Roundabout Details

Steptoe Dr./SR 240 EB Ramps/Columbia Park Trl.

Type
Roundabout
Status
Existing
Functional Class
Freeway Ramps
Control Type
All-Way Yield
Year Completed
2007
Previous Control Type
One/Two-Way Stop
Other Control Type
Metering Signal
Approaches
5
Driveways
0
City
Richland
County
Benton
State
WA
Country
United States
Latitude
46.23893
Longitude
-119.24546
Notes
5th leg is on-ramp to SR 240. Opened November 2007. According to local news (link below) they started metering the traffic on the westbound Columbia Park Trail approach in 2018. It only turns on when traffic coming off the freeway gets backed up. https://97rockonline.com/tri-cities-roundabout-gets-new-metered-traffic-light-wait-what/
Back to List