, 13.47747) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 35.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
Raindrop shaped. | |
Bjärred,
Skåne County Lomma Sweden |
Fjelievägen / E6 NB Ramps (55.72272, 13.09088) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
1976 | Raindrop shaped. Merging right-turn bypass lane on east leg. The previous control was yield from ramp. |
Polmont,
Scotland Falkirk United Kingdom |
Forth Valley [A9 (Inchyra Rd.) / A905 (Beancross Rd.) / M9 Ramps] (55.99715, -3.71783) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
||
Lisburn,
N. Ireland Lisburn & Castlereagh United Kingdom |
A3 (Saintfield Rd.) / A49 (Saintfield Rd.) / Largymore Link / M1 Ramps (54.50584, -6.02852) |
Signalized Roundabout/Circle Existing |
Signal None |
5 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
||
Dundalk,
Co Louth Ireland |
N52 (Eastern Bypass Rd.) / M1 Ramps (53.97072, -6.42384) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
||
Troon,
Scotland South Ayrshire United Kingdom |
A759 / A78 NB Off-Ramp / (frontage road) (55.56771, -4.63841) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Auchengate,
Scotland South Ayrshire United Kingdom |
A759 (Woodend Rd.) / A78 SB On-Ramp (55.56906, -4.63727) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Haggs,
Scotland Falkirk United Kingdom |
A803 (Kilsyth Rd.) / M80 SB Ramps (55.99122, -3.94095) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-lane w/ Traversable Central Island |
||
Kristianstad,
Skåne County Kristianstad Sweden |
Rte 118 / E22 NB Ramps (56.02453, 14.21201) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 67.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2017 | Elliptical shaped. ICD = 67 m x 61 m. Year Completed estimated (2015-2018). |
Dotsero,
CO Eagle Co. United States |
Colorado River Rd. / US 6 / I-70 Frontage Rd. / I-70 WB On-Ramp (39.64841, -107.06570) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | Year Completed estimated (2011-2015). |
Parachute,
CO Garfield Co. United States |
Old Hwy 6 / I-70 EB Ramps / (unknown) (39.42828, -108.07440) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | |
Parachute,
CO Garfield Co. United States |
Old Hwy 6 / I-70 WB Ramps (39.42982, -108.07610) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | |
Cashmere,
WA Chelan Co. United States |
Goodwin Rd. / US 2 EB Ramps / Hay Canyon Rd. (47.52907, -120.48927) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Hay Canyon Rd goes under Goodwin Rd just east of roundabout. https://www.co.chelan.wa.us/public-works/pages/west-cashmere-bridge-replacement-crp-693 |
Sydney,
NSW Parramatta Australia |
Australia Ave. / Underwood Rd. / A3 (Homebush Bay Dr.) Ramps (-33.85401, 151.07718) |
Roundabout Existing |
All-Way Yield Metering Signal |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
https://www.smh.com.au/national/nsw/sydney-s-worst-roundabout-gets-100m-upgrade-work-won-t-start-for-three-years-20220426-p5ag6u.html | |
Tigre,
Buenos Aires Province Partido de Tigre Argentina |
Luis Garcia / Montevideo / Ramal Tigre Ramps (-34.43272, -58.58513) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
||
Delta,
BC Greater Vancouver Canada |
River Rd. / Hwy 17 SB Ramps (49.15212, -122.95254) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2021 | https://canada.constructconnect.com/joc/news/projects/2021/12/new-interchange-improves-delta-connections |
Delta,
BC Greater Vancouver Canada |
River Rd. / Hwy 17 NB Ramps (49.15194, -122.94952) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2021 | Raindrop shaped. https://canada.constructconnect.com/joc/news/projects/2021/12/new-interchange-improves-delta-connections |
The Hague,
South Holland The Hague Netherlands |
Donau / A12 WB Ramps (52.05492, 4.40123) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
Turbo roundabout. Raindrop shaped. | |
Rotterdam Havens,
South Holland Rotterdam Netherlands |
Merseyweg / A15 EB Ramps / Europaweg (51.89988, 4.23228) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Pueblo,
CO Pueblo Co. United States |
Dillon Dr. / I-25 Frontage Road / I-25 SB On-Ramp (38.33775, -104.62031) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2016 | Year Completed estimated (2015-2018). |
Saint Cloud,
WI Fond Du Lac Co. United States |
CR G / STH 23 WB Ramps (43.77241, -88.17078) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Raindrop shaped. |
Saint Cloud,
WI Fond Du Lac Co. United States |
CR G / STH 23 EB Ramps (43.77066, -88.17090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Raindrop shaped. |
Tynaarlo,
Drenthe Tynaarlo Netherlands |
N386 / A28-E232 SB Ramps / (parking) (53.08031, 6.60176) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Tynaarlo,
Drenthe Tynaarlo Netherlands |
N386 / A28-E232 SB Ramps / Dorpsstraat (53.08035, 6.60571) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Zuidlaren,
Drenthe Tynaarlo Netherlands |
N386 / N34 SB Ramps (53.08533, 6.65335) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Zuidlaren,
Drenthe Tynaarlo Netherlands |
N386 / N34 NB Ramps (53.08579, 6.65493) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Hays,
KS Ellis Co. United States |
Vine St. (US 183) / I-70 EB Ramps (38.89756, -99.31782) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2021 | https://hayspost.com/posts/8b04e698-656a-41e7-86e6-e165ff1e4e68 |
Bloomingdale,
GA Chatham Co. United States |
GA 17 (Bloomingdale Rd.) / I-16 WB Ramps (32.10083, -81.32357) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Richmond Hill,
GA Bryan Co. United States |
GA 144 (Ford Ave.) / I-95 NB Ramps (31.95979, -81.32843) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2021-2022). |
Richmond Hill,
GA Bryan Co. United States |
GA 144 (Ford Ave.) / I-95 SB Ramps (31.96054, -81.32963) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2021-2022). |
Binghamton,
NY Broome Co. United States |
US 11 (Upper Front St.) / I-81 NB Ramps (42.12299, -75.90472) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://www.binghamtonhomepage.com/news/new-roundabout-opens-on-upper-front-st/ https://www.wbng.com/2022/06/22/one-roundabout-completed-one-more-go-town-dickinson-see-bridge-completion-new-traffic-patterns/ |
Jefferson City,
MO Cole Co. United States |
E McCarty St. / US 50 EB Ramps / Supercenter Dr. (38.54169, -92.12189) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Yielding right-turn bypass lane with acute view angle on northwest leg. Year Completed estimated (2007-2009). |
Jefferson City,
MO Cole Co. United States |
E McCarty St. / US 50 WB Ramps (38.54432, -92.11960) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Year Completed estimated (2007-2009). |
Fishers,
IN Hamilton Co. United States |
E 131st St. / SR 37 NB Ramps (39.97893, -86.00339) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2022 | Raindrop shaped. Opened July 2022. |
Fishers,
IN Hamilton Co. United States |
E 131st St. / SR 37 SB Ramps (39.97889, -86.00413) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2022 | Raindrop shaped. |
Indianapolis,
IN Marion Co. United States |
W Access Rd. / Bluffdale Dr. / W Access Rd. / I-69 SB Ramps (39.63578, -86.20605) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
||
Chaska,
MN Carver Co. United States |
Big Woods Blvd. / US 212 EB On-Ramp (44.79095, -93.63046) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2020 | Year Completed estimated (2019-2020). |
Binghamton,
NY Broome Co. United States |
Upper Front St. / Old Front St. / I-81 SB Ramps (42.12650, -75.90703) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | https://www.wbng.com/2022/08/04/second-roundabout-now-open-rt-11-town-dickinson/ |
Columbus,
MS Lowndes Co. United States |
Military Rd. / US 82 EB Ramps (33.51801, -88.41368) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | https://cdispatch.com/news/2020-11-19/military-road-roundabout-project-to-reach-completion-by-end-of-november/ |
Columbus,
MS Lowndes Co. United States |
Military Rd. / US 82 WB Ramps (33.51915, -88.41193) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | https://cdispatch.com/news/2020-11-19/military-road-roundabout-project-to-reach-completion-by-end-of-november/ |
Paeonian Springs,
VA Loudoun Co. United States |
Charles Town Pike / SR 7 WB Ramps (39.14190, -77.61205) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2015 | Year Completed estimated (2014-2016). |
Carpinteria,
CA Santa Barbara Co. United States |
Ogan Rd. / Via Real / US 101 NB On-Ramp (34.40144, -119.51551) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | https://www.coastalview.com/news/roadways-open-with-improvements/article_979e3586-c6f1-11ea-bc84-b3d50932177b.html |
Calgary,
AB Division 6 Canada |
Sarcee Trl. SW / Na'a Dr. SW / Trans-Canada Hwy EB Ramps (51.07800, -114.18891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2017 | |
Calgary,
AB Division 6 Canada |
West Valley Rd. SW / 101 St. SW / 1 Ave. SW / Trans-Canada Hwy EB On-Ramp (51.08514, -114.23423) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Calgary,
AB Division 6 Canada |
Valley Ridge Blvd. NW / Trans Canada Hwy EB Ramps (51.08743, -114.24755) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 67.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2022 | |
Richmond,
VA Richmond City United States |
W Laburnum Ave. / I-195 SB Ramps (37.58383, -77.47494) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Freeway Ramps (Grade-Separated) Single-lane w/ Traversable Central Island |
2020 | Central island made of pre-cast concrete. https://precast.org/2021/08/first-of-its-kind/ |
Waterford,
VA Loudoun Co. United States |
Charles Town Pike / E Colonial Hwy. / Dry Mill Pkwy. / SR 7 EB Ramps (39.14003, -77.61273) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2015 | Combines two stop-controlled intersections. Year Completed estimated (2014-2016). |
East Greenbush,
NY Rensselaer Co. United States |
US 4 (Troy Rd.) / I-90-Rte 9 WB Ramps (42.62923, -73.70059) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | |
Lake St Louis,
MO St. Charles Co. United States |
Lake Saint Louis Blvd. / Veteran's Memorial Pkwy. / I-70 EB Ramps (38.80322, -90.77073) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 67.0560 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | |
Mount Orab,
OH Brown Co. United States |
N High St. / SR 32 EB Ramps (39.04104, -83.92064) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Raindrop shaped. |
Girard,
PA Erie Co. United States |
SR 18 (Meadville Rd.) / I-90 WB Ramps (41.96319, -80.34086) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. https://www.goerie.com/story/news/local/2022/07/15/bridge-and-roundabouts-open-i-90-route-18-girard-platea-interchange-erie-county-pa/65373375007/ |
Girard,
PA Erie Co. United States |
SR 18 (Meadville Rd.) / I-90 EB Ramps (41.96210, -80.34068) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. https://www.goerie.com/story/news/local/2022/07/15/bridge-and-roundabouts-open-i-90-route-18-girard-platea-interchange-erie-county-pa/65373375007/ |
Beaver Falls,
PA Beaver Co. United States |
College Ave. / 31st St. / Moss Alley (40.77170, -80.32230) |
Other Existing |
All-Way Stop Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
Parking along circulatory roadway. | |
Indianapolis,
IN Marion Co. United States |
W County Line Rd. / N Bluff Rd. / I-69 (SR 37) NB Ramps (39.63481, -86.20389) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2021-2022). |
Delta,
BC Greater Vancouver Canada |
Nordel Way / Highway 91 Connector EB Ramps / Frontage Rd. (49.14617, -122.94689) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Merging right-turn bypass lane on east leg; add-lane right-turn bypass lane on south leg. |
Bargersville,
IN Johnson Co. United States |
SR 144 / I-69 SB Ramps (39.56591, -86.24760) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2022 | Interchange replaced at-grade signalized intersection. |
Bargersville,
IN Johnson Co. United States |
SR 144 / CR 144 / I-69 NB Ramps (39.56557, -86.24616) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2022 | Interchange replaced at-grade signalized intersection. |
Portage la Prairie,
MB Division 9 Canada |
Hwy 1A / Trans Canada Hwy. WB Ramps (49.97435, -98.35997) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://portageonline.com/articles/see-aerial-view-of-west-end-roundabout-now-open https://www.portageonline.com/articles/final-plan-for-west-end-overpass-complete |
Portage la Prairie,
MB Division 9 Canada |
Hwy 1A / Trans Canada Hwy. EB Ramps (49.97330, -98.36839) |
Roundabout Unknown |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Unknown |
https://www.portageonline.com/articles/update-on-west-end-overpass-replacement-construction | |
Cranberry Township,
PA Butler Co. United States |
MSA Dr. / I-79 NB Off-Ramp (40.68440, -80.09193) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | |
Lincoln,
NE Lancaster Co. United States |
S 68th St. / NE 2 WB Ramps (40.69162, -96.62914) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.9973 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. |
Whittlesford,
England Cambridgeshire United Kingdom |
A505 / M11 Ramps (52.09854, 0.13804) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Lincoln,
NE Lancaster Co. United States |
S 68th St. / NE 2 EB Ramps (40.68931, -96.62932) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.9976 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. |
Trego,
WI Washburn Co. United States |
US 63 / US 53 SB Ramps / CR E (45.89603, -91.82981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://mobile.twitter.com/WisDOTnorthwest/status/1587519853581271043?cxt=HHwWhoC8qaq5gIgsAAAA |
Trego,
WI Washburn Co. United States |
US 63 / US 53 NB Ramps / Service Loop (45.89745, -91.82604) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://mobile.twitter.com/WisDOTnorthwest/status/1587519853581271043?cxt=HHwWhoC8qaq5gIgsAAAA |
Chernogorsk,
Khakassia Chernogorsk Russia |
prospekt Kosmonavtov / M54 (avtodoroga Yenisey) EB Ramps (53.84000, 91.34129) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Marengo,
IL McHenry Co. United States |
SR 23 / I-90 WB Ramps (42.17930, -88.61798) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Yield-controlled right turn bypass lane on east leg off freeway exit ramp. Merging right turn bypass lane on south leg onto freeway entrance ramp. |
Marengo,
IL McHenry Co. United States |
SR 23 / I-90 EB Ramps (42.17539, -88.61798) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Yield-controlled right turn bypass lane on east leg off freeway exit ramp. Merging right turn bypass lane on south leg onto freeway entrance ramp. |
Bayonne,
NJ Hudson Co. United States |
Avenue E / I-78 Ramps (40.68260, -74.09906) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2018 | Roundabout centered under I-78 freeway ramps. Year Completed estimated (2017-2018). |
Varberg,
Halland County Varberg Sweden |
Värnamovägen / E6-E20 NB Ramps (57.12949, 12.31446) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7190 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Built after 2009 and before July 2016 as shown by Google StreetView. Previous control Yield from ramp and no control on other two approaches. |
Varberg,
Halland County Varberg Sweden |
Värnamovägen / E6-E20 SB Ramps (57.12786, 12.31052) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7190 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Built after 2012 and before 2018 as shown by Google StreetView. Previous control Yield from ramp and no control on other two approaches |
Williamsburg,
KY Whitley Co. United States |
US 25W / I-75 NB Ramps (36.79226, -84.16820) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Williamsburg,
KY Whitley Co. United States |
US 25W / I-75 SB Ramps (36.79318, -84.17100) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Buena Vista,
MI Saginaw Co. United States |
M-46 (E Holland Rd.) / I-75-US 23 SB Ramps (43.41453, -83.89324) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lane on north leg. Replaced cloverleaf interchange. https://www.michigan.gov/mdot/news-outreach/pressreleases/2022/03/30/i-75-m-46-work-in-saginaw-county-resumes-april-4-for-final-phase |
Saginaw,
MI Saginaw Co. United States |
M-46 (E Holland Rd.) / I-75-US 23 NB Ramps (43.41447, -83.88874) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Replaced cloverleaf interchange. Merging right-turn bypass lane on east leg. https://www.michigan.gov/mdot/news-outreach/pressreleases/2022/03/30/i-75-m-46-work-in-saginaw-county-resumes-april-4-for-final-phase |
Orlando,
FL Orange Co. United States |
(connector to Cargo Rd.) / Jeff Fuqua Blvd. Ramps (28.44101, -81.30795) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 42.9765 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | At Orlando International Airport. |
Grandview,
MO Jackson Co. United States |
US 71 NB Frontage Road / I-49-US 71 NB Ramps (38.86704, -94.52594) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://www.grandview.org/government/city-departments/public-works/projects/i-49-outer-roads-conversion |
Grandview,
MO Jackson Co. United States |
US 71 SB Frontage Rd. / I-49-US 71 SB Ramps (38.87725, -94.52680) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://www.grandview.org/government/city-departments/public-works/projects/i-49-outer-roads-conversion |
Iowa City,
IA Johnson Co. United States |
Herbert Hoover Hwy. NE / I-80 WB Ramps (41.67198, -91.44380) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Previous intersection was entrance ramp only. https://www.news.iowadot.gov/newsandinfo/2022/06/eastbound-i-80-ramps-at-herbert-hoover-highwayjohnson-county-road-f-44-exit-249-in-johnson-county-to.html |
Iowa City,
IA Johnson Co. United States |
Herbert Hoover Hwy. SE / I-80 EB Ramps (41.67099, -91.44629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Previous intersection was exit ramp only. https://www.news.iowadot.gov/newsandinfo/2022/06/eastbound-i-80-ramps-at-herbert-hoover-highwayjohnson-county-road-f-44-exit-249-in-johnson-county-to.html |
Voglans,
Auvergne-Rhône-Alpes Savoie France |
D1504 / D1201 Ramps (45.61639, 5.88404) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 96.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Bonne Terre,
MO St. Francois Co. United States |
Old Orchard Rd. / Raider Rd. / US 67 SB Ramps (37.91037, -90.53216) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Elliptical shaped. ICD = 155 ft x 145 ft. Year Completed estimated (2007-2009). |
Bonne Terre,
MO St. Francois Co. United States |
Old Orchard Rd. / US 67 NB Ramps (37.91294, -90.53029) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Year Completed estimated (2007-2009). |
Avila Beach,
CA San Luis Obispo Co. United States |
Avila Beach Dr. / Palisades Rd. / US 101 SB Ramps (35.17977, -120.70042) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening in fall of 2024. | |
Santa Barbara,
CA Santa Barbara Co. United States |
Olive Mill Rd. / Coast Village Rd. / N Jameson Ln. / US 101 Ramps (34.42156, -119.63993) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 46.3296 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Opened May 2024. https://www.youtube.com/watch?v=QKQzLS7q3iw |
Montecito,
CA Santa Barbara Co. United States |
San Ysidro Rd. / N Jameson Ln. / US 101 NB Ramps (34.42287, -119.63152) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 53.6445 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | This is an unique kidney shaped single-lane roundabout (approx. varying ICD 176' x 116'). Opened May 2024. https://www.youtube.com/watch?v=QKQzLS7q3iw |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 EB Ramps (36.76908, -121.73823) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.7573 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. Future 3rd leg is planned to connect to BlackieRd. | |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 WB Ramps (36.77058, -121.73771) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 NB Ramps (35.56543, -120.70151) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 56.0829 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 184 ft x 157 ft. Anticipated opening year 2030. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 SB Ramps / Theatre Dr. (35.56644, -120.70261) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.8909 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2030. | |
Morro Bay,
CA San Luis Obispo Co. United States |
Atascadero Rd. / US 101 NB Ramps / Main St. (35.38023, -120.85489) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 160 ft x 130 ft. Anticipated opening year 2026. | |
Truckee,
CA Nevada Co. United States |
Donner Pass Rd. / Cold Stream Rd. / I-80 EB Ramps (39.32359, -120.22747) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 |