City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Post Falls,
ID Kootenai County United States |
E 4th Ave. / N Idaho St. (47.71101, -116.93727) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Harpersfield,
OH Ashtabula County United States |
SR 534 (S Broadway) / SR 307 (N River Rd. E) (41.75981, -80.94122) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2024 | https://www.news5cleveland.com/news/local-news/we-follow-through/local-businesses-relieved-as-major-construction-project-concludes-in-ashtabula-county |
Carmel,
IN Hamilton County United States |
E 96th St. / N College Ave. (39.92715, -86.14588) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://content.govdelivery.com/attachments/fancy_images/INCARMEL/2025/07/12047605/6331942/college-ave-and-96th-street_crop.jpg https://content.govdelivery.com/accounts/INCARMEL/bulletins/3eb9634 North leg has an extra bypass lane for right turns but I marked as single lane since this lane doesn't allow entree into the roundabout. |
Carmel,
IN Hamilton County United States |
N College Ave. / Carmel Gateway (39.92869, -86.14591) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | Newly constructed entrance to commercial development to the west replacing the old entrance further south and for future development to the east. https://content.govdelivery.com/attachments/fancy_images/INCARMEL/2025/07/12047605/6331942/college-ave-and-96th-street_crop.jpg https://content.govdelivery.com/accounts/INCARMEL/bulletins/3eb9634 |
Genoa Township,
OH Delaware County United States |
Lewis Center Rd. / Worthington Rd. (40.19783, -82.91324) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | Peanut shaped. https://www.facebook.com/DelCoEngineer/posts/construction-in-actionworthington-road-lewis-center-road-intersection-genoa-town/1071976134965353/ |
Monument,
CO El Paso County United States |
W Baptist Rd. / Terrazzo Dr. (39.05656, -104.85476) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.codot.gov/projects/archives/baptistterrazzoroundabout |
Hays,
NC Wilkes County United States |
Traphill Rd. / Yellow Banks Rd. (36.26353, -81.12210) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2022 | https://www.ncdot.gov/news/press-releases/Pages/2022/2022-01-06-wilkes-county-roundabout.aspx |
Saginaw,
MN St. Louis County United States |
US 2 / STH 194 / Saginaw Rd. (46.84660, -92.41735) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2023 | |
Lino Lakes,
MN Ramsey County United States |
Hodgson Rd. / Ash St. (CR J) (45.12412, -93.12745) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | Elliptical shaped. ICD = 120 ft x 110 ft. https://www.facebook.com/StoeszLinoLakes/videos/all-lanes-open-on-new-roundabout-at-county-road-j-and-hodgson-happy-labor-day-we/534935302432611/ |
Scottsdale,
AZ Maricopa County United States |
E Happy Valley Rd. / N Alma School Rd. (33.71265, -111.85679) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Left-turn-only lane on west leg. |
Scottsdale,
AZ Maricopa County United States |
E Happy Valley Rd. / N Golf Club Dr. (33.71264, -111.86755) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Elliptical shaped. ICD = 165 ft x 130 ft. |
Derry Township,
PA Dauphin County United States |
Bachmanville Rd. / Homestead Rd. (40.26233, -76.63657) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2024 | |
East Hempfield Township,
PA Lancaster County United States |
Nissley Rd. / Pennscott Dr. / Bloomfield Way (40.08451, -76.39751) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2015-2016). https://lancasteronline.com/news/local/where-are-there-roundabouts-in-lancaster-county/article_f894d096-e616-11e9-9a69-8b2c73dade42.html |
Lancaster,
PA Lancaster County United States |
N Plum St. / (unknown) (40.05538, -76.30274) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (2010-2011). |
Thiells,
NY Rockland County United States |
Suffern Ln. / Hammond Rd. / Letchworth Village Rd. / Thiells-Mt Ivy Rd. (41.21116, -74.01775) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2025 | https://www.instagram.com/reel/DLKvS2py3Ps/ |
South Charleston,
WV Kanawha County United States |
Kanawha Turnpike / SR 601 (Jefferson Rd.) Ramps (38.35435, -81.71172) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2025 | https://www.youtube.com/watch?v=yTdSPHjvFrA |
Belton,
MO Cass County United States |
S Mullen Rd. / E Cambridge Rd. (38.79909, -94.51296) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | Year Completed estimated (2024-2025). |
(unincorporated),
GA Bibb County United States |
US 80-SR 22 (Eisenhower Pkwy.) / Knoxville Rd. (32.79855, -83.78279) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2023 | Intersection moved about 150 feet west. |
Cartersville,
VA Cumberland County United States |
SR 45 (Cartersville Rd.) / Columbia Rd. (37.65869, -78.12544) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://farmvilleherald.com/2024/03/work-continues-on-cartersville-roundabout-with-end-date-set/ |
Port Ludlow,
WA Jefferson County United States |
SR 104 / Paradise Bay Rd. / Shine Rd. (47.86767, -122.63923) |
Roundabout Existing |
All-Way Yield Other |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | Drawbridge signal approximately 800 ft to east. https://wsdot.wa.gov/construction-planning/search-projects/sr-104-paradise-bay-shine-road-sr-19-intersection-safety-improvements |
Moreland,
GA Coweta County United States |
US 29 / US 27 Alternate / Harris Rd. / Ralph Evans Rd. (33.27899, -84.76548) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | Traffic from the west (Harris Rd) must turn right before entering the roundabout. https://www.facebook.com/reel/385831194453450/ |
Port Wentworth,
GA Chatham County United States |
International Trade Pkwy. / Little Hearst Pkwy. (32.18100, -81.18378) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Year Completed estimated (2020-2021). |
Boiling Springs,
SC Spartanburg County United States |
Peachtree Rd. / Bible Church Rd. / Old Burnett Rd. / Midnight Rd. (35.07115, -81.95207) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2008-2009). Replaced triangle stop-controlled intersection. |
Monticello,
GA Jasper County United States |
GA 16 / GA 380 (Perimeter Rd.) (33.30243, -83.63426) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2023 | Elliptical shaped. ICD = 160 ft x 145 ft. Year Completed estimated (2023-2024). |
Brooks,
GA Spalding County United States |
GA 16 (Newnan Rd.) / Hollonville R. / Hwy. 85 Connector (33.25458, -84.48925) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2014-2016). |
Senoia,
GA Coweta County United States |
GA 16 / Old Hwy. 85 (33.29895, -84.59109) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). Intersection shifted approximately 450 ft to the east. |
Rock Hill,
SC York County United States |
Palmetto Pkwy. / Paragon Way (34.95949, -80.97499) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2023 | |
Easley,
SC Pickens County United States |
SC 135 (Dacusville Hwy.) / Jameson Rd. (34.90548, -82.60143) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://info2.scdot.org/projects/ViewerFiles/P039384_Project%20Handout_05.27.2021.pdf |
Gaylord,
MI Otsego County United States |
S Otsego Ave. (I-75 Business) / McCoy Rd. W (45.00258, -84.67734) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.michigan.gov/mdot/news-outreach/pressreleases/2024/07/03/traffic-changes-for-i-75-bl-south-otsego-ave-project-in-gaylord-start-july-9 |
Golden Valley,
MN Hennepin County United States |
STH 55 (Olson Hwy) Service Rd. / Douglas Dr. (44.98385, -93.36023) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2024 | https://www.goldenvalleymn.gov/395/Douglas-Drive-Highway-55-Intersection |
Boiling Springs,
SC Spartanburg County United States |
Sugar Ridge Rd. / Clark Rd. (35.05989, -82.02370) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/photo.php?fbid=660831062759092&id=100064966113442&set=a.343020981206770 |
Shakopee,
MN Scott County United States |
Eagle Creek Blvd / Vierling Dr (44.78342, -93.48206) |
Roundabout Existing |
All-Way Yield Other |
4 Approaches 0 Driveways 15.2400 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Double left-turn on north leg. Other control is warning lights that emergency vehicles are approaching. See the video for them. https://www.youtube.com/watch?v=vMYxApGIW7E |
Boiling Springs,
SC Spartanburg County United States |
Clark Rd. / Seay Rd. (35.05945, -82.01234) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2024-2025). https://www.wspa.com/news/local-news/look-alive-more-road-work-coming-to-the-upstate/ |
Shakopee,
MN Scott County United States |
Vierling Dr. / Lincoln St. (44.78215, -93.55707) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2018 | |
Carver,
MN Carver County United States |
Jonathan Carver Pkwy. / Dahlgren Rd. / 6th St. W (44.76130, -93.64302) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Prior Lake,
MN Scott County United States |
Carriage Hills Pkwy. NE / Carriage Hill Rd. NE / Meadowlawn Trl. NE (44.74042, -93.41711) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2019 | https://www.twincities.com/2019/06/21/roundabout-roundup-intersections-pop-up-around-prior-lake/ |
Hastings,
MN Dakota County United States |
160th St. E (CR 46) / Goodwin Ave. (CR 85) (44.71686, -92.95405) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.hastingsjournal.news/stories/county-road-46-expected-to-open-by-the-end-of-the-week,113462 |
Billings,
MT Yellowstone County United States |
Rimrock Rd. / 62nd St. W (45.79864, -108.67362) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/trailnetbillings/photos/top-the-roundabout-at-rimrock-and-62nd-street-west-above-heading-east-on-rimrock/1087984726704259/?_rdr |
Westfield,
IN Hamilton County United States |
E 181st St. / Wheeler Rd. (40.04993, -86.14190) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://mcusercontent.com/3b4615471287568023972d947/images/43b7e87b-2e4c-c0a5-c283-57fe838db290.jpg |
Deerfield,
OH Warren County United States |
Columbia Rd. / Davis Rd. / Myrtle Ave. (39.30098, -84.27895) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2025 | Replaced two offset intersections. https://www.choosedeerfield.com/news/columbia-road-and-davis-road-myrtle-ave-intersection-closure-for-2-weeks/ |
Onalaska,
WI La Crosse County United States |
East Ave. N / Riders Club Rd. (43.90543, -91.23514) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | https://www.facebook.com/cityofonalaskawisconsin/posts/construction-of-a-new-compact-roundabout-at-the-intersection-of-east-avenue-and-/544121814532976/ |
Castle Pines,
CO Douglas County United States |
E Happy Canyon Rd. / Lagae Rd. (39.45014, -104.87819) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://coloradocommunitymedia.com/2024/06/27/castle-pines-lagae-happy-canyon-road-roundabout-open/ |
Poughkeepsie,
NY Dutchess Co. United States |
New Hackensack Rd. (SR 376) / Hooker Ave. / Raymond Ave. / Vassar Farm Ln. (41.68145, -73.89631) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2025 | Replaced offset T intersections. https://www.governor.ny.gov/news/governor-hochul-announces-construction-set-begin-new-roundabout-along-state-route-376-dutchess |
Flovilla,
GA Butts County United States |
US 23 / GA 42 (33.26384, -83.90871) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://henryga.news/2023/01/05/new-roundabout-coming-near-flovilla-indian-springs/ |
Dade City,
FL Pasco Co. United States |
US 98-US 301 Bypass / Old Lakeland Hwy. / (parking) (28.35921, -82.18200) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Previous control was a merge lane on northbound; use a side street for southbound. https://www.facebook.com/MyFDOTTampa/posts/-project-progress-us-98-bypass-roundabout-is-opendade-city-a-new-roundabout-open/1001085718724813/ |
Page,
AZ Coconino Co. United States |
US 89 / N Lake Powell Blvd. / Scenic View Dr. (36.92559, -111.47206) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2024 | Elliptical shaped. ICD = 160 ft x 135 ft. |
Orlando,
FL Orange Co. United States |
Eagle Watch Dr. / Butler National Dr. (28.46545, -81.30645) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2016). |
Fishers,
IN Hamilton Co. United States |
Hoosier Rd. / 121st St. / (Fishers Community Center entrance) (39.96457, -85.96596) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://map.fishers.in.us/capitalprojects/ |
Wade,
NC Cumberland Co. United States |
Wade-Stedman Rd. / I-95 NB Ramps (35.15849, -78.71481) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Wade,
NC Cumberland Co. United States |
Wade-Stedman Rd. / I-95 SB Ramps (35.15945, -78.71772) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Wade,
NC Cumberland Co. United States |
Wade-Stedman Rd. / Elva Wallace Rd. (35.16039, -78.71954) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 |