City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Dublin,
OH Franklin Co. United States |
Shier Rings Rd. / (parking) / (parking) (40.09514, -83.16281) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Dublin,
OH Franklin Co. United States |
Eiterman Rd. / University Blvd. (40.09902, -83.17462) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2022 | https://dublinohiousa.gov/construction-updates/university-boulevard-phase-2-construction/ |
Dublin,
OH Franklin Co. United States |
Shier Rings Rd. / University Blvd. (40.09553, -83.16594) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://dublinohiousa.gov/construction-updates/university-boulevard-phase-2-construction/ |
Dublin,
OH Franklin Co. United States |
University Blvd. / (unknown) (40.09681, -83.16949) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | University Blvd was re-aligned to this location. https://dublinohiousa.gov/construction-updates/university-boulevard-phase-2-construction/ |
Dublin,
OH Franklin Co. United States |
Wyandotte Woods Blvd. / Kelly Dr. (40.12655, -83.09648) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2014). |
Apple Valley,
MN Dakota Co. United States |
Johnny Cake Ridge Rd. / 149th St. W (44.73360, -93.18726) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2020 | |
Sartell,
MN Stearns Co. United States |
Pine Cone Rd. / 27th St. N (45.65546, -94.22230) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2018 | https://wjon.com/detours-around-pinecone-road-north-in-sartell-begin-monday/ |
Sauk Rapids,
MN Benton Co. United States |
Summit Ave. S / 4th St. S (45.58720, -94.15738) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2019 | Peanut shaped. Each node ICD 105 ft; length 195 ft. https://www.ci.sauk-rapids.mn.us/vertical/Sites/%7B0431F973-8F1A-45B9-BC40-963EF7BF7919%7D/uploads/2019_4th_Street_South_Improvement_Project_Update.pdf |
Sartell,
MN Stearns Co. United States |
Pine Cone Rd. (55th Ave.) / 35th St. N (45.66272, -94.22234) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2018 | https://wjon.com/detours-around-pinecone-road-north-in-sartell-begin-monday/ |
St Cloud,
MN Stearns Co. United States |
33rd St S. / Oak Grove Rd. (CR 136) (45.51515, -94.19881) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Year Completed estimated (2020-2021). |
Fairhope,
AL Baldwin Co. United States |
CR 13 / CR 32 (30.47255, -87.86933) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2022 | https://www.wkrg.com/baldwin-county/county-road-32-roundabout-project-underway-confusing-motorists/ |
Lumberton,
TX Hardin Co. United States |
Chapel Creek Dr. / Spring Brook Ct. (30.25542, -94.20976) |
Other Existing |
All-Way Stop Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Gulfport,
MS Harrison Co. United States |
20th Ave. / Jones Park Dr. (30.36646, -89.08605) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
Pedestrian access to central island. | |
Biloxi,
MS Harrison Co. United States |
Ellzey Dr. / Medical Park Dr. (30.44652, -88.94459) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2018 | Circulatory roadway dotted edge line across exits. Year Completed estimated (2017-2019). |
Foley,
AL Baldwin Co. United States |
E Pride Blvd. / Creek Winds Rd. (30.38049, -87.66726) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2016 | Add-lane right-turn bypass lanes on northeast and southwest legs; merging right-turn bypass lanes on northwest and southeast legs. Year Completed estimated (2016-2017). |
Foley,
AL Baldwin Co. United States |
E Pride Blvd. / Beck Rd. (30.37455, -87.66643) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2016 | Add-lane right-turn bypass lanes on south, west, and east legs; merging right-turn bypass lane on north leg. Year Completed estimated (2016-2017). |
Foley,
AL Baldwin Co. United States |
S OWA Blvd. / Midtown Village Blvd. / (unknown) (30.37156, -87.65917) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2017 | Unsigned and unmarked left-turn-only trap lane on east leg. 2022 or earlier (SV) |
Pocatello,
ID Bannock Co. United States |
Olympus Dr. / Northgate Pkwy. / E Siphon Dr. (42.92794, -112.42884) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2018 | Concentric striped circulatory roadway with dotted edge line around entire circumference. No splitter island on east leg. Year Completed estimated (2017-2019). |
Nibley,
UT Cache Co. United States |
W 3200 S / S 1200 W (41.67509, -111.86225) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2020-2022). |
Woodburn,
OR Marion Co. United States |
OR 219 / Butteville Rd. (45.15079, -122.89405) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Yield-controlled right-turn bypass lane on west leg. South leg realigned with roundabout. Serves large warehouse. |
Syracuse,
UT Davis Co. United States |
W Parkview Dr. / S 2000 W (41.06461, -112.06470) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Salt Lake City,
UT Salt Lake Co. United States |
Parleys Canyon Blvd. / S 2000 E / Country Club Cir. (40.71923, -111.83359) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2021 | No splitter island on north leg; pedestrian ramp can lead directly into circulatory roadway. Year Completed estimated (2020-2021). |
West Valley City,
UT Salt Lake Co. United States |
Antelope Rd. / Hawker Ln. (40.70728, -112.05997) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2001 | Year Completed estimated (1997-2002). |
West Valley City,
UT Salt Lake Co. United States |
Collie Dr. / Dalmatian St. / Labrador Cir. (40.70477, -112.05642) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2004 | |
Draper,
UT Salt Lake Co. United States |
E 12200 S / S 450 E (40.52807, -111.87785) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2013-2014). |
Colorado Springs,
CO El Paso Co. United States |
Bradley Rd. / SR 83 (S Academy Blvd.) NB Ramps / Cody Dr. (38.77019, -104.75705) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2007 | Year Completed estimated (2006-2007). |
Colorado Springs,
CO El Paso Co. United States |
Peak Innovation Pkwy. / Integration Loop (38.77922, -104.71029) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Yield-controlled right-turn bypass lanes on north and south legs. Add-lane right-turn bypass lanes on east and west legs. Year Completed estimated (2020-2021). |
Colorado Springs,
CO El Paso Co. United States |
Shale Dr. / Graphite Dr. (38.89675, -104.67676) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2018 | Very wide circulatory roadway relative to entry width. Year Completed estimated (2017-2019). |
Colorado Springs,
CO El Paso Co. United States |
Mustang Rim Dr. / Durango Kid Dr. (38.92918, -104.68881) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2015). |
Colorado Springs,
CO El Paso Co. United States |
Issaquah Dr. / Durango Kid Dr. (38.92864, -104.68562) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2015). |
Colorado Springs,
CO El Paso Co. United States |
Issaquah Dr. / Hawk Wind Blvd. (38.92294, -104.68581) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2006-2011). |
Colorado Springs,
CO El Paso Co. United States |
Kenosha Dr. / Mulberry Dr. (38.94566, -104.67644) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2017). |
Colorado Springs,
CO El Paso Co. United States |
Shiloh Mesa Dr. / Mulberry Dr. (38.94332, -104.67591) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2019). |
Colorado Springs,
CO El Paso Co. United States |
Royal Pine Dr. / Purple Plum Way (38.97220, -104.75351) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (2007-2011). |
Colorado Springs,
CO El Paso Co. United States |
Spectrum Loop / Grey Hawk Dr. (39.02499, -104.81383) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2006-2011). |
Colorado Springs,
CO El Paso Co. United States |
Struthers Rd. / Gleneagle Dr. / Gleneagle Gate View (39.03042, -104.83108) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 64.0080 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2020 | Oval shaped. ICD = 210 ft x 185 ft. |
Castle Rock,
CO Douglas Co. United States |
N Meadows Dr. / (unknown) (39.41690, -104.89226) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2021 | |
Parker,
CO Douglas Co. United States |
S Red Sky Dr. / S Swift Fox Way (39.49572, -104.80072) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2005 | Year Completed estimated (2004-2005). |
Engelwood,
CO Douglas Co. United States |
Aviator Way / Aviator Ln. (39.55846, -104.84554) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (2002-2003). South leg added 2004-2005. |
Aurora,
CO Arapahoe Co. United States |
S Sampson Gulch Way / E Clifton Dr. (39.56850, -104.69683) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2017). |
Denver,
CO Denver Co. United States |
Fairmount Dr. / S Valentia St. (39.70575, -104.89029) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2001 | Year Completed estimated (1999-2002). |
Aurora,
CO Arapahoe Co. United States |
E Ellsworth Ave. / Robertsdale St. (39.71661, -104.67347) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Aurora,
CO Arapahoe Co. United States |
E Ellsworth Ave. / Trussville St. / 1st Ave. (39.71830, -104.66897) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Commerce City,
CO Adams Co. United States |
Walden St. / E 105th Ave. (39.88769, -104.77644) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2005 | Year Completed estimated (2004-2005). |
Commerce City,
CO Adams Co. United States |
E 112th Ave. / Potomac St. (39.89963, -104.82770) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Commerce City,
CO Adams Co. United States |
E 112th Ave. / (parking) (39.89972, -104.82580) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Cumming,
GA Cherokee Co. United States |
Holbrook Campground Rd. / Birmingham Hwy. / County Line Rd. (34.21315, -84.27118) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Bloomingdale,
GA Chatham Co. United States |
Bloomingdale Rd. / Little Neck Rd. / I-16 EB Ramps (32.09873, -81.32315) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Yield-controlled right-turn bypass lane on west leg (freeway exit ramp) that is aimed at circulatory roadway. Yield-controlled right-turn bypass lane on south leg onto freeway entrance ramp. |
Lakewood,
WA Pierce Co. United States |
Gravelly Lake Dr. SW / Washington Blvd. SW (47.14920, -122.53942) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://cityoflakewood.us/weekly-bulletin-220408/ |
Lakewood,
WA Pierce Co. United States |
Washington Blvd. SW / Interlaaken Dr. SW (47.14862, -122.54186) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). |
Lathrop,
MO Clinton Co. United States |
US 69 / MO-116 (39.55283, -94.23581) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.modot.org/clinton-county-us-route-69-and-route-116-intersection-improvement-project |
Lima,
OH Allen Co. United States |
SR 309 / S Thayer Rd. (40.73112, -84.01320) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2022 | https://www.hometownstations.com/news/saving-lives-is-the-goal-of-allen-countys-two-new-roundabouts-on-state-route-309/article_f37f2a24-1d8c-11ed-abd6-fbf254cf9124.html |
Harrod,
OH Allen Co. United States |
SR 309 / S Napoleon Rd. (40.73202, -83.93435) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.hometownstations.com/news/saving-lives-is-the-goal-of-allen-countys-two-new-roundabouts-on-state-route-309/article_f37f2a24-1d8c-11ed-abd6-fbf254cf9124.html |
Lincoln,
NE Lancaster Co. United States |
S Folsom St. / W Palm Canyon St. (40.75232, -96.73030) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2022 | Striped out shoulder on right side of north and south entries. https://www.lincoln.ne.gov/City/Departments/LTU/LTU-Projects/LOTM/Projects/Growth/Folsom-at-Old-Cheney |
Maple Grove,
MN Hennepin Co. United States |
Territorial Rd. / Fernbrook Ln. N (45.14293, -93.46214) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | Elliptical shaped. ICD = 105 ft x 100 ft. https://maplegrovevoice.com/f/project-update-fernbrook-lane-territorial-road-intersection |
Middlesboro,
KY Bell Co. United States |
SR 2079 (Winchester Ave.) / SR 2401 (S Petersborough Ave.) (36.60367, -83.72960) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | |
Parma,
MI Jackson Co. United States |
W Michigan Ave. / I-94 EB Ramps (42.26564, -84.61940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://jtv.tv/i-94-michigan-avenue-parma-interchange-to-reopen-tuesday/ |
Parma,
MI Jackson Co. United States |
W Michigan Ave. / Norton Rd. / I-94 WB Ramps (42.26653, -84.62125) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Combined two intersections. https://jtv.tv/i-94-michigan-avenue-parma-interchange-to-reopen-tuesday/ |
Rice Lake,
WI Barron Co. United States |
STH 48 (W Knapp St.) / US 53 NB Ramps (45.50926, -91.76067) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Yield-controlled right-turn bypass lane on east leg. https://www.apg-wi.com/rice_lake_chronotype/free/traffic-changes-around-us-53-wis-48-interchange-in-rice-lake-coming-in-october/article_4e8de952-0334-11eb-a7de-678b8ff263bc.html |
Rice Lake,
WI Barron Co. United States |
STH 48 (21st Ave - Knapp St.) / US 53 SB Ramps (45.50932, -91.76298) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Yield-controlled right-turn bypass lane on west leg. https://www.apg-wi.com/rice_lake_chronotype/free/traffic-changes-around-us-53-wis-48-interchange-in-rice-lake-coming-in-october/article_4e8de952-0334-11eb-a7de-678b8ff263bc.html |
Rice Lake,
WI Barron Co. United States |
STH 48 (21st Ave.) / West Ave. / 19th St. (45.50939, -91.76507) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2020 | https://www.apg-wi.com/rice_lake_chronotype/free/traffic-changes-around-us-53-wis-48-interchange-in-rice-lake-coming-in-october/article_4e8de952-0334-11eb-a7de-678b8ff263bc.html |
Bismarck,
ND Burleigh Co. United States |
43rd Ave. NE / N 19th St. (46.85254, -100.76214) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2022 | |
Bismarck,
ND Burleigh Co. United States |
43rd Ave. N / N 26th St. (46.85246, -100.75128) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2022 | |
West Fargo,
ND Cass Co. United States |
7th St. W / 19th Ave. W / 10th St. W (46.85395, -96.91104) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.8600 |
Other (At-Grade) Single-Lane |
2018 | |
Bakersfield,
CA Kern Co. United States |
Wings Way / Citation Way (35.43966, -119.05212) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2019 | Marked with double left turns but only one receiving exit lane. Year Completed estimated (2018-2020). |
Bakersfield,
CA Kern Co. United States |
Highgate Park Blvd. / Pemberley Passage Ave. (35.33797, -119.16322) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2018). |
Bakersfield,
CA Kern Co. United States |
Pemberley Passage Ave. / Hovington Ave. (35.33823, -119.15104) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2016). |
Bakersfield,
CA Kern Co. United States |
Windermere St. / Muirlands Pkwy. / Brentmoor Cir. (35.31845, -119.13707) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Fresno,
CA Fresno Co. United States |
E Fancher Creek Dr. / N Armstrong Ave. (36.74138, -119.67865) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2020 | |
Fresno,
CA Fresno Co. United States |
N Alicante Dr. / Crest View Dr. (36.90734, -119.74334) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 2 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2018). |
Merced,
CA Merced Co. United States |
E Yosemite Ave. / Campus Pkwy. (37.33240, -120.42433) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | Year Completed estimated (2021-2022). |
Merced,
CA Merced Co. United States |
Pacific Dr. / El Redondo Dr. (37.33543, -120.49525) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2004-2005). |
Merced,
CA Merced Co. United States |
Pacific Dr. / Horizons Ave. (37.33557, -120.48947) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Single-Lane |
2005 | Year Completed estimated (2004-2005). |
Merced,
CA Merced Co. United States |
El Redondo Dr. / Lehigh Dr. (37.33927, -120.49535) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2006 | |
Turlock,
CA Stanislaus Co. United States |
N Berkeley Ave. / Dancer Way (37.53472, -120.83029) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2006 | 2007 or earlier (SV) |
Turlock,
CA Stanislaus Co. United States |
N Berkeley Ave. / E Springer Dr. (37.53121, -120.83042) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2006 | |
Turlock,
CA Stanislaus Co. United States |
N Berkeley Ave. / Chandler Dr. (37.52638, -120.83061) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2006 | |
Ceres,
CA Stanislaus Co. United States |
El Camino Ave. / Park St. / Pine St. (37.58840, -120.95189) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2021 | Striped out shoulders on outside of each entry lane. https://www.cerescourier.com/news/local/pine-street-roundabout-work-starts/ |
Modesto,
CA Stanislaus Co. United States |
Student Center Dr. / 6th St. (37.66402, -121.03414) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2017 | Y-shaped intersection. Bike lane striped in circulatory roadway. 28181. |
Modesto,
CA Stanislaus Co. United States |
6th St. / B St. (37.66152, -121.03413) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2017 | On campus of Modesto Junior College West Campus. Bike lanes striped within circulatory roadway. Year Completed estimated (2016-2017). |
Modesto,
CA Stanislaus Co. United States |
4th St. / E St. (37.66411, -121.03798) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2017 | On campus of Modesto Junior College West Campus. Bike lanes striped in circulatory roadway. Painted splitter island on south leg. Year Completed estimated (2016-2017). |
Modesto,
CA Stanislaus Co. United States |
Hillglen Ave. / Sorrel Wood Dr. (37.68533, -120.95336) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2010 | |
Modesto,
CA Stanislaus Co. United States |
Kodiak Dr. / Lincoln Oak Dr. (37.68164, -120.94799) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2015-2016). |
Manteca,
CA San Joaquin Co. United States |
E Woodward Ave. / Shoreline Dr. / McKinley Ave. (37.77547, -121.27071) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2021 | No splitter island on north leg (rural). Year Completed estimated (2021-2022). |
Manteca,
CA San Joaquin Co. United States |
Galleria Dr. / Diablo View Dr. (37.77254, -121.26299) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Stockton,
CA San Joaquin Co. United States |
E Swain Rd. / Montauban Ave. (38.01248, -121.29015) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
Stockton,
CA San Joaquin Co. United States |
Montauban Ave. / Hammertown Dr. (38.01652, -121.28893) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2022 | |
Stockton,
CA San Joaquin Co. United States |
Buddy Holly Dr. / Nash Dr. (38.04691, -121.27337) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Stockton,
CA San Joaquin Co. United States |
Ocean Mist Way / A G Spanos Blvd. (38.05497, -121.34964) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2006 | |
Stockton,
CA San Joaquin Co. United States |
Breaker Way / Sand Castle Way (38.05649, -121.34750) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2006 | |
Stockton,
CA San Joaquin Co. United States |
Swainsons Hawk St. / Lands End Dr. (38.05429, -121.34275) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 2 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2006 | |
Bend,
OR Deschutes Co. United States |
SE 15th St. / SE Caldera Dr. (44.01354, -121.28410) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2021 | https://ktvz.com/news/bend/2021/08/06/city-of-bend-road-and-traffic-report-week-of-august-9-15/ |
Meridian,
ID Ada Co. United States |
S Eagle Rd. / E Zaldia Dr. / E Zaldia St. (43.56661, -116.35440) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2021-2022). |
Meridian,
ID Ada Co. United States |
E Wrightwood Dr. / S Luminous Ave. / E Crest Ridge Dr. (43.56552, -116.37989) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2014). |
Chubbuck,
ID Bannock Co. United States |
Mesquite Dr. / Parklawn Dr. / (parking) (42.92905, -112.46794) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2006-2009). |
Post Falls,
ID Kootenai Co. United States |
E Hope Ave. / N Damascus Rd. (47.73751, -116.88406) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2019 | North leg stubbed. Year Completed estimated (2018-2020). |
Post Falls,
ID Kootenai Co. United States |
E Poleline Ave. / N Cecil Rd. (47.73044, -116.90517) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.postfalls.gov/poleline-cecil-project/ |
Missoula,
MT Missoula Co. United States |
Southgate Mall Access Rd. / Mary Ave. (46.84412, -114.02685) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2016-2019). |
Missoula,
MT Missoula Co. United States |
Mary Ave. / Southgate Mall Access Rd. (46.84420, -114.03158) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2016-2019). |
Lehi,
UT Utah Co. United States |
N 3600 W / W 2700 N (40.42051, -111.90717) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2020 | Through-only and through-right arrows on all approaches, including on stem of T-intersection. |