City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Holly Springs,
GA Cherokee Co. United States |
Holly Commons Pkwy. (34.19365, -84.44589) |
Other Existing |
Unknown Unknown |
2 Approaches 2 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Liberty Township,
OH Butler Co. United States |
Aspenwood Dr. / Aspen Trail Blvd. (39.42119, -84.44619) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways 26.7559 |
Other (At-Grade) Single-Lane |
2003 | No splitter islands. ICD estimated from Google Maps linework. |
Meridian Township,
MI Ingham Co. United States |
Hulett Rd. / Bennett Rd. (42.69739, -84.44709) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.9884 |
Other (At-Grade) Single-Lane |
2004 | ICD estimated from Google Maps linework. |
Meridian Township,
MI Ingham Co. United States |
Park Lake Rd. / Burcham Dr. (42.74077, -84.44757) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.8232 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2013). ICD estimated from Google Maps linework. |
(unincorporated),
GA Cherokee Co. United States |
Harmony Lake Dr. / Argonne Terr. (34.19444, -84.44889) |
Other Existing |
All-Way Yield None |
4 Approaches 2 Driveways 177.8168 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2005 | Southbound entry has right of way. ICD estimated from Google Maps linework. |
Marietta,
GA Cobb Co. United States |
Hembree Rd. NE / Meadow Dr. NE / (school access) (34.02285, -84.45054) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.5546 |
Other (At-Grade) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Liberty Township,
OH Butler Co. United States |
Carriage House Blvd. / Thoroughbred Ln. / Winner Circle Dr. (39.39434, -84.45087) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0730 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Fayetteville,
GA Fayette Co. United States |
Kathi Ave. / Church St. / Easterbrook Way (33.45599, -84.45217) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.8790 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
West Chester Township,
OH Butler Co. United States |
Smith Rd. / Beckett Rd. / Beckett Meadows Rd. (39.35097, -84.45265) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.2538 |
Other (At-Grade) Single-Lane |
2018 | Opened May 2018. Entering ADT = 18,670 vpd as of Sept 2018. ICD estimated from Google Maps linework. |
Holly Springs,
GA Cherokee Co. United States |
Harmony Lake Rd. / Berkeley Terr. / Lakeview Terr. (34.17197, -84.45357) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
West Chester Township,
OH Butler Co. United States |
Tylersville Rd. / Beckett Rd. / (parking) (39.36211, -84.45517) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | This is the 40th roundabout in Butler County. The Butler County Engineer's Office has planned, designed, reviewed, or constructed 37 out of the 40. |
Fayetteville,
GA Fayette Co. United States |
Forrest Ave. / Hood Ave. (33.45700, -84.45584) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.8393 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Holly Springs,
GA Cherokee Co. United States |
Idlewood Dr. / Lorimore Pass (34.17380, -84.45747) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Fayetteville,
GA Fayette Co. United States |
Grady Ave. / Beauregard Blvd. / Redwine Rd. (33.44083, -84.45750) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.8984 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Marietta,
GA Cobb Co. United States |
Post Oak Tritt Rd. / Hembree Rd. (34.01244, -84.45950) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2020 | https://mailchi.mp/5d5027d112e4/traffic-alert-new-roundabout-now-in-operation |
Newport,
KY Campbell Co. United States |
Louie B Nunn Dr. / University Dr. (39.03333, -84.45999) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.6874 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Atlanta,
GA Cobb Co. United States |
Windy Hill Rd SE (33.91312, -84.46068) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Highland Heights,
KY Campbell Co. United States |
Martha Layne Collins Blvd. / Johns Hill Rd. / University Dr. / Knollwood Dr. (39.02729, -84.46077) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.6071 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Atlanta,
GA Cobb Co. United States |
Cobb Galleria Pkwy. / Galleria Pkwy. (33.88609, -84.46106) |
Other Existing |
Other Unknown |
2 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
Stop control within circulatory roadway. | |
Jackson,
MI Jackson Co. United States |
Springport Rd. / Rives Junction Rd. (42.28667, -84.46228) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.mlive.com/news/jackson/2023/04/new-roundabout-coming-soon-to-jackson-county-intersection.html |
Highland Heights,
KY Campbell Co. United States |
University Dr. / Sunset Dr. / 3 Mile Rd. / North Connector Rd. (39.04023, -84.46455) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.5267 |
Other (At-Grade) Unknown |
2017 | ICD estimated from Google Maps linework. |
West Chester Township,
OH Butler Co. United States |
Hutzelman Way / Plum Tree Dr. (39.35732, -84.46578) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.3977 |
Other (At-Grade) Single-Lane |
2002 | Painted splitter islands. ICD estimated from Google Maps linework. |
Canton,
GA Cherokee Co. United States |
Towne Mill Ave. / Towne Mill Crossing (34.30833, -84.46611) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.3671 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Canton,
GA Cherokee Co. United States |
Bluffs Pkwy / (unknown) (34.28787, -84.46622) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 61.1801 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | ICD estimated from Google Maps linework. |
Canton,
GA Cherokee Co. United States |
Towne Mill Ave. / Midway Crossing / Midway Ave. (34.30333, -84.46694) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.3297 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Marietta,
GA Cobb Co. United States |
Holly Springs Rd. / Davis Rd. (34.02670, -84.46830) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.6950 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Canton,
GA Cherokee Co. United States |
Bluffs Pkwy. / Bluffs Ct. (34.28477, -84.46851) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 57.2351 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | ICD estimated from Google Maps linework. |
Canton,
GA Cherokee Co. United States |
Bluffs Pkwy. / (unknown) (34.27975, -84.46860) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 66.1203 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | ICD estimated from Google Maps linework. |
Newport,
KY Campbell Co. United States |
Johns Hill Rd. (KY 2345) / North Connector Rd. (39.02910, -84.46990) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.6059 |
Other (At-Grade) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Canton,
GA Cherokee Co. United States |
Bluffs Pkwy. / (unknown) (34.27347, -84.47071) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 64.1514 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | ICD estimated from Google Maps linework. |
Atlanta,
GA Cobb Co. United States |
Interstate North Pkwy. W / (parking lots) (33.90105, -84.47099) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 25.7737 |
Other (At-Grade) Single-Lane |
2017 | Through bypass lane in southbound direction. ICD estimated from Google Maps linework. |
East Lansing,
MI Ingham Co. United States |
Bogue St. / Shaw Ln. (42.72575, -84.47185) |
Roundabout Removed |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Roundabout built in 2000, removal date estimated (2013-2015). |
East Lansing,
MI Ingham Co. United States |
Bogue St. / Wilson Rd. (42.72326, -84.47186) |
Other Removed |
Unknown Unknown |
4 Approaches 0 Driveways 36.8508 |
Other (At-Grade) Unknown |
ICD estimated from Google Maps linework. | |
(unincorporated),
GA Fayette Co. United States |
Brogdon Rd. / New Hope Rd. (33.49399, -84.47306) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://fayettecountyga.gov/splost-2017/project-details.php?project=brogdon-new-hope-roads-intersection |
Saint Clair,
OH Butler Co. United States |
Wayne Madison Rd. / Trenton Rd. (39.47196, -84.47733) |
Roundabout Existing |
All-Way Yield Other |
4 Approaches 0 Driveways 62.4840 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2021 | Egg shaped. ICD = 205 ft x 180 ft. Railroad crossing approximately 900 feet to south with railroad queue detection on south leg of roundabout to limit roundabout blockage. |
(unincorporated),
GA Cherokee Co. United States |
River Ridge High School access / parking access (34.11611, -84.47916) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 140.4079 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Access to high school. ICD estimated from Google Maps linework. |
Fairfield Township,
OH Butler Co. United States |
Hamilton Mason Rd. / Liberty Fairfield Rd. (39.37527, -84.48046) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.6219 |
Other (At-Grade) Single-Lane |
2008 | Since completion, has reduced accidents by 80%. Replaced two offset T intersections. Previously controlled by two-way stop Functional Class: Major Collector ICD estimated from Google Maps linework. |
East Lansing,
MI Ingham Co. United States |
Wilson Rd. / Red Cedar Rd. (42.72324, -84.48238) |
Other Removed |
Unknown Unknown |
4 Approaches 0 Driveways 23.6898 |
Other (At-Grade) Unknown |
ICD estimated from Google Maps linework. | |
Ellijay,
GA Gilmer Co. United States |
River St. / Dalton St. / Main St. (34.69513, -84.48260) |
Other Existing |
Unknown Unknown |
6 Approaches 0 Driveways 38.2967 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
North Avondale,
OH Hamilton Co. United States |
Dana Ave. / Clinton Springs Ave. (39.15192, -84.48330) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 25.9328 |
Other (At-Grade) Single-Lane |
2015 | This roundabout is mentioned in this local newspaper article (https://www.cincinnati.com/story/news/politics/2017/09/12/northside-you-ready-roundabout/646761001/) ICD estimated from Google Maps linework. |
Lexington,
KY Fayette Co. United States |
S Hanover Ave. / Fincastle Rd. (38.03292, -84.48508) |
Other Existing |
All-Way Stop Unknown |
4 Approaches 0 Driveways 33.8660 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
St. Clair Township,
OH Butler Co. United States |
Hamilton Trenton Rd. / Riverside Dr. / Busenbark Rd. / (parking lot) (39.46565, -84.48671) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.7252 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Lexington,
KY Fayette Co. United States |
S Hanover Ave. / Slashes Rd. (38.03143, -84.48720) |
Other Existing |
All-Way Stop None |
4 Approaches 3 Driveways 47.0370 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Canton,
GA Cherokee Co. United States |
Reservoir Rd. / Great Sky Pkwy. / Sunshower Ridge (34.27694, -84.48833) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 64.1487 |
Other (At-Grade) Single-Lane |
2003 | ICD estimated from Google Maps linework. |
Marietta,
GA Cobb Co. United States |
(unknown) (33.90376, -84.49158) |
Other Existing |
Uncontrolled Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Cemetery drive. | |
Cincinnati,
OH Hamilton Co. United States |
Fulton Ave / Eden Park Drive (39.11472, -84.49347) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.2865 |
Other (At-Grade) Single-Lane |
1999 | ICD estimated from Google Maps linework. |
Fairfield Township,
OH Butler Co. United States |
Millikin Rd. / Morris Rd. / Carter Cir. (39.40585, -84.49448) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | Roundabout opened August 3, 2024. |
Fairfield,
OH Butler Co. United States |
Seward Rd. / Essex Orchard Station Dr. (39.31580, -84.49502) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 22.1763 |
Other (At-Grade) Single-Lane |
1997 | Year Completed estimated (1994-2000). ICD estimated from Google Maps linework. |
Fairfield,
OH Butler Co. United States |
Seward Rd. / Kohn Dr. (39.31476, -84.49520) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 20.3285 |
Other (At-Grade) Single-Lane |
1997 | Little deflection for northbound through movement. Year Completed estimated (1994-2000). ICD estimated from Google Maps linework. |
Newport,
KY Campbell Co. United States |
Taylor-Southgate Bridge / 3rd St. / York St. (39.09337, -84.49734) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.2512 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Lansing,
MI Ingham Co. United States |
Forest Rd. / Collins Rd. (42.70389, -84.49795) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2021 | |
Holly Springs,
GA Cherokee Co. United States |
Hickory Rd. / Betty Barrett Way (34.17294, -84.49807) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | North leg stubbed. |
Newport,
KY Campbell Co. United States |
W 4th St. / 3rd St. / 5th St. / Chestnut Way (39.08959, -84.49992) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 66.7434 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Canton,
GA Cherokee Co. United States |
(unknown) (34.27026, -84.50371) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
||
Lexington,
KY Fayette Co. United States |
Alumni Dr. / College Way / Commonwealth St. (38.01878, -84.50541) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.3997 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Smyrna,
GA Cobb Co. United States |
Roswell St. SE / Hawthorne Ave. SE / Mathews St. (33.89051, -84.50542) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | Replaced 6-legged intersection. |
Fayetteville,
GA Fayette Co. United States |
Lees Mill Rd. / Veterans Pkwy. (33.50874, -84.50648) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.8083 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Holt,
MI Ingham Co. United States |
Cedar St. / Holbrook Rd. (42.63206, -84.50667) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 50.9640 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | ICD estimated from Google Maps linework. |
Ellijay,
GA Gilmer Co. United States |
GA 382 / Old Highway 5 (34.63999, -84.50847) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | West leg realigned 360 feet to south to create four-legged intersection. Year Completed estimated (2019-2021). |
Fayetteville,
GA Fayette Co. United States |
Veterans Pkwy. / Iver Pl. (33.46878, -84.50910) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.8406 |
Other (At-Grade) Single-Lane |
2016 | Right-turn only lanes on north, south, and west legs. ICD estimated from Google Maps linework. |
Fayetteville,
GA Fayette Co. United States |
Veterans Pkwy. / Sandy Creek Rd. / Arthur Rank Ave. (33.47251, -84.50923) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.8425 |
Other (At-Grade) Single-Lane |
2018 | Right turn only lanes on north and south legs. Add lane right-turn bypass on west leg. https://thecitizen.com/2018/02/09/fayettevilles-5th-roundabout-operation-june/ ICD estimated from Google Maps linework. |
Lexington,
KY Fayette Co. United States |
Alumni Dr. / University Dr. / University Ct. (38.02175, -84.50949) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.3980 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Cincinnati,
OH Hamilton Co. United States |
Roebling Way / Theodore M Berry Way / Walnut St. (39.09641, -84.51076) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 16.6842 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Hamilton,
OH Butler Co. United States |
Trenton Oxford Rd. (SR 73) / Jacksonburg Rd. (39.48456, -84.51249) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | |
(unincorporated),
GA Fulton Co. United States |
Redwine Pkwy. / Abbey Dr. (33.66778, -84.51472) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.8680 |
Other (At-Grade) Single-Lane |
2005 | Painted splitter islands. ICD estimated from Google Maps linework. |
(unincorporated),
GA Fulton Co. United States |
Redwine Rd. / Tinsley Way (33.66278, -84.51500) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.8633 |
Other (At-Grade) Single-Lane |
2005 | Painted splitter islands. ICD estimated from Google Maps linework. |
Smyrna,
GA Cobb Co. United States |
Powder Springs St. / Village Green Cir. / Fuller St. / King St. (33.88554, -84.51644) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 70.3948 |
Other (At-Grade) Single-Lane |
Park in central island. ICD estimated from Google Maps linework. | |
Hamilton,
OH Butler Co. United States |
Hamilton Mason Rd. / Hamilton Enterprise Park Dr. / Gilmore Rd. (39.37927, -84.51743) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.6196 |
Other (At-Grade) Single-Lane |
2019 | Existing Gilmore Road was relocated to align with existing Hamilton Enterprise Park Dr. A single-lane modern roundabout with 150' inscribed diameter. ICD estimated from Google Maps linework. |
Woodstock,
GA Cherokee Co. United States |
Main St. / Haney Rd. (34.10844, -84.51760) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 25.7108 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Lexington,
KY Fayette Co. United States |
Iron Works Pkwy. / War Admiral Blvd. / Jenney Ln. (38.14812, -84.52026) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.3265 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Smyrna,
GA Cobb Co. United States |
Belmont Blvd. / Belmont Pl. SE (33.89147, -84.52132) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2013 | Lane changes required for through movements or left turns to circulate or exit. |
Canton,
GA Cherokee Co. United States |
Gresham Mill Pkwy (34.14154, -84.52252) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 27.6777 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
St. Clair Township,
OH Butler Co. United States |
Jacksonburg Rd. / Morganthaler Rd. (39.46012, -84.52261) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0399 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Lansing Township,
MI Ingham Co. United States |
Wood St. / Sams Way (42.76276, -84.52303) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.5810 |
Other (At-Grade) Single-Lane |
2007 | ICD estimated from Google Maps linework. |
Woodstock,
GA Cherokee Co. United States |
Towne Lake Pkwy. / Mill St. (34.10213, -84.52395) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | Yield-controlled right-turn bypass lane on west leg. North leg stubbed. https://www.facebook.com/photo.php?fbid=501469782009822&id=100064404141252&set=a.223252569831546 |
Smyrna,
GA Cobb Co. United States |
Ward St. SE / Belmont Blvd. (33.89155, -84.52734) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2013 | Broken edge line across exits. |
Atlanta,
GA Fulton Co. United States |
Preservation Cir. (33.65154, -84.52790) |
Other Existing |
All-Way Stop Unknown |
4 Approaches 0 Driveways 55.6745 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Woodstock,
GA Cherokee Co. United States |
Woodstock Pkwy. / Rope Mill Rd. (34.11812, -84.52852) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2013 | Edge line extension across exits. |
Lansing Township,
MI Ingham Co. United States |
Lake Lansing Rd. / Chamberlain Dr. (42.76086, -84.52982) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.9966 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Marietta,
GA Cobb Co. United States |
Halsey Ave SE / (unknown) (33.91412, -84.53237) |
Other Existing |
Uncontrolled None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Lansing,
MI Ingham Co. United States |
Harding Ave. / Pershing Ave. (42.71364, -84.53384) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.1015 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Canton,
GA Cherokee Co. United States |
Laurel Canyon Pkwy. / Canyon Trl. / Pepperwood Way (34.26425, -84.53504) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Georgetown,
KY Scott Co. United States |
Outer Ring Rd. / Team Services Way (38.24794, -84.53523) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2016 | Add-lane right-turn bypass lane on south leg. Merging right-turn bypass lane on north leg with acute entry angle. |
Fairfield Township,
OH Butler Co. United States |
Hamilton Mason Rd. / Hancock Ave. / Grand Blvd. / Tuley Rd. / Tylersville Rd. (39.38134, -84.53572) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.journal-news.com/news/five-points-roundabout-construction-to-happen-in-2022-in-hamilton/XYJYRDXKBVEK7DSQ7RPFT7RNFA/ |
Marietta,
GA Cobb Co. United States |
Fairground St. / Allgood Rd. / Chicopee Dr. (33.96695, -84.53750) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.7632 |
Other (At-Grade) Single-Lane |
2012 | Previously controlled by two-way stop ICD estimated from Google Maps linework. |
Lexington,
KY Fayette Co. United States |
W Reynolds Rd. / Keithshire Way / Wellington Way (37.99520, -84.53814) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.1196 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
1999 | Opened between 1997 and 2002. Functional Class: Collector ICD estimated from Google Maps linework. |
Spring Arbor,
MI Jackson Co. United States |
Dearing Rd. / McCain Rd. (42.23292, -84.54088) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Peanut shaped. https://www.mlive.com/news/jackson/2023/09/it-looks-like-a-peanut-but-its-really-jacksons-newest-roundabout.html. |
Georgetown,
KY Scott Co. United States |
Outer Ring Rd. / Gate 21 Rd. (38.25434, -84.54168) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2015 | Year Completed estimated (2014-2016). |
Lansing,
MI Ingham Co. United States |
Michigan Ave. / Washington Square (42.73360, -84.55225) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.3176 |
Other (At-Grade) Single-Lane |
2007 | ICD estimated from Google Maps linework. |
Lansing,
MI Ingham Co. United States |
Barnes Ave. / Coleman Ave. (42.71488, -84.55390) |
Traffic Calming Circle Existing |
Unknown Unknown |
0 Approaches 0 Driveways 20.1829 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Marietta,
GA Cobb Co. United States |
Sandtown Rd. SW / Westside Dr. / (parking) (33.93120, -84.55519) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2019 | |
Lansing,
MI Ingham Co. United States |
Barnes Ave. / Davis Ave. (42.71489, -84.55698) |
Traffic Calming Circle Existing |
Unknown Unknown |
0 Approaches 0 Driveways 18.4279 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Lexington,
KY Lexington-Fayette Co. United States |
Old Frankfort Pike / Alexandria Dr. (38.06952, -84.55762) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2010 | |
Blaine,
GA Pickens Co. United States |
GA 136 / GA 136 Connector (34.51086, -84.55772) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Replaced triangular set of intersections. |
South Fulton,
GA Fulton Co. United States |
Campbellton Rd. / Boat Rock Rd. / New Hope Rd. (33.70883, -84.55827) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2021 | https://www.ajc.com/news/atlanta-news/fultons-newest-roundabout-slated-to-open-for-traffic-monday/BHWZ3ODGGJGBRKYLGGM3AZUZXY/ |
Lansing,
MI Ingham Co. United States |
Beal Ave. / Sparrow Ave. (42.71602, -84.56174) |
Traffic Calming Circle Existing |
Unknown Unknown |
0 Approaches 0 Driveways 8.7750 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Lansing,
MI Ingham Co. United States |
Barnes Ave. / Beal Ave. (42.71491, -84.56174) |
Traffic Calming Circle Existing |
Unknown Unknown |
0 Approaches 0 Driveways 15.7953 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Van Wert,
OH Van Wert Co. United States |
US 224 / US 127 / Marsh Rd. (40.90046, -84.57198) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Opened August 5, 2022. https://www.hometownstations.com/news/new-roundabout-just-north-of-van-wert-expected-to-open-on-august-5th/article_5605707a-129a-11ed-9c27-bf0fae2306bd.html |
Lansing,
MI Ingham Co. United States |
Moores River Dr. / Boston Blvd. / Pattengill Ave. (42.71923, -84.57225) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 15.7942 |
Other (At-Grade) Single-Lane |
2002 | ICD estimated from Google Maps linework. |
Kennesaw,
GA Cobb Co. United States |
Barrett Lakes Blvd. / Shiloh Valley Dr. (34.00320, -84.57276) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.6636 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://www.mdjonline.com/news/south-barrett-reliever-roundabout-opens-to-public/article_db8e3cf4-7005-11e8-b68e-5fe8e2834b71.html ICD estimated from Google Maps linework. |