City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Perth Airport,
WA Australia |
Horrie Miller Dr. / Reid Rd. (-31.96972, 115.96787) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.5141 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Redcliffe,
WA Australia |
Dunreath Dr. / Tonkin Hwy NB Ramps (-31.94527, 115.95042) |
Roundabout Existing |
All-Way Yield Unknown |
2 Approaches 0 Driveways 46.6188 |
Freeway Ramps (Grade-Separated) Single-Lane |
ICD estimated from Google Maps linework. | |
Perth Airport,
WA Australia |
Dunreath Dr. / Tonkin Hwy SB Ramps (-31.94391, 115.95158) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.6195 |
Freeway Ramps (Grade-Separated) Single-Lane |
ICD estimated from Google Maps linework. | |
Spokane,
WA Spokane Co. United States |
Freya St. / US 395 NB Ramps (47.72033, -117.35784) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 35.3533 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Completed July 2009. ICD estimated from Google Maps linework. |
(unincorporated),
WA Spokane Co. United States |
SR 902 (W Medical Lake Rd.) / Craig Rd. (47.59464, -117.60751) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.7735 |
Other (At-Grade) Single-Lane |
2018 | Compact roundabout (95' ICD). Open to traffic July 23, 2018. ICD estimated from Google Maps linework. |
Spokane,
WA Spokane Co. United States |
SR 290 (Trent Ave) / Martin Luther King Jr Way / Perry St. (47.66163, -117.39014) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 19.3053 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | New intersection of MLK Jr. Way and SR 290. Open to traffic August 5, 2018. Two circulating lanes for SR 290 WB entry leg ICD estimated from Google Maps linework. |
Monroe,
WA Snohomish Co. United States |
Chain Lake Rd. / N Kelsey St. (47.86475, -121.96958) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 29.6464 |
Other (At-Grade) Single-Lane |
2014 | Bing "On the Street" view shows it under construction ICD estimated from Google Maps linework. |
Marysville,
WA Snohomish Co. United States |
25th Ave. NE / 174th St. NE (48.15374, -122.19930) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.7001 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2017 | May be large enough to qualify as a compact roundabout but has a fully traversable central island. ICD estimated from Google Maps linework. |
Airway Heights,
WA Spokane Co. United States |
US 2 / Spokane Tribe Casino Entrance (47.64293, -117.61009) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.0853 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | Open 11/13/2017. Casino open on January 8, 2018. First multilane on a WSDOT facility in Eastern Region. ICD estimated from Google Maps linework. |
Spokane,
WA Spokane Co. United States |
Freya St. / US 395 SB Ramps (47.72328, -117.35776) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.1548 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Open August 2012. ICD estimated from Google Maps linework. |
Seattle,
WA King Co. United States |
Boylston Ave. / E. Howell St. (47.61765, -122.32347) |
Traffic Calming Circle Existing |
Unknown None |
4 Approaches 0 Driveways 128.8107 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Spokane Valley,
WA Spokane Co. United States |
E Broadway Ave. / N Flora Rd. (47.66424, -117.17510) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.1305 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (2009-2011). ICD estimated from Google Maps linework. |
Liberty Lake,
WA Spokane Co. United States |
E Mission Ave. / N Molter Rd. (47.67131, -117.08964) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 31.3654 |
Other (At-Grade) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Bellingham,
WA Whatcom Co. United States |
N State St. / Wharf St. / N Forest St. / Boulevard (48.74361, -122.48473) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.8297 |
Other (At-Grade) Single-Lane |
2013 | Open October 2013. ICD estimated from Google Maps linework. |
Bellingham,
WA Whatcom Co. United States |
Haxton Way / Kwina Rd. (48.79386, -122.63408) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2013 | Oblong shape. ICD = 170 ft x 135 ft. Open August 2013. Lummi Indian Reservation. |
Bellingham,
WA Whatcom Co. United States |
Northwest Blvd. / McLeod Rd. (48.78262, -122.50297) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.6614 |
Other (At-Grade) Single-Lane |
2013 | Open June 2013. ICD estimated from Google Maps linework. |
Bellingham,
WA Whatcom Co. United States |
Everson Goshen Rd. / E Smith Rd. (48.83263, -122.37755) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2015 | Open June 2015. |
Sedro-Woolley,
WA Skagit Co. United States |
SR 9 / Rhodes Rd. / Jameson Rd. (48.49863, -122.24720) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4477 |
Other (At-Grade) Single-Lane |
2016 | Open November 2016. ICD estimated from Google Maps linework. |
Sedro-Woolley,
WA Skagit Co. United States |
SR 20 / Cook Rd. (48.50724, -122.24428) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 58.5542 |
Other (At-Grade) Single-Lane |
2014 | Open July 2014. ICD estimated from Google Maps linework. |
Sedro-Woolley,
WA Skagit Co. United States |
Cook Rd. / Ferry St. / Washington St. / Edward R Murrow St. (48.50715, -122.24729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 69.6321 |
Other (At-Grade) Single-Lane |
2013 | Open October 2013. ICD estimated from Google Maps linework. |
Lynden,
WA Whatcom Co. United States |
SR 546 / Bender Rd. (48.96442, -122.44116) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.2849 |
Other (At-Grade) Single-Lane |
2013 | Open August 2013. ICD estimated from Google Maps linework. |
Lynden,
WA Whatcom Co. United States |
SR 546 / Depot Rd. (48.96478, -122.45217) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2052 |
Other (At-Grade) Single-Lane |
2013 | Open August 2013. ICD estimated from Google Maps linework. |
Lynden,
WA Whatcom Co. United States |
SR 546 / Northwood Rd. (48.96424, -122.40709) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.9551 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2016 | Open June 2016. ICD estimated from Google Maps linework. |
Kendall,
WA Whatcom Co. United States |
SR 542 / SR 547 (Kendall Corner) (48.91692, -122.13767) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.5337 |
Other (At-Grade) Single-Lane |
2015 | Open September 2015. ICD estimated from Google Maps linework. |
Conway,
WA Skagit Co. United States |
SR 534 (Pioneer Hwy) / Fir Island Rd. / Conway Frontage Rd. / Main St. (48.34133, -122.33929) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3641 |
Other (At-Grade) Single-Lane |
2014 | Oblong shape. Open July 2014. Replaced two closely spaced stop-controlled intersections. ICD estimated from Google Maps linework. |
Anacortes,
WA Skagit Co. United States |
R Ave. / 22nd St. (48.50423, -122.60992) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.6011 |
Other (At-Grade) Single-Lane |
2013 | Open December 2013. ICD estimated from Google Maps linework. |
Mount Vernon,
WA Skagit Co. United States |
Anderson Rd. / Cedardale Rd. (48.39943, -122.32812) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2013 | Open November 2013. |
Spokane,
WA Spokane Co. United States |
E Wellesley Ave. / N Freya St. (47.70060, -117.35714) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.6198 |
Other (At-Grade) Single-Lane |
2016 | Open October 2016. ICD estimated from Google Maps linework. |
East Wenatchee,
WA Douglas Co. United States |
US 2-US 97 / Enterprise Dr. (47.51101, -120.29731) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2016 | Open June 2016. |
Benton City,
WA Benton Co. United States |
SR 224 / SR 225 / I-82 WB Ramps (46.25173, -119.47550) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.2934 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Replaced two close-spaced stop-controlled intersections. Open June 2016. ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
W 45th St. / S Olympia St. (46.16925, -119.13812) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.3928 |
Other (At-Grade) Single-Lane |
2014 | Open June 2014. ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
W Grandridge Blvd. / N Young St. (46.21653, -119.21799) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 167.7587 |
Other (At-Grade) Single-Lane |
2014 | Right-turn-only lane on north leg. Open September 2014. ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
S Clodfelter Rd. / W 10th St. (46.20097, -119.24385) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.9044 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | Open August 2015. ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
W Metaline Ave. / N Nevada St. / W Montana St. (46.22031, -119.23826) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 14.0478 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2013 | Open September 2013. ICD estimated from Google Maps linework. |
Liberty Lake,
WA Spokane Co. United States |
Liberty Lake Rd. / Harvard Rd. / E Mission Ave. / I-90 WB Off-Ramp (47.67454, -117.11097) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.0137 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | Open October 2013. ICD estimated from Google Maps linework. |
Redmond,
WA King Co. United States |
NE 76th St. / 164th Ave. NE (47.67214, -122.12180) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 99.7242 |
Other (At-Grade) Single-Lane |
2012 | Oblong shape. Connected two T-intersections on either side of median to allow crossing and left-turn movements. Open December 2012. ICD estimated from Google Maps linework. |
Snoqualmie,
WA King Co. United States |
SR 202 / Tokul Rd. / Mill Pond Rd. (47.54073, -121.83292) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 37.8938 |
Other (At-Grade) Single-Lane |
2016 | Open August 2016. ICD estimated from Google Maps linework. |
Redmond,
WA King Co. United States |
NE 116th St. / 172nd Ave. NE (47.70403, -122.11106) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.5420 |
Other (At-Grade) Single-Lane |
2015 | Open April 2015. ICD estimated from Google Maps linework. |
Redmond,
WA King Co. United States |
NE 116th St. / 162nd Ave. NE (47.70420, -122.12313) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 116.5413 |
Other (At-Grade) Single-Lane |
2014 | Open May 2014. ICD estimated from Google Maps linework. |
Lake Stevens,
WA Snohomish Co. United States |
SR 92 / 99th Ave NE (48.02885, -122.09804) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.5396 |
Other (At-Grade) Single-Lane |
2013 | Reverse curves on east and west approaches. Open November 2013. ICD estimated from Google Maps linework. |
Lake Stevens,
WA Snohomish Co. United States |
SR 92 / 113th Ave. SE (48.03019, -122.07884) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.9412 |
Other (At-Grade) Single-Lane |
2013 | Reverse curves on east and west approaches. Open November 2013. ICD estimated from Google Maps linework. |
Bellevue,
WA King Co. United States |
W Lake Sammamish Pkwy SE / I-90 WB Ramps (47.56690, -122.09947) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 139.9998 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Open November 2013. Raindrop shape. |
Everett,
WA Snohomish Co. United States |
41st St. / Lowell Riverfront Trl. Ext. (47.96284, -122.19307) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.9842 |
Other (At-Grade) Single-Lane |
2013 | Right-turn bypass lane on north leg. Open January 2013. ICD estimated from Google Maps linework. |
Lacey,
WA Thurston Co. United States |
Boulevard Rd. SE / 22nd Ave. (47.02903, -122.86477) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 97.6905 |
Other (At-Grade) Single-Lane |
2014 | Right-turn-only lane on west leg. Elliptical shape. Open October 2014. ICD estimated from Google Maps linework. |
Edgewood,
WA Pierce Co. United States |
Jovita Blvd. E / Emerald St. (47.25272, -122.29104) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.6695 |
Other (At-Grade) Single-Lane |
2013 | Open July 2013. ICD estimated from Google Maps linework. |
Nisqually,
WA Thurston Co. United States |
SR 510 / Reservation Rd. SE (47.01164, -122.69148) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2013 | Reverse curves on west and east legs. Open November 2013. |
Nisqually,
WA Thurston Co. United States |
SR 510 / Yelm Hwy SE (47.00928, -122.68839) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 62.7079 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Right-turn bypass lane on southwest leg. Open December 2013. ICD estimated from Google Maps linework. |
Mattawa,
WA Grant Co. United States |
SR 243 / Road 24 SW (46.73775, -119.91718) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2889 |
Other (At-Grade) Single-Lane |
2014 | Reverse curves on north and south legs. Open May 2014. ICD estimated from Google Maps linework. |
Hunts Point,
WA King Co. United States |
84th Ave. NE / NE 30th St. (47.63651, -122.22817) |
Traffic Calming Circle Existing |
All-Way Yield None |
3 Approaches 0 Driveways 159.3457 |
Other (At-Grade) Single-Lane |
2014 | Originally built between 1990 and 2002. Modified June 2014 to realign south leg. No splitter islands. ICD estimated from Google Maps linework. |
Hunts Point,
WA King Co. United States |
Hunts Point Rd. / NE 28th St. / 84th Ave. NE / SR 520 ramps (47.63600, -122.22744) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6536 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Open June 2014. ICD estimated from Google Maps linework. |
Joint Base Lewis-McChord,
WA Pierce Co. United States |
D St. / South Dr. / Integrity Gate (47.11600, -122.61932) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.3273 |
Other (At-Grade) Single-Lane |
2014 | Open July 2014. ICD estimated from Google Maps linework. |
Snohomish,
WA Snohomish Co. United States |
Ave. D / Bickford Ave. / 15th St. (47.93037, -122.10101) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 79.2238 |
Other (At-Grade) Single-Lane |
2014 | Open July 2014. ICD estimated from Google Maps linework. |
Yarrow Point,
WA King Co. United States |
92nd Ave. NE / NE Points Dr. / NE 33rd St. / SR 520 WB Off-Ramp (47.64153, -122.21728) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 86.9075 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | Open August 2014. ICD estimated from Google Maps linework. |
Ruston,
WA Pierce Co. United States |
Main St. / Bay View Corridor (47.29744, -122.50297) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.1095 |
Other (At-Grade) Single-Lane |
2014 | Open September 2014. ICD estimated from Google Maps linework. |
Ruston,
WA Pierce Co. United States |
N Ruston Way / Grand Ave. (47.29725, -122.50488) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 79.3788 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Ruston,
WA Pierce Co. United States |
N Ruston Way / Baltimore St. / N 51st St. / Yacht Club Rd. (47.29908, -122.50894) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 101.2449 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Marysville,
WA Snohomish Co. United States |
SR 531 (172nd St. NE) / 23rd Ave. NE (48.15210, -122.19919) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2016 | Open January 2016. |
Cashmere,
WA Chelan Co. United States |
N Division St. / Cottage Ave. (47.52214, -120.46999) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2015 | Open October 2015. |
Lacey,
WA Thurston Co. United States |
Willamette Dr. NE / 31st Ave. NE (47.07789, -122.75228) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.9205 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | Open October 2015. ICD estimated from Google Maps linework. |
Seabeck,
WA Kitsap Co. United States |
Seabeck Hwy NW / NW Holly Rd. (47.60901, -122.75692) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2015 | Open October 2015. |
Woodland,
WA Cowlitz Co. United States |
SR 503 (Lewis River Rd.) / Scott Ave. (45.91699, -122.74009) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.7138 |
Other (At-Grade) Single-Lane |
2015 | Open September 2015. ICD estimated from Google Maps linework. |
Lynnwood,
WA Snohomish Co. United States |
68th Ave. W / 204th St. SW (47.81409, -122.32484) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 20.0509 |
Other (At-Grade) Single-Lane |
2015 | Edmonds Community College. Open August 2015. ICD estimated from Google Maps linework. |
Kelso,
WA Cowlitz Co. United States |
SR 432 / Old Hwy 99 / I-5 NB Ramps / Kelso Dr. (46.10491, -122.87586) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | Open August 2015. Elliptical shape. ICD = approximately 110 ft x 100 ft. |
Joint Base Lewis-McChord,
WA Pierce Co. United States |
Colorado Ave. / Garcia Blvd. (47.09688, -122.58387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.4657 |
Other (At-Grade) Single-Lane |
2015 | Open January 2015. ICD estimated from Google Maps linework. |
Monroe,
WA Snohomish Co. United States |
W Main St. / SR 522 SB Ramps (47.84883, -122.00879) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Right-turn bypass lane on west leg. Open December 2014. |
Bonney Lake,
WA Pierce Co. United States |
198th Ave. E / Cascadia Blvd. E (47.12299, -122.16688) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.6959 |
Other (At-Grade) Single-Lane |
2008 | Fourth (southeast) leg added 2018. ICD estimated from Google Maps linework. |
Bonney Lake,
WA Pierce Co. United States |
Cascadia Blvd E / Canyon View Blvd. E (47.12810, -122.17464) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.6916 |
Other (At-Grade) Single-Lane |
2008 | ICD estimated from Google Maps linework. |
Bonney Lake,
WA Pierce Co. United States |
Cascadia Blvd E. / Forest Park Blvd. E (47.12820, -122.18033) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.0035 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Open December 2014. ICD estimated from Google Maps linework. |
Edmonds,
WA Snohomish Co. United States |
212th St. SW / 84th Ave. W / SW Bowdoin Way (47.80701, -122.34716) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 113.9049 |
Other (At-Grade) Single-Lane |
2014 | Open November 2014. ICD estimated from Google Maps linework. |
Marysville,
WA Snohomish Co. United States |
SR 9 / 84th St. NE / Getchell Rd. (48.07196, -122.11135) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2014 | Right-turn-only lanes on all four legs. Open October 2014. |
Wenatchee,
WA Chelan Co. United States |
US 97 Alt / Ohme Garden Rd. / Warehouse Way (47.48082, -120.32091) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.0940 |
Other (At-Grade) Single-Lane |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Spokane,
WA Spokane Co. United States |
N Waikiki Rd. / N Mill Rd. (47.76113, -117.42815) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.5085 |
Other (At-Grade) Single-Lane |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Redmond,
WA King Co. United States |
NE Novelty Hill Rd. / 195th Ave. NE (47.68845, -122.07993) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.5909 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Redmond,
WA King Co. United States |
NE Union Hill Rd. / 196th Ave. NE (47.67501, -122.07901) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open September 2012. |
Arlington,
WA Snohomish Co. United States |
SR 531 (172nd St NE) / SR 9 (48.15166, -122.11325) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.6373 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Joint Base Lewis-McChord,
WA Pierce Co. United States |
Portland Ave. SW / Boundary St. SW / Camp Murray Gate (47.12106, -122.56300) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.6312 |
Other (At-Grade) Single-Lane |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Silverdale,
WA Kitsap Co. United States |
Silverdale Way NW / Chico Way NW / NW Newberry Hill Rd. (47.63704, -122.70135) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 15.2906 |
Other (At-Grade) Single-Lane |
2012 | Open September 2012. ICD estimated from Google Maps linework. |
Poulsbo,
WA Kitsap Co. United States |
NE Lincoln Rd / Noll Rd. NE / Gala Way NE (47.75092, -122.61274) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2012 | Open September 2012. Replaced two offset T-intersections. |
Sammamish,
WA King Co. United States |
NE 8th St. / 233rd Ave NE (47.61687, -122.02903) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 63.6012 |
Other (At-Grade) Single-Lane |
2012 | Open September 2012. ICD estimated from Google Maps linework. |
Joint Base Lewis-McChord,
WA Pierce Co. United States |
Murray Rd. SW / 150th St. SW (47.12084, -122.54259) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open September 2012. |
Mill Creek,
WA Snohomish Co. United States |
SE 116th St. / 56th Ave SE (47.89201, -122.15856) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 80.8842 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2012 | Open August 2012. ICD estimated from Google Maps linework. |
Pasco,
WA Franklin Co. United States |
N 4th Ave. / N 3rd Ave. / W Marie St. (46.23961, -119.09537) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 61.1277 |
Other (At-Grade) Single-Lane |
2012 | Open August 2012. ICD estimated from Google Maps linework. |
Airway Heights,
WA Spokane Co. United States |
Sprague Ave. / Quest Dr. (47.65441, -117.56614) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.4880 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open July 2012. Concentric circulatory roadway striping. ICD estimated from Google Maps linework. |
Lake Stevens,
WA Snohomish Co. United States |
N Davies Rd. / Frontier Village Access Rd. (48.00472, -122.10462) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2012 | Painted splitter islands. Open July 2012. |
Pasco,
WA Franklin Co. United States |
Saraceno Way / (Columbia Basin College entrance) (46.25374, -119.12143) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.5560 |
Other (At-Grade) Single-Lane |
2000 | Year Completed estimated (1996-2003). ICD estimated from Google Maps linework. |
Federal Way,
WA King Co. United States |
S 308th St. / 14th Ave. S (47.32601, -122.31601) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 19.5072 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2014 | This is a mini-roundabout with fully traversable center island. Inscribed diameter is about 64 feet, opened in August 2014. An RRFB is present at the school crossing on the east leg; the previous raised crosswalk was removed. The north leg is a driveway to the newly remodeled high school. Both streets are Minor Collectors with 25 mph speed limits. |
Federal Way,
WA King Co. United States |
3rd Ave. SW / SW 330th St. (47.30636, -122.33874) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 17.8167 |
Other (At-Grade) Single-Lane |
2014 | This is a "Compact" single-lane roundabout with center island landscaping and a truck apron, inscribed circle diameter is 76 feet. Pedestrian refuge islands on the east-west approaches provide channelization. ICD estimated from Google Maps linework. |
Federal Way,
WA King Co. United States |
SW 330th St. / 6th Ave. SW (47.30622, -122.34230) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 20.2463 |
Other (At-Grade) Single-Lane |
2014 | This is a "Compact" urban roundabout with central island landscaping and a truck apron, inscribed diameter is 76 feet. Pedestrian refuge islands on the east-west approaches provide channelization. This and the one at 3rd Ave SW / SW 330th Street were opened in November 2014. ICD estimated from Google Maps linework. |
Federal Way,
WA King Co. United States |
12th Ave. SW / 12th Pl. SW / SW 340th St. (47.29677, -122.35142) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.6299 |
Other (At-Grade) Single-Lane |
2013 | Inscribed diameter of 76 feet, landscaped central island, yield control on all approaches. No curbing for channelizing the approaches, paint only. Opened November 2013. ICD estimated from Google Maps linework. |
Kent,
WA King Co. United States |
SE 244th St. / 100th Ave. SE (47.38335, -122.20736) |
Traffic Calming Circle Existing |
Other None |
4 Approaches 0 Driveways 11.3213 |
Other (At-Grade) Single-Lane |
2016 | This is now a dog bone-shaped traffic circle with two-way Yield control on the east and west approaches and no control north-south. Previous control was stop-control on the east leg only before the west leg was built. ICD estimated from Google Maps linework. |
Chehalis,
WA Lewis Co. United States |
NW West St. / NW Pennsylvania Ave. (46.66652, -122.97639) |
Traffic Calming Circle Existing |
One-Way/Two-Way Stop None |
4 Approaches 0 Driveways |
Other (At-Grade) Unknown |
2008 | Year Completed estimated (2006-2009). |
Chehalis,
WA Lewis Co. United States |
NW Louisiana Ave. / Car Dealership Access (46.68261, -122.97338) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.5097 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Vancouver,
WA Clark Co. United States |
Fort Vancouver Way. / Evergreen Blvd. (45.62863, -122.66310) |
Other Existing |
All-Way Stop Unknown |
4 Approaches 0 Driveways 40.0897 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Vancouver,
WA Clark Co. United States |
NE 44th St. / NE 137th Ave. (45.65377, -122.53207) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.8796 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Vancouver,
WA Clark Co. United States |
NE 39th St. / NE 137th Ave. / NE 138th Ave. (45.65025, -122.53209) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.4044 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Vancouver,
WA Clark Co. United States |
NE 32nd Cir. / NE 138th Ave. (45.64517, -122.53057) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0778 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Ridgefield,
WA Clark Co. United States |
NW 319th St. / NW 31st Ave. (45.85093, -122.70594) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Part of Ilani Casino interchange project. |
Ridgefield,
WA Clark Co. United States |
NW 319th St. / I-5 SB Ramps (45.85163, -122.70380) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2017 | Part of Ilani Casino interchange project. |
Ridgefield,
WA Clark Co. United States |
NW La Center Rd. / I-5 NB Ramps (45.85214, -122.70160) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2017 | Part of Ilani Casino interchange project. |
Camas,
WA Clark Co. United States |
NW 6th Ave. / SR 14 WB Ramps / NW Norwood St. (45.58216, -122.42684) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 |